At least 415 records · Page 23

The cost of direct air capture and storage can be reduced via strategic deployment but is unlikely to fall below stated cost targets

Carbon dioxide removal (CDR) is necessary to minimize the impact of climate change by tackling hard-toabate sectors and historical emissions. Direct air capture and storage (DACS) is an important CDR technology, but it remains unclear when and how DACS can be economically viable. Here, we use a bottom-up engineering-economic model together with top-down technological learning projections to calculate plant-level cost trajectories for four DACS technologies. Our analysis demonstrates that the costs of these technologies can plateau by 2050 at around $\$$100-600 t-CO 2 -1 mainly via capital cost reduction through aggressive deployment, but still exceed the optimistic targets defined by countries such as the US (i.e., $\$$100 t-CO 2 -1 ). A further analysis of existing policy mechanisms indicates that strong, project-catered policy support will be required to create market opportunities, accelerate DACS scale-up and lower the costs further. Our work suggests that strategic DACS deployment and operation must be coupled with strong policies to minimise the cost of DACS and maximise the opportunity to make a planet-scale climate impact.

54 ENVIRONMENTAL SCIENCES↗

Using Innovative Technologies for Manufacturing and Evaluating Rocket Engine Hardware

Many of the manufacturing and evaluation techniques that are currently used for rocket engine component production are traditional methods that have been proven through years of experience and historical precedence. As we enter into a new space age where new launch vehicles are being designed and propulsion systems are being improved upon, it is sometimes necessary to adopt new and innovative techniques for manufacturing and evaluating hardware. With a heavy emphasis on cost reduction and improvements in manufacturing time, manufacturing techniques such as Direct Metal Laser Sintering (DMLS) and white light scanning are being adopted and evaluated for their use on J-2X, with hopes of employing both technologies on a wide variety of future projects. DMLS has the potential to significantly reduce the processing time and cost of engine hardware, while achieving desirable material properties by using a layered powdered metal manufacturing process in order to produce complex part geometries. The white light technique is a non-invasive method that can be used to inspect for geometric feature alignment. Both the DMLS manufacturing method and the white light scanning technique have proven to be viable options for manufacturing and evaluating rocket engine hardware, and further development and use of these techniques is recommended.

Betts, Erin M.↗

Deployment of plug-in electric vehicles in China and the USA: issues and opportunities, foreword

Plug-in electric vehicles (PEVs), including battery electric vehicles (BEVs) and plug-in hybrid electric vehicles (PHEVs), have been promoted globally for their emission reductions and energy conservation. In addition to financial incentives for PEVs in many countries (Stephens et al. 2018), emission and energy regulatory systems provide additional incentives for PEVs in the USA, Europe, and China (European Union 2014; Innovation Center for Energy and Transportation 2019; U.S. EPA and NHTSA 2012). These incentives, together with PEV technology advances and cost reductions, have caused PEV sales to grow exponentially in many countries and global regions; PEV stocks totaled more than 5 million by the end of 2018 (Fig. 1). The International Energy Agency (2019) projects that PEV sales will grow even more quickly through 2030 to reach a total global PEV stock of 130 million to 250 million.

China↗

Drop C: The Drop-In, Ring-of-Power Heliostat (Final Report)

This report summarizes the work performed within the Drop-C: The Drop-In, Ring-of-Power Heliostat project. The Drop-C project aimed to develop a novel heliostat with an installed cost of $\$50$/m 2 ($\$2015$) which is a drastic cost reduction compared to the state-of-the-art. The resulting 27m 2 SunRing TM heliostat’s relative small size necessitates the parallel development of a wireless solar field network and a rapid calibration system. The SunRing heliostat is an evolution of the Ring-of-Power (ROP) design from Abengoa Solar LLC which had a reported installed cost of $114/m 2 . Cost savings relative to the ROP were sought by increasing the mirror area, improving the structural efficiency, a more accurate assessment of wind loads, and an improved assembly and installation procedure. The project spanned three Budget Periods (BP) where a digital heliostat was developed in BP1 using wind tunnel testing to define load conditions.

14 SOLAR ENERGY↗

PILOT PLANT EVALUATIONS OF RARE EARTH ELEMENT RECOVERY AND CONCENTRATION FROM PRE-COMBUSTION BITUMINOUS COAL SOURCES

Rare earths and other critical elements are commonly associated with coal-based sources and sometimes at concentrations that may be attractive for recovery as a byproduct of coal production. The results obtained from laboratory research performed during the past five years have led to the design, construction and testing of a pilot plant that recovered rare earth elements from several bituminous coal-based materials including coarse refuse as well as solutions from a small heap leach and acid mine drainage. From this initial design, rare earth oxide (REO) concentrates having a purity greater than 90% have been produced using solvent extraction as the primary means of concentration. Following cost reduction and process intensification efforts, the circuit was revised to include feed calcination and several selective precipitation stages as a substitute for the original direct leach-solvent extraction circuit. Pilot test results revealed that the modified circuit was ideal for treating the relatively low-grade feedstocks and provided similar final REO purities at a significantly lower cost. This communication will present the flowsheets evaluated in the pilot plant along with technical and economic analyses for each circuit.

Coal↗

Improving Performance of III-V Solar Cells Grown on Spalled Germanium with Ex Situ Substrate Planarization

Controlled spalling allows removal of devices and provides an opportunity for cost reduction through substrate reuse. However, the fracture-based process can leave behind morphological surface features, notably river lines, that can disrupt epitaxial growth and degrade device performance. We investigate the viability of various wet etch chemistries to planarize river lines to ensure high-quality device growth and performance without mechanical repolishing, and so maintain a route towards cost-effective reuse. Etching in a HF: HNO 3 :CH 3 COOH solution effectively planarizes river lines and produces a surface that yields devices with equivalent performance to those grown on epi-ready Ge wafer surfaces. Further studies will focus on optimizing etch composition, temperature, and time to minimize material removal while maintaining a suitable surface for high-quality epitaxy.

germanium↗

Catalytic Oxygen Reduction for Deep O 2 Removal from CO 2 Streams

Streams of CO 2 from various capture processes may contain several impurities of which O 2 is often overlooked as a problematic impurity. Because of its reactivity, the National Energy Technology Laboratory has recommended a stringent limit, less than 10 ppm, for the O 2 level in treated CO 2 products for safe transport, storage, and utilization. Here, in this study, a variety of catalytic oxygen reduction approaches using commercial automotive exhaust emission catalysts are evaluated for O 2 removal from CO 2 streams using different reducing agents, including H 2 , CO, CH 3 OH, and CH 4 . When the amount of reductant added into the feed is carefully controlled, H 2 , CO, or CH 3 OH can effectively remove O 2 from 1.5% to below 10 ppm with a single-reactor design (>99.93% removal efficiency), while simultaneously meeting the impurity limits for other species. With CH 4 as a reductant, it is challenging to simultaneously meet the the O 2 and CO specifications in a single-reactor design because CH 4 also reacts with CO 2 to produce high levels of CO in the stream (at several hundred ppm). A dual-reactor design is developed to enable the use of CH 4 , a readily available and low-cost reductant, for the purification of CO 2 streams to meet the specifications for O 2 and other impurities.

CO2 purification↗

Carl T. Hayden Veterans Affairs Medical Center: Smart Buildings Case Study

The purpose of this smart buildings case study is to showcase a leading example of a GEB renovation project in the federal buildings space and provide key information on the technology and control upgrades, costs, and energy and utility bill savings. This case study also provides information and recommendations for selecting energy conservation measures (ECMs) and choosing energy and cost reduction strategies from the energy management team at the site. The findings from this successful GEB project can be used to help pave the way for additional GEB retrofits in the future. The Carl T. Hayden Veterans Affairs (VA) Medical Center in Phoenix, Arizona, demonstrates that GEB strategies and technologies can be realistically deployed today across buildings with substantial energy and cost savings. The project implemented both ECMs and grid-interactive technologies and controls strategies, making it a leading example of a smart, sustainable, and efficient commercial building.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Using Innovative Technologies for Manufacturing Rocket Engine Hardware

Many of the manufacturing techniques that are currently used for rocket engine component production are traditional methods that have been proven through years of experience and historical precedence. As the United States enters into the next space age where new launch vehicles are being designed and propulsion systems are being improved upon, it is sometimes necessary to adopt innovative techniques for manufacturing hardware. With a heavy emphasis on cost reduction and improvements in manufacturing time, rapid manufacturing techniques such as Direct Metal Laser Sintering (DMLS) are being adopted and evaluated for their use on NASA s Space Launch System (SLS) upper stage engine, J-2X, with hopes of employing this technology on a wide variety of future projects. DMLS has the potential to significantly reduce the processing time and cost of engine hardware, while achieving desirable material properties by using a layered powder metal manufacturing process in order to produce complex part geometries. Marshall Space Flight Center (MSFC) has recently hot-fire tested a J-2X gas generator (GG) discharge duct that was manufactured using DMLS. The duct was inspected and proof tested prior to the hot-fire test. Using a workhorse gas generator (WHGG) test fixture at MSFC's East Test Area, the duct was subjected to extreme J-2X hot gas environments during 7 tests for a total of 537 seconds of hot-fire time. The duct underwent extensive post-test evaluation and showed no signs of degradation. DMLS manufacturing has proven to be a viable option for manufacturing rocket engine hardware, and further development and use of this manufacturing method is recommended.

Betts, E. M.↗

Benefits of Using a Mars Forward Strategy for Lunar Surface Systems

This paper identifies potential risk reduction, cost savings and programmatic procurement benefits of a Mars Forward Lunar Surface System architecture that provides commonality or evolutionary development paths for lunar surface system elements applicable to Mars surface systems. The objective of this paper is to identify the potential benefits for incorporating a Mars Forward development strategy into the planned Project Constellation Lunar Surface System Architecture. The benefits include cost savings, technology readiness, and design validation of systems that would be applicable to lunar and Mars surface systems. The paper presents a survey of previous lunar and Mars surface systems design concepts and provides an assessment of previous conclusions concerning those systems in light of the current Project Constellation Exploration Architectures. The operational requirements for current Project Constellation lunar and Mars surface system elements are compared and evaluated to identify the potential risk reduction strategies that build on lunar surface systems to reduce the technical and programmatic risks for Mars exploration. Risk reduction for rapidly evolving technologies is achieved through systematic evolution of technologies and components based on Moore's Law superimposed on the typical NASA systems engineering project development "V-cycle" described in NASA NPR 7120.5. Risk reduction for established or slowly evolving technologies is achieved through a process called the Mars-Ready Platform strategy in which incremental improvements lead from the initial lunar surface system components to Mars-Ready technologies. The potential programmatic benefits of the Mars Forward strategy are provided in terms of the transition from the lunar exploration campaign to the Mars exploration campaign. By utilizing a sequential combined procurement strategy for lunar and Mars exploration surface systems, the overall budget wedges for exploration systems are reduced and the costly technological development gap between the lunar and Mars programs can be eliminated. This provides a sustained level of technological competitiveness as well as maintaining a stable engineering and manufacturing capability throughout the entire duration of Project Constellation.

Mulqueen, Jack↗

Development of a Techno-Economic Analysis Framework for a Solar Thermochemical Fuel Production Process

Synthetic liquid fuels can provide a drop-in substitute for fossil-based fuels in sectors such as aviation and maritime, where electrification is not a viable option due to the need for high specific energy density. However, for these alternative fuels to be adopted at a commercial scale, their price must be competitive compared to their fossil-based counterparts. The reverse water-gas shift (RWGS) reaction offers a promising pathway, using hydrogen (sourced from electrolysis) and carbon dioxide as the feed and reacting to produce syngas - a mixture of H2 and CO at a specific ratio. Syngas is a useful precursor that can be converted into fuels and chemicals via known downstream processes, such as liquid transportation fuels via Fischer-Tropsch (FT) synthesis. The RWGS reaction is currently not applied in commercial scale, unlike the rest of the components in the process chain (electrolyzers and syngas-to-fuel synthesis units). The RWGS reaction poses several challenges due to its restrictive thermodynamics. Being an equimolar reaction, high temperatures and a large excess of H2 are needed to achieve reasonable CO2 conversion at equilibrium. This has detrimental effects on practical process implementation and the quality of syngas that can be produced, with direct effect on the energy and capital requirements, as well as the need for expensive downstream separation. In this work, we are proposing to develop a new concentrating solar thermal (CST) compatible RWGS reactor, performing the reaction in a 2-step chemical looping process using metal oxide at a temperature range of 600-800 degrees Celsius. By decoupling the reactor from the solar receiver, the Generation 3 (Gen3) CST technology could be utilized, together with its proposed thermal energy storage (TES) technology, benefitting from a good match to the required temperatures. CST technology is a viable option for supplying the heat that could be rapidly deployed in scale, thus being a good match to the gas-to-liquid (GTL) process which requires a large minimal scale to be commercially viable. The integration of TES with CST also allows operating the plant at large annual capacity factors and avoids multiple shutdown/startup cycles, thus fitting into the steady-state operation mode that most GTL processes require. The main innovation in the proposed design hinges on a countercurrent reaction design using a packed bed reactor. In 2019 Metcalfe et al. showed the benefits of countercurrent species exchange could be realized in a redox chemical-looping processes, by storing the favorable countercurrent chemical potential profiles in a packed bed of non-stoichiometric oxide. Metcalfe et al. applied this breakthrough concept to the WGS reaction, which is conventionally a co-feed catalytic process, showing a dramatic improvement. Bulfin et al. (2023) performed a similar proof-of-concept demonstration for the RWGS reaction using CeO2, achieving cumulative and peak CO2 conversions of 88% and 95%, respectively, compared to a thermodynamic limit of 58% for the co-feed catalytic process at the same conditions. In our new REGENLOOP project, we are developing a reactor prototype from the heat-exchange packed bed reactor-type, a commonly used reactor in the chemical industry. The endothermic heat of reduction will be supplied to the reactor using CST, while the same heat transfer fluid (HTF) mechanism will be used to extract the exothermic heat of oxidation. An array of multiple reactors is used to supply constant high-purity CO stream, that is then mixed with H2 from electrolysis to produce a high-purity syngas at the required composition. By removing the CO-CO2 separation after the RWGS process, significant energy and cost reduction can be achieved. A physics-based TEA framework is currently being developed, covering all the major plant processes, from the solar collection through storage, chemical looping RWGS, GTL, and auxiliary unit operations, up to the liquid hydrocarbon product. This modeling framework will utilize reduced-order models for the chemical looping RWGS and TES, CST modeling using SolarPILOT, and Aspen Plus for the GTL. By using this combined physics-based approach, the effects of design/operating parameters on the performance and cost can be elucidated. In our presentation, the modeling framework will be presented in detail, including preliminary cost predictions of using this plant configuration under a few selected relevant case studies. This study will be used to identify the major cost drivers, informing further system design and optimization needed to chart the way for a commercially viable pathway.

14 SOLAR ENERGY↗

Wind Turbine Drivetrain Reliability [Slides]

Pitch bearings, main bearings, and gearboxes in conventional wind turbine drivetrains often do not meet their 20-year minimum specified lifetime, resulting in turbine downtime as well as expensive, time-consuming repairs or replacements. The dominant failure modes of the drivetrain components and the conditions that lead to their failure are not fully accounted for during product design or routinely modeled for life management. Drivetrain reliability improvements and O&M cost reductions remain top priorities for both land-based and offshore wind turbines, especially as wind turbines continue to be deployed in increasingly remote and offshore locations, continue to increase in size, and are becoming expected to be in service beyond their original design life, all of which correspond to an increase in the impact of any reliability issues on O&M costs. This presentation summarizes the most recent activities by NREL and ANL on drivetrain reliability.

17 WIND ENERGY↗

Drivetrain Reliability Collaborative Update

Pitch bearings, main bearings, and gearboxes in conventional wind turbine drivetrains often do not meet their 20-year minimum specified lifetime, resulting in turbine downtime as well as expensive, time-consuming repairs or replacements. The dominant failure modes of the drivetrain components and the conditions that lead to their failure are not fully accounted for during product design or routinely modeled for life management. Drivetrain reliability improvements and O&M cost reductions remain top priorities for both land-based and offshore wind turbines, especially as wind turbines continue to be deployed in increasingly remote and offshore locations, continue to increase in size, and are becoming expected to be in service beyond their original design life, all of which correspond to an increase in the impact of any reliability issues on O&M costs. This presentation summarizes the most recent activities by NREL and ANL on drivetrain reliability.

bearing↗

Ares I and Ares V First Stage - Powering Exploration

The National Aeronautics and Space Administration (NASA) Ares Projects Office (APO) is continuing to make progress toward the final design of the first stage propulsion system for the Ares I crew launch vehicle and the Ares V cargo launch vehicle. Ares I and Ares V will provide the space launch capabilities needed to fulfill NASA' s exploration strategy of sending human beings to the Moon, Mars, and beyond. As primary propulsion for the Ares launch vehicles, the Space Shuttle-derived Reusable Solid Rocket Motor (RSRM) is one of the first and most important components to be tested. The first flight of Ares I, called Ares I-X, will occur in April 2009, with booster integration to begin at Kennedy Space Center (KSC) by autumn 2008. The Ares I-X flight will use a combination of flight and simulation hardware to obtain data on controlling the long and narrow crew launch vehicle configuration. The test will use a four-segment RSRM from the Shuttle inventory and a fifth spacer segment to simulate the size and weight of the operational five-segment motor to be used on later flights. The upper stage, Orion crew exploration vehicle, and launch abort system will all be replaced with simulator hardware. Manufacturing work has begun on the spacer segment, as well as the new forward hardware for the booster. Atlas V avionics will be adapted to control Ares I-X' s first stage. That hardware is undergoing hardware-in-the-loop testing in a contractor-provided systems integration laboratory (SIL); a critical design review (CDR) was completed in December 2007. Drogue and main parachute drop tests have also been conducted successfully at Yuma Proving Grounds, allowing the First Stage team to begin fabricating parachutes for Ares I-X. The Ares I-X flight test will be the first flight test for the parachutes. A series of preliminary design technical interchange meetings is being conducted prior to the Ares I-X CDR in January 2007 to ensure readiness for the flight. Much of the First Stage activity in 2007 has focused on a series of preliminary design (PDR) activities associated with each booster subsystem. These events will culminate in a formal preliminary design review in 2008, where subsystems and component specifications will be developed and associated analyses and drawings will be evaluated for technical adequacy. The first stage also has been undergoing a series of trade studies to determine means for upgrading booster performance and reducing operational costs. Performance improvement studies have included changing from polybutadiene acrylonitrile (PBAN) propellant to hydroxyl-terminated polybutadiene (HTPB); replacing aluminum with composite motor casings; and optimizing or upgrading the propellant grain and nozzle structures. Some or all of these changes could result in a block upgrade to the Ares I first stage, after becoming the standard configuration for the Ares V. The cost reduction studies included a change from reusable or recoverable boosters to completely expendable boosters; changing from hydrazine-powered to more environmentally friendly electrohydrostatic actuators (EHAs) on the thrust vector control (TVC) system; and changing the location of the separation plane to reduce the likelihood of recontact upon booster separation. The expendability trade study resulted in a decision to keep the recoverable boosters, as the new hardware costs significantly outweighed the potential operational cost savings due to reduced ground operations. Likewise, due to cost considerations, the team continued using existing hydrazine-powered actuators for the TVC system. The separation plane location for Ares I is still being studied, with results to be announced in 2008. In short, the Ares launch vehicles' first stage is building upon NASA's close familiarity with this Shuttle-derived system, while continuing to seek out improvements for long-term exploration.

Priskos, Alex S.↗

Computer vision research at Marshall Space Flight Center

Orbital docking, inspection, and sevicing are operations which have the potential for capability enhancement as well as cost reduction for space operations by the application of computer vision technology. Research at MSFC has been a natural outgrowth of orbital docking simulations for remote manually controlled vehicles such as the Teleoperator Retrieval System and the Orbital Maneuvering Vehicle (OMV). Baseline design of the OMV dictates teleoperator control from a ground station. This necessitates a high data-rate communication network and results in several seconds of time delay. Operational costs and vehicle control difficulties could be alleviated by an autonomous or semi-autonomous control system onboard the OMV which would be based on a computer vision system having capability to recognize video images in real time. A concept under development at MSFC with these attributes is based on syntactic pattern recognition. It uses tree graphs for rapid recognition of binary images of known orbiting target vehicles. This technique and others being investigated at MSFC will be evaluated in realistic conditions by the use of MSFC orbital docking simulators. Computer vision is also being applied at MSFC as part of the supporting development for Work Package One of Space Station Freedom.

Vinz, Frank L.↗

Techno-economic analysis of non-aqueous hybrid redox flow batteries

Renewable energy has become indispensable to improving human life, but its growth is hampered by a lack of cost-effective energy storage systems to solve the intermittency problem. Non-aqueous hybrid redox flow batteries (NAqHRFBs), based on lithium metal anode and organic redox molecules (redoxmers), have been investigated as an attractive energy storage option because of their high cell voltages and energy densities compared to other redox flow battery candidates. However, little is known about the economic potential of NAqHRFBs, as well as the operational and materials impacts. This research establishes a techno-economic model to analyze the capital costs of NAqHRFBs with selected organic redoxmers, including 2,2,6,6-tetramethylpiperidine-1-oxyl (TEMPO). Sensitivity analyses for current density, area-specific resistance, cell voltage, electrolyte composition, redoxmer price, and equivalent molecular weight indicate the key factors in controlling NAqHRFB capital cost. To make the current NAqHRFB cost-effective, the first priority is to increase the operation current density over 10 times of those used in lab-scale tests, followed by adjusting redoxmer-related characteristics to afford more cost reduction space such as decreasing the unit price by ~20 fold. The results have shed light on potential material development and system engineering directions to make NAqHRFBs viable for renewable energy storage.

25 ENERGY STORAGE↗

IACMI Project 4.7: Pultruded Textile Carbon Fiber for Spar Caps (Final Report)

The primary objective of this project was to demonstrate the potential to significantly reduce the cost of wind turbine blades with carbon fiber reinforced polymer (CFRP) structure. Applicability of textile carbon fibers (TCF) were evaluated for use in pultruded spar cap (SC) elements as a path to cost reduction for utility scale wind turbine blades. In earlier work for the Department of Energy (DOE) Wind Energy Technologies Office (WETO), a collaboration of Sandia National Laboratory (SNL), Oak Ridge National Laboratory (ORNL), and Montana State University has demonstrated potential for pultruded TCF to compete with infused fiberglass and commercially available carbon fiber pultruded sections for spar cap construction. In the design cases evaluated, the TCF sections fared well when compared on cost per unit composite stiffness and cost per unit composite compressive strength for those designs [1]. Both stiffness and compressive strength tend to be key factors in the design of blade composite Spar Cap which carry the bulk of the blade structural loads in bending. Spar Cap design tends to distribute largely symmetric tensile and compressive stresses to opposite sides of the spar structure, but since carbon fiber composite compressive strength is typically 20-50% lower than tensile strength, the compressive loading reaches failure levels well before the tensile loading. Stiffness is critical in containing the large tip deflection in high wind loading situations. However, materials and process development were very limited in the earlier study and the work in this project was expanded to make the comparative information more representative of what will be required in order to make further inroads towards implementation. Similar to that study, this project team confirmed that the primary materials of interest for pultruded spar cap elements should be thermoset (TS) resins reinforced by carbon fibers, utilizing as high a percentage of TCF as practical to benchmark cost and performance against commercial carbon fibers. To make the closest comparison possible and eliminate specific test article size, resin selection, and equipment/operational nuance effects, the team planned to pultrude sections with 100% commercially available carbon fiber (Panex 35 carbon fiber from Zoltek) as well as samples utilizing high fractions of TCF. The resin system chosen was based on formulations recommended by large wind industry supplier Hexion and consisted of Hexion resin RSL-4597, curing agent CCA-138, and internal mold release additive 117, along with common kaolin filler ASP400P from BASF. As commonly deployed in spar cap configurations, the team had a mold built to pultrude a rectangular spar cap element of 100mm width and 3mm thickness. The extremely limited number of samples produced for the earlier study were produced with a “generic” epoxy utilized for a variety of applications by the pultruder contracted to produce test articles for demonstration purposes. More importantly, those samples were produced at a fiber fraction only slightly over 50%. Based on feedback from our industrial advisory team for that project and strongly recommended by this project team, the consensus is that it is highly desirable to obtain fiber fractions of 65-68% for significant penetration in wind blade spar cap. Although this requirement has yet to be exhaustively confirmed in readily available information, this was established as a project goal and informally decided we needed to exceed 60% fiber fraction to gain serious industry consideration. Previous TCF pultrusion trials have been challenged by the lack of robust TCF packages, resulting in non-uniform tension across and between tows, as well as excess labor and waste for removal of interleaved paper. The non-uniform tension and associated intermingling of tows in textile acrylic fiber tows and associated difficulties created from broken filaments in carbon fiber conversion inhibit the ordered packing necessary to enhance fiber fraction elevation. (These “cross-overs” are not considered undesirable for textile applications and there is some sense that they might be advantageous for those applications). In addition to work that is ongoing at the acrylic fiber manufacturers to improve their formats, The Institute of Advanced Composites Manufacturing Innovation (IACMI) Project 6.12 (report PA16-0349-6.12-01) [2] has developed and demonstrated a more robust packaging and creeling approach that at least partially addresses these issues, thus improving control of the TCF feed into the pultrusion unit. It was hoped that these and other improvements currently being implemented would allow us to achieve fiber fractions at least approaching these fiber fraction targets. During this project, sections utilizing 100% commercially available carbon fiber reinforcement were produced as a baseline, as well as sections reinforced with about 94% TCF and the balance being commercially available fiber for comparison. The most important finding was that similar to results reported in the earlier WETO-funded project and results from tests of TCF reported at IACMI meetings, this work demonstrated that sections pultruded with TCF in an epoxy resin frequently utilized in actual spar cap production had stiffness and compressive strengths largely comparable to similar sections pultruded with a commercially available carbon fiber also frequently utilized in the wind industry. Although the amount of that data is limited, some of the tensile strength results were actually closer than would have been expected based on fiber strength results provided by the TCF and commercial fiber producers. The actual test data are reported and discussed in detail in Section 5. The pultruded sections dominated by TCF reinforcement were approximately 8-10% lower in fiber fraction than for the sections produced using commercial fiber alone, making direct comparison difficult. The COVID-19 project has provided significant insight into the current state-of-the-art with various TCF product forms. The data obtained in this project will guide the planned improvements at the precursor level, especially in attaining uniform tensioning and payout to facilitate enhanced fiber fractions and overall processability of the TCF composites. The project team is providing guidance to stakeholders concerning the attributes, needs, and potential demand for TCF in wind blade spar caps. Results achieved in this project are consistent with findings in the related work cited [1] and support this guidance and the high potential for this product type. TCF precursor-producing partners continue to express interest in enhancing their product forms and the team looks forward to working with these improved materials as they become available.

42 ENGINEERING↗

Benefits Of Automated Construction And Energy Efficiency Measures In Modular Homes

This article builds on and adds to a Buildings XV publication that introduced the Transformative Efficiency and Automation in Modular Homes (TEAMH) project. The TEAMH project sought to develop a scalable solution for producing modular homes with 20-50% energy savings and similar cost relative to site-fabricated single-family home construction. A key aspect of the project was assessing the potential for labor cost reductions through automation-assisted construction using light gauge steel (LGS). To quantify the advantages of this approach, side-by-side comparisons were made between traditional wood-framed construction and automation-assisted LGS construction. This demonstration involved constructing one wood-framed wall and several LGS test walls, accompanied by a time-and-motion study. The results indicated that automation assistance could decrease construction time and associated labor costs by as much as 46%. High-performance envelope technologies for exterior insulation and air sealing were evaluated to compare modular homes with site-built homes that meet the International Energy Conservation Code (IECC). A key technology considered was vacuum insulation panels (VIPs) with fiberglass cores. Guarded hot box testing of multiple full-scale wall assemblies containing different combinations of exterior continuous insulation systems containing phenolic foam and VIPs. Testing on various full-scale wall assemblies revealed that, with LGS construction, cavity insulation had minimal impact on exterior wall performance. Omitting cavity insulation can reduce labor and material costs while streamlining manufacturing, as its installation is labor-intensive and not easily automated due to the need for precise placement around wiring and other internal components. Guarded hot box tests of multiple LGS test walls with foam and VIP-based exterior insulation systems achieved R-values of up to 31 hr-ft2-°F/Btu. Finally, building energy modeling of multiple modular home designs indicated that the upgraded envelope assemblies can yield heating energy savings of up to 50% and cooling energy savings of up to 30% compared to IECC 2018 standards.

Shrestha, Som [ORNL] (ORCID:0000000183993797)↗