Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Alternating current”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

A Prototype Wire Position Monitoring System

The Wire Position Monitoring System (WPM) will track changes in the transverse position of LCLS Beam Position Monitors (BPMs) to 1{micro}m over several weeks. This position information will be used between applications of beam based alignment to correct for changes in component alignment. The WPM system has several requirements. The sensor range must be large enough so that precision sensor positioning is not required. The resolution needs to be small enough so that the signal can be used to monitor motion to 1{micro}m. The system must be stable enough so that system drift does not mimic motion of the component being monitored. The WPM sensor assembly consists of two parts, the magnetic sensor and an integrated lock-in amplifier. The magnetic sensor picks up a signal from the alternating current in a stretched wire. The voltage v induced in the sensor is proportional to the wire displacement from the center of the sensor. The integrated lock-in amplifier provides a DC output whose magnitude is proportional to the AC signal from the magnetic sensor. The DC output is either read on a digital voltmeter or digitized locally and communicated over a computer interface.

43 PARTICLE ACCELERATORS↗

Advanced Vehicle Testing Activity Benchmark Testing of the Chevrolet Volt Onboard Charger

The Chevrolet Volt onboard charge module, which converts alternating current (AC) power into direct current (DC) power to charge the vehicle’s onboard energy storage system, was benchmark tested for AC to DC efficiency by the Idaho National Laboratory as part of its conduct of the U.S. Department of Energy’s Advanced Vehicle Testing Activity. Charging with Level 2 electric vehicle supply equipment (EVSE) at 208 VAC input (60 Hz), the Volt onboard charge module was calculated to be 91.7% efficient while operating between 3.0 AC kW and 3.3 AC kW. Charging with Level 1 EVSE at 120 VAC input (60 Hz) the Volt onboard charge module was calculated to be 90.6% efficient while operating near 1.3 AC kW. Given that most Level 2 EVSE are greater than 99% efficient1 when operating above 3.0 AC kW (Level 2) and a Level 1 EVSE was measured to be 98% efficient2 when operating above 1.25 AC kW (120VAC), the average overall AC to DC charging efficiency for the Chevrolet Volt connected to an EVSE (from the AC grid through the EVSE and the Volt’s onboard charge module OBCM) is 90.8% for Level 2 and 88.8% for Level 1.

25 ENERGY STORAGE↗

Generation IV nuclear energy system initiative; air-cooled option RCCS studies and NSTF preparation

The Reactor Cavity Cooling System (RCCS) is an important system to the passive safety case being incorporated in the overall safety strategy for the Next Generation Nuclear Plant (NGNP). The RCCS will be one of the new safety systems specifically designed for the next generation of nuclear power plants. In particular, it is being developed and incorporated into the proposed reactor and plant designs for the very high temperature reactor (VHTR)—a helium gas cooled nuclear plant with a thermal-spectrum reactor. The RCCS forms a passive heat sink external to the reactor, and is located within the reactor cavity/silo surrounding the metal vessel. During emergency accident conditions when all ac (alternating current) power is lost, natural convection of the RCCS coolant removes the heat radiated or naturally convected from the metal vessel wall to the inner boundary of the RCCS facing the vessel. RCCS will be a first-of-a-kind (FOAK) passive safety system for core decay heat removal when the FOAK VHTR is built.

Lomperski, S.↗

Efficient Algorithm for Locating and Sizing Series Compensation Devices in Large Transmission Grids: Model Implementation (PART 1)

We explore optimization methods for planning the placement, sizing and operations of Flexible Alternating Current Transmission System (FACTS) devices installed to relieve transmission grid congestion. We limit our selection of FACTS devices to Series Compensation (SC) devices that can be represented by modification of the inductance of transmission lines. Our master optimization problem minimizes the l 1 norm of the inductance modification subject to the usual line thermal-limit constraints. We develop heuristics that reduce this non-convex optimization to a succession of Linear Programs (LP) which are accelerated further using cutting plane methods. The algorithm solves an instance of the MatPower Polish Grid model (3299 lines and 2746 nodes) in 40 seconds per iteration on a standard laptop—a speed up that allows the sizing and placement of a family of SC devices to correct a large set of anticipated congestions. We observe that our algorithm finds feasible solutions that are always sparse, i.e., SC devices are placed on only a few lines. In a companion manuscript, we demonstrate our approach on realistically-sized networks that suffer congestion from a range of causes including generator retirement. In this manuscript, we focus on the development of our approach, investigate its structure on a small test system subject to congestion from uniform load growth, and demonstrate computational efficiency on a realistically-sized network.

25 ENERGY STORAGE↗

Efficient Algorithm for Locating and Sizing Series Compensation Devices in Large Transmission Grids: Solutions and Applications (PART II)

In a companion manuscript, we developed a novel optimization method for placement, sizing, and operation of Flexible Alternating Current Transmission System (FACTS) devices to relieve transmission network congestion. Specifically, we addressed FACTS that provide Series Compensation (SC) via modification of line inductance. In this manuscript, this heuristic algorithm and its solutions are explored on a number of test cases: a 30-bus test network and a realistically-sized model of the Polish grid (~2700 nodes and ~3300 lines). The results on the 30-bus network are used to study the general properties of the solutions including non-locality and sparsity. The Polish grid is used as a demonstration of the computational efficiency of the heuristics that leverages sequential linearization of power flow constraints and cutting plane methods that take advantage of the sparse nature of the SC placement solutions. Using these approaches, the algorithm is able to solve an instance of Polish grid in tens of seconds. We explore the utility of the algorithm by analyzing transmission networks congested by (a) uniform load growth, (b) multiple overloaded configurations, and (c) sequential generator retirements

25 ENERGY STORAGE↗

Analysis of Loss-of-Offsite-Power Events 1998–2012

Loss of offsite power (LOOP) can have a major negative impact on a power plant’s ability to achieve and maintain safe shutdown conditions. Risk analyses performed loss of all alternating current power contributes over 70% of the overall risk at some U.S. nuclear plants. LOOP event and subsequent restoration of offsite power are important inputs to plant probabilistic risk assessments. This report presents a statistical and engineering analysis of LOOP frequencies and durations at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience from fiscal year 1998 through 2012. Frequencies and durations were determined for four event categories: plant-centered, switchyard-centered, grid-related, and weather-related. The EDG failure modes considered are failure to start, failure to load and run, and failure to run more than 1 hour. The component reliability estimates and the reliability data are trended for the most recent 10-year period while yearly estimates for reliability are provided for the entire active period. A statistically significant increase in industry performance was identified for plant-centered and switchyard-centered LOOP frequencies. There is no statistically significant trend in LOOP durations.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

How Do The EV Project Participants Feel about Charging Their EV at Home?

Key Observations from the Survey of the EV Project Participants; In June 2013, 72% of EV Project participants were very satisfied with their home charging experience; 21% of participants relied totally on home charging for all of their charging needs; Volt owners relied more on home charging than Leaf owners, who reported more use of away-from-home charging; 74% of participants reported that they plug in their plug-in electric vehicle (PEV) every time they park at home. Others plugged in as they determined necessary to support their driving needs; 40% of participants reported that they would not have or are unsure that in June 2013 whether they would have purchased an alternating current (AC) Level 2 electric vehicle supply equipment (EVSE) for home charging if it had not been provided by The EV Project; and 61% of participants reported that The EV Project incentive was very important or important in their decision to obtain a PEV.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Scalable Heuristics for Planning, Placement and Sizing of Flexible AC Transmission System Devices

Aiming to relieve transmission grid congestion and improve or extend feasibility domain of the operations, we build optimization heuristics, generalizing standard AC Optimal Power Flow (OPF), for placement and sizing of Flexible Alternating Current Transmission System (FACTS) devices of the Series Compensation (SC) and Static VAR Compensation (SVC) type. One use of these devices is in resolving the case when the AC OPF solution does not exist because of congestion. Another application is developing a long-term investment strategy for placement and sizing of the SC and SVC devices to reduce operational cost and improve power system operation. SC and SVC devices are represented by modification of the transmission line inductances and reactive power nodal corrections respectively. We find one placement and sizing of FACTs devices for multiple scenarios and optimal settings for each scenario simultaneously. Our solution of the nonlinear and nonconvex generalized AC-OPF consists of building a convergent sequence of convex optimizations containing only linear constraints and shows good computational scaling to larger systems. The approach is illustrated on single- and multi-scenario examples of the Matpower case-30 model.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Report on FY15 Alloy 617 Code Rules Development

Due to its strength at very high temperatures, up to 950°C (1742°F), Alloy 617 is the reference construction material for structural components that operate at or near the outlet temperature of the very high temperature gas-cooled reactors. However, the current rules in the ASME Section III, Division 5 Subsection HB, Subpart B for the evaluation of strain limits and creep-fatigue damage using simplified methods based on elastic analysis have been deemed inappropriate for Alloy 617 at temperatures above 650°C (1200°F) (Corum and Brass, Proceedings of ASME 1991 Pressure Vessels and Piping Conference, PVP-Vol. 215, p.147, ASME, NY, 1991). The rationale for this exclusion is that at higher temperatures it is not feasible to decouple plasticity and creep, which is the basis for the current simplified rules. This temperature, 650°C (1200°F), is well below the temperature range of interest for this material for the high temperature gas-cooled reactors and the very high temperature gas-cooled reactors. The only current alternative is, thus, a full inelastic analysis requiring sophisticated material models that have not yet been formulated and verified. To address these issues, proposed code rules have been developed which are based on the use of elastic-perfectly plastic (EPP) analysis methods applicable to very high temperatures. The proposed rules for strain limits and creep-fatigue evaluation were initially documented in the technical literature (Carter, Jetter and Sham, Proceedings of ASME 2012 Pressure Vessels and Piping Conference, papers PVP 2012 28082 and PVP 2012 28083, ASME, NY, 2012), and have been recently revised to incorporate comments and simplify their application. Background documents have been developed for these two code cases to support the ASME Code committee approval process. These background documents for the EPP strain limits and creep-fatigue code cases are documented in this report.

36 MATERIALS SCIENCE↗

Application of Combined Sustained and Cyclic Loading Test Results to Alloy 617 Elevated Temperature Design Criteria

Alloy 617 is a reference structural material for very high temperature components of advanced-gas cooled reactors with outlet temperatures in the range of 900-950°C . In order for designers to be able to use Alloy 617 for these high temperature components, Alloy 617 has to be approved for use in Section III (the nuclear section) of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code. A plan has been developed to submit a draft code for Alloy 617 to ASME Section III by 2015. However, the current rules in Subsection NH for the evaluation of strain limits and creep-fatigue damage using simplified methods based on elastic analysis have been deemed inappropriate for Alloy 617 at temperatures above 1200°F (650°C). The rationale for this exclusion is that at higher temperatures it is not feasible to decouple plasticity and creep deformation, which is the basis for the current simplified rules. This temperature, 1200 °F, is well below the temperature range of interest for this material in High Temperature Gas Cooled Reactor (HTGR) applications. The only current alternative is, thus, a full inelastic analysis which requires sophisticated material models which have been formulated but not yet verified. To address this issue, proposed code rules have been developed which are based on the use of elastic-perfectly plastic (EPP) analysis methods and which are expected to be applicable to very high temperatures.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Online Monitoring of Induction Motors

The online monitoring of active components project, under the Advanced Instrumentation, Information, and Control Technologies Pathway of the Light Water Reactor Sustainability Program, researched diagnostic and prognostic models for alternating current induction motors (IM). Idaho National Laboratory (INL) worked with the Electric Power Research Institute (EPRI) to augment and revise the fault signatures previously implemented in the Asset Fault Signature Database of EPRI’s Fleet Wide Prognostic and Health Management (FW PHM) Suite software. Induction Motor diagnostic models were researched using the experimental data collected by Idaho State University. Prognostic models were explored in the set of literature and through a limited experiment with 40HP to seek the Remaining Useful Life Database of the FW PHM Suite.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Interface Control Document for the EMPACT Module that Estimates Electric Power Transmission System Response to EMP-Caused Damage

The EPREP code is designed to evaluate the effects of an Electro-Magnetic Pulse (EMP) on the electric power transmission system. The EPREP code embodies an umbrella framework that allows a user to set up analysis conditions and to examine analysis results. The code links to three major physics/engineering modules. The first module describes the EM wave in space and time. The second module evaluates the damage caused by the wave on specific electric power (EP) transmission system components. The third module evaluates the consequence of the damaged network on its (reduced) ability to provide electric power to meet demand. This third module is the focus of the present paper. The EMPACT code serves as the third module. The EMPACT name denotes EMP effects on Alternating Current Transmission systems. The EMPACT algorithms compute electric power transmission network flow solutions under severely damaged network conditions. Initial solutions are often characterized by unacceptible network conditions including line overloads and bad voltages. The EMPACT code contains algorithms to adjust optimally network parameters to eliminate network problems while minimizing outages. System adjustments include automatically adjusting control equipment (generator V control, variable transformers, and variable shunts), as well as non-automatic control of generator power settings and minimal load shedding. The goal is to evaluate the minimal loss of customer load under equilibrium (steady-state) conditions during peak demand.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Analysis of Loss-of-Offsite-Power Events 1998–2013

Loss of offsite power (LOOP) can have a major negative impact on a power plant’s ability to achieve and maintain safe shutdown conditions. Risk analyses suggest that loss of all alternating current power contributes over 70% of the overall risk at some U.S. nuclear plants. LOOP event and subsequent restoration of offsite power are important inputs to plant probabilistic risk assessments. This report presents a statistical and engineering analysis of LOOP frequencies and durations at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience during calendar years 1997 through 2013. Frequencies and durations were determined for four event categories: plant-centered, switchyard-centered, grid-related, and weather-related. The emergency diesel generator failure modes considered are failure to start, failure to load and run, and failure to run more than 1 hour. The component reliability estimates and the reliability data are trended for the most recent 10-year period while yearly estimates for reliability are provided for the entire active period. No statistically significant trends in LOOP frequencies over the 1997–2013 period are identified. There is a possibility that a significant trend in grid-related LOOP frequency exists that is not easily detected by a simple analysis. Statistically significant increases in recovery times after grid- and switchyard-related LOOPs are identified.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Quality Assurance Framework for Mini-Grids

Providing clean and affordable energy services to the more than 1 billion people globally who lack access to electricity is a critical driver for poverty reduction, economic development, improved health, and social outcomes. More than 84% of populations without electricity are located in rural areas where traditional grid extension may not be cost-effective; therefore, distributed energy solutions such as mini-grids are critical. To address some of the root challenges of providing safe, quality, and financially viable mini-grid power systems to remote customers, the U.S. Department of Energy (DOE) teamed with the National Renewable Energy Laboratory (NREL) to develop a Quality Assurance Framework (QAF) for isolated mini-grids. The QAF for mini-grids aims to address some root challenges of providing safe, quality, and affordable power to remote customers via financially viable mini-grids through two key components: (1) Levels of service: Defines a standard set of tiers of end-user service and links them to technical parameters of power quality, power availability, and power reliability. These levels of service span the entire energy ladder, from basic energy service to high-quality, high-reliability, and high-availability service (often considered 'grid parity'); (2) Accountability and performance reporting framework: Provides a clear process of validating power delivery by providing trusted information to customers, funders, and/or regulators. The performance reporting protocol can also serve as a robust monitoring and evaluation tool for mini-grid operators and funding organizations. The QAF will provide a flexible alternative to rigid top-down standards for mini-grids in energy access contexts, outlining tiers of end-user service and linking them to relevant technical parameters. In addition, data generated through implementation of the QAF will provide the foundation for comparisons across projects, assessment of impacts, and greater confidence that will drive investment and scale-up in this sector. The QAF implementation process also defines a set of implementation guidelines that help the deployment of mini-grids on a regional or national scale, helping to insure successful rapid deployment of these relatively new remote energy options. Note that the QAF is technology agnostic, addressing both alternating current (AC) and direct current (DC) mini-grids, and is also applicable to renewable, fossil-fuel, and hybrid systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Virginia Offshore Wind Technology Advancement Project (VOWTAP) DOE EE0005985 Final Technical Report Rev 1a

The primary purpose of the VOWTAP was to advance the offshore wind industry in the United States (U.S.) by demonstrating innovative technologies and process solutions that would establish offshore wind as a cost-effective renewable energy resource. The VOWTAP Team proposed to design, construct, and operate a 12 megawatt (MW) offshore wind facility located approximately 27 statute miles (mi) (24 nautical miles [nm], 43 kilometers [km]) off the coast of Virginia. The proposed Project would consist of two Alstom Haliade™ 150-6 MW turbines mounted on inward battered guide structures (IBGS), a 34.5-kilovolt (kV) alternating current (AC) submarine cable interconnecting the WTGs (inter-array cable), a 34.5-kV AC submarine transmission cable (export cable), and a 34.5 kV underground cable (onshore interconnection cable) that would connect the Project with existing Dominion infrastructure located in Virginia Beach, Virginia (Figure 1). Interconnection with the existing Dominion infrastructure would also require an onshore switch cabinet, a fiber optic cable, and new interconnection station to be located entirely within the boundaries of the Camp Pendleton State Military Reservation (Camp Pendleton). The VOWTAP balanced technology innovation with commercial readiness such that turbine operations were anticipated to commence by 2018. Dominion, as the leaseholder of the Virginia Wind Energy Area (WEA), anticipated leveraging lessons learned through the VOWTAP, and applying them to future commercial-scale offshore wind development.

17 WIND ENERGY↗

Feedstock to Tailpipe Initiative: Kansas Biofuels Production, Testing and Certification Laboratory

The primary task of this grant was to establish an ASTM testing facility for biodiesel and ethanol and to use this facility to develop methods to predict fuel characteristics based on feedstock composition and feedstock cultivation. In addition to characterizing fuel properties, this grant allowed for the purchase and installation of a Fourier Transform Infrared Spectroscopy (FTIR) emissions analyzer that will provide an analysis of the emissions leaving the engine in order to meet EPA regulations. This FTIR system is combined with an Alternating Current (AC) dynamometer that allows the engine to follow Environmental Protection Agency (EPA) Federal Test Procedure (FTP) cycles. A secondary task was to investigate cultivating algae utilizing wastewater and top-down ecological control and subsequent harvesting using coagulation and dissolved air flotation. Lipid extraction utilizing environmentally-friendly and cost-effective solvents, with and without cell-disruption pretreatment was also explored. Significant work on the hydrothermal liquefaction of wastewater cultivated algae was conducted.

09 BIOMASS FUELS↗

Models and methods for assessing the value of HVDC adn MVDC technologies in modern power grids (Annual Report, Executive Summary)

Evolution of today’s predominantly alternating current (ac) transmission grid in to mixed ac transmission – high-voltage direct current (HVdc) systems is expected with the decreasing costs of and advancements in power electronics technologies. The recent technological advancements include the development of more efficient and compact voltage source converters (VSCs) that can provide fast response. Because of their controllability and fast response, HVdc systems provide the ability to enhance reliability of the ac transmission grid through frequency support, voltage control, and congestion relief. The HVdc systems can also provide other ancillary services to enhance the economics and reliability of the ac transmission grids, and to optimize their performance. The tools, models, and methods developed to evaluate their benefits will be key enablers to understanding the value proposition introduced by the fast-acting HVdc systems. The main motivation of this work was to develop models and methods to explore and quantify the technical and economic benefits of HVdc systems and fast response VSC technologies in the future grid of United States. The models and methods explore the benefits of HVdc systems through provision of controlled active/reactive power and fast response. The fast response can provide much-needed multiobjective services to the grid (e.g., frequency response, voltage control) while moving blocks of energy. The models and methods can be applied to study other power electronics technologies and scenarios such as those undertaken in ongoing studies led by the North American Electric Reliability Corporation (NERC) Inverter-based Resource Performance Task Force (IRPTF). The IRPTF studies identify the problems associated with power electronics-based technologies as they are integrated in to the bulk power system (or the ac transmission system).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Frequency Instability Problems in North American Interconnections

Alternating current power transmission and distribution systems in the United States operate at a nominal (target) frequency of 60 Hz. Large deviations from this frequency can cause network instability, and even small deviations can adversely affect sensitive end-use devices. Frequency deviations commonly result from a mismatch between energy supply and demand on a power network. If supply is insufficient to meet demand, the system frequency will decrease; if supply exceeds demand, frequency will increase. Over 100 balancing authorities within four electrical interconnections in North America manage power flows so that frequency will remain stable.

24 POWER TRANSMISSION AND DISTRIBUTION↗