Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “BEAM LOSS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

A Quest for Measuring Ion Bunch Longitudinal Profiles with One Picosecond Accuracy in the SNS Linac.

The SNS linac utilizes several accelerating structures operating at different frequencies and with different transverse focusing structures. Low-loss beam transport requires a careful matching at the transition points in both the transverse and longitudinal axes. Longitudinal beam parameters are measured using four Bunch Shape Monitors (used at many ion accelerator facilities, aka Feschenko devices). These devices, as initially delivered to the SNS, provided an estimated accuracy of about 5 picoseconds, which was sufficient for the initial beam commissioning. New challenges of improving beam transport for higher power operation will require measuring bunch profiles with 1-2 picoseconds accuracy. We have successfully implemented a number of improvements to maximize the performance characteristics of the delivered devices. We will discuss the current status of this instrument, its ultimate theoretical limit of accuracy, and how we measure its accuracy and resolution with real beam conditions.

43 PARTICLE ACCELERATORS↗

Study of Effects of Failure of Beamline Elements and its Compensation in CW Superconducting Linac

Project-X is a proposed high intensity proton facility to be built at Fermilab in United States. The first stage consists of a superconducting linac (SC) operating in continuous wave (CW) mode to accelerate a H{sup -} beam from 2.1 MeV to 3 GeV. Failure of any beamline element during operations induces a downstream mismatch of the beam which is especially severe when the failure occurs at low energy. A large mismatch causes emittance growth and ultimately results in beam losses. In a worst case scenario, the operability of the machine may be affected and long downtime may be needed to replace the failed element. To minimize possible downtime, the optics can be designed in a way that allows local retuning to make the machine operable. This paper presents studies performed to investigate retuning scenarios after failure of an accelerating cavity or a focusing magnet at critical locations in the Project-X CW superconducting linac.

43 PARTICLE ACCELERATORS↗

Commissioning of a beta* knob for dynamic IR correction at RHIC

In addition to the recent optics correction technique demonstrated at CERN and applied at RHIC, it is important to have a separate tool to control the value of the beta functions at the collision point ({beta}*). This becomes even more relevant when trying to reach high level of integrated luminosity while dealing with emittance blow-up over the length of a store, or taking advantage of compensation processes like stochastic cooling. Algorithms have been developed to allow modifying independently the beta function in each plane for each beam without significant increase in beam losses. The following reviews the principle of such algorithms and their experimental implementation as a dynamic {beta}-squeeze procedure.

43 PARTICLE ACCELERATORS↗

BEAM INSTRUMENTATION FOR HIGH POWER HADRON BEAMS

This presentation will describe developments in the beam diagnostics which support the understanding and operation of high power hadron accelerators. These include the measurement of large dynamic range transverse and longitudinal beam profiles, beam loss detection, and non-interceptive diagnostics.

Aleksandrov, Alexander V↗

Low-energy beam transport studies supporting the Spallation Neutron Source 1-MW beam operationa

The H- injector consisting of a cesium enhanced RF-driven ion source and a 2-lens electrostatic low-energy beam transport (LEBT) system supports the Spallation Neutron Source 1-MW beam operation with ~38 mA beam current in the linac at 60 Hz with a pulse length of up to ~1.0 ms. In this work, two important issues associated with the low-energy beam transport are discussed: 1) inconsistent dependence of the post-RFQ beam current on the ion source tilt angle, and 2) high power beam losses on the LEBT electrodes under some off-nominal conditions compromising their reliability.

Han, Baoxi↗

Tracking Simulation of Third-Integer Resonant Extraction for Fermilab's Mu2e Experiment

The Mu2e experiment at Fermilab requires acceleration and transport of intense proton beams in order to deliver stable, uniform particle spills to the production target. To meet the experimental requirement, particles will be extracted slowly from the Delivery Ring to the external beamline. Using Synergia2, we have performed multi-particle tracking simulations of third-integer resonant extraction in the Delivery Ring, including space charge effects, physical beamline elements, and apertures. A piecewise linear ramp profile of tune quadrupoles was used to maintain a constant averaged spill rate throughout extraction. To study and minimize beam losses, we implemented and introduced a number of features, beamline element apertures, and septum plane alignments. Additionally, the RF Knockout (RFKO) technique, which excites particles transversely, is employed for spill regulation. Combined with a feedback system, it assists in fine-tuning spill uniformity. Simulation studies were carried out to optimize the RFKO feedback scheme, which will be helpful in designing the final spill regulation system.

Park, Chong Shik↗

Changes to the Transfer Line Collimation System for the High-Luminosity LHC Beams

The current LHC transfer line collimation system will not be able to provide enough protection for the high brightness beams in the high-luminosity LHC era. The new collimation system will have to attenuate more and be more robust than its predecessor. The active jaw length of the new transfer line collimators will therefore be 2.1 m instead of currently 1.2 m. The transfer line optics will have to be adjusted for the new collimator locations and larger beta functions at the collimators for absorber robustness reasons. In this paper the new design of the transfer line collimation system will be presented with its implications on transfer line optics and powering, maintainability, protection of transfer line magnets in case of beam loss on a collimator and protection of the LHC aperture.

43 PARTICLE ACCELERATORS↗

MODEL OF ELECTRON CLOUD INSTABILITY IN FERMILAB RECYCLER

An electron cloud instability might limit the intensity in the Fermilab Recycler after the PIP-II upgrade. A multibunch instability typically develops in the horizontal plane within a hundred turns and, in certain conditions, leads to beam loss. Recent studies have indicated that the instability is caused by an electron cloud, trapped in the Recycler index dipole magnets. We developed an analytical model of an electron cloud driven instability with the electrons trapped in combined function dipoles. The resulting instability growth rate of about 30 revolutions is consistent with experimental observations and qualitatively agrees with the simulation in the PEI code. The model allows an estimation of the instability rate for the future intensity upgrades.

43 PARTICLE ACCELERATORS↗

Proton Beam Intensity Upgrades for the Neutrino Program at Fermilab

Fermilab is committed to upgrading its accelerator complex towards the intensity frontier to pursue HEP research in the neutrino sector and beyond. The upgrade has two steps: 1) the Proton Improvement Plan (PIP), which is underway, has its primary goal to start providing 700 kW beam power on NOvA target by the end of 2017 and 2) the foreseen PIP–II will replace the existing LINAC, a 400 MeV injector to the Booster, by an 800 MeV superconducting LINAC by the middle of next decade, with output beam intensity from the Booster increased significantly and the beam power on the NOvA target increased to <1.2 MW. In any case, the Fermilab Booster is going to play a very significant role for the next two decades. In this context, we have recently developed and commissioned an innovative beam injection scheme for the Booster called "early injection scheme". This scheme is already in operation and has a potential to increase the Booster beam intensity from the PIP design goal by a considerable amount with a reduced beam emittance and beam loss. In this paper, we will present results from our experience from the new scheme in operation, current status and future plans.

43 PARTICLE ACCELERATORS↗

Static Magnetic Properties of AL800 Garnet Material

A second harmonic tunable RF cavity is being devel-oped for the Fermilab Booster. This device, which prom-ises reduction of the particle beam loss at the injection, transition, and extraction stages, employs perpendicularly biased garnet material for frequency tuning. The required range of the tuning is significantly wider than in previously built and tested tunable RF devices. As a result, the mag-netic field in the garnet comes fairly close to the gyromag-netic resonance line at the lower end of the frequency range. The chosen design concept of a tuner for the cavity cannot ensure uniform magnetic field in the garnet mate-rial; thus, it is important to know the static magnetic prop-erties of the material to avoid significant increase in the lo-cal RF loss power density. This report summarizes studies performed at Fermilab to understand variations in the mag-netic properties of the AL800 garnet material used to build the tuner of the cavity.

43 PARTICLE ACCELERATORS↗

Fast Beam Tuning for Accelerator Driven Systems

The biggest challenge for Accelerator Driven Systems (ADS) is the stringent availability requirement of >99% compared to ~80% achieved by a typical accelerators. In addition to overall availability, due to thermal stress problems, ADS is also sensitive to the length of each downtime. A significant source of downtime is re-adjustment tuning of the system to account for drift in component behavior, or substitution of a backup device for one that failed. Tuning at present is done by hand, i.e. with human observation, interpretation, and decision, a process which takes hours; whereas ADS requires recovery in minutes. In this research, we apply intelligent controls in a (simulated) proton linac to automate fine-tuning. Beam monitor data is fed into a controller which adjusts magnet currents and RF power to minimize beam loss. We consider fluctuations in ion source characteristics; drift in magnet behavior (mechanical motion, or change in calibration); and failure of an accelerating cavity.

43 PARTICLE ACCELERATORS↗

Preliminary Modelling of Radiation Levels at the Fermilab PIP-II Linac

PIP-II is the Fermilab's flagship project for providing powerful, high-intensity proton beams to the laboratory's experiments. The heart of PIP-II is an 800-MeV superconducting linac accelerator. It will be located in a new tunnel with new service buildings and connected to the present Booster through a new transfer line. To support the design of civil engineering and mechanical integration, this paper provides preliminary estimation of radiation level in the gallery at an operational beam loss limit of 0.1 W/m, by means of Monte Carlo calculations with FLUKA and MARS15 codes.

Lari, L.↗

The FNAL Booster 2nd Harmonic RF Cavity

A second harmonic RF cavity which uses perpendicularly biased garnet for frequency tuning is currently being constructed for use in the Fermilab Booster. The cavity will operate at twice the fundamental RF frequency, from ~76 - 106 MHz, and will be turned on only during injection, and transition or extraction. Its main purpose is to reduce beam loss as required by Fermilab’s Proton Improvement Plan (PIP). After three years of optimization and study, the cavity design has been finalized and all constituent parts have been received. We discuss the design aspects of the cavity and its associated systems, component testing, and status of the cavity construction.

43 PARTICLE ACCELERATORS↗

Preliminary Modelling of Radiation Levels at the Fermilab PIP-II Linac

PIP-II is the Fermilab's flagship project for providing powerful, high-intensity proton beams to the laboratory's experiments. The heart of PIP-II is an 800-MeV superconducting linac accelerator. It will be located in a new tunnel with new service buildings and connected to the present Booster through a new transfer line. To support the design of civil engineering and mechanical integration, this paper provides preliminary estimation of radiation level in the gallery at an operational beam loss limit of 0.1 W/m, by means of Monte Carlo calculations with FLUKA and MARS15 codes.

43 PARTICLE ACCELERATORS↗

Wake Functions for Laminated Magnets and Applications for Fermilab Booster Synchrotron

The Fermilab Booster beam is exposed to magnet laminations, resulting in impedance effects much larger than resistive wall effects in a beam pipe. We present a calculation of wake functions in laminated magnets, which show large values at distances of the order of a few meters, but decrease quickly to zero beyond that. Therefore, strong inbunch and nearest-bunch effects are present. We show realistic Synergia simulations of the Booster using these wake functions and space-charge solvers appropriate for the various geometries of the constituent elements of the machine. The simulation of tune shifts is in good agreement with experimental data. We find that wake fields in the Booster magnet laminations strongly increase beam emittance and have the potential to cause significant beam loss.

43 PARTICLE ACCELERATORS↗

Injection Bucket Jitter Compensation using Phase Lock System at Fermilab Booster

The extraction bucket position in the Fermilab Booster is controlled with a cogging process that involves the comparison of the Booster rf count and the Recycler Ring revolution marker. A one rf bucket jitter in the extraction bucket position results from the variability of the process that phase matches the Booster to the Recycler. However, the new slow phase lock process used to lock the frequency and phase of the Booster rf to the Recycler rf has been made digital and programmable and has been modified to correct the extraction notch position. The beam loss at the Recycler injection has been reduced by 20%.

43 PARTICLE ACCELERATORS↗

Synchronous High-frequency Distributed Readout For Edge Processing At The Fermilab Main Injector And Recycler

The Main Injector (MI) was commissioned using data acquisition systems developed for the Fermilab Main Ring in the 1980s. New VME-based instrumentation was commissioned in 2006 for beam loss monitors (BLM)[2], which provided a more systematic study of the machine and improved displays of routine operation. However, current projects are demanding more data and at a faster rate from this aging hardware. One such project, Real-time Edge AI for Distributed Systems (READS), requires the high-frequency, low-latency collection of synchronized BLM readings from around the approximately two-mile accelerator complex. Significant work has been done to develop new hardware to monitor the VME backplane and broadcast BLM measurements over Ethernet, while not disrupting the existing operations critical functions of the BLM system. This paper will detail the design, implementation, and testing of this parallel data pathway.

43 PARTICLE ACCELERATORS↗

Injection of Direct-Sequence Spread Spectrum Pilot Tones into Beamline Components as a Means of Downconverter Stabilization and Real-Time Receiver Calibration

Beamline components used for diagnostic elements often rely on thermal stabilization, continual physical maintenance (ie. tuning), and frequent beam-based calibrations to maintain specified performance. Direct-sequence spread spectrum (DSSS) pilot tones injected into a particular element and combined with the beam-derived signal can subsequently be separated and used to assess performance degradation. In addition, the DSSS tone can be used as a real-time calibration signal, without interference to the intended diagnostic signal. This paper demonstrates such a technique in the design of a Beam Current Monitor downconverter system, as an intended upgrade to the CEBAF Beam Loss Accounting system. A brief spread-spectrum primer is included, as well as a description of appropriate spreading codes and their generation.

Musson, John↗