Relativistic Heavy Ion Collider spin flipper commissioning plan

The commissioning of the RHIC spin flipper in the RHIC Blue ring during the RHIC polarized proton run in 2009 showed the detrimental effects of global vertical coherent betatron oscillation induced by the 2-AC dipole plus 4-DC dipole configuration. This global orbital coherent oscillation of the RHIC beam in the Blue ring in the presence of collision modulated the beam-beam interaction between the two RHIC beams and affected Yellow beam lifetime. The experimental data at injection with different spin tunes by changing the snake current also demonstrated that it was not possible to induce a single isolated spin resonance with the global vertical coherent betatron oscillation excited by the two AC dipoles. Hence, RHIC spin flipper was re-designed to eliminate the coherent vertical betatron oscillation outside the spin flipper by adding three additional AC dipoles. This paper presents the experimental results as well as the new design.

43 PARTICLE ACCELERATORS↗

First beam commissioning at BNL ERL SRF Gun

The 704 MHz SRF gun successfully generated the first photoemission beam in November of 2014. The configurations of the test and the sub-systems are described.The latest results of SRF commissioning, including the cavity performance, cathode QE measurements, beam current/energy measurements, are presented in the paper.

43 PARTICLE ACCELERATORS↗

Commissioning and Operation of 12 GeV CEBAF

The Continuous Electron Beam Accelerator Facility (CEBAF) located at the Thomas Jefferson National Accelerator Laboratory (JLab) has been recently upgraded to deliver continuous electron beams to the experimental users at a maximum energy of 12 GeV, three times the original design energy of 4 GeV. This paper will present an overview of the upgrade, referred to as the 12GeV upgrade, and highlights from recent beam commissioning results.

43 PARTICLE ACCELERATORS↗

Commissioning of the 123 MeV injector for 12 GeV CEBAF

The upgrade of CEBAF to 12GeV included modifications to the injector portion of the accelerator. These changes included the doubling of the injection energy and relocation of the final transport elements to accommodate changes in the CEBAF recirculation arcs. This paper will describe the design changes and the modelling of the new 12GeV CEBAF injector. Stray magnetic fields have been a known issue for the 6 GeV CEBAF injector, the results of modelling the new 12GeV injector and the resulting changes implemented to mitigate this issue are described in this paper. The results of beam commissioning of the injector are also presented.

43 PARTICLE ACCELERATORS↗

Testing and Commissioning of a Multifunctional Tool for the Dismantling of the Activated Internals of the KNK Reactor Shaft - 13524

The Compact Sodium Cooled Reactor Facility Karlsruhe (KNK), a prototype reactor to demonstrate the Fast Breeder Reactor Technology in Germany, was in operation from 1971 to 1991. The dismantling activities started in 1991. The project aim is the green field in 2020. Most of the reactor internals as well as the primary and secondary cooling loops are already dismantled. The total contaminated sodium inventory has already been disposed of. Only the high activated reactor vessel shielding structures are remaining. Due to the high dose rates these structures must be dismantled remotely. For the dismantling of the primary shielding of the reactor vessel, 12 stacked cast iron blocks with a total mass of 90 Mg and single masses up to 15.5 Mg, a remote-controlled multifunctional dismantling device (HWZ) was designed, manufactured and tested in a mock-up. After successful approval of the test sequences by the authorities, the HWZ was implemented into the reactor building containment for final assembling of the auxiliary equipment and subsequent hot commissioning in 2012. Dismantling of the primary shielding blocks is scheduled for early 2013. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Commissioning and Operation of a Robotic Arm for Waste Retrieval at Trawsfynydd NPP, North Wales - 12091

Trawsfynydd is one of the UK's first generation Magnox nuclear power plants. It started operation in 1965 and ceased generation in 1991. Before the site can enter the 'care and maintenance' phase a number of wet and dry waste stores around the site must be emptied and their contents made safe. Wet wastes include sludges and resins produced during the operating life of the NPP. The sludges and resins are stored in a number of different tanks that vary significantly in terms of size, shape, internal features and access. A dexterous long reach manipulator arm has been designed and built to facilitate tank clearance. Commissioning of the arm was carried out in parallel with Factory Acceptance Testing (FAT) at the manufacturer's site in Colorado, USA. In addition to basic functional testing this work included a full range of task based testing to ensure that the arm, tools, control system and support equipment were thoroughly exercised in representative conditions. Trawsfynydd is one of the lead sites in the UK's program for nuclear plant decommissioning. As such the lessons learned, both in terms of technology and process, will be applicable across the remainder of the fleet. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Design, Construction, and Commissioning of the RH LLW Disposal Facility at INL - 19445

The newly-commissioned Remote-Handled Low-Level Waste (RH LLW) Disposal Facility at Idaho National Laboratory (INL) provides permanent disposal capability critical for continuing INL nuclear research and Naval Reactors missions at the Idaho site. The facility mission need [critical decision (CD)- 0] was approved in 2009. Alternative selection (CD-1) was finalized in 2011. The project performance baseline (CD-2/3) was approved and design was initiated in 2014 and construction began in 2015. Construction was completed and transitioned to Materials and Fuels Complex (MFC) Operations in 2017. The facility successfully achieved readiness with authorization to begin operations (CD-4) in 2018. The $77 M line-item capital-acquisition project was completed six months ahead of the congressional commitment date and significantly under budget. This paper presents highlights of the RH LLW Disposal Facility project delivery and a summary of facility features and critical characteristics. Highlights include: - As a hazard category II nuclear facility, the project complied with United States Department of Energy (DOE) requirements for incorporation of nuclear safety into facility design and construction as identified in DOE-STD-1189 as well as 10 CFR 835 Subpart K requirements for incorporation of ALARA principles in facility design. - From an environmental compliance perspective, the facility was subject to National Environmental Policy Act requirements resulting in a Finding of No Significant Impact as determined by an Environmental Assessment. An operating disposal authorization statement from the Low-Level Waste Disposal Facility Federal Review Group (LFRG) authorizing waste disposal operations in accordance with DOE Order 435.1 was obtained. - The project was delivered using a design-build delivery method with a firm-fixed price with incentive fee contracting mechanism. The project was executed as a line-item capital-acquisition project, in full compliance with DOE Order 413.3B under INL's certified Earned Value Management System (EVMS) program. - The facility supports twenty years of waste disposal operations with five disposal vault configurations in four vault arrays supporting six different cask/canister system configurations. Three of the six cask/canister systems currently exist and three will be developed to support future operations. There are a total of 446 waste disposal vaults that will accommodate disposal of a total of 939 stainless steel radioactive waste canisters. The facility is designed to accommodate canisters with contact radiation dose rates as high as 600 Sievert/hour (60,000 Rem/hour). - The facility underwent a rigorous readiness review process in accordance with DOE Order 425.1D. Readiness activities included rigorous facility testing and shakedown activities, a management-self assessment, a contractor operational readiness review, and a DOE operational readiness review. Readiness was demonstrated for an existing cask/canister system (the MFC HFEF-5 cask). Separate readiness activities will be conducted for each cask/canister system as they are brought online for facility operations. INL's successful delivery of the project has provided waste disposal capability to ensure long-term viability of planned and current facilities and missions associated with both INL and the Naval Reactors Facility. Successful execution of the project has proven to be strategically important to future capital investments in capabilities necessary to advance INL's mission. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Safety software release options to support plant start-up and commissioning activities - 285

The schedule demands on new nuclear power plant site testing and commissioning programs challenge the plant's Instrumentation and Control (I and C) supplier's ability to provide certified safety software releases to meet the needs of these programs. This paper outlines the typical certified safety software development and certification process which follows a Waterfall software life-cycle model. The conflicts that result between supporting the site program and the safety software supplier's internal certification program are identified. An adapted 'functional' safety release process is presented that supports the site program's needs for software changes and in parallel enables the safety software certification process to proceed. Comparisons between the two safety software release processes are examined and the benefits realized through the use of the adapted 'functional' safety software release process are discussed. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

THE EMMA COMMISSIONING PROCEDURE

The author begins with a brief review of the goals of the EMMA experiment. He then describe two stages of EMMA commissioning. The first stage is simply to get the beam to circulate a full turn in the ring, and is done only once during the course of the experiment. The second stage will be repeated several times, at least once for each lattice configuration, and involves two parts: setting the required values for the machine parameters, and determining the tunes and time of flight as a function of energy.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Installation and Commissioning Automated Demand Response Systems

Demand Response (DR) can be defined as actions taken to reduce electric loads when contingencies, such as emergencies and congestion, occur that threaten supply-demand balance, or market conditions raise supply costs. California utilities have offered price and reliability DR based programs to customers to help reduce electric peak demand. The lack of knowledge about the DR programs and how to develop and implement DR control strategies is a barrier to participation in DR programs, as is the lack of automation of DR systems. Most DR activities are manual and require people to first receive notifications, and then act on the information to execute DR strategies. Levels of automation in DR can be defined as follows. Manual Demand Response involves a labor-intensive approach such as manually turning off or changing comfort set points at each equipment switch or controller. Semi-Automated Demand Response involves a pre-programmed demand response strategy initiated by a person via centralized control system. Fully-Automated Demand Response does not involve human intervention, but is initiated at a home, building, or facility through receipt of an external communications signal. The receipt of the external signal initiates pre-programmed demand response strategies. We refer to this as Auto-DR (Piette et. al. 2005). Auto-DR for commercial and industrial facilities can be defined as fully automated DR initiated by a signal from a utility or other appropriate entity and that provides fully-automated connectivity to customer end-use control strategies. One important concept in Auto-DR is that a homeowner or facility manager should be able to 'opt out' or 'override' a DR event if the event comes at time when the reduction in end-use services is not desirable. Therefore, Auto-DR is not handing over total control of the equipment or the facility to the utility but simply allowing the utility to pass on grid related information which then triggers facility defined and programmed strategies if convenient to the facility. From 2003 through 2006 Lawrence Berkeley National Laboratory (LBNL) and the Demand Response Research Center (DRRC) developed and tested a series of demand response automation communications technologies known as Automated Demand Response (Auto-DR). In 2007, LBNL worked with three investor-owned utilities to commercialize and implement Auto-DR programs in their territories. This paper summarizes the history of technology development for Auto-DR, and describes the DR technologies and control strategies utilized at many of the facilities. It outlines early experience in commercializing Auto-DR systems within PG&E DR programs, including the steps to configure the automation technology. The paper also describes the DR sheds derived using three different baseline methodologies. Emphasis is given to the lessons learned from installation and commissioning of Auto-DR systems, with a detailed description of the technical coordination roles and responsibilities, and costs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Commissioning of the ATLAS pixel detector

The ATLAS pixel detector is a high precision silicon tracking device located closest to the LHC interaction point. It belongs to the first generation of its kind in a hadron collider experiment. It will provide crucial pattern recognition information and will largely determine the ability of ATLAS to precisely track particle trajectories and find secondary vertices. It was the last detector to be installed in ATLAS in June 2007, has been fully connected and tested in-situ during spring and summer 2008, and is ready for the imminent LHC turn-on. The highlights of the past and future commissioning activities of the ATLAS pixel system are presented.

79 ASTRONOMY AND ASTROPHYSICS↗

Commissioning of the Electron Line of the Linac Coherent Light Source. Dose Rate Measurements and Simulations

The Linac Coherent Light Source at the SLAC National Accelerator Laboratory (operated by Stanford University for the US Department of Energy) is the world's first hard X-ray Free Electron Laser machine. It uses high energy electrons delivered by a linac to create ultrafast and brilliant X-ray pulses that can be used as a 'high-speed' camera to obtain images of atoms and molecules. LCLS is a pioneer machine and, as such, its design has encountered unprecedented challenges, the solutions to which will benefit future facilities of its kind across the globe. This article describes the radiation protection aspects of LCLS electron beamlines. Special emphasis is put on the successful commissioning of the LCLS electron line, where, for all examined loss sources, the measured prompt and residual dose rates are in agreement with or below the values predicted through detailed Monte Carlo simulations, used earlier to design the shielding.

43 PARTICLE ACCELERATORS↗

Commissioning Results of the Upgraded Neutralized Drift Compression Experiment

Recent changes to the NDCX beamline offer the promise of higher charge compressed bunches (>15nC), with correspondingly large intensities (>500kW/cm2), delivered to the target plane for ion-beam driven warm dense matter experiments. We report on commissioning results of the upgraded NDCX beamline that includes a new induction bunching module with approximately twice the volt-seconds and greater tuning flexibility, combined with a longer neutralized drift compression channel.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Machine Studies During Beam Commissioning of the SPS-to-LHC Transfer Lines

Through May to September 2008, further beam commissioning of the SPS-to-LHC transfer lines was performed. For the first time, optics and dispersion measurements were also taken in the last part of the lines, and into the LHC. Extensive trajectory and optics studies were conducted, in parallel with hardware checks. In particular dispersion measurements and their comparison with the beam line model were analysed in detail and led to propose the addition of a dispersion-free steering algorithm in the existing trajectory correction program. Its effectiveness was simulated and is briefly discussed.

43 PARTICLE ACCELERATORS↗

Beam commissioning of the RFQ for the RHIC-EBIS project

Beam commissioning of a new 4 rod RFQ has started at Brookhaven National Laboratory (BNL). The RFQ will accelerate intense heavy ion beams provided by an Electron Beam ion Source (EBIS) up to 300 keV/u. The RFQ will accelerate a range of Q/M from 1 to 1/6, and the accelerated beam will be finally delivered to the Relativistic Heavy Ion Collider (RHIC) and NASA Space Radiation Laboratory (NSRL). The first beam was successfully accelerated and the bunch structures of He{sup +} and Cu{sup 10+} beams were measured. The further beam tests are in progress.

43 PARTICLE ACCELERATORS↗

RHIC Spin Flipper Commissioning Status

The commissioning of the RHIC spin flipper in the RHIC Blue ring during the RHIC polarized proton run in 2009 showed the detrimental effects of global vertical coherent betatron oscillation induced by the 2-AC dipole plus 4-DC dipole configuration. This global orbital coherent oscillation of the RHIC beam in the Blue ring in the presence of collision modulated the beam-beam interaction between the two RHIC beams and affected Yellow beam polarization. The experimental data at injection with different spin tunes by changing the snake current also demonstrated that it was not possible to induce a single isolated spin resonance with the global vertical coherent betatron oscillation excited by the two AC dipoles. Hence, a new design was proposed to eliminate the coherent vertical betatron oscillation outside the spin flipper by adding three additional AC dipoles. This paper presents the experimental results as well as the new design.

43 PARTICLE ACCELERATORS↗