Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Control Centers”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

Automatic Dependent Surveillance-Broadcast (ADS-B) In-Trail Procedures (ITP)

Aircraft in oceanic and remote non-radar airspace frequently fly for extended periods of time in the same direction, at the same time, along similar flight paths as other aircraft. Since there is no radar surveillance, controllers use procedural separation to ensure that aircraft remain separated. Procedural separation distances are typically larger than radar separation distances and as a result aircraft operating in oceanic airspace are sometimes held at non-optimal flight levels due to conflicting traffic at intervening flight levels. Automatic Dependent Surveillance-Broadcast (ADS-B) In-Trail Procedures (ITP) were developed to enable flight level change maneuvers that would otherwise not be possible with current procedural separation standards. Aircraft operators choosing to equip with an ADS-B transceiver and an appropriate onboard decision support system would be able to take advantage of these procedures when operating in proximity to aircraft equipped with a suitable ADS-B transmitter (“ADS-B Out”). The ability to perform in-trail maneuvers to achieve more time at optimum altitudes could result in more efficient and predictable flight profiles thereby saving fuel and in some cases allowing operators to make beneficial operational decisions. NASA first began developing ADS-B ITP in 2003 as a result of a desire to develop methodologies, concepts, and procedures to reduce separation requirements for future air transportation systems using airborne ADS-B. The objectives were to provide insight into the details necessary to reduce separation requirements for the future and to develop applications that could provide incentives for operators to voluntarily equip with transformational technologies. From 2003 to 2008, NASA conducted research that supported the development of ITP including batch simulations, human-in-the-loop experiments and avionics and separation standards development. This research showed enough maturity and benefit that in 2008, the FAA Surveillance and Broadcast Services (SBS) program adopted ADS-B ITP as one of their three key, near-term applications to make use of ADS-B-In. The FAA developed an agreement with NASA to transition the technology and established an FAA project for the purpose of performing an operational trial of ADS-B ITP in revenue service in the summer of 2011. The objectives of the project are to a) validate the operational performance and economic benefits of ITP; and b) develop and validate ADS-B ITP Minimum Operational Performance Specifications (MOPS) material. As a part of this project, the FAA established agreements with United Airlines and Honeywell. The agreements include the work necessary for the development, certification and installation of onboard systems for twelve United Airlines 747-400s. ITP system development is nearly complete and certification activities are underway. The FAA project has also been working with Oakland Oceanic Control Center (ZOA) and the FAA’s Oceanic and Offshore Operations Office to develop controller procedures and safety analyses that are required to support the flight trial. The FAA has also been working on the development of an ITP Operational Specification that should be approved this April. The presentation will cover some of the key aspects of the development, challenges, and integration required to successfully transition ADS-B ITP from a concept in 2003 to flight trials in revenue service in 2011.

Kenneth M Jones↗

Final Technical Report: Center for Mechanistic Control of Unconventional Formations

The overarching mission of the Center for Mechanistic Control of Unconventional Formations (CMC-UF) was to garner cross-cutting, fundamental, geoscience knowledge to achieve mechanistic control over the strongly coupled nonequilibrium physical and geochemical processes in extreme geological environments including shale, mudstone, marls, and other tight rocks with nanoscale pores. Collectively, these are referred to as unconventional formations and they often play the role of seals for other subsurface storage formations. The fundamental knowledge garnered by CMC-UF enabled science-based management of US unconventional formations for subsurface storage of carbon dioxide and TWh quantities of renewable energy as hydrogen and/or compressed air over longer timeframes as well as for natural gas production, with reduced environmental impacts, in the short term.

58 GEOSCIENCES↗

Tonopah Test Range Air Monitoring: CY2013 Meteorological, Radiological, and Airborne Particulate Observations

In 1963, the U.S. Department of Energy (DOE) (formerly the Atomic Energy Commission [AEC]), implemented Operation Roller Coaster on the Tonopah Test Range (TTR) and an adjacent area of the Nevada Test and Training Range (NTTR) (formerly the Nellis Air Force Range). This test resulted in radionuclide-contaminated soils at Clean Slate I, II, and III. This report documents observations made during on-going monitoring of radiological, meteorological, and dust conditions at stations installed adjacent to Clean Slate I and Clean Slate III and at the TTR Range Operations Control center. The primary objective of the monitoring effort is to determine if winds blowing across the Clean Slate sites are transporting particles of radionuclide-contaminated soils beyond both the physical and administrative boundaries of the sites. Results for the calendar year (CY) 2013 monitoring include: (1) the gross alpha and gross beta values from the monitoring stations are approximately equivalent to the highest values observed during the CY2012 reporting at the surrounding Community Environmental Monitoring Program (CEMP) stations (this was the latest documented data available at the time of this writing); (2) only naturally occurring radionuclides were identified in the gamma spectral analyses; (3) the ambient gamma radiation measurements indicate that the average annual gamma exposure is similar at all three monitoring stations and periodic intervals of increased gamma values appear to be associated with storm fronts passing through the area; and (4) the concentrations of both resuspended dust and saltated sand particles generally increase with increasing wind speed. However, differences in the observed dust concentrations are likely due to differences in the soil characteristics immediately adjacent to the monitoring stations. Neither the resuspended particulate radiological analyses nor the ambient gamma radiation measurements suggest wind transport of radionuclide-contaminated soils.

(1)↗

Design Report on the MiniFuel Instrumented Test Apparatus for Understanding Radiation Effects

Most nuclear fuels irradiations at Oak Ridge National Laboratory (ORNL) over the past decade have been conducted using MiniFuel—a static capsule design employing subscale fuel specimens to collect separate-effects irradiated fuel performance data. Irradiation conditions for MiniFuel experiments are predicted pre-test using reactor physics, and thermal models are verified post-irradiation via SiC dilatometry and various spectrometry methods. Relevant fuel performance parameters are also observed post-irradiation in a hot cell, thereby providing a single data point for each parameter representing the cumulative effects of the irradiation conditions. Substantially more data can be harvested from a single test and within a shorter duration by instrumenting irradiation vehicles and measuring desired quantities in situ. This report presents the design and analysis of the MiniFuel INstrumented Irradiation Test Apparatus for Understanding Radiation Effects (MINITAURE)—an instrumented test rig based on the separate-effects MiniFuel concept that aims to capture fission gas release (FGR) and thermal conductivity degradation of fuel specimens during irradiation in the High Flux Isotope Reactor (HFIR). MINITAURE will be integrated with the Materials Irradiation Facility (MIF) located in the HFIR building outside the reactor containment. The MIF will act as the instrumentation and control center for the experiment, enabling real-time feedback from in situ sensors and control of irradiation temperatures via a gas delivery system. Two unique capsule designs were developed to capture each phenomenon: the thermal conductivity capsule, which uses a thermopile method to estimate fuel specimen thermal conductivity, and the fission gas release capsule, which will have continuous flowing gas communication to high-purity germanium detectors that are housed in the MIF for monitoring FGR. This report details the reactor physics and heat transfer modeling activities that were used to inform the experiment design and predict capsule performance. It also describes out-of-pile activities conducted to stand up this new capability and verify the measurement techniques. Modeling efforts to date have demonstrated the feasibility of the in situ measurement techniques and supported the development of the MINITAURE assembly configuration. Out-of-pile testing of the thermal conductivity measurement shows promise in capturing relative changes in thermal conductivity. However, significant errors exist in the measured absolute value, posing a need for further refinement.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Remote Science Operation Center research

Progress in the following areas is discussed: the design, planning and operation of a remote science payload operations control center; design and planning of a data link via satellite; and the design and prototyping of an advanced workstation environment for multi-media (3-D computer aided design/computer aided engineering, voice, video, text) communications and operations.

Banks, P. M.↗

Model analysis of remotely controlled rendezvous and docking with display prediction

Manual control of rendezvous and docking (RVD) of two spacecraft in low earth orbit by a remote human operator is discussed. Experimental evidence has shown that control performance degradation for large transmission delays (between spacecraft and operations control center) can be substantially improved by the introduction of predictor displays. An intial Optimal Control Model (OCM) analysis of RVD translational and rotational perturbation control was performed, with emphasis placed on the predictive capabilities of the combined Kalman estimator/optimal predictor with respect to control performance, for a range of time delays, motor noise levels and tracking axes. OCM predictions are then used as a reference for comparing tracking performance with a simple predictor display, as well as with no display prediction at all. Use is made here of an imperfect internal model formulation, whereby it is assumed that the human operator has no knowledge of the system transmission delay.

Milgram, P.↗

Web-Altairis: An Internet-Enabled Ground System

This paper describes Web-Altairis, an Internet-enabled ground system software package funded by the Advanced Automation and Architectures Branch (Code 588) of NASA's Goddard Space Flight Center. Web-Altairis supports the trend towards "lights out" ground systems, where the control center is unattended and problems are resolved by remote operators. This client/server software runs on most popular platforms and provides for remote data visualization using the rich functionality of the VisAGE toolkit. Web-Altairis also supports satellite commanding over the Internet. This paper describes the structure of Web-Altairis and VisAGE, the underlying technologies, the provisions for security, and our experiences in developing and testing the software.

Miller, Phil↗

Progress on the International Space Station - We're Part Way up the Mountain

The first phase of the International Space Station construction has been completed, and research has begun. Russian, U.S., and Canadian hardware is on orbit, and Italian logistics modules have visited often. With the delivery of the U.S. Laboratory, Destiny, significant research capability is in place, and dozens of U.S. and Russian experiments have been conducted. Crew members have been on orbit continuously since November 2000. Several "bumps in the road" have occurred along the way, and each has been systematically overcome. Enormous amounts of hardware and software are being developed by the International Space Station partners and participants around the world and are largely on schedule for launch. Significant progress has been made in the testing of completed elements at launch sites in the United States and Kazakhstan. Over 250,000 kilograms of flight hardware have been delivered to the Kennedy Space Center and integrated testing of several elements wired together has progressed extremely well. Mission control centers are fully functioning in Houston, Moscow, and Canada, and operations centers Darmstadt, Tsukuba, Turino, and Huntsville will be going on line as they are required. Extensive coordination efforts continue among the space agencies of the five partners and two participants, involving 16 nations. All of them continue to face their own challenges and have achieved significant successes. This paper will discuss the contributions of the International Space Station partners and participants, their accomplished milestones, and upcoming events. The International Space Station program, the largest and most complicated peacetime project in history, has progressed part way up the mountain, and the partners are continuing their journey to the top. The International Space Station (ISS) is unprecedented in its technological, engineering, and management complexity, and is one of the largest international collaborations ever undertaken. The ISS is a dramatic example of the ability of nations to work together as a team toward common goals and dreams. The challenges encountered and overcome by the international ISS team have been likened to climbing a mountain. Construction of the ISS has progressed rapidly in the past year. ISS is now a functioning microgravity laboratory in space hosting a permanent human presence, prompting the characterization that we are "part way up the mountain, and the team continues its climb."

Fortenberry, Lindy↗

An Evidence-based Approach to Developing a Management Strategy for Medical Contingencies on the Lunar Surface: The NASA/Haughton-Mars Project (HMP) 2006 Lunar Medical Contingency Simulation at Devon Island

The lunar architecture for future sortie and outpost missions will require humans to serve on the lunar surface considerably longer than the Apollo moon missions. Although the Apollo crewmembers sustained few injuries during their brief lunar surface activity, injuries did occur and are a concern for the longer lunar stays. Interestingly, lunar medical contingency plans were not developed during Apollo. In order to develop an evidence-base for handling a medical contingency on the lunar surface, a simulation using the moon-Mars analog environment at Devon Island, Nunavut, high Canadian Arctic was conducted. Objectives of this study included developing an effective management strategy for dealing with an incapacitated crewmember on the lunar surface, establishing audio/visual and biomedical data connectivity to multiple centers, testing rescue/extraction hardware and procedures, and evaluating in suit increased oxygen consumption. Methods: A review of the Apollo lunar surface activities and personal communications with Apollo lunar crewmembers provided the knowledge base of plausible scenarios that could potentially injure an astronaut during a lunar extravehicular activity (EVA). Objectives were established to demonstrate stabilization and transfer of an injured crewmember and communication with ground controllers at multiple mission control centers. Results: The project objectives were successfully achieved during the simulation. Among these objectives were extraction from a sloped terrain by a two-member crew in a 1 g analog environment, establishing real-time communication to multiple centers, providing biomedical data to flight controllers and crewmembers, and establishing a medical diagnosis and treatment plan from a remote site. Discussion: The simulation provided evidence for the types of equipment and methods for performing extraction of an injured crewmember from a sloped terrain. Additionally, the necessary communications infrastructure to connect multiple centers worldwide was established from a remote site. The surface crewmembers were confronted with a number of unexpected scenarios including environmental, communications, EVA suit, and navigation challenges during the course of the simulation which provided insight into the challenges of carrying out a medical contingency in an austere environment. The knowledge gained from completing the objectives will be incorporated into the exploration medical requirements involving an incapacitated astronaut on the lunar surface.

Scheuring, R. A.↗

Assessment of Air Traffic Controller Acceptability of Aircrew Route Change Requests

NASA developed the traffic aware strategic aircrew requests concept for a cockpit automation that identifies route improvements and advises the aircrew to request the change from the air traffic controller. In order to increase the chance of air traffic control approval, the automation ensures that the route is clear of known traffic, weather, and airspace restrictions. Hence the technology is anticipated to provide benefits in areas such as flight efficiency, flight schedule compliance, passenger comfort, and pilot and controller workload. In support of a field trial of a prototype of the technology, observations were conducted at the Atlanta and Jacksonville air traffic control centers to identify the main factors that affect the acceptability of aircrew requests by air traffic controllers. Observers shadowed air traffic controllers as the test flight pilot made pre-scripted requests to invoke acceptability issues and then they interviewed voluntarily fifty controllers with experience ranging from one to thirty-five years. The most common reason for rejecting requests is conflicting with traffic followed by violating air traffic procedures, increasing sector workload, and conflicting with major arrival and departure flows and flow restrictions. Quantitative parameters such as the distance that a route should maintain from sector boundaries and special use airspace were identified and recommended for inclusion in the automation.

Flight Optimization; Field Trial↗

Assessment of Air Traffic Controller Acceptability of Aircrew Route Change Requests

NASA developed the traffic aware strategic aircrew requests concept for a cockpit automation that identifies route improvements and advises the aircrew to request the change from the air traffic controller. In order to increase the chance of air traffic control approval, the automation ensures that the route is clear of known traffic, weather, and airspace restrictions. Hence the technology is anticipated to provide benefits in areas such as flight efficiency, flight schedule compliance, passenger comfort, and pilot and controller workload. In support of a field trial of a prototype of the technology, observations were conducted at the Atlanta and Jacksonville air traffic control centers to identify the main factors that affect the acceptability of aircrew requests by air traffic controllers. Observers shadowed air traffic controllers as the test flight pilot made pre-scripted requests to invoke acceptability issues and then they interviewed voluntarily fifty controllers with experience ranging from one to thirty-five years. The most common reason for rejecting requests is conflicting with traffic followed by violating air traffic procedures, increasing sector workload, and conflicting with major arrival and departure flows and flow restrictions. Quantitative parameters such as the distance that a route should maintain from sector boundaries and special use airspace were identified and recommended for inclusion in the automation.

Flight Optimization; Field Trial↗

Automated Reconstruction of Control Logic for Programmable Logic Controller Forensics

This paper presents Similo, an automated scalable framework for control logic forensics in industrial control systems. Similo is designed to investigate denial of engineering operations (DEO) attacks, recently demonstrated to hide malicious control logic in a programmable logic controller (PLC) at field sites from an engineering software (at control center). The network traffic (if captured) contains substantial evidence to investigate DEO attacks including manipulation of control logic. Laddis, a state-of-the-art forensic approach for DEO attacks, is a binary-logic decompiler for the Allen-Bradley’s RSLogix engineering software and MicroLogix 1400 PLC. It is developed with extensive manual reverse engineering effort of the underlying proprietary network protocol and the binary control logic. Unfortunately, Laddis is not scalable and requires similar efforts to extend on other engineering software/PLCs. The proposed solution, Similo, is based on the observation that engineering software of different vendors are equipped with decompilers. Similo is a virtual-PLC framework that integrates the decompilers with their respective (previously-captured) ICS network traffic of control logic. It recovers the binary logic into a high-level source code (of the programming languages defined by IEC 61131-3 standard) automatically. Similo can work with both proprietary/open protocols without requiring protocol specifications and the binary formats of control logic. Thus, it is scalable to different ICS vendors. We evaluate Similo on three PLCs of two ICS vendors, i.e. MicroLogix 1400, MicroLogix 1100, and Modicon M221. These PLCs support proprietary protocols and the control logics written in two programming languages: Ladder Logic and Instruction List. The evaluation results show that Similo can accurately reconstruct a control logic from an ICS network traffic and can be used to investigate the DEO attacks effectively.

Ali qasim, Syed↗

Telemetry Computer System at Wallops Flight Center

This paper describes the Telemetry Computer System in operation at NASA's Wallops Flight Center for real-time or off-line processing, storage, and display of telemetry data from rockets and aircraft. The system accepts one or two PCM data streams and one FM multiplex, converting each type of data into computer format and merging time-of-day information. A data compressor merges the active streams, and removes redundant data if desired. Dual minicomputers process data for display, while storing information on computer tape for further processing. Real-time displays are located at the station, at the rocket launch control center, and in the aircraft control tower. The system is set up and run by standard telemetry software under control of engineers and technicians. Expansion capability is built into the system to take care of possible future requirements.

Bell, H.↗

TASAR Flight Trial 2: Assessment of Air Traffic Controller Acceptability of TASAR Requests

In support of the Flight Trial (FT-2) of NASA's prototype of the Traffic Aware Strategic Aircrew Requests (TASAR) concept, observations were conducted at the air traffic facilities to identify and assess the main factors that affect the acceptability of pilot requests by air traffic controllers. Two observers shadowed air traffic controllers at the Atlanta (ZTL) and Jacksonville (ZJX) air traffic control centers as the test flight pilot made pre-scripted requests to invoke acceptability issues and then they interviewed the observed and other controllers voluntarily. Fifty controllers were interviewed with experience ranging from one to thirty-five years. All interviewed controllers were enthusiastic about the technology and accounting for sector boundaries in pilot requests, particularly if pilots can be made aware of high workload situations. All interviewed controllers accept more than fifty percent of pilot requests; forty percent of them reject less than ten percent of requests. The most common reason for rejecting requests is conflicting with traffic followed by violating letters of agreement (LOAs) and negatively impacting neighboring sector workload, major arrival and departure flows and flow restrictions. Thirty-six requests were made during the test, eight of which were rejected due to: the aircraft already handed off to another sector, violating LOA, opposing traffic, intruding into an active special use airspace (SUA), intruding into another center, weather, and unfamiliarity with the requested waypoint. Nine requests were accepted with delay mostly because the controller needed to locate unfamiliar waypoints or to coordinate with other controllers.

Idris, Husni↗

Development of a Space Station Operations Management System

To enhance the productivity of operations aboard the Space Station, a means must be provided to augment, and frequently to supplant, human effort in support of mission operations and management, both on the ground and onboard. The Operations Management System (OMS), under development at the Johnson Space Center, is one such means. OMS comprises the tools and procedures to facilitate automation of station monitoring, control, and mission planning tasks. OMS mechanizes, and hence rationalizes, execution of tasks traditionally performed by mission planners, the mission control center team, onboard System Management software, and the flight crew.

Brandli, A. E.↗

Reducing the cognitive workload: Trouble managing power systems

The complexity of space-based systems makes monitoring them and diagnosing their faults taxing for human beings. Mission control operators are well-trained experts but they can not afford to have their attention diverted by extraneous information. During normal operating conditions monitoring the status of the components of a complex system alone is a big task. When a problem arises, immediate attention and quick resolution is mandatory. To aid humans in these endeavors we have developed an automated advisory system. Our advisory expert system, Trouble, incorporates the knowledge of the power system designers for Space Station Freedom. Trouble is designed to be a ground-based advisor for the mission controllers in the Control Center Complex at Johnson Space Center (JSC). It has been developed at NASA Lewis Research Center (LeRC) and tested in conjunction with prototype flight hardware contained in the Power Management and Distribution testbed and the Engineering Support Center, ESC, at LeRC. Our work will culminate with the adoption of these techniques by the mission controllers at JSC. This paper elucidates how we have captured power system failure knowledge, how we have built and tested our expert system, and what we believe are its potential uses.

Manner, David B.↗

Reducing the cognitive workload - Trouble managing power systems

The complexity of space-based systems makes monitoring them and diagnosing their faults taxing for human beings. When a problem arises, immediate attention and quick resolution is mandatory. To aid humans in these endeavors we have developed an automated advisory system. Our advisory expert system, Trouble, incorporates the knowledge of the power system designers for Space Station Freedom. Trouble is designed to be a ground-based advisor for the mission controllers in the Control Center Complex at Johnson Space Center (JSC). It has been developed at NASA Lewis Research Center (LeRC) and tested in conjunction with prototype flight hardware contained in the Power Management and Distribution testbed and the Engineering Support Center, ESC, at LeRC. Our work will culminate with the adoption of these techniques by the mission controllers at JSC. This paper elucidates how we have captured power system failure knowledge, how we have built and tested our expert system, and what we believe its potential uses are.

Manner, David B.↗