Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “BUDGET AND FUNDING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

Full Life-Cycle Defect Management Assessment: Initial Inspection Data Collection Results and Research Questions for Further Study

It is often the case in software projects that when schedule and budget resources are limited, the Verification and Validation (V&V) activities suffer. Fewer V&V activities can be afforded and moreover, short-term challenges can result in V&V activities being scaled back or dropped altogether. As a result, too often the default solution is to save activities for improving software quality until too late in the life-cycle, relying on late-term code inspections followed by thorough testing activities to reduce defect counts to acceptable levels. As many project managers realize, however, this is a resource-intensive way of achieving the required quality for software. The Full Life-cycle Defect Management Assessment Initiative, funded by NASA s Office of Safety and Mission Assurance under the Software Assurance Research Program, aims to address these problems by: Improving the effectiveness of early life-cycle V&V activities to make their benefits more attractive to team leads. Specifically, we focus on software inspection, a proven method that can be applied to any software work product, long before executable code has been developed; Better communicating this effectiveness to software development teams, along with suggestions for parameters to improve in the future to increase effectiveness; Analyzing the impact of early life-cycle V&V on the effectiveness and cost required for late life-cycle V&V activities, such as testing, in order to make the tradeoffs more apparent. This white paper reports on an initial milestone in this work, the development of a preliminary model of inspection effectiveness across multiple NASA Centers. This model contributes toward reaching our project goals by: Allowing an examination of inspection parameters, across different types of projects and different work products, for an analysis of factors that impact defect detection effectiveness. Allowing a comparison of this NASA-specific model to existing recommendations in the literature regarding how to plan effective inspections. Forming a baseline model which can be extended to incorporate factors describing: the numbers and types of defects that are missed by inspections; how such defects flow downstream through software development phases; how effectively they can be caught by testing activities in the late stages of development. The model has been implemented in a prototype web-enabled decision-support tool which allows developers to enter their inspection data and receive feedback based on a comparison against the model. The tool also allows users to access reusable materials (such as checklists) from projects included in the baseline. Both the tool itself and the model underlying it will continue to be extended throughout the remainder of this initiative. As results of analyzing inspection effectiveness for defect containment are determined, they can be shared via the tool and also via updates to existing training courses on metrics and software inspections. Moreover, the tool will help satisfy key CMMI requirements for the NASA Centers, as it will enable NASA to take a global view across peer review results for various types of projects to identify systemic problems. This analysis can result in continuous improvements to the approach to verification.

Shull, Forrest↗

Measurements of nitric acid, carboxylic acids, and selected aerosol species for the NASA/GTE Pacific Mission - West (PEM-WEST)

The research investigation funded through this grant to the University of New Hampshire was performed during a major field expedition conducted by the NASA Tropospheric Chemistry Program. The NASA Global Tropospheric Experiment (GTE) executed an airborne science mission (PEM-WEST A) aboard the NASA Ames DC-8 over the Pacific Ocean during Sep./Oct. 1981. The atmosphere over the central Pacific Ocean is the only major region in the Northern Hemisphere that is relatively free from direct anthropogenic influence. Thus, this environment is ideally suited to study the natural biogeochemical cycles of carbon, nitrogen, ozone, sulfur, and aerosols without serious confounding problems related to anthropogenic emissions. Asian sources account for about 17 percent of the global budgets of nitrogen oxides (NO(x)) and sulfur dioxide (SO2). The Pacific Rim region therefore provides the opportunity to study the anthropogenic impact on natural atmospheric chemical cycles. The PEM-WEST A flights were focused on contrasting the chemistry of 'clean' air over the central Pacific with anthropogenically impacted air advected off the Asian continent. The principal objectives of PEM-WEST A were to investigate the atmospheric chemistry of ozone (O3) and its precursors, and to study important aspects of the atmospheric sulfur cycle over the western Pacific Ocean. Measurements conducted by the University of New Hampshire contributed directly to both of these objectives. Subsequent PEM-WEST field missions are planned by GTE in the mid-1990's to contrast atmospheric chemistry documented during PEM-WEST A with other time periods. This report presents preliminary findings from the PEM-WEST A field mission. Data interpretation is currently ongoing with the goal of manuscript submission of scientific results to a special issue of the Journal of Geophysical Research-Atmospheres in Feb. 1994. The reader is strongly encouraged to review this suite of profession articles to appreciate the overall scientific findings and benefits of the PEM-WEST A field mission.

Talbot, Robert W.↗

Advanced Manufacturing for Thermal and Environmental Control Systems: Achieving National Energy Goals

This project was part of a regional initiative in the five counties of Central New York (CNY) that received funding from the U.S. Department of Energy (DOE) and four other federal agencies through the 2012 Advanced Manufacturing Jobs and Innovation Accelerator Challenge (AMJIAC). The CNY initiative was focused on cultivating the emergent regional cluster in “Advanced Manufacturing for Thermal and Environmental Control (AM-TEC).” As one component of the CNY AM-TEC initiative, the DOE-funded project supported five research & development seed projects that strategically targeted: 1) needs and opportunities of CNY AM-TEC companies, and 2) the goal of DOE’s Advanced Manufacturing Office (AMO) to reduce energy consumption by 50% across product life-cycles over 10 years. The project also sought to fulfill the AMO mission of developing and demonstrating new, energy-efficient processing and materials technologies at a scale adequate to prove their value to manufacturers and spur investment. The five seed projects demonstrated technologies and processes that can reduce energy intensity and improve production as well as use less energy throughout their lifecycles. The project was conducted over three years in two 18-month budget periods. During the first budget period, two projects proposed in the original AMJAIC application were successfully completed: Seed Project 1 focused on saving energy in heat transfer processes via development of nano structured surfaces to significantly increase heat flux; Seed Project 2 addressed saving energy in data centers via subzero cooling of the computing processors. Also during the first budget period, a process was developed and executed to select a second round of seed projects via a competitive request for proposals from regional companies and university collaborators. Applicants were encouraged to form industry-academic partnerships to leverage experience and resources of public and private sectors in the CNY region. Proposals were evaluated by a national panel of experts. Three projects were selected for awards and were completed successfully during the second budget period: Seed Project 3 focused on enabling self-powered furnaces to permit residents to shelter in place during power outages; Seed Project 4 addressed development of a novel method of controlling air conditioning systems that could enable flexible load matching in market segments not possible with existing technologies; and Seed Project 5 focused on the creation of smarter occupancy sensors to enable effective highly localized demand based ventilation.

30 DIRECT ENERGY CONVERSION↗

Mission Status, On-Orbit Performance, and Lessons Learned of the Global Ecosystem Dynamics Investigation (GEDI) Lidar Laser Transmitters

The Global Ecosystems Dynamics Investigation (GEDI) Lidar, is a global 3-dimensional biomass lidar instrument aboard the International Space Station (ISS) and the Japanese Experiment Module (JEM). Its core mission is to measure the global carbon balance of Earth’s forests with 3 laser transmitters using multi-beam waveform-capture methods. GEDI’s laser transmitter concept was originally funded by NASA Goddard’s Earth Science Technology Office (ESTO) for future Earth Altimetry and Lidar missions ~ 20 years ago, and after a long road of development, the first flight-ready unit was a 10 mJ-class system for GEDI’s ISS-based specifications. Furthermore, no adjustment in drive parameters has been required nor significant decay detected after 4 years of near continuous operation of 3 on-board lasers, which were designed for a 2-year mission. We report on the GEDI laser design process, their on-orbit performance, the major lessons learned, and some critical insight into our in-house flight quality development process that enabled their delivery within budget, schedule, and low risk extended mission life capability.

D. Barry Coyle↗

A Proposed Approach for Prioritizing Maintenance at NASA Centers

The National Aeronautics and Space Administration (NASA) manages a vast array of infrastructure assets across ten National Centers with a worth of at least 30 billion dollars. Eighty percent of this infrastructure is greater than 40 years old and is in degraded condition. Maintenance budgets are typically less than one percent of current replacement value (CRV), much less than the 2-4% recommended by the National Research Council. The maintenance backlog was 2.55 billion dollars in FY10 and growing. NASA s annual budgets have flattened and are at risk of being reduced, so the problem is becoming even more difficult. NASA Centers utilize various means to prioritize and accomplish maintenance within available budgets, though data is suspect and processes are variable. This paper offers a structured means to prioritize maintenance based on mission criticality and facility performance (ability of the facility to deliver on its purpose). Mission alignment is assessed using the current timeframe Mission Dependence Index and a measure of facility alignment with the 2011 NASA Strategic Plan for the long-term perspective. Facility performance is assessed by combining specific findings from a structured facility condition assessment and an assessment of actual functional output. These are then combined in a matrix to identify the facilities most critical to mission and able to deliver services. The purpose of this approach is to provide the best benefits for the available funding. Additionally, this rationale can also be applied to the prioritization of investment (recapitalization) projects so that the ultimate customers of this paper, the senior infrastructure managers at each NASA Center, are better able to strategically manage their capabilities.

Dunn, Steven C.↗

Laboratory Directed Research and Development Program Activities for FY 2007.

Brookhaven National Laboratory (BNL) is a multidisciplinary laboratory that carries out basic and applied research in the physical, biomedical, and environmental sciences, and in selected energy technologies. It is managed by Brookhaven Science Associates, LLC, (BSA) under contract with the U. S. Department of Energy (DOE). BNL's Fiscal year 2007 budget was $515 million. There are about 2,600 employees, and another 4,500 guest scientists and students who come each year to use the Laboratory's facilities and work with the staff. The BNL Laboratory Directed Research and Development (LDRD) Program reports its status to the U.S. Department of Energy (DOE) annually in March, as required by DOE Order 413.2B, 'Laboratory Directed Research and Development', April 19, 2006, and the Roles, Responsibilities, and Guidelines for Laboratory Directed Research and Development at the Department of Energy/National Nuclear Security Administration Laboratories dated June 13, 2006. In accordance this is our Annual Report in which we describe the Purpose, Approach, Technical Progress and Results, and Specific Accomplishments of all LDRD projects that received funding during Fiscal Year 2007. The goals and objectives of BNL's LDRD Program can be inferred from the Program's stated purposes. These are to (1) encourage and support the development of new ideas and technology, (2) promote the early exploration and exploitation of creative and innovative concepts, and (3) develop new 'fundable' R&D projects and programs. The emphasis is clearly articulated by BNL to be on supporting exploratory research 'which could lead to new programs, projects, and directions' for the Laboratory. We explicitly indicate that research conducted under the LDRD Program should be highly innovative, and an element of high risk as to success is acceptable. In the solicitation for new proposals for Fiscal Year 2007 we especially requested innovative new projects in support of RHIC and the Light Source and any of the Strategic Initiatives listed at the LDRD web site. These included support for NSLS-II, RHIC evolving to a quantum chromo dynamics (QCD) lab, nanoscience, translational and biomedical neuroimaging, energy and, computational sciences. As one of the premier scientific laboratories of the DOE, BNL must continuously foster groundbreaking scientific research. At Brookhaven National Laboratory one such method is through its LDRD Program. This discretionary research and development tool is critical in maintaining the scientific excellence and long-term vitality of the Laboratory. Additionally, it is a means to stimulate the scientific community and foster new science and technology ideas, which becomes a major factor in achieving and maintaining staff excellence and a means to address national needs within the overall mission of the DOE and BNL.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Hardware Development Process for Human Research Facility Applications

The simple goal of the Human Research Facility (HRF) is to conduct human research experiments on the International Space Station (ISS) astronauts during long-duration missions. This is accomplished by providing integration and operation of the necessary hardware and software capabilities. A typical hardware development flow consists of five stages: functional inputs and requirements definition, market research, design life cycle through hardware delivery, crew training, and mission support. The purpose of this presentation is to guide the audience through the early hardware development process: requirement definition through selecting a development path. Specific HRF equipment is used to illustrate the hardware development paths. The source of hardware requirements is the science community and HRF program. The HRF Science Working Group, consisting of SCientists from various medical disciplines, defined a basic set of equipment with functional requirements. This established the performance requirements of the hardware. HRF program requirements focus on making the hardware safe and operational in a space environment. This includes structural, thermal, human factors, and material requirements. Science and HRF program requirements are defined in a hardware requirements document which includes verification methods. Once the hardware is fabricated, requirements are verified by inspection, test, analysis, or demonstration. All data is compiled and reviewed to certify the hardware for flight. Obviously, the basis for all hardware development activities is requirement definition. Full and complete requirement definition is ideal prior to initiating the hardware development. However, this is generally not the case, but the hardware team typically has functional inputs as a guide. The first step is for engineers to conduct market research based on the functional inputs provided by scientists. CommerCially available products are evaluated against the science requirements as well as modifications needed to meet program requirements. Options are consolidated and the hardware development team reaches a hardware development decision point. Within budget and schedule constraints, the team must decide whether or not to complete the hardware as an in-house, subcontract with vendor, or commercial-off-the-shelf (COTS) development. An in-house development indicates NASA personnel or a contractor builds the hardware at a NASA site. A subcontract development is completed off-site by a commercial company. A COTS item is a vendor product available by ordering a specific part number. The team evaluates the pros and cons of each development path. For example, in-bouse developments utilize existing corporate knowledge regarding bow to build equipment for use in space. However, technical expertise would be required to fully understand the medical equipment capabilities, such as for an ultrasound system. It may require additional time and funding to gain the expertise that commercially exists. The major benefit of subcontracting a hardware development is the product is delivered as an end-item and commercial expertise is utilized. On the other hand, NASA has limited control over schedule delays. The final option of COTS or modified COTS equipment is a compromise between in-house and subcontracts. A vendor product may exist that meets all functional requirements but req uires in-house modifications for successful operation in a space environment. The HRF utilizes equipment developed using all of the paths described: inhouse, subcontract, and modified COTS.

Bauer, Liz↗

Evolution of the Florida Launch Site Architecture: Embracing Multiple Customers, Enhancing Launch Opportunities

The impending conclusion of the Space Shuttle Program and the Constellation Program cancellation unveiled in the FY2011 President's budget created a large void for human spaceflight capability and specifically launch activity from the Florida launch Site (FlS). This void created an opportunity to re-architect the launch site to be more accommodating to the future NASA heavy lift and commercial space industry. The goal is to evolve the heritage capabilities into a more affordable and flexible launch complex. This case study will discuss the FlS architecture evolution from the trade studies to select primary launch site locations for future customers, to improving infrastructure; promoting environmental remediation/compliance; improving offline processing, manufacturing, & recovery; developing range interface and control services with the US Air Force, and developing modernization efforts for the launch Pad, Vehicle Assembly Building, Mobile launcher, and supporting infrastructure. The architecture studies will steer how to best invest limited modernization funding from initiatives like the 21 st elSe and other potential funding.

Colloredo, Scott↗

Bob Wilson and The Birth of Fermilab

In the 1960’s the Lawrence Berkeley Laboratory (then The Lawrence Radiation Laboratory) submitted two proposals to build the next high energy physics research laboratory. The first included a 200 GeV accelerator and associated experimental facilities. The cost was $350 million. The Bureau of the Budget rejected that proposal as a “budget buster”. It ruled that $250 million was the maximum that could be accepted. The second proposal was for a reduced scope laboratory that met the Bureau of the Budget’s cost limitation, but it was for a lower energy accelerator and somewhat smaller and fewer experimental facilities. The powerful Congressional Joint Committee on Atomic Energy rejected the reduced scope proposal as inadequate to provide physics results of sufficient interest to justify the cost. It was then that Bob Wilson came forth with a third proposal, coping with that “Catch 22” and leading to the creation of Fermilab. How he did it will be the subject of this colloquium.

99 GENERAL AND MISCELLANEOUS↗

Regal Beloit Final Technical Report

The original project proposal submitted from NovaTorque Inc (NovaTorque) in 2016 was to improve the existing motor with 95% efficiency by reducing the losses by 21% to achieve 96%. A few months after the proposal was submitted, NovaTorque lost funding and went out of business. The assets of NovaTorque were then acquired by Regal Beloit Corporation (“Regal Beloit” or “Regal”). When the NovaTorque proposal was selected, the project was transferred to Regal Beloit. Once we had production samples from the new Regal production line, they were tested at the Regal Beloit test lab in Wausau, WI. The original NovaTorque motor had an efficiency of 95%, but when the technology was transferred to Regal Beloit, there were multiple manufacturing improvements made, even though the basic electromagnetic design did not change. The test results in Wausau showed that the motors made at the Regal Beloit plant had an efficiency of 96%. Since the goal of the project was to reduce the losses by 21%, a new efficiency target of 96.8% became the project objective. In the first budget period, motors were tested to get the baseline performance. We then used FEA modeling with ANSYS Maxwell to model the existing motor to get correlation between the FEA simulations and the actual test results. Once the model was validated, we evaluated some changes that could be made to the stator to reduce the losses and improve efficiency without changing the rotor or stator housing, keeping the modifications easy to implement. The changes were primarily in the area of making the stator axially shorter and adding Soft Magnetic Composite (SMC) tooth tips. In the second budget period, we proceeded to design and build the new stator that was identified above and identified additional improvements in the process that included a stator machining modification and the use of rectangular wire. When we actually built the motor, the choice of rectangular wire turned out to be a problem. The wire was made by squishing round wire to get the rectangular shape, which caused work hardening, making the wire too stiff to make the desired coils. We shifted to annealed square wire which was better, but we still could not maintain the proper coil envelope. The result was that we had reduced cross section area for stator laminations. We also had to have a radial offset resulting in a radial misalignment between the stator and rotor because of the oversized coils. After the motor was completed, it was shipped to Texas A&M University for testing. With the loss of flux from these issues, the measured motor efficiency was only 96.3%. The primary focus of this motor was to make sure our FEA simulation model predicted the measured losses and overall efficiency, this we moved on to the FEA simulation. The FEA simulations of the motor “as built” with misalignments had good correlation with the test results, so the next step was to use that model to optimize the design of the motor for a final build. This time we considered changes to the stator and rotor and also minor changes to the housing diameter. In the third budget period, we did the detailed design and construction of the final prototypes. The final prototypes had a slight increase in the stator diameter to fit in a standard Regal Beloit housing. We shortened the stator and use more layers of wire in the coils. We also increased the cone angle of the rotor and stator from the original 110 degrees to 130 degrees to get some additional efficiency and optimized the stator cross section. The predicted efficiency from the FEA simulations was 96.9%. When completed, the motors were tested. We were a little short of reaching our target efficiency goal of 96.8%. We were only able to get to 96.7% efficiency. While it may be possible with additional iterations in designs and future builds to gain that additional 0.1%, we believe that we are close to the best we can achieve from a practical viewpoint, and additional iterations would be more work than the potential gains would be worth. No other motor in this class can even reach the 96% that we started with.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Underestimation of Project Costs

Large projects almost always exceed their budgets. Estimating cost is difficult and estimated costs are usually too low. Three different reasons are suggested: bad luck, overoptimism, and deliberate underestimation. Project management can usually point to project difficulty and complexity, technical uncertainty, stakeholder conflicts, scope changes, unforeseen events, and other not really unpredictable bad luck. Project planning is usually over-optimistic, so the likelihood and impact of bad luck is systematically underestimated. Project plans reflect optimism and hope for success in a supposedly unique new effort rather than rational expectations based on historical data. Past project problems are claimed to be irrelevant because "This time it's different." Some bad luck is inevitable and reasonable optimism is understandable, but deliberate deception must be condemned. In a competitive environment, project planners and advocates often deliberately underestimate costs to help gain project approval and funding. Project benefits, cost savings, and probability of success are exaggerated and key risks ignored. Project advocates have incentives to distort information and conceal difficulties from project approvers. One naively suggested cure is more openness, honesty, and group adherence to shared overall goals. A more realistic alternative is threatening overrun projects with cancellation. Neither approach seems to solve the problem. A better method to avoid the delusions of over-optimism and the deceptions of biased advocacy is to base the project cost estimate on the actual costs of a large group of similar projects. Over optimism and deception can continue beyond the planning phase and into project execution. Hard milestones based on verified tests and demonstrations can provide a reality check.

Cost estimation↗

Inspector General Semiannual Report to Congress - October 1, 2008 - March 31, 2009

On behalf of the Department of Energy's Office of Inspector General, I am pleased to submit our Semiannual Report to Congress for the period ending March 31, 2009. The Report highlights key accomplishments of the Office of Inspector General, particularly pertaining to our efforts to ensure the economy, efficiency, and effectiveness of Department of Energy operations. Details pertaining to some of our most significant reviews and projects are presented in the Report. This reporting period has been quite eventful. On February 17, 2009, the President signed the American Recovery and Reinvestment Act of 2009. The stated intent of this new legislation is to strengthen the U.S. economy through the creation of new jobs, aiding State and local governments with budget shortfalls, cutting taxes for working families, and investing in the long-term health of the Nation's economic prosperity. The Recovery Act establishes the status of the Nation's energy supply as a prime focus. Specifically, the Department of Energy will receive approximately $40 billion for various energy, environmental, and science programs and initiatives. The passage of this legislation makes the coming months an exciting and transformative time for the Department of Energy and the Office of Inspector General. In recognition of the need for effective oversight to protect taxpayer interests, the Recovery Act includes the creation of the Recovery Act Accountability and Transparency Board and mandates specific actions by the Inspectors General. I will be a permanent member of this newly created Board, along with nine other Inspectors General whose agencies are significant recipients of Recovery Act funds. Since the passage of the legislation, my office has developed a strategy consistent with the objectives outlined in the Recovery Act. The overarching goal of the strategy is to ensure that the taxpayers interests relating to the performance and results of the Recovery Act are protected. During this reporting period, my office issued two reports pertaining to the Recovery Act. In our first report entitled, 'The American Recovery and Reinvestment Act at the Department of Energy', we identified 'lessons learned' based on prior work with the intention of providing the Department with a resource as it moves forward with its Recovery Act-related efforts. Secondly, we recently issued a report entitled, 'The Department of Energy's Acquisition Workforce and its Impact on Implementation of the American Recovery and Reinvestment Act of 2009', which describes the current status of the Department's acquisition workforce, positive actions that have already been taken, and the challenges that remain in light of the impact of the Recovery Act. Additionally, although not initiated as a Recovery Act report, shortly after the passage of the legislation, we issued a related report entitled, 'The Department of Energy's Loan Guarantee Program for Innovative Energy Technologies', in which we evaluated the Department's progress in establishing internal and operational controls over the program. Further, we have conducted nearly 40 fraud awareness briefings to nearly 2,000 Department and contractor officials. While such briefings are a routine part of our work, these particular briefings were specifically designed to heighten awareness of the vulnerabilities, risks, and potential fraud schemes related to the Recovery Act. The work of safeguarding public resources and the public trust is a collaborative effort that stretches across government, including agency management and the Congress. Much work has been done, but more remains and we look forward to the coming challenges.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Retro-Commissioning Sensor Suitcase

This software package is the Graphic User Interface (GUI) software component for the Sensor Suitcase Retro-Commissioning project, which is a sensor and analysis system to support monitoring-based retro-commissioning of small commercial buildings, performed by non-experts. Small commercial buildings typically do not have the budgets or business economics to allow investing in energy efficiency enhancements the building retro-commissioning provides. In addition, they do not have in-house staff with expertise in building systems who can perform building retro-commissioning or identify energy efficiency improvement opportunities. The solution to this problem is to develop a turn-key hardware/software solution (the RCx Sensor Suitcase) that can be used by non-experts to automatically generate low and no-cost energy efficiency rec commendations that will improve building operating costs, occupant comfort and building energy performance. This is a joint project between Lawrence Berkeley National Laboratory, leading the development of the software and analysis elements, and Pacific Northwest National Laboratory (PNNL), leading the development of the hardware and sensor elements with an associated table-based configuration support tool. The project is funded by the U.S. Department of Energy. This software package was developed as a proof-of-concept prototype for the sensor suitcase software component. The software component was developed with a Microsoft Excel spreadsheet which reads the sensor data and calls a MATLAB DLL to analyze the sensor data.

Lin, Guanjing↗

Final Scientific/Technical Report of Gas Hydrate Dynamics on the Alaskan Beaufort Continental Slope: Modeling and Field Characterization

Methane Hydrates, a solid form of methane and water, exist at high pressures and low temperatures, occurs on every continental margin on Earth, represents one of the largest reservoirs of carbon on the planet, and, if destabilized, may play an important role in both slope stability and climate change. For decades, researchers have studied methane hydrates with the hope of determining if methane hydrates are destabilizing, and if so, how this destabilization might impact slope stability and ocean/atmosphere carbon budgets. In the past ~5 years, it has become well established that the upper “feather-edge” of methane hydrate stability (intermediate water depths of ~200-500 meters below sea level) represents an important frontier for methane hydrates stability research, as this zone is most susceptible to destabilization due to minor fluctuations in ocean temperature in space and time. The Arctic Ocean—one of the fastest warming regions on Earth—is perhaps the best place to study possible changes to methane hydrate stability due to ocean warming. To address the stability of methane hydrates at intermediate ocean depths, Southern Methodist University in partnership with Oregon State University and The United State Geological Survey at Woods Hole began investigating methane hydrate stability in intermediate water depths below both the US Beaufort Sea and the Atlantic Margin, from 2012-2017. The work was funded by the Department of Energy’s (DOE) National Energy Technology Laboratory (NETL). The key goal of the SMU component of this study was to collect the first ever heat flow data in the Beaufort Sea and compare measured shallow (probe-based1) heat flow values with deeper (BSR-derived2) heat flow values, and from this, determine whether hydrates were in thermal equilibrium. In September 2016, SMU/OSU collected the first ever heat flow measurements in the US Beaufort Sea. Despite poor weather and rough seas, the cruise was a success, with 116 heat flow measurements acquired across the margin, spanning 4 transects separated by more than 400 km. Useable heat flow data exists for 97% (113) of probe heat flow measurements, revealing a clear picture of regional heat flow across the basin. During the past 8 months since the cruise, SMU researchers have processed the heat flow and thermal conductivity measurements and compared results to deeper heat flow estimates obtained from seismic data. The analysis reveals clear, consistent trends: All probe heat flow measurements in depths greater than 800 mbsl are consistent with BSR-derived values; heat flow measurements obtained in water depths between ~250-750 mbsl are systematically lower than those estimated from BSRs; and heat flow estimates in water depths shallower than ~250 mbsl are systematically warmer than deeper estimates. The consistency between shallow (probe) and deep (BSR) heat flow measurements at depths greater than ~750 m where ocean temperature changes are minimal supports the premise that the hydrates consist primarily of methane and represent a valuable tool for estimating heat flow. The anomalous cooling trend observed in the upper 250 m is consistent with expected seasonal effects observed in shallow ocean buoy measurements in the arctic, when cold, less dense melting sea ice cools the upper 200 m of the ocean during the summer as ice melting occurs. The discrepancy in heat flow at intermediate water depths is best explained via recent intermediate ocean temperature warming, where long-term (annual or longer) warming intermediate ocean bottom waters result in an anomalously low heat flow in shallow heat flow measurements. Using the characteristic 1D time-length scale for diffusion, we estimate that ocean temperature warming began no later than ~1200 years ago but arguably much more recently as results are limited by seismic resolution. More importantly, our analysis indicates methane hydrate is destabilizing not only in the upper feather edge (200-500 mbsl) but at depths as great as 750 mbsl. The intermediate ocean warming rate supports previous studies suggesting geologically rapid warming (>0.1 deg C/decade) at intermediate ocean depths in the Beaufort Sea. Assuming no further changes or additional warming, our analysis indicates methane hydrates will destabilize at seafloor depths shallower than 750 mbsl in the Beaufort Sea within the next ~3000 years. 1 Probe outfitted with sensors inserted into the seafloor sediment 2 Bottom-simulating reflector (BSR) seismic data indicates presence of hydrate deposits

58 GEOSCIENCES↗

Energy Efficiency Collaboratives

Collaboratives for energy efficiency have a long and successful history and are currently used, in some form, in more than half of the states. Historically, many state utility commissions have used some form of collaborative group process to resolve complex issues that emerge during a rate proceeding. Rather than debate the issues through the formality of a commission proceeding, disagreeing parties are sent to discuss issues in a less-formal setting and bring back resolutions to the commission. Energy efficiency collaboratives take this concept and apply it specifically to energy efficiency programs—often in anticipation of future issues as opposed to reacting to a present disagreement. Energy efficiency collaboratives can operate long term and can address the full suite of issues associated with designing, implementing, and improving energy efficiency programs. Collaboratives can be useful to gather stakeholder input on changing program budgets and program changes in response to performance or market shifts, as well as to provide continuity while regulators come and go, identify additional energy efficiency opportunities and innovations, assess the role of energy efficiency in new regulatory contexts, and draw on lessons learned and best practices from a diverse group. Details about specific collaboratives in the United States are in the appendix to this guide. Collectively, they demonstrate the value of collaborative stakeholder processes in producing successful energy efficiency programs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Quantitative Risk Management - Risk Informed Decision Making on High-Risk Waste Remediation Projects - 19022

For every $1 billion invested in projects, $97 million is wasted due to poor project performance. That means 9.7% of money spent on projects is wasted due to poor risk and uncertainty management. High-risk projects, similar to those in waste remediation, have the most to lose. A solid quantitative risk management program is one of the keys to increasing the likelihood that a project will succeed. A quantitative risk program solves two major problems that challenge the effective management of risk and uncertainty: 1. Risks arise at all levels of an organization; however, not all organizational levels have an effective way to identify and resolve them. This can lead to risks that, even if identified, are not reported. 2. Decision-makers are often forced to operate solely on intuition when implementing mitigation strategies, not fully understanding the effects that certain decisions have on the program's cost and schedule. A quantitative risk program uses a risk register and builds it into the project/program integrated schedule to assess the impact of these risks, typically at the 80% confidence contingency level for specific milestones and/or project completion. Implementing a quantitative risk program drives a forward-thinking, proactive mentality to problem solving into all levels of the organization. A healthy risk program for regular reporting and communication ensures that all members of an organization are thinking about risks and using their communication channels to resolve them. It gives a method of communication and incentive for all levels in the organization and helps to ensure that risks will be reported and resolved. Pacific Northwest National Laboratory (PNNL) has developed tools and methods that provide a level of realism for analyzing different scenarios and estimating contingency that does not exist in the standard industry risk tool kit. These tools and methods provide decision-makers with actionable, quantitatively based information to guide their decision making. The first tool is a probabilistic branching risk model for mitigation strategies. Current quantitative risk analysis tools in the industry simulate two cases: fully mitigated and un-mitigated. In the fully mitigated case, the user assumes that every planned mitigation activity is successful. In the un-mitigated case, the user assumes that none are successful. The truth lies between these two extremes. The PNNL team has developed a probabilistic risk model for mitigation scenarios that includes a probability that a mitigation activity will succeed and a probability that a mitigation action will be funded. These probabilities are elicited from subject matter experts and ensure that the contingency calculations at the specified confidence are approaching reality. The second tool developed at PNNL is the Risk Box, which is a tool that integrates with different scenarios in the risk register. For example, say the user is faced with two different and mutually exclusive mitigation actions to reduce a risk. The Risk Box methodology performs the contingency calculations and then displays them on a time-phased graph that shows how each scenario reduces the risk contingency needed on the project/program. This graph then provides quantitative information to show decision-makers which mitigation action provides the greatest reduction (cost and schedule) in risk contingency for the program. Implementing these and other tools within a structured risk program increases the likelihood that a project will come in on schedule and budget, ensures that all personnel are proactively thinking about problems and resolutions, creates communication channels for all members to submit and resolve potential problems, produces a prioritized list of risk rankings to focus leadership on issues that may cause the biggest problems, and implements processes that drive updates to the risk program as the risk profile changes. PNNL has been developing these methods and using them on projects for over 20 years. They have been successfully applied on waste management projects, high-tech research and development projects, and construction projects, and they continue to be used on a number of U.S. Department of Energy projects today. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FutureGen 2.0 Oxy-combustion Large Scale Test – Final Report

The primary objectives of the FutureGen 2.0 CO 2 Oxy-Combustion Large Scale Test Project were to site, permit, design, construct, and commission, an oxy-combustion boiler, gas quality control system, air separation unit, and CO 2 compression and purification unit, together with the necessary supporting and interconnection utilities. The project was to demonstrate at commercial scale (168MWe gross) the capability to cleanly produce electricity through coal combustion at a retrofitted, existing coal-fired power plant; thereby, resulting in near-zeroemissions of all commonly regulated air emissions, as well as 90% CO 2 capture in steady-state operations. The project was to be fully integrated in terms of project management, capacity, capabilities, technical scope, cost, and schedule with the companion FutureGen 2.0 CO 2 Pipeline and Storage Project, a separate but complementary project whose objective was to safely transport, permanently store and monitor the CO 2 captured by the Oxy-combustion Power Plant Project. The FutureGen 2.0 Oxy-Combustion Large Scale Test Project successfully achieved all technical objectives inclusive of front-end-engineering and design, and advanced design required to accurately estimate and contract for the construction, commissioning, and start-up of a commercial-scale "ready to build" power plant using oxy-combustion technology, including full integration with the companion CO 2 Pipeline and Storage project. Ultimately the project did not proceed to construction due to insufficient time to complete necessary EPC contract negotiations and commercial financing prior to expiration of federal co-funding, which triggered a DOE decision to closeout its participation in the project. Through the work that was completed, valuable technical, commercial, and programmatic lessons were learned. This project has significantly advanced the development of near-zero emission technology and will be helpful to plotting the course of, and successfully executing future large demonstration projects. This Final Scientific and Technical Report describes the technology and engineering basis of the project, inclusive of process systems, performance, effluents and emissions, and controls. Further, the project cost estimate, schedule, and permitting requirements are presented, along with a project risk and opportunity assessment. Lessons-learned related to these elements are summarized in this report. Companion reports Oxy-combustion further document the accomplishments and learnings of the project, including: A.01 Project Management Report which describes what was done to coordinate the various participants, and to track their performance with regard to schedule and budget B.02 Lessons Learned - Technology Integration, Value Improvements, and Program Management, which describes the innovations and conclusions that we arrived upon during the development of the project, and makes recommendations for improvement of future projects of a similar nature . B.03 Project Economics, which details the capital and operation costs and their basis, and also illustrates the cost of power produced by the plant with certain sensitivities. B.04 Power Plant, Pipeline, and Injection Site Interfaces, which details the interfaces between the two FutureGen projects B.05 Contractual Mechanisms for Design, Construction, and Operation, which describes the major EPC, and Operations Contracts required to execute the project.

54 ENVIRONMENTAL SCIENCES↗

Accelerator Stewardship Test Facility Program - Elliptical Twin Cavity for Accelerator Applications

Funding is being requested pursuant to the proposals entitled Elliptical Twin Cavity for Accelerator Applications that was submitted and reviewed through the Portfolio Analysis and Management System (PAMS). The PAMS proposal identifier number is 0000219731. The proposed new type of superconducting cavity, the Elliptical Twin Cavity, is capable of accelerating or decelerating beams in two separate beam pipes. This configuration is particularly effective for high-current, low energy electron beams that will be used for bunched beam cooling of high-energy protons or ions. Having the accelerated beam physically separated from the decelerated beam, but interacting with the same RF mode, means that the low energy beam from the gun can be injected into to the superconducting cavity without bends enabling a small beam emittance to be maintained. A staff engineer who has been working with non-standard complicated cavity structures replaces the senior engineer (in the original budget) who is moving on to be a project leader. This is reflected in a slightly increased engineer time and in reduced costs. The Indirect costs for FY16 are lower than the previous projection. As a result, there is no scope reduction.

99 GENERAL AND MISCELLANEOUS↗