Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “DAMS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

Assessment of Fluctuating Reservoir Elevations Using Hydraulic Models and Impacts to Larval Pacific Lamprey Rearing Habitat in the Bonneville Pool

This report presents the results of a modeling assessment of likely lamprey larval habitat that may be impacted by dewatering of the major tributary delta regions in the Bonneville Pool of the Columbia River. This assessment was conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Army Corps of Engineers Portland District (CENWP). The goal of the study was to provide baseline data about how the regions of interest would potentially be impacted at three river flows (10, 50, and 90 percent exceedance flow) for four different forebay elevations at Bonneville Dam. Impacts of unsteady flows at The Dalles Dam and changing forebay elevation at Bonneville Dam for a 2-week period were also assessed. The area of dewatered regions was calculated by importing modeled data outputs into a GIS and then calculating the change in inundated area near tributary deltas for the four Bonneville forebay surface elevations. From the modeled output we determined that the overall change in area is less sensitive to elevations changes during higher river discharges. Changing the forebay elevation at Bonneville and the resulting impact to total dewatered regions was greater at the lowest modeled river flow (97 kcfs) and showed the greatest variation at the White Salmon/Hood River delta regions followed by the Wind, Klickitat and the Little White Salmon rivers. To understand how inundation might change on a daily and hourly basis. Unsteady flow models were run for a 2-week period in 2002 and compared to 2014. The water surface elevation in the upstream pool closely follows that of the Bonneville Dam forebay with rapid changes of 1 to 2-ft possible. The data shows that 2.5-ft variation in water surface elevation occurred during this period in 2002 and a 3.7-ft change occurred in 2014. The duration of these changes were highly variable and generally did not stay constant for more than a 5-hr period.

42 ENGINEERING↗

Total Dissolved Gas Prediction and Optimization in RIVERWARE

Management and operation of dams within the Columbia River Basin (CRB) provides the region with irrigation, hydropower production, flood control, navigation, and fish passage. These various system-wide demands can require unique dam operations that may result in both voluntary and involuntary spill, thereby increasing tailrace levels of total dissolved gas (TDG) which can be fatal to fish. Appropriately managing TDG levels within the context of the systematic demands requires a predictive framework robust enough to capture the operationally related effects on TDG levels. Development of the TDG predictive methodology herein attempts to capture the different modes of hydro operation, thereby making it a viable tool to be used in conjunction with a real-time scheduling model such as RiverWare. The end result of the effort will allow hydro operators to minimize system-wide TDG while meeting hydropower operational targets and constraints. The physical parameters such as spill and hydropower flow proportions, accompanied by the characteristics of the dam such as plant head levels and tailrace depths, are used to develop the empirically-based prediction model. In the broader study, two different models are developed a simplified and comprehensive model. The latter model incorporates more specific bubble physics parameters for the prediction of tailrace TDG levels. The former model is presented herein and utilizes an empirically based approach to predict downstream TDG levels based on local saturation depth, spillway and powerhouse flow proportions, and entrainment effects. Representative data collected from each of the hydro projects is used to calibrate and validate model performance and the accuracy of predicted TDG uptake. ORNL, in conjunction with IIHR - Hydroscience & Engineering, The University of Iowa, carried out model adjustments to adequately capture TDG levels with respect to each plant while maintaining a generalized model configuration. Validation results indicate excellent model performance with coefficient of determination values exceeding 92% for all sites. This approach enables model extension to an increasingly wider array of hydropower plants, i.e., with the proper data input, TDG uptake can be calculated independent of actual physical component design. The TDG model is used as a module in the systematic optimization framework of RiverWare, a river and reservoir modeling tool used by federal agencies, public utility districts, and other dam owners and operators to forecast, schedule, and manage hydropower assets. The integration and testing of the TDG module within RiverWare, led by University of Colorado's Center for Advanced Decision Support for Water and Environmental Systems (CADSWES), will allow users to generate optimum system schedules based on the minimization of TDG. Optimization analysis and added value will be quantified as system wide reductions in TDG achieved while meeting existing hydropower constraints. Future work includes the development of a method to predict downstream reservoir forebay TDG levels as a function of upstream reservoir tailrace TDG values based on river hydrodynamics, hydro operations, and reservoir characteristics. Once implemented, a holistic model that predicts both TDG uptake and transport will give hydropower operators valuable insight into how system-wide environmental effects can be mitigated while simultaneously balancing stakeholder interests.

13 HYDRO ENERGY↗

French Modular Impoundment: Final Cost and Performance Evaluation

This report comprises the Final Cost and Performance Report for the Department of Energy Award # EE0007244, the French Modular Impoundment (aka the “French Dam”.) The French Dam is a system of applying precast modular construction to water control structures. The “French Dam” is a term used to cover the construction means/methods used to construct or rehabilitate dams, diversion structures, powerhouses, and other hydraulic structures which impound water and are covered under FDE’s existing IP (Patents # US8414223B2; US9103084B2.)

13 HYDRO ENERGY↗

Bureau of Reclamation Hydropower Lease of Power Privilege: Case Studies and Considerations

This report analyzes the U.S. Bureau of Reclamation's (Reclamation) lease of power privilege (LOPP) regulatory process for a nonfederal entity to use a Reclamation jurisdictional dam or conduit for power generation. Recent federal initiatives encouraging hydropower development at federally-owned facilities coupled with Reclamation's hydroelectric potential has led to an increased interest in powering Reclamation dams and conduits through the LOPP process. During the last five years, 23 of the 36 total LOPP projects (76 MW) have been initiated and are at some phase of the development process. Resource assessments analyzed in this report identify over 360 MW of hydroelectric potential at Reclamation-owned dams and conduits. This report provides considerations from Reclamation staff involved in the LOPP regulatory process and developers that have received an LOPP and are currently generating hydropower at a Reclamation dam or conduit. The authors also analyze LOPP regulatory processing timelines before and after the implementation of federal initiatives to streamline the LOPP process and provide case studies of hydropower projects that have obtained an LOPP.

13 HYDRO ENERGY↗

Species-specific Susceptibility to Scale Loss: Using Simulated Shear to Understand Among Species Differences in Turbine Passage Injury

Hydropower is the largest source of utility-scale, renewable electricity (e.g., 44% of all renewable energy) in the USA to date (U.S. Energy Information Administration (USEIA), 2017); however, dam installation and operation have impacted natural upstream and downstream fish passage and altered connectivity of riverine fish communities throughout the USA (Čada, 1998; Čada et al., 2006; Pracheil et al., 2016a). Fish ladders and exclusion devices (among others) allow fish to safely circumvent and avoid passage through the turbines altogether (Čada, 2001), but are rarely 100% effective. At many dams, passage through turbines is unavoidable, and stressors like collision with structures or blade strike, barotrauma or cavitation, turbulence, and exposure to shear forces may cause injury or mortality to entrained fish (Čada, 2001; Neitzel et al., 2004; Pracheil et al., 2016a). Passage injury and mortality may be a consequence of exposure to the entire suite of stressors, while the exact role of each is difficult to ascertain and link to individuals (Colotelo et al., 2017). Contributing complicating factors to understanding mortality include turbine type, variation in fish size (i.e., life stages), and the marked morphological diversity of freshwater fishes (Pracheil et al., 2016a; Colotelo et al., 2017). Laboratory studies aimed to understand the effects of turbine passage have quantified each stressor separately to determine appropriate dose-response relationships based on fish size, species, etc. Establishing dose-response relationships by stressor for priority species that interact with hydropower dams is one of the primary objectives of the Biologicallybased Design and Evaluation (BioDE) project being conducted at Oak Ridge National Laboratory (ORNL) and Pacific Northwest National Laboratory (PNNL). At its core, BioDE is focused on empirically driven research that quantifies fish responses to stressors at exposure levels similar to those experienced during turbine passage so that Biological Performance Assessment (BioPA) models can be developed. The BioPA model informs hydropower turbine design modifications based on predicted injury and mortality in response to various stressor exposures, e.g., blade strike, shear, and barotrauma. Stress exposure is defined by computational fluid dynamics models of the turbine environment. Fish response relationships are determined through laboratory studies like the one reported in this document. The BioPA model will aid turbine manufactures, plant operators, and dam owners with design of lower impact turbines and modify operating procedures to maximize survival of entrained fishes.

13 HYDRO ENERGY↗

The Integrated Basin-Scale Opportunity Assessment Initiative: Pilot Assessment for the Deschutes River Basin

In 2010, the U.S. Department of Energy’s (DOE’s) Wind and Water Power Technologies Office provided funding to Pacific Northwest National Laboratory, Oak Ridge National Laboratory (ORNL), and Argonne National Laboratory to develop an approach for assessing a river basin as an integrated system within the context of existing uses and environmental conditions to identify opportunities for sustainable hydropower development and environmental improvements. Called the Integrated Basin-Scale Opportunity Assessment Initiative (BSOA Initiative), the project is one of seven action items of the March 24, 2010 Memorandum of Understanding (MOU) for Sustainable Hydropower. Early efforts of the BSOA Initiative focused on forming a National Steering Committee, identifying potential basins for opportunity assessments, methodologies for stakeholder engagement, existing and needed analytical tools, barriers to the opportunity assessment process, and significant data gaps. One of the key outcomes was identifying a need for better collaborative decision-making tools that can be used by stakeholders. In response to this need, the Basin-Scale Project Team chose a scenario-based modeling approach for assessing hydropower, environmental, and other water-use opportunities. The approach involved the development of a daily hydrologic model for the Upper Deschutes River and Lower Crooked River subbasins to simulate alternative water management scenarios. Two example scenarios were constructed to demonstrate the use of the hydrologic model to explore three management goals in the Deschutes Basin: 1) increasing hydropower assets by adding new generation at existing dams or diversions and in existing irrigation canals or conduits, 2) increasing instream flows to benefit fish and aquatic ecosystems, and 3) maintaining existing water uses (primarily irrigation). Actions to achieve these goals were simulated by incrementally increasing minimum flow requirements during the storage season and reducing water demands during the irrigation season, while simulating hydropower generation at non-powered dams and in irrigation canals. As part of the effort to demonstrate scenario-based modeling, the project team also developed a web-based data-visualization interface for synthesizing modeling results. The interface allows users to view model results in raw form (daily flow) or in the form of value-based metrics that are based on specific information needs expressed by stakeholders (e.g., how often flow exceeds a conservation flow target at a certain location). In addition to the modeling efforts, 29 potential hydropower sites (14 non-powered dams, 15 canal/conduit sites) were evaluated for their technical and economic feasibility using ORNL’s Hydropower Energy and Economic Assessment tool. Results of the feasibility assessment indicated that eight of the sites (four non-powered dams, four canals/conduits) may be feasible and could add approximately 19 megawatts (MW) of hydroelectric capacity in the basin and generate over 78 gigawatt-hours (GWh) of energy per year. The approach presented here is intended to encourage consideration of methods that emphasize exploration of a range of potential management actions that may achieve a better balance among multiple, and often conflicting, management goals. It is important to consider the approach as an iterative and collaborative process focused on moving debates beyond agreement about an exact target that is acceptable to all parties to a discussion of how stakeholders can better understand how achieving their goals interacts with the achievement of goals by other stakeholder groups. By exploring the results of the model in this way, stakeholders are more likely to narrow the bounds of interest so that more in-depth analysis can be completed.

13 HYDRO ENERGY↗

The Relationship of Hydrology in the Green River to Colorado Pikeminnow Populations

The Federally listed Colorado Pikeminnow (CP) (Ptychocheilus Lucius) has been declining in the Green River Basin over the last 20 years. Muth et al. (2000) recommended flows and temperatures to benefit endangered fish species downstream of Flaming Gorge Dam on the Green River. The recommendations identified a range of flows during the base flow period (flows that occur after the annual snowmelt runoff period, usually from early summer to the following spring) that were intended to benefit CP. The recommendations indicated that the mean flow for the summer–winter period should be established each year on the basis of anticipated hydrologic conditions, but adjustments could be made if hydrologic conditions change. Flow should gradually decline from peak flow to base flow, with the base flow reached by early to middle summer (depending on hydrologic conditions) and maintained through February. The rate of decline should depend on rates of decline in Yampa River flows and the recommended rates of decline for dam releases. No specific recommendations were made for base flow variation in Reach 1, but variation around the annual mean base flow should be restricted to achieve recommended levels of variation in Reach 2 (middle Green River) (Table 5.5 in Muth et al. 2000). Implementation of the flow and temperature recommendations served as the proposed action for an EIS on Flaming Gorge Dam operations. A Biological Assessment of the impacts on endangered species of implementing the recommendations was prepared and a Biological Opinion that called for development of a study plan to examine the effects of implementation. Projects to address this evaluation were identified in the Green River Study Plan and have been conducted since then. The purpose of the Study Plan was to identify and recommend to the Recovery Program those monitoring or research projects necessary for implementation and evaluation of the flow and temperature recommendations. Those projects included studies to evaluate the anticipated effects of implementing the recommendations (including potential adverse effects identified in the 2006 Biological Opinion) and studies to examine recognized uncertainties of the recommendations. A new recovery program summer base flow study plan was approved in September of 2020 to evaluate stable and elevated summer base flows below Flaming Gorge Dam intended to benefit CP spawning and rearing success. Anecdotal observations suggest CP production may have been higher in years prior to flow restrictions for endangered fish. Based on long-term CP monitoring data in the Green River, Bestgen and Hill (2016) concluded that CP would benefit from higher summer baseflows (1,700-3,000 ft 3 /sec) with flows above or below associated with lower abundance of age-0 CP. Therefore, flexibility in the ROD is currently being utilized to establish higher stable summer base flows in an attempt create more advantageous conditions for spawning and rearing CP. These fish recovery flows are restrictive to WAPA in the summer months, therefore it is necessary to conduct an analysis of historic river data relationships to CP abundance to better understand if the recommended fish flows (elevated and stable base flows) are necessary for fish recovery.

54 ENVIRONMENTAL SCIENCES↗

Hungry Horse Mitigation : Flathead Lake : Annual Progress Report 2007.

The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote the 'Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by the Council in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research. Monitoring, for example, includes a spring gillnetting series conducted annually in Flathead Lake and builds on an existing data set initiated in 1981. Monitoring of the experimental kokanee reintroduction was a primary activity of this project between 1992 and 1997. Lake trout, whose high densities have precluded successful mitigation of losses of other species in Flathead Lake, have been monitored since 1996 to measure several biological parameters. Results of this work have utility in determining the population status of this key predator in Flathead Lake. The project has also defined the baseline condition of the Flathead Lake fishery in 1992-1993 and has conducted annual lakewide surveys since 1998. The restoration component of the project has addressed several stream channel, riparian, and fish passage problems, and suppression of non-native fish. The research component of the project began in FY 2000 and measured trophic linkages between M. relicta and other species to assist in predicting the results of our efforts to suppress lake trout. Only Work Element A in the Statement of Work is funded entirely by Hungry Horse Mitigation funds. Additional funds are drawn from other sources to assist in completion of all remaining Work Elements.

13 HYDRO ENERGY↗

Secure & Restore Critical Fisheries Habitat, Flathead Subbasin, FY2008 Annual Report.

The construction of Hungry Horse Dam inundated 125 km of adfluvial trout habitat in the South Fork of the Flathead River and its tributaries, impacting natural fish reproduction and rearing. Rapid residential and commercial growth in the Flathead Watershed now threaten the best remaining habitats and restrict our opportunities to offset natural resource losses. Hydropower development and other land disturbances caused severe declines in the range and abundance of our focal resident fish species, bull trout and westslope cutthroat trout. Bull trout were listed as threatened in 1998 under the Endangered Species Act and westslope cutthroat were petitioned for listing under ESA. Westslope cutthroat are a species of special concern in Montana and a species of special consideration by the Confederated Salish and Kootenai Tribes. The Secure & Protect Fisheries Habitat project follows the logical progression towards habitat restoration outlined in the Hungry Horse Dam Fisheries Mitigation Implementation Plan approved by the NWPPC in 1993. This project is also consistent with the 2000 Fish and Wildlife Program and the Flathead River Subbasin Plan that identifies the protection of habitats for these populations as one of the most critical needs in the subbasin and directs actions to offset habitat losses. The Flathead basin is one of the fastest growing human population centers in Montana. Riparian habitats are being rapidly developed and subdivided, causing habitat degradation and altering ecosystem functions. Remaining critical habitats in the Flathead Watershed need to be purchased or protected with conservation easements if westslope cutthroat and bull trout are to persist and expand within the subbasin. In addition, habitats degraded by past land uses need to be restored to maximize the value of remaining habitats and offset losses caused by the construction of Hungry Horse Dam. Securing and restoring remaining riparian habitat will benefit fish by shading and moderating water temperatures, stabilizing banks and protecting the integrity of channel dimension, improving woody debris recruitment for in-channel habitat features, producing terrestrial insects and leaf litter for recruitment to the stream, and helping to accommodate and attenuate flood flows. The purpose of this project is to work with willing landowners to protect the best remaining habitats in the Flathead subbasin as identified in the Flathead River Subbasin Plan. The target areas for land protection activities follow the priorities established in the Flathead subbasin plan and include: (1) Class 1 waters as identified in the Flathead River Subbasin Plan; (2) Class 2 watersheds as identified in the Flathead River Subbasin Plan; and (3) 'Offsite mitigation' defined as those Class 1 and Class 2 watersheds that lack connectivity to the mainstem Flathead River or Flathead Lake. This program focuses on conserving the highest quality or most important riparian or fisheries habitat areas consistent with program criteria. The success of our efforts is subject to a property's actual availability and individual landowner negotiations. The program is guided using biological and project-based criteria that reflect not only the priority needs established in the Flathead subbasin plan, but also such factors as cost, credits, threats, and partners. The implementation of this project requires both an expense and a capital budget to allow work to be completed. This report addresses accomplishments under both budgets during FY08 as the two budgets are interrelated. The expense budget provided pre-acquisition funding to conduct activities such as surveys, appraisals, staff support, etc. The capital budget was used to purchase the interest in each parcel including closing costs. Both the pre-acquisition contract funds and the capital funds used to purchase fee title or conservation easements were spent in accordance with the terms negotiated within the FY08 through FY09 MOA between the Tribes, State, and BPA. In FY08, the focus of this project was to pursue all possible properties targeted by the Tribes and Montana Fish, Wildlife and Parks. Although we were not be able to acquire an interest in all properties targeted this fiscal year due to limited time, BPA staff constraints, and negotiation constraints, we expended approximately $4.2M providing BPA with 4.2 km of credit. The Siderius and Gardner parcels were protected with conservation easements. The Siderius conservation easement is held by the Flathead Land Trust and the Gardner conservation easement is held by the Tribes. Fee title was acquired for three parcels with the Tribes holding title to the Cole and Firestone parcels and MFWP holding title to the parcels acquired from Plum Creek Timber Company. All stream kilometers credited to BPA offset construction and inundation impacts (not operations related impacts) associated with Hungry Horse Dam as defined in the 1991 Hungry Horse Loss Assessment.

13 HYDRO ENERGY↗

Hungry Horse Mitigation : Flathead Lake : Annual Progress Report 2008.

The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote the 'Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by the Council in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research. Monitoring, for example, includes a spring gillnetting series conducted annually in Flathead Lake and builds on an existing data set initiated in 1981. Monitoring of the experimental kokanee reintroduction was a primary activity of this project between 1992 and 1997. Lake trout, whose high densities have precluded successful mitigation of losses of other species in Flathead Lake, have been monitored since 1996 to measure several biological parameters. Results of this work have utility in determining the population status of this key predator in Flathead Lake. The project has also defined the baseline condition of the Flathead Lake fishery in 1992-1993 and has conducted annual lakewide surveys since 1998. The restoration component of the project has addressed several stream channel, riparian, and fish passage problems, and suppression of non-native fish. The research component of the project began in FY 2000 and measured trophic linkages between M. relicta and other species to assist in predicting the results of our efforts to suppress lake trout. Only Work Element A in the Statement of Work is funded entirely by Hungry Horse Mitigation funds. Additional funds are drawn from other sources to assist in completion of all remaining Work Elements.

13 HYDRO ENERGY↗

Annotated bibliography for the humpback chub (Gila cypha) with emphasis on the Grand Canyon population.

Glen Canyon Dam is a hydroelectric facility located on the Colorado River in Arizona that is operated by the U.S. Bureau of Reclamation (Reclamation) for multiple purposes including water storage, flood control, power generation, recreation, and enhancement of fish and wildlife. Glen Canyon Dam operations have been managed for the last several years to improve conditions for the humpback chub (Gila cypha) and other ecosystem components. An extensive amount of literature has been produced on the humpback chub. We developed this annotated bibliography to assist managers and researchers in the Grand Canyon as they perform assessments, refine management strategies, and develop new studies to examine the factors affecting humpback chub. The U.S. Geological Survey recently created a multispecies bibliography (including references on the humpback chub) entitled Bibliography of Native Colorado River Big Fishes (available at www.fort.usgs.gov/Products/data/COFishBib). That bibliography, while quite extensive and broader in scope than ours, is not annotated, and, therefore, does not provide any of the information in the original literature. In developing this annotated bibliography, we have attempted to assemble abstracts from relevant published literature. We present here abstracts taken unmodified from individual reports and articles except where noted. The bibliography spans references from 1976 to 2009 and is organized in five broad topical areas, including: (1) biology, (2) ecology, (3) impacts of dam operations, (4) other impacts, and (5) conservation and management, and includes twenty subcategories. Within each subcategory, we present abstracts alphabetically by author and chronologically by year. We present relevant articles not specific to either the humpback chub or Glen Canyon Dam, but cited in other included reports, under the Supporting Articles subcategory. We provide all citations in alphabetical order in Section 7.

13 HYDRO ENERGY↗

HydroBio: Hydropower Capacity and Freshwater Biodiversity in Conterminous United States Sub-basins

This dataset summarizes existing and potential hydropower capacity and freshwater biodiversity at the sub-basin level throughout the conterminous United States (CONUS). It contains descriptive information regarding each sub-basin (e.g., 8-digit hydrologic unit code identifier, name, states, and size) along with sub-basin-level summaries of: 1) existing hydropower capacity (MW), 2) potential nominal non-powered dam (NPD) capacity (MW), 3) potential capacity of new stream reach development (NSD) (MW), and 4) freshwater biodiversity, including the total richness of fish, crayfish, and mussels and metrics that account for how rare and threatened those species tend to be. Hydropower data were obtained from Oak Ridge National Laboratory data resources (Existing Hydropower Assets, Non-Powered Dam Technical Potential, and New Stream Reach Development). Freshwater biodiversity data were obtained from NatureServe. Sub-basin characteristic information was obtained from the United States Geological Survey. Additionally, long data that provide lists of unique elements within each sub-basin for each constituent data resource (e.g., NatureServe, Existing Hydropower Assets) are provided to enhance dataset utility for users. The dataset provides, for the first time, a national-level assessment of existing and potential hydropower capacity in the context of freshwater biodiversity and is a valuable resource for stakeholders tasked with providing affordable, reliable energy to the American public while maintaining or enhancing invaluable freshwater resources. The dataset contains six data files in comma separated (*.csv) format that are within a zipped file.

Bozeman, Bryan [Oak Ridge National Laboratory (ORN↗

Landslides caused by the Mw7.8 Kaikōura earthquake and the immediate response

Tens of thousands of landslides were generated over 10,000 km 2 of North Canterbury and Marlborough as a consequence of the 14 November 2016, M w 7.8 Kaikōura Earthquake. The most intense landslide damage was concentrated in 3500 km 2 around the areas of fault rupture. Given the sparsely populated area affected by landslides, only a few homes were impacted and there were no recorded deaths due to landslides. Landslides caused major disruption with all road and rail links with Kaikōura being severed. The landslides affecting State Highway 1 (the main road link in the South Island of New Zealand) and the South Island main trunk railway extended from Ward in Marlborough all the way to the south of Oaro in North Canterbury. The majority of landslides occurred in two geological and geotechnically distinct materials reflective of the dominant rock types in the affected area. In the Neogene sedimentary rocks (sandstones, limestones and siltstones) of the Hurunui District, North Canterbury and around Cape Campbell in Marlborough, first-time and reactivated rock-slides and rock-block slides were the dominant landslide type. These rocks also tend to have rock material strength values in the range of 5-20 MPa. In the Torlesse ‘basement’ rocks (greywacke sandstones and argillite) of the Kaikōura Ranges, first-time rock and debris avalanches were the dominant landslide type. These rocks tend to have material strength values in the range of 20-50 MPa. A feature of this earthquake is the large number (more than 200) of valley blocking landslides it generated. This was partly due to the steep and confined slopes in the area and the widely distributed strong ground shaking. The largest landslide dam has an approximate volume of 12(±2) M m 3 and the debris from this travelled about 2.7 km 2 downslope where it formed a dam blocking the Hapuku River. The long-term stability of cracked slopes and landslide dams from future strong earthquakes and large rainstorms are an ongoing concern to central and local government agencies responsible for rebuilding homes and infrastructure. A particular concern is the potential for debris floods to affect downstream assets and infrastructure should some of the landslide dams breach catastrophically. At least twenty-one faults ruptured to the ground surface or sea floor, with these surface ruptures extending from the Emu Plain in North Canterbury to offshore of Cape Campbell in Marlborough. The mapped landslide distribution reflects the complexity of the earthquake rupture. Landslides are distributed across a broad area of intense ground shaking reflective of the elongate area affected by fault rupture, and are not clustered around the earthquake epicentre. The largest landslides triggered by the earthquake are located either on or adjacent to faults that ruptured to the ground surface. Surface faults may provide a plane of weakness or hydrological discontinuity and adversely oriented surface faults may be indicative of the location of future large landslides. Their location appears to have a strong structural geological control. Initial results from our landslide investigations suggest predictive models relying only on ground-shaking estimates underestimate the number and size of the largest landslides that occurred.

58 GEOSCIENCES↗

The Io decametric emission cone

The Voyager 1 and 2 Planetary Radio Astronomy observations of Jovian decametric radiation (DAM) were transformed into a fixed Io-Jupiter coordinate system for Io longitudes every 10 deg apart starting from 200 to 260 deg (seven plots per spacecaft). An analysis of the data in this coordinate system has shown that the Io-dependent DAM emissions are generated in hollow cones at all frequencies over the fixed Io longitudes studied. The edges of the emission cones are, in many cases, broad in longitude (30 deg or more), with distinct differences found between the characteristics of DAM emission at the edges of the emission cones. The shapes of the DAM emission cones are explained by using three-dimensional ray-tracing calculations within a model Jovian atmosphere.

Green, J. L.↗

Physiological Anatomical Rodent Experiment (PARE) .04 Feasibility Test 1

The objective of this feasibility study was to investigate the environmental/treatment stresses in the proposed PARE.04 experiments in a ground based study to determine if these stresses were of sufficient magnitude to compromise the planned shuttle experiments. Eighty pregnant Sprague-Dawley rats were received on day 2 (day l equals day of vaginal plug) of gestation (G2) and on G7 60 were laparotomized to determine the condition of pregnancy and allow assignment to test groups. The five test groups (N equals 10 each group) were as follows: Group 1, nominal flight; Group 2, laparotomy control; Group 3, hysterectomy control; Group 4, vivarium control; Group 5, caesarean delivery. On G17, groups 1, 2, and 5 were subjected to unilateral hysterectomy to obtain fetuses for evaluation. There was no difference in fetal crown-rump length, fetal weight, or placental weight in any of the test groups subjected to unilateral hysterectomy at G17. Animals were allowed to go to term and animals in each group delivered between the morning of G22 and the afternoon of G23. Rats assigned to Group 5 began delivering vaginally prior to the designated time for caesarean section, thus only 2 animals in this group were delivered by caesarean section. After delivery, a blood sample was taken from the dam, and they were euthanized and the thymus and adrenal glands weighed. Pups from experimental dams were tattooed for identification, the anogenital distance of male pups was photographed for later measurement, and all pups placed with foster dams and litter sizes were standardized to 10. On day 7, all pups were euthanized, and pup adrenal glands and thymus weighed. Laparotomy at G7 with or without unilateral hysterectomy at G17, had no effect on pregnancy maintenance or vaginal delivery. There was no difference in maternal adrenal or thymus weights or plasma levels of catecholamines, estradiol, progesterone, or corticosterone. Likewise, there was no difference in the anogenital distance (index of fetal stress) of neonatal male pups, between any of the experimental groups. From days 0-7, weight gain from dams in all experimental groups was similar. Lastly, there was no difference in weights of thymus and adrenal glands in pups euthanized at day 7. Collectively, these data indicate that treatment stresses inherent in the proposed PARE.04 experimental design should not compromise the planned shuttle experiments.

Burden, Hubert W.↗

Physiological Anatomical Rodent Experiment (PARE) .04 feasibility test 2

The objective of this feasibility study was to subject pregnant rats of the same age, strain, and size that will be utilized in a shuttle flight experiment to all flight conditions except the unique microgravity of space flight and determine the feasibility of the proposed experimental design to meet the experimental objectives. The study utilized facilities at NASA, Ames Research Center, Moffett Field, CA to subject the rats to the gravitational stresses of a simulated shuttle launch and simulated shuttle landing. One hundred pregnant rats were received on gestation day (G) 2 (day 1 = day of vaginal sperm) and on G7, eighty rats were laparotomized to determine the condition of pregnancy and allow assignment to test groups. The five test groups (N=10 each group) were as follows: Group 1, Nominal Flight; Group 2, Laparotomy Control; Group 3, Hysterectomy Control; Group 4, Vivarium Control; Group 5, Delayed Recovery. On G9, animals in groups 1,2,3, and 5 were subjected to a shuttle launch simulation. On G18, groups 1,2, and 3 were subjected to a shuttle landing simulation and on this same day groups 1 and 2 were subjected to unilateral hysterectomy to obtain fetuses and placentas for evaluation. Fetal crown-rump length and fetal weight of the Nominal Flight group was significantly less than the Laparotomy Control group, but placentas were similar. On G20, group 5 was subjected to a shuttle landing simulation and on this day this group received a unilateral hysterectomy and fetuses and placentas were weighed. Animals in all groups were allowed to go to term and all animals delivered between 06:00 hours G22 and 18:00 hours G23. After delivery, a blood sample was taken from each experimental dam, and they were euthanized and the thymus and adrenal glands weighed. The thymus weight from all experimental group dams was decreased relative to the Vivarium Control group but adrenal glands and hormone values in dam plasma was similar in all groups. Pups from experimental groups were tattooed for identification, the anogenital distance of male pups was measured, and all pups placed with foster dams and litter sizes were standardized to 10. There was no difference in anogenital distances between male pups from different test groups. Pups delivered from Delayed Recovery animals were smaller than pups delivered from Nominal Flight animals. On neonatal day 7, all pups were euthanized and pup adrenal glands and thymus weighed. There was no difference in weights of thymus and adrenal glands in pups euthanized at neonatal day 7. Collectively, these data confirm the feasibility of the experimental design to meet objectives of the studies proposed for shuttle flight.

Burden, Hubert W.↗

Hypergravity Effects on the Mother-Offspring System in Mammals

In 1995, ten pregnant female rats were launched on the Space Shuttle (STS-70) on Gestational day (G) 11 of their 22-day pregnancy as part of the NASA/NIH.Rodent (R)2 Experiment. Following landing on G20, fetuses were harvested from half of the dams, 0 g while the remaining five dams underwent birth. Spaceflight did not interrupt pregnancy, alter litter sizes, or affect body weights or gender ratios of the fetuses or neonates. Analyses of rats exposed to Hypergravity (HG) at 2.0-g, HG 1.75-g, HG 1.5-g were also conducted. Dams were exposed to continuous centrifugation from G I I through G20, with brief daily stops for animal health checks and maintenance. For both the G20 and Birth dams, comparable litter sizes and litter gender ratios were observed across gravity conditions. However, centrifugation-exposed (HG and RC) fetuses and neonates showed significantly lower body masses (p less than 0.05) relative to SC offspring. FIG 2.0-g offspring weighed significantly less than those in all other gravity conditions (p less than 0.05). Changes in the mothers care of the young will be discussed.

Ronca, April E.↗

Maternal Behavior Under Different Gravitational Conditions

In 1995, ten pregnant female rats were launched on the Space Shuttle (STS-70) on Gestational day (G)11 of their 22-day pregnancy as part of the NASA/NIH.Rodent(R)2 Experiment. Following landing on G20, fetuses were harvested from half of the dams, while the remaining five dams underwent birth. Spaceflight did not interrupt pregnancy, alter litter sizes, or affect body weights or gender ratios of the fetuses or neonates. Analyses of rats exposed to Hypergravity (HG) at 2.0-g, HG 1.75-g, HG 1.5-g were also conducted. Dams were exposed to continuous centrifugation from G11 through G20, with brief daily stops for animal health checks and maintenance. For both the G20 and Birth dams, comparable litter sizes and litter gender ratios were observed across gravity conditions. However, centrifugation-exposed (HG and RC) fetuses and neonates showed significantly lower body masses (p<0.05) relative to SC offspring. HG 2.0-g offspring weighed significantly less than those in all other gravity conditions (p<0.05). Changes in the mothers' care of the young will be discussed.

Ronca, April E.↗