Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Generation scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

An Enabling Technology for New Planning and Scheduling Paradigms

The Night Projects Directorate at NASA's Marshall Space Flight Center is developing a new planning and scheduling environment and a new scheduling algorithm to enable a paradigm shift in planning and scheduling concepts. Over the past 33 years Marshall has developed and evolved a paradigm for generating payload timelines for Skylab, Spacelab, various other Shuttle payloads, and the International Space Station. The current paradigm starts by collecting the requirements, called ?ask models," from the scientists and technologists for the tasks that are to be scheduled. Because of shortcomings in the current modeling schema, some requirements are entered as notes. Next, a cadre with knowledge of vehicle and hardware modifies these models to encompass and be compatible with the hardware model; again, notes are added when the modeling schema does not provide a better way to represent the requirements. Finally, the models are modified to be compatible with the scheduling engine. Then the models are submitted to the scheduling engine for automatic scheduling or, when requirements are expressed in notes, the timeline is built manually. A future paradigm would provide a scheduling engine that accepts separate science models and hardware models. The modeling schema would have the capability to represent all the requirements without resorting to notes. Furthermore, the scheduling engine would not require that the models be modified to account for the capabilities (limitations) of the scheduling engine. The enabling technology under development at Marshall has three major components: (1) A new modeling schema allows expressing all the requirements of the tasks without resorting to notes or awkward contrivances. The chosen modeling schema is both maximally expressive and easy to use. It utilizes graphical methods to show hierarchies of task constraints and networks of temporal relationships. (2) A new scheduling algorithm automatically schedules the models without the intervention of a scheduling expert. The algorithm is tuned for the constraint hierarchies and the complex temporal relationships provided by the modeling schema. It has an extensive search algorithm that can exploit timing flexibilities and constraint and relationship options. (3) An innovative architecture allows multiple remote users to simultaneously model science and technology requirements and other users to model vehicle and hardware characteristics. The architecture allows the remote users to submit scheduling requests directly to the scheduling engine and immediately see the results. These three components are integrated so that science and technology experts with no knowledge of the vehicle or hardware subsystems and no knowledge of the internal workings of the scheduling engine have the ability to build and submit scheduling requests and see the results. The immediate feedback will hone the users' modeling skills and ultimately enable them to produce the desired timeline. This paper summarizes the three components of the enabling technology and describes how this technology would make a new paradigm possible.

Jaap, John↗

Artificial Neural Network Modeling for Airline Disruption Management

Since the 1970s, most airlines have incorporated computerized support for managing disruptions during flight schedule execution. However, existing platforms for airline disruption management (ADM) employ monolithic system design methods that rely on the creation of specific rules and requirements through explicit optimization routines, before a system that meets the specifications is designed. Thus, current platforms for ADM are unable to readily accommodate additional system complexities resulting from the introduction of new capabilities, such as the introduction of unmanned aerial systems (UAS), operations and infrastructure, to the system. To this end, we use historical data on airline scheduling and operations recovery to develop a system of artificial neural networks (ANNs), which describe a predictive transfer function model (PTFM) for promptly estimating the recovery impact of disruption resolutions at separate phases of flight schedule execution during ADM. Furthermore, we provide a modular approach for assessing and executing the PTFM by employing a parallel ensemble method to develop generative routines that amalgamate the system of ANNs. Our modular approach ensures that current industry standards for tardiness in flight schedule execution during ADM are satisfied, while accurately estimating appropriate time-based performance metrics for the separate phases of flight schedule execution.

Kolawole Ogunsina↗

An Infrared Telescope for Planet Detection and General Astrophysics

NASA plans to launch a Terrestrial Planet Finder (TPF) mission in 2014 to detect and characterize Earth-like planets around nearby stars, perform comparative planetology studies, and obtain general astrophysics observations. During our recently completed a TPF Mission Architecture study for NASA/JPL we developed the conceptual design for a 28-meter telescope with an IR Coronagraph that meets these mission objectives. This telescope and the technology it embodies are directly applicable to future Far-IR and Submillimeter space missions. The detection of a 30th magnitude planet located within 50 milli-arc-seconds of a 5th (Visual) magnitude star is an exceptionally challenging objective. Observations in the thermal infrared (7-17 microns) are somewhat easier since the planet is "only" 15(sup m) fainter than the star at these wavelengths, but many severe challenges must still be overcome. These challenges include: 1. Designing a coronagraph for star:planet separations less than or equal to lambda/D. 2. Developing the deployment scheme for a 28m space telescope that can fit in an existing launch vehicle payload fairing. 3. Generating configuration layouts for the IR telescope, coronagraph, spacecraft bus, sunshade, solar array, and high-gain antenna. 4. Providing: Structural stability to within 10 microns to support the optics. Thermal control to achieve the necessary structural stability, as well as providing a stable (approx. 30K) thermal environment for the optics. Dynamics isolation from potential jitter sources. 5. Minimizing launch mass to provide the maximum payload for the science mission Interfacing to an EELV Heavy launch vehicle, including acoustic and stress loads for the launch environment. 6. Identifying the key technologies (which can be developed by 2009) that will enable TPF mission to be performed. 7. Generating a manufacturing plan that will permit TPF to be developed at a reasonable cost and schedule. Many of these design challenges result in inherently conflicting requirements on the design of TPF. Drawing on our experience with large space telescopes such as the Chandra X-ray Observatory and the Next Generation Space Telescope, we have created a conceptual design for TPF that successfully meets these challenging requirements. This paper describes our solution to these challenges.

Lillie, C. F.↗

Design, development and commissioning of a multi-alkali semiconductor photocathode deposition system for the IUAC Delhi light source photoinjector

A fourth-generation light source, called Delhi Light Source (DLS) based on photocathode-based RF gun has been commissioned at Inter-University Accelerator Centre, New Delhi. Presently, the electron beam is being generated from copper photocathode and the beam is being used for scheduled experiments. Soon, the semiconductor photocathode will be used to produce higher beam current. Here, to develop the semiconductor photocathode, a dedicated photocathode deposition facility was developed in collaboration with Brookhaven national Laboratory (BNL) and has been successfully commissioned and becomes operational at IUAC. This deposition facility is an integrated system with the electron gun and is a unique system as it is capable of producing, preserving (without residual gas poisoning) and in-vacuum transfer of the deposited photocathodes from the deposition chamber up to the RF electron gun. The system is designed to operate under ultra-high vacuum (UHV) and is equipped with load-lock chambers, substrate heating assembly, thickness monitoring via a quartz crystal microbalance (QCM), and an in-situ setup for quantum efficiency (QE) measurements. After testing of all the subsystems and a detailed calibration, the first deposition of a cesium telluride (Cs 2 Te) photocathode was successfully performed on a copper (Cu) substrate. This successful commissioning and initial deposition mark a significant step toward the indigenous photocathode development and lays the groundwork for further research into advanced photo emissive materials at IUAC. This paper will discuss the salient features, installation, commissioning, first semiconductor photocathode deposition and its results.

47 OTHER INSTRUMENTATION↗

MICCO: An Enhanced Multi-GPU Scheduling Framework for Many-Body Correlation Functions

Calculation of many-body correlation functions is one of the critical kernels utilized in many scientific computing areas, especially in Lattice Quantum Chromodynamics (Lattice QCD). It is formalized as a sum of a large number of contraction terms each of which can be represented by a graph consisting of vertices describing quarks inside a hadron node and edges designating quark propagations at specific time intervals. Due to its computation- and memory-intensive nature, real-world physics systems (e.g., multi-meson or multi-baryon systems) explored by Lattice QCD prefer to leverage multi-GPUs. Different from general graph processing, many-body correlation function calculations show two specific features: a large number of computation-/data-intensive kernels and frequently repeated appearances of original and intermediate data. The former results in expensive memory operations such as tensor movements and evictions. The latter offers data reuse opportunities to mitigate the data-intensive nature of many-body correlation function calculations. However, existing graph-based multi-GPU schedulers cannot capture these data-centric features, thus resulting in a sub-optimal performance for many-body correlation function calculations. To address this issue, this paper presents a multi-GPU scheduling framework, MICCO, to accelerate contractions for correlation functions particularly by taking the data dimension (e.g., data reuse and data eviction) into account. This work first performs a comprehensive study on the interplay of data reuse and load balance, and designs two new concepts: local reuse pattern and reuse bound to study the opportunity of achieving the optimal trade-off between them. Based on this study, MICCO proposes a heuristic scheduling algorithm and a machine-learning-based regression model to generate the optimal setting of reuse bounds. Specifically, MICCO is integrated into a real-world Lattice QCD system, Redstar, for the first time running on multiple GPUs. The evaluation demonstrates MICCO outperforms other state-of-art works, achieving up to 2.25× speedup in synthesized datasets, and 1.49× speedup in real-world correlation functions.

Wang, Qihan↗

Project Plan: Salt in Situ Heater Test

This project plan gives a high-level description of the US Department of Energy Office of Nuclear Energy (DOE-NE) Spent Fuel and Waste Disposition (SFWD) campaign in situ borehole heater test project planned for the Waste Isolation Pilot Plant (WIPP) site, titled the Brine Availability Test in Salt (BATS). BATS is the first stage in a planned sequence of tests to bolster the technical basis for disposal of heat generating waste in salt. This plan provides an overview of the schedule and responsibilities of the parties involved. This project is a collaborative effort by Sandia, Los Alamos, and Lawrence Berkeley National Laboratories to execute a series of small-diameter borehole heater tests in salt for the DOE-NE SFWD campaign. Design of a heater test in salt at WIPP has evolved over several years. The experiment has begun in January 2020 and the first phase will continue for several months with the possibility for follow on testing. BATS comprises a suite of modular tests, which consist of a group of adjacent horizontal boreholes in the wall of drifts at WIPP. Each test is centered around a packer-isolated heated borehole (12.2 cm [4.81 diameter) containing equipment for water-vapor collection and borehole closure monitoring, surrounded by smaller-diameter (up to 5.3 cm [2.11 diameter) satellite observation boreholes. Observation boreholes contain grouted-in temperature sensors, electrical resistivity tomography (ERT) sensors, and fiber optics; packer-isolated tracer release and sampling intervals; and acoustic emission (AE) piezoelectric sensors. A larger-diameter (12.2 cm [4.81) satellite borehole includes sorel and salt cement plugs, as part of an engineered barrier sealing test. The first two tests, to be implemented in parallel, are heated (target borehole wall temperature of 120 °C) and unheated, with similar arrays of observation borehole monitoring changes. Follow-on tests will be designed using information gathered from the first two tests, and may be conducted at other borehole wall temperatures, use multiple observation boreholes, and may include different measurement types and test designs. This 2020 update of the original 2018 project plan satisfies DOE-NE Spent Fuel and Waste Science and Technology (SFWST) milestone M3SF-205N010303034, as part of the SNL "Salt Disposal R&D" work package.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An MILP-Based Distributed Energy Management for Coordination of Networked Microgrids

An MILP-based distributed energy management for the coordination of networked microgrids is proposed in this paper. Multiple microgrids and the utility grid are coordinated through iteratively adjusted price signals. Based on the price signals received, the microgrid controllers (MCs) and distribution management system (DMS) update their schedules separately. Then, the price signals are updated according to the generation–load mismatch and distributed to MCs and DMS for the next iteration. The iteration continues until the generation–load mismatch is small enough, i.e., the generation and load are balanced under agreed price signals. Through the proposed distributed energy management, various microgrids and the utility grid with different economic, resilient, emission and socio-economic objectives are coordinated with generation–load balance guaranteed and the microgrid customers’ privacy preserved. In particular, a piecewise linearization technique is employed to approximate the augmented Lagrange term in the alternating direction method of multipliers (ADMM) algorithm. Thus, the subproblems are transformed into mixed integer linear programming (MILP) problems and efficiently solved by open-source MILP solvers, which would accelerate the adoption and deployment of microgrids and promote clean energy. The proposed MILP-based distributed energy management is demonstrated through various case studies on a networked microgrids test system with three microgrids.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Dynamic gas temperature measurement system

The development of an advanced measuring system which measures the rapidly varying gas temperature at the exit of an aircraft jet engine combustor during ground based testing of hot section components was identified. Sensor guidelines, technical approach/program schedule, and the accomplishments are reviewed. The environment of a present generation combustor is shown. The method uses two beadless junctions type-B thermocouples to measure heat transfer coefficient in situ. Heat conduction effects are shown by a finite element model of the thermocouple.

Elmore, D.↗

Lunar base surface mission operations. Lunar Base Systems Study (LBSS) task 4.1

The purpose was to perform an analysis of the surface operations associated with a human-tended lunar base. Specifically, the study defined surface elements and developed mission manifests for a selected base scenario, determined the nature of surface operations associated with this scenario, generated a preliminary crew extravehicular and intravehicular activity (EVA/IVA) time resource schedule for conducting the missions, and proposed concepts for utilizing remotely operated equipment to perform repetitious or hazardous surface tasks. The operations analysis was performed on a 6 year period of human-tended lunar base operation prior to permanent occupancy. The baseline scenario was derived from a modified version of the civil needs database (CNDB) scenario. This scenario emphasizes achievement of a limited set of science and exploration objectives while emplacing the minimum habitability elements required for a permanent base.

Source record↗

Simulator evaluation of the final approach spacing tool

The design and simulator evaluation of an automation tool for assisting terminal radar approach controllers in sequencing and spacing traffic onto the final approach course is described. The automation tool, referred to as the Final Approach Spacing Tool (FAST), displays speed and heading advisories for arrivals as well as sequencing information on the controller's radar display. The main functional elements of FAST are a scheduler that schedules and sequences the traffic, a 4-D trajectory synthesizer that generates the advisories, and a graphical interface that displays the information to the controller. FAST was implemented on a high performance workstation. It can be operated as a stand-alone in the Terminal Radar Approach Control (TRACON) Facility or as an element of a system integrated with automation tools in the Air Route Traffic Control Center (ARTCC). FAST was evaluated by experienced TRACON controllers in a real-time air traffic control simulation. Simulation results show that FAST significantly reduced controller workload and demonstrated a potential for an increase in landing rate.

Davis, Thomas J.↗

Application of modern control design methodology to oblique wing research aircraft

A Linear Quadratic Regulator synthesis technique was used to design an explicit model following control system for the Oblique Wing Research Aircraft (OWRA). The forward path model (Maneuver Command Generator) was designed to incorporate the desired flying qualities and response decoupling. The LQR synthesis was based on the use of generalized controls, and it was structured to provide a proportional/integral error regulator with feedforward compensation. An unexpected consequence of this design approach was the ability to decouple the control synthesis into separate longitudinal and lateral directional designs. Longitudinal and lateral directional control laws were generated for each of the nine design flight conditions, and gain scheduling requirements were addressed. A fully coupled 6 degree of freedom open loop model of the OWRA along with the longitudinal and lateral directional control laws was used to assess the closed loop performance of the design. Evaluations were performed for each of the nine design flight conditions.

Vincent, James H.↗

g-LIMIT: A Vibration Isolation System for the Microgravity Science Glovebox

For many microgravity science experiments using the Microgravity Science Glovebox (MSG), the ambient acceleration environment will exceed desirable levels. To provide a more quiescent acceleration environment, a vibration isolation system named g-LIMIT (GLovebox Integrated Microgravity Isolation Technology) is being designed. g-LIMIT is the next generation of technology developed for and demonstrated by STABLE on the USML-2 mission in October 1995. Although g-LIMIT is a sub-rack level isolation system that can be used in a variety of applications, g-LIMIT is uniquely optimized for MSG implementation. Standard MSG structural and umbilical interfaces will be used so that the isolation mount is transparent to the user with no additional accommodation requirements. g-LIMIT consists of three integrated isolator modules, each of which is comprised of a dual axis actuator, two axes of acceleration sensing, two axes of position sensing, control electronics, and data transmission capabilities in a minimum-volume package. In addition, this system provides the unique capability for measuring absolute acceleration of the experiment independent of accelerometers as a by-product of the control system and will have the capability of generating pristine accelerations to enhance experiment operations. g-LIMIT is scheduled for flight during the UF-2 mission and will be available to glovebox investigators immediately after characterization testing.

Whorton, Mark S.↗

Enhanced project management tool

A system for managing a project that includes multiple tasks and a plurality of workers. Input information includes characterizations based upon a human model, a team model and a product model. Periodic reports, such as one or more of a monthly report, a task plan report, a schedule report, a budget report and a risk management report, are generated and made available for display or further analysis or collection into a customized report template. An extensible database allows searching for information based upon context and upon content. Seven different types of project risks are addressed, including non-availability of required skill mix of workers. The system can be configured to exchange data and results with corresponding portions of similar project analyses, and to provide user-specific access to specified information.

Maluf, David A.↗

Installation of Ohio's First Electrolysis-Based Hydrogen Fueling Station

This paper describes progress made towards the installation of a hydrogen fueling station in Northeast Ohio. In collaboration with several entities in the Northeast Ohio area, the NASA Glenn Research Center is installing a hydrogen fueling station that uses electrolysis to generate hydrogen on-site. The installation of this station is scheduled for the spring of 2012 at the Greater Cleveland Regional Transit Authority s Hayden bus garage in East Cleveland. This will be the first electrolysis-based hydrogen fueling station in Ohio.

Scheidegger, Brianne T.↗

Assessment of Delivery Accuracy in an Operational-Like Environment

In order to enable arrival management concepts and solutions in a Next Generation Air Transportation System (NextGen) environment, ground-based sequencing and scheduling functions were developed to support metering operations in the National Airspace System. These sequencing and scheduling tools are designed to assist air traffic controllers in developing an overall arrival strategy, from enroute down to the terminal area boundary. NASA developed a ground system concept and protoype capability called Terminal Sequencing and Spacing (TSAS) to extend metering operations into the terminal area to the runway. To demonstrate the use of these scheduling and spacing tools in an operational-like environment, the FAA, NASA, and MITRE conducted an Operational Integration Assessment (OIA) of a prototype TSAS system at the FAA's William J. Hughes Technical Center (WJHTC). This paper presents an analysis of the arrival management strategies utilized and delivery accuracy achieved during the OIA. The analysis demonstrates how en route preconditioning, in various forms, and schedule disruptions impact delivery accuracy. As the simulation spanned both enroute and terminal airspace, the use of Ground Interval Management - Spacing (GIM-S) enroute speed advisories was investigated. Delivery accuracy was measured as the difference between the Scheduled Time of Arrival (STA) and the Actual Time of Arrival (ATA). The delivery accuracy was computed across all runs conducted during the OIA, which included deviations from nominal operations which are known to commonly occur in real operations, such as schedule changes and missed approaches. Overall, 83% of all flights were delivered into the terminal airspace within +/- 30 seconds of their STA and 94% of flights were delivered within +/- 60 seconds. The meter fix delivery accuracy standard deviation was found to be between 36 and 55 seconds across all arrival procedures. The data also showed when schedule disruptions were excluded, the percentage of aircraft delivered within +/- 30 seconds was between 85 and 90% across the various arrival procedures at the meter fix. This paper illustrates the ability to meet new delivery accuracy requirements in an operational-like environment using operational systems and NATCA controller participants, while also including common events that might cause disruptions to the schedule and overall system.

Air Traffic Scheduling↗

NASA Handbook 7010: Direct Field Acoustic Testing

Instruments, spacecraft, antennas, reflectors, and other mechanical hardware have been undergoing acoustic qualification testing over the last decade using loudspeakers. This speaker-generated Direct Field Acoustic Test (DFAT) method offers cost, mobility, and schedule advantages over the conventional Reverberant Acoustic Field Test (RAFT) method. To develop most appropriate acoustic test program using the DFAT method for a flight project, flight project managers and their technical staffs will need overall guidance and technical rational for using DFAT to qualify flight hardware for acoustic environments. The NASA Chief Engineer Office had tasked JPL to prepare a NASA Handbook for DFAT Dynamics Testing. The handbook was completed and was released by NASA headquarters in 2015. The handbook provides advantages and disadvantages of such method of testing, key references and a series of recommended practices for test preparation and test performance. This paper will summarize key and important steps related to this method of acoustic testing.

Kolaini, Ali R↗

Comparison of two Calibrations of NASA's MC60 Five-component Semi-span Balance

Two separate manual calibrations of NASA’s MC60 five–component semi–span balance were compared. The calibrations were performed in 1999 and 2019using CALSPAN Force Measurement System’s Large Load Rig. The Iterative Method was chosen as the load prediction algorithm and data reduction matrices were generated from both calibration data sets. Then, the applied calibration load schedules, the standard deviations of the calibration load residuals, the prime sensitivities of the five gages, and the maximum outputs at capacity of the five gages were compared. In addition, the calibration data of 1999 was used as check load data for the data reduction matrix that was obtained from the 2019 data. Overall, the agreement between the data analysis results is very good considering the facts that two different load schedules were used for the calibrations, different people performed the calibrations, different instrumentation was used to measure the loads and the outputs, the Large Load Rig was moved to a different site in between the calibrations, and no tare load corrections could be applied to the 1999 data set. Nevertheless, the calibration data of 2019 is clearly the better data set. This observation is no surprise considering that CALSPAN Force Measurement Systems made significant investments in calibration hardware and process improvements during the last 20 years.

wind tunnel balance↗