HSR transition jump optics in the September 2022 layout
Transition is crossed during acceleration in the Hadron Storage Ring (HSR) for all species other than protons. A first-order transition jump scheme manipulates the value of the optical quantity γ T and distorts the optics of the HSR around the time that the beam energy γ beam crosses the nominal transition value γ T 0 . The jump scheme in the Relativistic Heavy Ion Collider (RHIC) uses 48 jump quads, driven by 12 bi-polar power supplies that each drive 4 quads in series. Ten of those 48 are eliminated in the preliminary September 2022 HSR layout (EIC-HSR-220921a) that was developed from RHIC with no initial regard for transition crossing. This note analyzes the performance of the 38-quad HSR scheme, by comparison with the 48-quad RHIC scheme. It is concerned only with optics – the manipulation and response of Twiss functions and related quantities – and not with beams. This evaluation is a necessary first step before enhancing the transition jump scheme to restore RHIC performance in the HSR. Eventually full beam simulations of transition crossing need to be performed.