Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “transportation planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

Advanced Technology Spark-Ignition Aircraft Piston Engine Design Study

The advanced technology, spark ignition, aircraft piston engine design study was conducted to determine the improvements that could be made by taking advantage of technology that could reasonably be expected to be made available for an engine intended for production by January 1, 1990. Two engines were proposed to account for levels of technology considered to be moderate risk and high risk. The moderate risk technology engine is a homogeneous charge engine operating on avgas and offers a 40% improvement in transportation efficiency over present designs. The high risk technology engine, with a stratified charge combustion system using kerosene-based jet fuel, projects a 65% improvement in transportation efficiency. Technology enablement program plans are proposed herein to set a timetable for the successful integration of each item of required advanced technology into the engine design.

Stuckas, K. J.↗

JPL antenna technology development

Plans for evaluating, designing, fabricating, transporting and deploying cost effective and STS compatible offset wrap rib antennas up to 300 meters in diameter for mobile communications, Earth resources observation, and for the orbiting VLBI are reviewed. The JPL surface measurement system, intended for large mesh deployable antenna applications will be demonstrated and validated as part of the antenna ground based demonstration program. Results of the offset wrap rib deployable antenna technology development will include: (1) high confidence structural designs for antennas up to 100 meters in diameter; (2) high confidence estimates of functional performance and fabrication cost for a wide range of antenna sizes (up to 300 meters in diameter); (3) risk assessment for fabricating the large size antennas; and (4) 55 meter diameter flight quality hardware that can be cost effectively completed toto accommodate a flight experiment and/or application.

Freeland, R. E.↗

The spark-ignition aircraft piston engine of the future

The advanced technology, spark ignition, aircraft piston engine design study was conducted to determine the improvements that could be made by taking advantage of technology that could reasonably be expected to be made available for an engine intended for production by January 1, 1990. Two engines were proposed to account for levels of technology considered to be moderate risk and high risk. The moderate risk technology engine is a homogeneous charge engine operating on avgas and offers a 40% improvement in transportation efficiency over present designs. The high risk technology engine, with a stratified charge combustion system using kerosene-based jet fuel, projects a 65% improvement in transportation efficiency. Technology enablement program plans are proposed herein to set a timetable for the successful integration of each time of required advanced technology into the engine design.

Stuckas, K. J.↗

Draft Environmental Impact Statement for the Ulysses Mission (Tier 2)

This Draft Environmental Impact Statement (DEIS) addresses the environmental impacts which may be caused by the preparation and operation of the Ulysses spacecraft, including its planned launch on the Space Transportation System (STS) Shuttle and the alternative of canceling further work on the mission. The launch configuration will use the STS/Inertial Upper Stage (IUS)/Payload Assist Module-Special(PAM-S) combination. The Tier 1 EIS included a delay alternative which considered the Titan 4 launch vehicle as an alternative booster stage for launch in 1991 or later. However, the U.S. Air Force, which procures the Titan 4 for NASA, could not provide a Titan 4 vehicle for the 1991 launch opportunity because of high priority Department of Defense requirements. The only expected environmental effects of the proposed action are associated with normal Shuttle launch operations. These impacts are limited largely to the near-field at the launch pad, except for temporary stratospheric ozone effects during launch and occasional sonic boom effects near the landing site. These effects have been judged insufficient to preclude Shuttle launches. In the event of (1) an accident during launch, or (2) reentry of the spacecraft from earth orbit, there are potential adverse health and environmental effects associated with the possible release of plutonium dioxide from the spacecraft's radioisotope thermoelectric generators (RTG). The potential effects considered in this EIS include risks of air and water quality impacts, local land area contamination, adverse health and safety impacts, the disturbance of biotic resources, impacts on wetland areas or areas containing historical sites, and socioeconomic impacts. Intensive analysis of the possible accidents associated with the proposed action are underway and preliminary results indicate small health or environmental risks. The results of a Final Safety Analysis Report will be available for inclusion into the final EIS.

Source record↗

Final environmental impact statement for the Galileo Mission (Tier 2)

This Final Environmental Impact Statement (FEIS) addresses the proposed action of completing the preparation and operation of the Galileo spacecraft, including its planned launch on the Space Transportation System (STS) Shuttle in October 1989, and the alternative of canceling further work on the mission. The only expected environmental effects of the proposed action are associated with normal launch vehicle operation, and are treated in published National Environmental Policy Act (NEPA) documents on the Shuttle (NASA 1978) and the Kennedy Space Center (NASA 1979), and in the KSC Environmental Resources Document (NASA 1986) and the Galileo Tier 1 EIS (NASA 1988a). The environmental impacts of a normal launch were deemed insufficient to preclude Shuttle operations. Environmental impacts may also result from launch or mission accidents that could release plutonium fuel used in the Galileo power system. Intensive analysis of the possible accidents associated with the proposed action reveal small health or environmental risks. There are no environmental impacts in the no-action alternative. The remote possibility of environmental impacts of the proposed action must be weighed against the large adverse fiscal and programmatic impacts inherent in the no-action alternative.

Source record↗

Draft environmental impact statement for the Galileo Mission (Tier 2)

This Draft Environmental Impact Statement (DEIS) addresses the environmental impacts which may be caused by the preparation and operation of the Galileo spacecraft, including its planned launch on the Space Transportation System (STS) Shuttle and the alternative of canceling further work on the mission. The launch configuration will use the STS/Inertial Upper Stage (IUS)/Payload Assist Module-Special (PAM-S) combination. The Tier 1 EIS included a delay alternative which considered the Titan 4 launch vehicle as an alternative booster stage for launch in 1991 or later. However, the U.S. Air Force, which procures the Titan 4 for NASA, could not provide a Titan 4 vehicle for the 1991 launch opportunity because of high priority Department of Defense requirements. The only expected environmental effects of the proposed action are associated with normal Shuttle launch operations. These impacts are limited largely to the near-field at the launch pad, except for temporary stratospheric ozone effects during launch and occasional sonic boom effects near the landing site. These effects have been judged insufficient to preclude Shuttle launches. In the event of: (1) an accident during launch, or (2) reentry of the spacecraft from earth orbit, there are potential adverse health and environmental effects associated with the possible release of plutonium dioxide from the spacecraft's radioisotope thermoelectric generators (RTG).

Source record↗

Research and test facilities

A description is given of each of the following Langley research and test facilities: 0.3-Meter Transonic Cryogenic Tunnel, 7-by 10-Foot High Speed Tunnel, 8-Foot Transonic Pressure Tunnel, 13-Inch Magnetic Suspension & Balance System, 14-by 22-Foot Subsonic Tunnel, 16-Foot Transonic Tunnel, 16-by 24-Inch Water Tunnel, 20-Foot Vertical Spin Tunnel, 30-by 60-Foot Wind Tunnel, Advanced Civil Transport Simulator (ACTS), Advanced Technology Research Laboratory, Aerospace Controls Research Laboratory (ACRL), Aerothermal Loads Complex, Aircraft Landing Dynamics Facility (ALDF), Avionics Integration Research Laboratory, Basic Aerodynamics Research Tunnel (BART), Compact Range Test Facility, Differential Maneuvering Simulator (DMS), Enhanced/Synthetic Vision & Spatial Displays Laboratory, Experimental Test Range (ETR) Flight Research Facility, General Aviation Simulator (GAS), High Intensity Radiated Fields Facility, Human Engineering Methods Laboratory, Hypersonic Facilities Complex, Impact Dynamics Research Facility, Jet Noise Laboratory & Anechoic Jet Facility, Light Alloy Laboratory, Low Frequency Antenna Test Facility, Low Turbulence Pressure Tunnel, Mechanics of Metals Laboratory, National Transonic Facility (NTF), NDE Research Laboratory, Polymers & Composites Laboratory, Pyrotechnic Test Facility, Quiet Flow Facility, Robotics Facilities, Scientific Visualization System, Scramjet Test Complex, Space Materials Research Laboratory, Space Simulation & Environmental Test Complex, Structural Dynamics Research Laboratory, Structural Dynamics Test Beds, Structures & Materials Research Laboratory, Supersonic Low Disturbance Pilot Tunnel, Thermal Acoustic Fatigue Apparatus (TAFA), Transonic Dynamics Tunnel (TDT), Transport Systems Research Vehicle, Unitary Plan Wind Tunnel, and the Visual Motion Simulator (VMS).

Source record↗

Open Rotor - Analysis of Diagnostic Data

NASA is researching open rotor propulsion as part of its technology research and development plan for addressing the subsonic transport aircraft noise, emission and fuel burn goals. The low-speed wind tunnel test for investigating the aerodynamic and acoustic performance of a benchmark blade set at the approach and takeoff conditions has recently concluded. A high-speed wind tunnel diagnostic test campaign has begun to investigate the performance of this benchmark open rotor blade set at the cruise condition. Databases from both speed regimes will comprise a comprehensive collection of benchmark open rotor data for use in assessing/validating aerodynamic and noise prediction tools (component & system level) as well as providing insights into the physics of open rotors to help guide the development of quieter open rotors.

Envia, Edmane↗

Open Advanced Air Mobility Project Vertiport and Route Decision Support Tool

The expected rise of Urban Air Mobility (UAM) presents local and regional planners with unique challenges. Aviation-based urban transportation requires analysis of new planning factors in addition to traditional factors. For example, the planner must be able to analyze community impacts (e.g. aircraft noise) and restrictions (e.g. airspace restrictions, terrain avoidance). This presentation presents a software modeling tool to address these planning challenges.

Shapiro, David L.↗

A Single-Point Modeling Approach for the Intercomparison and Evaluation of Ozone Dry Deposition Across Chemical Transport Models (Activity 2 of AQMEII4)

A primary sink of air pollutants and their precursors is dry deposition. Dry deposition estimates differ across chemical transport models, yet an understanding of the model spread is incomplete. Here, we introduce Activity 2 of the Air Quality Model Evaluation International Initiative Phase 4 (AQMEII4). We examine 18 dry deposition schemes from regional and global chemical transport models as well as standalone models used for impact assessments or process understanding. We configure the schemes as single-point models at eight Northern Hemisphere locations with observed ozone fluxes. Single-point models are driven by a common set of site-specific meteorological and environmental conditions. Five of eight sites have at least 3 years and up to 12 years of ozone fluxes. The interquartile range across models in multiyear mean ozone deposition velocities ranges from a factor of 1.2 to 1.9 annually across sites and tends to be highest during winter compared with summer. No model is within 50 % of observed multiyear averages across all sites and seasons, but some models perform well for some sites and seasons. For the first time, we demonstrate how contributions from depositional pathways vary across models. Models can disagree with respect to relative contributions from the pathways, even when they predict similar deposition velocities, or agree with respect to the relative contributions but predict different deposition velocities. Both stomatal and nonstomatal uptake contribute to the large model spread across sites. Our findings are the beginning of results from AQMEII4 Activity 2, which brings scientists who model air quality and dry deposition together with scientists who measure ozone fluxes to evaluate and improve dry deposition schemes in the chemical transport models used for research, planning, and regulatory purposes.

Dry deposition↗

Washington State Highway Bridge Seismic Screening Tool (BSST) (Technical Report)

The Regional Resiliency Assessment Program (RRAP) is a cooperative assessment of specific critical infrastructure within a designated geographic area and a regional analysis of the surrounding infrastructure that addresses a range of infrastructure resilience issues that could have regionally and nationally significant consequences. In 2017, the U.S. Department of Homeland Security’s Cybersecurity and Infrastructure Security Agency (CISA) sponsored the Washington State Transportation Systems RRAP project in coordination with the Washington Emergency Management Division (EMD), Washington State Department of Transportation (WSDOT), and other regional stakeholders. This project is focused on assessing the impacts of a Cascadia Subduction Zone (CSZ) earthquake on state transportation systems and, in particular, how those impacts may affect the ability of emergency response efforts to move supplies into the region. The intended outcome of this analysis is the prioritization of transportation routes and modes for additional planning, investment, hardening, or other activities to enhance their resilience - and therefore, to enhance their ability to support response and recovery efforts following a CSZ earthquake. An important part of this transportation system-level assessment has been to assess the seismic vulnerability of the state highway system. In doing so, the RRAP project team developed a Bridge Seismic Screening Tool (BSST) to assess, at a system-level, the potential impacts that a CSZ earthquake could have on state highway bridges. The first step in the BSST is to assess the seismic vulnerability of highway bridge infrastructure in Washington State following a CSZ earthquake to determine a projected or potential damage state. Damage states are then used to determine approximate reopening times for bridge crossings.2 This document provides details on the methodological development of the BSST, the implementation of that tool to analyze the projected damage incurred in a CSZ earthquake scenario, and the determination of corresponding reopening times of interstate and state highway bridges following such an event. The BSST was implemented programmatically using a Microsoft Excel macro-enabled workbook; instructions on use of this tool are provided in the accompanying report, Washington State Highway Bridge Seismic Screening Tool (BSST) - User Manual.

42 ENGINEERING↗

Bridge Seismic Screening Tool (BSST), Version 2.0

The Regional Resiliency Assessment Program (RRAP) is a cooperative assessment of specific critical infrastructure within a designated geographic area and a regional analysis of the surrounding infrastructure that addresses a range of infrastructure resilience issues that could have regionally and nationally significant consequences. In 2018, DHS’s Cybersecurity and Infrastructure Security Agency (CISA) sponsored the Oregon Transportation Systems RRAP project in coordination with the Office of the Governor (under the oversight of the state resilience officer), the Oregon Office of Emergency Management (OEM), the Oregon Department of Transportation (ODOT), and other regional stakeholders (CISA 2021). This project focuses on assessing the impacts of a Cascadia Subduction Zone (CSZ) earthquake on state transportation systems and, in particular, how those impacts may affect the ability of emergency response efforts to move supplies into the region. The intended outcome of this analysis is the prioritization of transportation routes and modes for additional planning, investment, hardening, or other activities to enhance their resilience—and therefore, to enhance their ability to support response and recovery efforts following a CSZ earthquake. An important part of this transportation system-level assessment has been to assess the seismic vulnerability of the state highway system. In doing so, the RRAP project team used the Bridge Seismic Screening Tool (BSST) to assess, at a system-level, the potential impacts that a CSZ earthquake could have on state highway bridges (Bergerson et al. 2019).1 Argonne National Laboratory (Argonne), in collaboration with the Washington State Department of Transportation (WSDOT), originally developed the BSST as part of the 2017 Washington State Transportation Systems RRAP project, a sister project to the 2018 Oregon Transportation Systems RRAP project. Argonne updated the BSST during this more recent project in Oregon based on feedback from stakeholders and subject matter experts (SMEs) on the original version of the tool. The first step in the BSST is to assess the seismic vulnerability of roadway bridges following a CSZ earthquake to determine a projected or potential damage state. Damage states then help determine approximate reopening times for bridge crossings.2 This document provides details on the BSST methodology, the implementation of that tool to analyze the projected damage incurred in a CSZ earthquake scenario, and the determination of corresponding reopening times of interstate, state highway, and local bridges following such an event.

58 GEOSCIENCES↗

Research and technology goals and objectives for Integrated Vehicle Health Management (IVHM)

Integrated Vehicle Health Management (IVHM) is defined herein as the capability to efficiently perform checkout, testing, and monitoring of space transportation vehicles, subsystems, and components before, during, and after operational This includes the ability to perform timely status determination, diagnostics, and prognostics. IVHM must support fault-tolerant response including system/subsystem reconfiguration to prevent catastrophic failures; and IVHM must support the planning and scheduling of post-operational maintenance. The purpose of this document is to establish the rationale for IVHM and IVHM research and technology planning, and to develop technical goals and objectives. This document is prepared to provide a broad overview of IVHM for technology and advanced development activities and, more specifically, to provide a planning reference from an avionics viewpoint under the OAST Transportation Technology Program Strategic Plan.

Source record↗

Integrated Logistics and Supportability Challenges of Sustained Human Lunar Exploration

NASA’s Artemis program plans to establish a sustained human presence on the lunar surface. The International Space Station other space station programs have demonstrated long-duration human spaceflight operations that reuse infrastructure in Low Earth Orbit, sometimes including long uncrewed “dormant” periods. In contrast, human lunar exploration to date has consisted solely of relatively short sortie missions, rather than a sustained presence. A sustained human outpost on the Moon that can support month-long crewed exploration missions and be reused by multiple crews will be more challenging than past operations, particularly from the perspective of logistics, supportability, and risk. This paper examines the integrated logistics and supportability challenges of sustained human lunar exploration and provides a review of historical spaceflight experience in terms of crewed mission endurance, uncrewed duration, transportation overhead, and access to abort. Planned Artemis Base Camp crewed mission endurance is approximately 2.5 times longer than past lunar surface crewed mission endurance, but similar to average time between resupply for the International Space Station. Sustained human spacecraft have only twice experienced uncrewed durations longer than the planned interval between Artemis Base Camp missions, and Artemis surface assets will face long uncrewed periods more regularly than any past sustained human spacecraft. Transportation of crew and cargo to and from the Moon will be more difficult and time-consuming than transportation to and from Low Earth Orbit, and crew access to abort will be more limited. The implications of Artemis lunar operations for crewed Mars mission planning are also discussed. Historical approaches to risk management—including logistics, supportability, and abort strategies—should be reexamined and re-optimized for this new mission context. Sustained lunar operations will provide a valuable proving ground for testing new approaches to crewed space exploration.

logistics↗

Airport Infrastructure Expansion Under Uncertainty

Multistage stochastic optimization can help transportation hubs like airports and seaports plan for future infrastructure expansion while considering risks from emerging technologies and changes in demand.

ADVANCED PROPULSION SYSTEMS,MATHEMATICS AND COMPUT↗

Integrated Logistics and Supportability Challenges of Sustained Human Lunar Exploration

NASA’s Artemis program plans to establish a sustained human presence on the lunar surface. The International Space Station and other space station programs have demonstrated long-duration human spaceflight operations that reuse infrastructure in Low Earth Orbit, sometimes including long uncrewed “dormant” periods. In contrast, all human exploration beyond Low Earth Orbit to date has consisted solely of relatively short sortie missions, rather than a sustained presence. A sustained human outpost on the Moon that can support month-long crewed exploration missions and be reused by multiple crews will be more challenging than past operations, particularly from the perspective of logistics, supportability, and risk. This paper examines the integrated logistics and supportability challenges of sustained human lunar exploration and provides a review of historical spaceflight experience in terms of crewed mission endurance, uncrewed duration, transportation overhead, and access to abort. Planned Artemis Base Camp crewed mission endurance is approximately 2.5 times longer than past lunar surface crewed mission endurance, but similar to the average time between resupply for the International Space Station. Sustained human spacecraft have only twice experienced uncrewed durations longer than the planned interval between Artemis Base Camp missions, and Artemis surface assets will face long uncrewed periods more regularly than any past sustained human spacecraft. Transportation of crew and cargo to and from the Moon will be more difficult and time-consuming than transportation to and from Low Earth Orbit, and crew access to abort will be more limited. The implications of Artemis lunar operations for crewed Mars mission planning are also discussed. Historical approaches to risk management—including logistics, supportability, and abort strategies—should be reexamined and re-optimized for this new mission context. Sustained lunar operations will provide a valuable proving ground for testing new approaches to crewed space exploration.

logistics↗

Planning for the Space Exploration Initiative - The nuclear propulsion option

The Space Exploration Initiative includes both lunar and Mars program elements as well as robotic science missions. Space transportation is a primary part of all planning for exploration. The high performance propulsion capabilities of nuclear propulsion offer the potential to reduce substantially the flight times to and from Mars and to reduce the mass launched into low earth orbit.

Bennett, Gary L.↗

Water resources planning for rivers draining into Mobile Bay. Part 2: Non-conservative species transport models

Total coliform group bacteria were selected to expand the mathematical modeling capabilities of the hydrodynamic and salinity models to understand their relationship to commercial fishing ventures within bay waters and to gain a clear insight into the effect that rivers draining into the bay have on water quality conditions. Parametric observations revealed that temperature factors and river flow rate have a pronounced effect on the concentration profiles, while wind conditions showed only slight effects. An examination of coliform group loading concentrations at constant river flow rates and temperature shows these loading changes have an appreciable influence on total coliform distribution within Mobile Bay.

April, G. C.↗