Parametric Cost Models for Space Telescopes

Multivariable parametric cost models for space telescopes provide several benefits to designers and space system project managers. They identify major architectural cost drivers and allow high-level design trades. They enable cost-benefit analysis for technology development investment. And, they provide a basis for estimating total project cost. A survey of historical models found that there is no definitive space telescope cost model. In fact, published models vary greatly [1]. Thus, there is a need for parametric space telescopes cost models. An effort is underway to develop single variable [2] and multi-variable [3] parametric space telescope cost models based on the latest available data and applying rigorous analytical techniques. Specific cost estimating relationships (CERs) have been developed which show that aperture diameter is the primary cost driver for large space telescopes; technology development as a function of time reduces cost at the rate of 50% per 17 years; it costs less per square meter of collecting aperture to build a large telescope than a small telescope; and increasing mass reduces cost.

Stahl, H. Philip↗

Pros, Cons, and Alternatives to Weight Based Cost Estimating

Many cost estimating tools use weight as a major parameter in projecting the cost. This is often combined with modifying factors such as complexity, technical maturity of design, environment of operation, etc. to increase the fidelity of the estimate. For a set of conceptual designs, all meeting the same requirements, increased weight can be a major driver in increased cost. However, once a design is fixed, increased weight generally decreases cost, while decreased weight generally increases cost - and the relationship is not linear. Alternative approaches to estimating cost without using weight (except perhaps for materials costs) have been attempted to try to produce a tool usable throughout the design process - from concept studies through development. This paper will address the pros and cons of using weight based models for cost estimating, using liquid rocket engines as the example. It will then examine approaches that minimize the imp~ct of weight based cost estimating. The Rocket Engine- Cost Model (RECM) is an attribute based model developed internally by Pratt & Whitney Rocketdyne for NASA. RECM will be presented primarily to show a successful method to use design and programmatic parameters instead of weight to estimate both design and development costs and production costs. An operations model developed by KSC, the Launch and Landing Effects Ground Operations model (LLEGO), will also be discussed.

Joyner, Claude R.↗

New Approaches in Reusable Booster System Life Cycle Cost Modeling

This paper presents the results of a 2012 life cycle cost (LCC) study of hybrid Reusable Booster Systems (RBS) conducted by NASA Kennedy Space Center (KSC) and the Air Force Research Laboratory (AFRL). The work included the creation of a new cost estimating model and an LCC analysis, building on past work where applicable, but emphasizing the integration of new approaches in life cycle cost estimation. Specifically, the inclusion of industry processes/practices and indirect costs were a new and significant part of the analysis. The focus of LCC estimation has traditionally been from the perspective of technology, design characteristics, and related factors such as reliability. Technology has informed the cost related support to decision makers interested in risk and budget insight. This traditional emphasis on technology occurs even though it is well established that complex aerospace systems costs are mostly about indirect costs, with likely only partial influence in these indirect costs being due to the more visible technology products. Organizational considerations, processes/practices, and indirect costs are traditionally derived ("wrapped") only by relationship to tangible product characteristics. This traditional approach works well as long as it is understood that no significant changes, and by relation no significant improvements, are being pursued in the area of either the government acquisition or industry?s indirect costs. In this sense then, most launch systems cost models ignore most costs. The alternative was implemented in this LCC study, whereby the approach considered technology and process/practices in balance, with as much detail for one as the other. This RBS LCC study has avoided point-designs, for now, instead emphasizing exploring the trade-space of potential technology advances joined with potential process/practice advances. Given the range of decisions, and all their combinations, it was necessary to create a model of the original model and use genetic algorithms to explore results. A strong business case occurs when viable paths are identified for an affordable up-front investment, and these paths can credibly achieve affordable, responsive operations, characterized by smaller direct touch labor efforts at the wing level from flight to flight. The results supporting this approach, its potential, and its conclusions are presented here.

Zapata, Edgar↗

New Approaches in Reuseable Booster System Life Cycle Cost Modeling

This paper presents the results of a 2012 life cycle cost (LCC) study of hybrid Reusable Booster Systems (RBS) conducted by NASA Kennedy Space Center (KSC) and the Air Force Research Laboratory (AFRL). The work included the creation of a new cost estimating model and an LCC analysis, building on past work where applicable, but emphasizing the integration of new approaches in life cycle cost estimation. Specifically, the inclusion of industry processes/practices and indirect costs were a new and significant part of the analysis. The focus of LCC estimation has traditionally been from the perspective of technology, design characteristics, and related factors such as reliability. Technology has informed the cost related support to decision makers interested in risk and budget insight. This traditional emphasis on technology occurs even though it is well established that complex aerospace systems costs are mostly about indirect costs, with likely only partial influence in these indirect costs being due to the more visible technology products. Organizational considerations, processes/practices, and indirect costs are traditionally derived ("wrapped") only by relationship to tangible product characteristics. This traditional approach works well as long as it is understood that no significant changes, and by relation no significant improvements, are being pursued in the area of either the government acquisition or industry?s indirect costs. In this sense then, most launch systems cost models ignore most costs. The alternative was implemented in this LCC study, whereby the approach considered technology and process/practices in balance, with as much detail for one as the other. This RBS LCC study has avoided point-designs, for now, instead emphasizing exploring the trade-space of potential technology advances joined with potential process/practice advances. Given the range of decisions, and all their combinations, it was necessary to create a model of the original model and use genetic algorithms to explore results. A strong business case occurs when viable paths are identified for an affordable up-front investment, and these paths can credibly achieve affordable, responsive operations, characterized by smaller direct touch labor efforts at the wing level from flight to flight. The results supporting this approach, its potential, and its conclusions are presented here.

Zapata, Edgar↗

Assurance Equations: A Cost and Criticality Model for Optimizing Quality Assurance Surveillance

The cost of quality vs cost of failure correction has been a long-running topic of discussion within the Aerospace community. It leads directly to concepts of “risk tolerance”, and risk-based decision-making. It would be valuable if there was a way to compute the optimal investment in customer-executed quality assurance activities using defect significance with respect to performance objectives, the activities’ defect detection effectiveness, and the cost-penalty for late discovery of impactful defects. This optimization is particularly of interest to projects whose budget constraints significantly limit their risk management options.The cost to fix defects (i.e., failure correction) escalates as the project matures. There have been studies attempting to determine the relative cost of fixing defects discovered during various phases of a project life cycle with important implications, all of which suggest growth factors are large. The commonly referred to 1:10:100 rule represents a cost multiplier for repair/rework across the Design to Fab to Test hardware development phases. Cost premiums for QA activities also accumulate when they are treated as mandatory (due to schedule drag) or are performed later than their assigned phase.This paper describes the modeling of development phase -dependencies in the conduct of typical customer-executed quality assurance activities. Our initial modeling encompasses:• Distinct phases of the production lifecycle• Multiple kinds of Defects, each with some a-priori likelihood of being present• Each defect’s impact on performance Objectives for a type of hardware• The cost and efficacy of assurance techniques at detecting such Defects• The costs of fixing those Defects detected in a given phase of the production lifecycleThe model captures assurance activities’ abilities to Detect defects. Upon detection it is assumed that the Defect is immediately fixed. Defects that “escape” detection by some activity may thereafter be detected by a later activity, but by then the cost of fixing the Defect may have escalated. Defects are related to the performance Objectives they would detract from, were those Defects to remain present in the operating system.We have constructed and are exploring, a model that relates the importance of hardware system elements to mission objectives, the impact of types of Defects on those hardware types, the cost of customer-executed assurance activities (i.e., supplier controls) and their effectiveness towards reducing an impactful quality escape, and the cost of Defect correction across production phase. We describe the approach taken to select the key model aspects, why they are relevant to our NASA mission, and our efforts to populate it with relevant and contemporary data. We use a notional example to illustrate model design and function.

Plante, Jeannette↗

Estimating the variable cost for high-volume and long-haul transportation of densified biomass and biofuel

This article analyzes rail transportation costs of products that have similar physical properties as densified biomass and biofuel. The results of this cost analysis are useful to understand the relationship and quantify the impact of a number of factors on rail transportation costs of denisfied biomass and biofuel. These results will be beneficial and help evaluate the economic feasibility of high-volume and long-haul transportation of biomass and biofuel. High-volume and long-haul rail transportation of biomass is a viable transportation option for biofuel plants, and for coal plants which consider biomass co-firing. Using rail optimizes costs, and optimizes greenhouse gas (GHG) emissions due to transportation. Increasing bioenergy production would consequently result in lower GHG emissions due to displacing fossil fuels. To estimate rail transportation costs we use the carload waybill data, provided by Department of Transportation’s Surface Transportation Board for products such as grain and liquid type commodities for 2009 and 2011. We used regression analysis to quantify the relationship between variable transportation unit cost ($/ton) and car type, shipment size, rail movement type, commodity type, etc. The results indicate that: (a) transportation costs for liquid is $2.26/ton–$5.45/ton higher than grain type commodity; (b) transportation costs in 2011 were $1.68/ton–$5.59/ton higher than 2009; (c) transportation costs for single car shipments are $3.6/ton–$6.68/ton higher than transportation costs for multiple car shipments of grains; (d) transportation costs for multiple car shipments are $8.9/ton and $17.15/ton higher than transportation costs for unit train shipments of grains.

09 BIOMASS FUELS↗

Open Architecture for Cost Savings in Advanced Nuclear Reactors

Recently, nuclear power plant build projects in the West have run over budget due to high capital costs and schedule overruns. Compared to other sources of energy, nuclear power plants have higher capital costs. Reactors are often different at every site, resulting in a lack of standardization. Nuclear is expected to compete with other low carbon sources of energy which have lower capital costs making it essential for nuclear to develop ways of reducing costs. Strategies such as standardization, learning rates, modularization, and schedule reduction in advanced reactors can reduce nuclear costs by about 40%. Standardization as a way of cutting capital costs has been explored even in large nuclear power plants. Standardization of certain plant components can result in lower component and installation costs and higher learning from experience. Standardization can be achieved by adopting a criterion of key performance indicators and general design principles for a specific system or component such as the balance of plant. Modularization allows the construction of certain components of SMRs in a factory, which saves time, increases productivity, and encourages higher learning rates. Production learning decreases the time and the cost related to an activity. The potential for modularized components of advanced reactors to be manufactured in factories makes it conducive to achieving higher learning rates. Developing large-capacity nuclear programs through sequential builds cultivates a higher learning rate, which in effect may reduce schedule overruns. Open architecture has been identified as a way to drive standardization among advanced reactor designs and result in cost savings. Open architecture (OA) is defined as a design enabling a diverse supply chain by defining and publishing requirements of systems or equipment in functional and/or interface terms, utilizing technical standards in widespread use. Currently, the nuclear industry’s approach is to use closed architecture, making most designs proprietary. However, collaboration between various advanced reactor vendors and suppliers utilizing the concept of open architecture can result in modular and standardized architecture of subsystems or subcomponents of a nuclear power plant. Completely standardizing nuclear power plants may be impossible, however, certain common subsystems amongst the various reactor designs could be standardized and/or access a wider supply chain and leverage existing learning from other sectors. Open architecture will save time and allocate resources to the parts of the plants that have the most unique features. A key advantage of open architecture is its ability to improve production learning across advanced reactors (AR) types in the industry, by providing and utilizing the same kind of component. Sodium fast reactor (SFR), High Temperature Gas Reactor (HTGR) and Molten Salt Reactor (MSR) are the advanced reactors considered for this project. This paper aims to determine the cost savings in advanced reactor programs due to open architecture learning rate. This work is an extension of work done on light water reactor small modular reactors; the cost methodology was utilized to investigate the impact of open architecture on advanced reactors with a particular focus on sodium fast reactors. The cost data on sodium fast reactors used in the model presented the most adequate information required for the analysis.

Advanced Nuclear Reactors↗

New Berkeley Lab Report Tracks a Decade of PV Installed Cost Trends

Installations of PV systems have been expanding at a rapid pace in recent years. In the United States, the market for PV is driven by national, state, and local government incentives, including upfront cash rebates, production-based incentives, requirements that electricity suppliers purchase a certain amount of solar energy, and Federal and state tax benefits. These programs are, in part, motivated by the popular appeal of solar energy and by the positive attributes of PV - e.g., modest environmental impacts, avoidance of fuel price risks, coincidence with peak electrical demand, and the location of PV at the point of use. Given the relatively high cost of PV, however, a key goal of these policies is to encourage cost reductions over time. Therefore, as policy incentives have become more significant and as PV deployment has accelerated, so too has the desire to track the installed cost of PV systems over time, by system characteristics, by system location, and by component. A new Lawrence Berkeley National Laboratory report, 'Tracking the Sun: The Installed Cost of Photovoltaics in the U.S. from 1998-2007', helps to fill this need by summarizing trends in the installed cost (i.e., the cost paid by the system owner) of grid-connected PV systems in the U.S. The report is based on an analysis of project-level cost data from nearly 37,000 residential and non-residential PV systems completed from 1998-2007 and installed on the utility-customer-side of the meter. These systems total 363 MW, equal to 76% of all grid-connected PV capacity installed in the U.S. through 2007, representing the most comprehensive data source available on the installed cost of PV in the United States. The data were obtained from administrators of PV incentive programs around the country, who typically collect installed cost data for systems receiving incentives. A total of 16 programs, spanning 12 states, ultimately provided data for the study. Reflecting the broader geographical trends in the U.S. PV market, the vast majority of the systems in the data sample are located in California (83%, by capacity) and New Jersey (12%), The remaining systems are located in Arizona, Connecticut, Illinois, Massachusetts, Maryland, Minnesota, New York, Oregon, Pennsylvania, and Wisconsin. The PV systems in the dataset range in size from 100 W to 1.3 MW, almost 90% of which are smaller than 10 kW. This article briefly summarizes some of the key findings from the Berkeley Lab study (the full report can be downloaded at http://eetd.lbl.gov/ea/emp/re-pubs.html). The article begins by summarizing trends related to the installed cost of PV systems prior to receipt of any financial incentives, and then discusses how changes in incentive levels over time and variation across states have impacted the net installed cost of PV to the customer, after receipt of incentives. Note that all cost and incentive data are presented in real 2007 dollars (2007$), and all capacity and dollars-perwatt ($/W) data are presented in terms of rated module power output under Standard Test Conditions (DC-STC).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Systematic Approach to Better Understanding Integration Costs

This research presents a systematic approach to evaluating the costs of integrating new generation and operational procedures into an existing power system, and the methodology is independent of the type of change or nature of the generation. The work was commissioned by the U.S. Department of Energy and performed by the National Renewable Energy Laboratory to investigate three integration cost-related questions: (1) How does the addition of new generation affect a system's operational costs, (2) How do generation mix and operating parameters and procedures affect costs, and (3) How does the amount of variable generation (non-dispatchable wind and solar) impact the accuracy of natural gas orders? A detailed operational analysis was performed for seven sets of experiments: variable generation, large conventional generation, generation mix, gas prices, fast-start generation, self-scheduling, and gas supply constraints. For each experiment, four components of integration costs were examined: cycling costs, non-cycling VO&M costs, fuel costs, and reserves provisioning costs. The investigation was conducted with PLEXOS production cost modeling software utilizing an updated version of the Institute of Electrical and Electronics Engineers 118-bus test system overlaid with projected operating loads from the Western Electricity Coordinating Council for the Sacramento Municipal Utility District, Puget Sound Energy, and Public Service Colorado in the year 2020. The test system was selected in consultation with an industry-based technical review committee to be a reasonable approximation of an interconnection yet small enough to allow the research team to investigate a large number of scenarios and sensitivity combinations. The research should prove useful to market designers, regulators, utilities, and others who want to better understand how system changes can affect production costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The Current State of Light-Duty Electric Vehicle Supply Equipment Costs: An Assessment of Contemporary Understanding

This study uses a hybrid meta-analysis and literature-review approach to understand the current state of knowledge regarding the costs of electric vehicle supply equipment (EVSE). We present a novel way to consider, categorize, and label measures of cost and show cost measure estimates from a sample of 13 recent studies. We find that in general, there is too much variation and too few commonly represented EVSE cost measures to reasonably provide aggregate figures for these measures. We propose a convention for presenting EVSE cost measures that includes the application (commercial or residential), the power level (Level 1, Level 2, DCFC [with further distinction based on rated power capacity]), and the type of cost measure (hardware, installation, operation, and total cost). We contend that providing researchers with standard cost measures will help to advance our knowledge of EVSE costs by ensuring that future work will use common metrics. Establishing common metrics will enable conventional meta-analyses that will make assessments of EVSE costs even more accessible. Additionally, common metrics will make tracking costs more reliable as the technology continues to evolve and become more ubiquitous.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Parametric Cost Model for Ground and Space Telescopes

Parametric cost models can be used by designers and project managers to compare cost between major architectural cost drivers and allow high-level design trades; enable cost-benefit analysis for technology development investment; and, provide a basis for estimating total project cost between related concepts. The NASA Marshall Space Flight Center has developed a 5-parameter first-article optical telescope assembly cost model OTA$ (FY17) = $20M x 30(S/G)x D(1.7)x λ(-0.5)x T(-0.25)x e(-0.028) (Y-1960)Where S/G = 1 for space and 0 for ground telescopes, D = diameter, λ= diffraction limited wavelength, T = operating temperature and Y = year of development. The model explains 92% (Adjusted R2) of the cost variation in a database of 47 total ground and space telescope assemblies (OTA). The MSFC model estimates the most likely cost for only the OTA. Where an OTA is defined as the subsystem which collects electromagnetic radiation and focuses it (focal) or concentrates it (afocal) into the science instruments. An OTA consists of the primary mirror, secondary mirror, auxiliary optics and support structure (such as optical bench or truss structure, primary support structure, secondary support structure or spiders, straylight baffles, mechanisms for adjusting the optical components, electronics or power systems for operating these mechanisms, etc.). Finally, duplication only reduces cost for the manufacture of identical systems(i.e. multiple aperture sparse arrays or interferometers). And, while duplication does reduce the cost of manufacturing the mirrors of segmented primary mirror, this cost savings does not appear to manifest itself in the final primary mirror assembly(presumably because the structure for a segmented mirror is more complicated than for a monolithic mirror).

Space Telescope Cost Model, Parametric Cost Model↗

Minimally Invasive Treatment for Benign Prostatic Hyperplasia: Economic Evaluation from a Standardized Hospital Case Costing System

Purpose: Minimally invasive alternatives to transurethral resection of the prostate (TURP) such as prostate arterial embolization (PAE) and photoselective vaporization of the prostate (PVP) are being explored as adjuncts in the care of patients with benign prostatic hyperplasia. However, there are conflicting reports of the costs of these procedures. The purpose of this study was to compare the direct and indirect hospital costs of TURP, PAE and PVP. Materials and Methods: A chart review was performed in patients who underwent TURP, PVP and PAE from April 2015 to March 2017. All hospital costs were collected in accordance with the Ontario Case Costing Initiative, a standardized medical case costing system. Costs were characterized as direct or indirect and fixed or variable. Probabilistic sensitivity analysis was conducted to study cost uncertainty. Results: During the study period, a total of 209 men underwent TURP, 28 PVP and 21 PAE. Mean age (years) was as follows: TURP 71.43; PVP 73.66; PAE 70.77 (p = 0.366). Mean length of stay (days) was as follows: TURP 1.63; PVP 1.55; PAE 1 (p = 0.076). Total costs of the PAE group ($3829, SD $1582) were less than both PVP ($5719, SD $1515) and TURP groups ($5034, SD $1997, p < 0.001). There was no significant difference in direct costs between the groups. Monte Carlo simulation demonstrated that PAE was the least costly alternative majority of the time. Conclusions: The total hospital costs of PAE at our institution are significantly lower than those of PVP and TURP.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Decarbonization scenarios of the U.S. Electricity system and their costs

Decarbonizing the electricity system to zero-carbon emission is crucial for climate change mitigation. Previous studies have shown that such a transition in the United States (U.S.) may lead to higher system cost compared to a business-as-usual case, but it is not well-known how the cost of electricity generation varies at sub-regional level under the transition, and studies have rarely evaluated the trade-off between the cost and avoided climate damages, as well as the potential roles of negative emission technologies (NETs) in the electricity decarbonization. In this work, we present a regionally resolved national model to quantify the cost of decarbonizing the U.S. electricity system under a set of possible scenarios. The results show that, compared to the reference scenario without a decarbonization policy, reaching zero CO 2 emission by 2050 would incur, depending on the scenarios, 335-494 billion USD additional cost to the U.S. electric power sector during 2020-2050. The regional costs of electricity generation ranges from 2.4 to 4.7 cent/kWh, largely due to the generation profiles and renewable resources availability of those regions. The additional costs can be translated to an average CO 2 abatement cost of 29-59 USD/metric ton CO 2 (with 2%-7% discount rates), which are comparable to the social cost of carbon in the literature at around 4% discount rate. The results also show that the cost of mitigating the last few percent CO 2 emission from the U.S. electricity system may exceed the costs of NETs, indicating an opportunity for NETs to contribute to electricity decarbonization.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Extending cost–benefit analysis for the sustainability impact of inter-urban Intelligent Transport Systems

The paper reports research involving three cost–benefit analyses performed on different ITS schemes (Active Traffic Management, Intelligent Speed Adaptation and the Automated Highway System) on one of the UK's busiest highways — the M42. The environmental scope of the assets involved is widened to take into account the possibility of new technology linked by ICT and located within multiple spatial regions. The areas focused on in the study were data centre energy emissions, the embedded emissions of the road-side infrastructure, vehicle tailpipe emissions, additional hardware required by the vehicles (if applicable) and safety, and all aspects of sustainability. Dual discounting is applied which aims to provide a separate discount rate for environmental elements. For ATM, despite the energy costs of the data centre, the initial implementation costs and mitigation costs of its embedded emissions, a high cost–benefit ratio of 5.89 is achieved, although the scheme becomes less effective later on its lifecycle due to rising costs of energy. ISA and AHS generate a negative result, mainly due to the cost of getting the vehicle on the road. In order to negate these costs, the pricing of the vehicle should be scaled depending upon the technology that is outfitted. Retrofitting on vehicles without the technology should be paid for by the driver. ATM will offset greenhouse gas emissions by 99 kt of CO{sub 2} equivalency over a 25 year lifespan. This reduction has taken into account the expected improvement in vehicle technology. AHS is anticipated to save 280 kt of CO{sub 2} equivalency over 15 years of operational usage. However, this offset is largely dependent on assumptions such as the level of market penetration. - Highlights: • Three cost–benefit analyses are applied to inter-urban intelligent transport. • For ATM, a high cost–benefit ratio of 5.89 is achieved. • ATM offsets greenhouse gas emissions by 99 kt of CO{sub 2} equivalency over 25 years. • ISA and AHS generate a negative result due to vehicle implementation costs. • AHS is anticipated to save 280 kt of CO{sub 2} equivalency over 15 years.

54 ENVIRONMENTAL SCIENCES↗

Estimating the cost of saving electricity through U.S. utility customer-funded energy efficiency programs

The program administrator and total cost of saved energy allow comparison of the cost of efficiency across utilities, states, and program types, and can identify potential performance improvements. Comparing program administrator cost with the total cost of saved energy can indicate the degree to which programs leverage investment by participants. Based on reported total costs and savings information for U.S. utility efficiency programs from 2009 to 2013, here we estimate the savings-weighted average total cost of saved electricity across 20 states at 0.046 per kilowatt-hour (kW h), comparing favorably with energy supply costs and retail rates. Programs targeted on the residential market averaged 0.030 per kW h compared to 0.053 per kW h for non-residential programs. Lighting programs, with an average total cost of 0.018 per kW h, drove lower savings costs in the residential market. We provide estimates for the most common program types and find that program administrators and participants on average are splitting the costs of efficiency in half. More consistent, standardized and complete reporting on efficiency programs is needed. Differing definitions and quantification of costs, savings and savings lifetimes pose challenges for comparing program results. Reducing these uncertainties could increase confidence in efficiency as a resource among planners and policymakers.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Evaluating the causes of cost reduction in photovoltaic modules

Photovoltaic (PV) module costs have declined rapidly over forty years but the reasons remain elusive. Here we advance a conceptual framework and quantitative method for quantifying the causes of cost changes in a technology, and apply it to PV modules. Our method begins with a cost model that breaks down cost into variables that changed over time. Cost change equations are then derived to quantify each variable's contribution. We distinguish between changes observed in variables of the cost model – which we term low-level mechanisms of cost reduction – and research and development, learning-by-doing, and scale economies, which we refer to as high-level mechanisms. We find that increased module efficiency was the leading low-level cause of cost reduction in 1980–2012, contributing almost 25% of the decline. Government-funded and private R&D was the most important high-level mechanism over this period. After 2001, however, scale economies became a more significant cause of cost reduction, approaching R&D in importance. Policies that stimulate market growth have played a key role in enabling PV's cost reduction, through privately-funded R&D and scale economies, and to a lesser extent learning-by-doing. The method presented here can be adapted to retrospectively or prospectively study many technologies, and performance metrics besides cost.

14 SOLAR ENERGY↗

Quantifying the economic costs of power outages owing to extreme events: A systematic review

Quantifying the economic cost of long-duration power outages is crucial to justifying investments in resiliency and reliability improvements. However, extensive study on the subject complicates the identification of power outage costs and determining the most suitable approach to quantify them for an individual, specific facility, particularly in the context of extreme events. Here, this research provides a systematic review of economic studies estimating the impact of environmental disasters at the microeconomic and macroeconomic levels. Of 326 articles, evaluating the costs of power outages in extreme events, this work identified 22 studies that attempted to quantify the economic costs. These findings indicate that quantifying power outage costs lacks standardization, posing challenges for comparing different studies. Most analyses aiming to quantify these costs for utilities, sectors, and the overall economy rely on outdated survey data, which offer generalized rather than specific cost estimations. The costs of power outages exhibit a significant dependence on factors such as the sector involved, the type of customer affected, and the outage duration. To quantify industry costs, the research in this study suggests that using the National Renewable Energy Laboratory's online, open-access Customer Damage Function Calculator is the best option for individual-level assessments of industries, hospitals, offices, education centers, and similar facilities. However, the Interruption Cost Estimate Calculator can estimate outage costs across industrial, commercial, and residential sectors for macroeconomic outcomes. Finally, this article discusses the relative strengths of these methods and tools and the potential directions for future research.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

On-Road Heavy-Duty Low-NOx Technology Cost Study

The National Renewable Energy Laboratory (NREL) conducted a cost analysis for emission control technologies under contract to the California Air Resources Board (CARB). CARB sought incremental cost analysis for emission control technologies for on-road heavy-duty (HD) engines, used in vehicle greater than 14,000 pounds (lbs) gross vehicle weight rating (GVWR) to achieve oxides of nitrogen (NOx) emissions rates significantly lower than those required by current emissions standards. Specifically, incremental costs (without any retail price mark-up) were estimated for representative diesel, natural gas, and gasoline engine and emission aftertreatment systems that were selected to represent potential technology packages that could achieve 0.02 grams per brake horsepower hour (g/bhp-hr) NOx on certification test cycles, including a proposed updated certification test cycle that includes additional low load operating conditions. NREL surveyed stakeholders including industry association groups, Tier 1 suppliers, and engine original equipment manufacturers (OEMs) to estimate incremental direct and indirect costs. Incremental costs were considered for current engine full useful life (FUL) definitions, as well as with proposed increased FUL and warranty period. The incremental costs were subsequently incorporated in life-cycle cost analyses examining the incremental engine and aftertreatment costs along with life-cycle costs over the various engine FUL scenarios. Life-cycle costs analysis included the incremental upfront cost, fuel consumption changes (changes in fuel economy), diesel exhaust fluid (DEF) consumption changes, and the maximum FUL of the aftertreatment package (major overhaul intervals).

33 ADVANCED PROPULSION SYSTEMS↗