Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “scope”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

Improving anatomical mapping of complexly deformed anatomy for external beam radiotherapy and brachytherapy dose accumulation in cervical cancer

Purpose: In the treatment of cervical cancer, large anatomical deformations, caused by, e.g., tumor shrinkage, bladder and rectum filling changes, organ sliding, and the presence of the brachytherapy (BT) applicator, prohibit the accumulation of external beam radiotherapy (EBRT) and BT dose distributions. This work proposes a structure-wise registration with vector field integration (SW+VF) to map the largely deformed anatomies between EBRT and BT, paving the way for 3D dose accumulation between EBRT and BT. Methods: T2w-MRIs acquired before EBRT and as a part of the MRI-guided BT procedure for 12 cervical cancer patients, along with the manual delineations of the bladder, cervix-uterus, and rectum-sigmoid, were used for this study. A rigid transformation was used to align the bony anatomy in the MRIs. The proposed SW+VF method starts by automatically segmenting features in the area surrounding the delineated organs. Then, each organ and feature pair is registered independently using a feature-based nonrigid registration algorithm developed in-house. Additionally, a background transformation is calculated to account for areas far from all organs and features. In order to obtain one transformation that can be used for dose accumulation, the organ-based, feature-based, and the background transformations are combined into one vector field using a weighted sum, where the contribution of each transformation can be directly controlled by its extent of influence (scope size). The optimal scope sizes for organ-based and feature-based transformations were found by an exhaustive analysis. The anatomical correctness of the mapping was independently validated by measuring the residual distances after transformation for delineated structures inside the cervix-uterus (inner anatomical correctness), and for anatomical landmarks outside the organs in the surrounding region (outer anatomical correctness). The results of the proposed method were compared with the results of the rigid transformation and nonrigid registration of all structures together (AST). Results: The rigid transformation achieved a good global alignment (mean outer anatomical correctness of 4.3 mm) but failed to align the deformed organs (mean inner anatomical correctness of 22.4 mm). Conversely, the AST registration produced a reasonable alignment for the organs (6.3 mm) but not for the surrounding region (16.9 mm). SW+VF registration achieved the best results for both regions (3.5 and 3.4 mm for the inner and outer anatomical correctness, respectively). All differences were significant (p < 0.02, Wilcoxon rank sum test). Additionally, optimization of the scope sizes determined that the method was robust for a large range of scope size values. Conclusions: The novel SW+VF method improved the mapping of large and complex deformations observed between EBRT and BT for cervical cancer patients. Future studies that quantify the mapping error in terms of dose errors are required to test the clinical applicability of dose accumulation by the SW+VF method.

60 APPLIED LIFE SCIENCES↗

Presto 4.18 user's guide.

Presto is a Lagrangian, three-dimensional explicit, transient dynamics code that is used to analyze solids subjected to large, suddenly applied loads. The code is designed for a parallel computing environment and for problems with large deformations, nonlinear material behavior, and contact. Presto also has a versatile element library that incorporates both continuum elements and structural elements. This user's guide describes the input for Presto that gives users access to all the current functionality in the code. The environment in which Presto is built allows it to be coupled with other engineering analysis codes. Using a concept called scope, the input structure reflects the fact that Presto can be used in a coupled environment. The user's guide describes how scope is implemented from the outermost to the innermost scopes. Within a given scope, the descriptions of input commands are grouped based on functionality of the code. For example, all material input command lines are described in a chapter of the user's guide for all the material models that can be used in Presto.

99 GENERAL AND MISCELLANEOUS↗

Visualization and Data Analysis at the Exascale

The scope of our working group is scientific visualization and data analysis. Scientific visualization refers to the process of transforming scientific simulation and experimental data into images to facilitate visual understanding. Data analysis refers to the process of transforming data into an information-rich form via mathematical or computational algorithms to promote better understanding. We share scope on data management with the Storage group. Data management refers to the process of tracking, organizing and enhancing the use of scientific data. The purpose of our work is to enable scientific discovery and understanding. Visualization and data analysis has a broad scope as an integral part of scientific simulations and experiments, it is also a distinct separate service for scientific discovery and documentation purposes. Our scope includes an exascale software and hardware infrastructure that effectively supports visualization and data analysis.

ALGORITHMS↗

Formulation and Characterization of Waste Glasses with Varying Processing Temperature

This report documents the preliminary results of glass formulation and characterization accomplished within the finished scope of the EM-31 technology development tasks for WP-4 and WP-5, including WP-4.1.2: Glass Formulation for Next Generation Melter, WP-5.1.2.3: Systematic Glass Studies, and WP-5.1.2.4: Glass Formulation for Specific Wastes. This report also presents the suggested studies for eventual restart of these tasks. The initial glass formulation efforts for the cold crucible induction melter (CCIM), operating at {approx}1200 C, with selected HLW (AZ-101) and LAW (AN-105) successfully developed glasses with significant increase of waste loading compared to that is likely to be achieved based on expected reference WTP formulations. Three glasses formulated for AZ-101HLW and one glass for AN-105 LAW were selected for the initial CCIM demonstration melter tests. Melter tests were not performed within the finished scope of the WP-4.1.2 task. Glass formulations for CCIM were expanded to cover additional HLWs that have high potential to successfully demonstrate the unique advantages of the CCIM technologies based on projected composition of Hanford wastes. However, only the preliminary scoping tests were completed with selected wastes within the finished scope. Advanced glass formulations for the reference WTP melter, operating at {approx}1200 C, were initiated with selected specific wastes to determine the estimated maximum waste loading. The incomplete results from these initial formulation efforts are summarized. For systematic glass studies, a test matrix of 32 high-aluminum glasses was completed based on a new method developed in this study.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Short-Term Test Results: Multifamily Home Energy Efficiency Retrofit

Multifamily deep energy retrofits (DERs) represent great potential for energy savings, while also providing valuable insights on research-generated efficiency measures, cost-effectiveness metrics, and risk factor strategies for the multifamily housing industry. The Bay Ridge project is comprised of a base scope retrofit with a goal of achieving 30% savings (relative to pre-retrofit), and a DER scope with a goal of 50% savings (relative to pre-retrofit). The base scope has been applied to the entire complex, except for one 12-unit building which underwent the DER scope. Findings from the implementation, commissioning, and short-term testing at Bay Ridge include air infiltration reductions of greater than 60% in the DER building; a hybrid heat pump system with a Savings to Investment Ratio (SIR) > 1 (relative to a high efficiency furnace) which also provides the resident with added incentive for energy savings; and duct leakage reductions of > 60% using an aerosolized duct sealing approach. Despite being a moderate rehab instead of a gut rehab, the Bay Ridge DER is currently projected to achieve energy savings ≥ 50% compared to pre-retrofit, and the short-term testing supports this estimate.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Bay Ridge Gardens - Mixed-Humid Affordable Multifamily Housing Deep Energy Retrofit

Under this project, Newport Partners (as part of the BA-PIRC research team) evaluated the installation, measured performance, and cost-effectiveness of efficiency upgrade measures for a tenant-in-place DER at the Bay Ridge multifamily (MF) development in Annapolis, Maryland. The design and construction phase of the Bay Ridge project was completed in August 2012. This report summarizes system commissioning, short-term test results, utility bill data analysis, and analysis of real-time data collected over a one-year period after the retrofit was complete. The Bay Ridge project is comprised of a 'base scope' retrofit which was estimated to achieve a 30%+ savings (relative to pre-retrofit) on 186 apartments, and a 'DER scope' which was estimated to achieve 50% savings (relative to pre-retrofit) on a 12-unit building. The base scope was applied to the entire apartment complex, except for one 12-unit building which underwent the DER scope. A wide range of efficiency measures was applied to pursue this savings target for the DER building, including improvements/replacements of mechanical equipment and distribution systems, appliances, lighting and lighting controls, the building envelope, hot water conservation measures, and resident education. The results of this research build upon the current body of knowledge of multifamily retrofits. Towards this end, the research team has collected and generated data on the selection of measures, their estimated performance, their measured performance, and risk factors and their impact on potential measures.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Bay Ridge Gardens – Mixed Humid Affordable Multifamily Housing Deep Energy Retrofit: Annapolis, Maryland - Building America Case Study: Whole-House Solutions for Existing Homes [Fact Sheet]

Under this project, Newport Partners (as part of the BA-PIRC research team) evaluated the installation, measured performance, and cost-effectiveness of efficiency upgrade measures for a tenant-in-place DER at the Bay Ridge multifamily (MF) development in Annapolis, Maryland. The design and construction phase of the Bay Ridge project was completed in August 2012. This report summarizes system commissioning, short-term test results, utility bill data analysis, and analysis of real-time data collected over a one-year period after the retrofit was complete. The Bay Ridge project is comprised of a "base scope" retrofit which was estimated to achieve a 30%+ savings (relative to pre-retrofit) on 186 apartments, and a "DER scope" which was estimated to achieve 50% savings (relative to pre-retrofit) on a 12-unit building. The base scope was applied to the entire apartment complex, except for one 12-unit building which underwent the DER scope. A wide range of efficiency measures was applied to pursue this savings target for the DER building, including improvements/replacements of mechanical equipment and distribution systems, appliances, lighting and lighting controls, the building envelope, hot water conservation measures, and resident education. The results of this research build upon the current body of knowledge of multifamily retrofits. Towards this end, the research team has collected and generated data on the selection of measures, their estimated performance, their measured performance, and risk factors and their impact on potential measures.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

In-Situ Gamma-Ray Assay of the East Cell Line in the 235-F Plutonium Fuel Form Facility

On September 17 th -19 th , 2013, scientists from SRNL took a series of in-situ gamma-ray measurements in the maintenance trench beneath Cells 1-5 on the east line of the PuFF facility using a well-collimated, high-purity germanium detector. The cell interiors were assayed along with the furnaces and storage coolers that protrude beneath the cells. The detector efficiency was estimated using a combination of MCNP simulations and empirical measurements. Data analysis was performed using three gamma-rays emitted by Pu-238 (99.85 keV, 152.7 keV, and 766.4 keV) providing three independent estimates of the mass of Pu-238 holdup in each of the cells. The weighted mean of these three results was used as the best estimate of Pu-238 holdup in the East Cell Line of PuFF. The results of the assay measurements are found in the table on the following page along with the results from the scoping assay performed in 2006. All uncertainties in this table (as well as the rest of the report) are reported at 1σ. Summing the assay results and treating MDAs as M 238Pu = 0 ± MDA, the total holdup in the East Cell Line was 240 ± 40 grams. This result is 100 grams lower than the previous estimate, a 0.55σ difference. The uncertainty in the Pu-238 holdup is also reduced substantially relative to the 2006 scoping assay. However, the current assay results are in agreement with the 2006 scoping assay results due to the large uncertainty associated with the 2006 scoping assays. The current assay results support the conclusion that the 2006 results bound the Pu-238 mass in Cells 1-5. These results should be considered preliminary since additional measurements of the East Cell line are scheduled for 2017 and 2018. Those measurements will provide detailed information about the distribution of Pu-238 in the cells to be used to refine the results of the current assay.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Principle Findings from Development of a Recirculated Exhaust Gas Intake Sensor (REGIS) Enabling Cost-Effective Fuel Efficiency Improvement

Kick-off of the Bosch scope of work for the REGIS project started in October 2012. The primary work-packages included in the Bosch scope of work were the following: overall project management, development of the EGR sensor (design of sensor element, design of protection tube, and design of mounting orientation), development of EGR system control strategy, build-up of prototype sensors, evaluation of system performance with the new sensor and the new control strategy, long-term durability testing, and development of a 2nd generation sensor concept for continued technology development after the REGIS project. The University of Clemson was a partner with Bosch in the REGIS project. The Clemson scope of work for the REGIS project started in June 2013. The primary work-packages included in the Clemson scope of work were the following: development of EGR system control strategy, and evaluation of system performance with the new sensor and new control strategy. This project was split into phase I, phase II and phase III. Phase I work was completed by the end of June 2014 and included the following primary work packages: development of sensor technical requirements, assembly of engine testbench at Clemson, design concept for sensor housing, connector, and mounting orientation, build-up of EGR flow test benches at Bosch, and build-up of first sensor prototypes. Phase II work was completed by the end of June 2015 and included the following primary work pack ages: development of an optimizing function and demonstration of robustness of sensor, system control strategy implementation and initial validation, completion of engine in the loop testing of developed control algorithm, completion of sensor testing including characteristic line, synthetic gas test stand, and pressure dependency characterization, demonstration of benefits of control w/o sensing via simulation, development of 2nd generation sensor concept. Notable technical achievements from phase II were the following: publication of two new technical papers by Clemson detailing the control strategies used for the EGR system control. The two papers was published in the 2016 SAE World Congress in April 2016. The titles of each paper are, “Physics-Based Exhaust Pressure and Temperature Estimation for Low Pressure EGR Control in Turbocharged Gasoline Engines,” by K. Siokos, and “A Control Algorithm for Low Pressure – EGR Systems using a Smith Predictor with Intake Oxygen Sensor Feedback”, by R. Koli. All phase III work packages have been completed. The primary work packages in phase III were the following: completion of long-term sensor durability testing, final demonstration of benefits of EGR control w/o sensing, final decision of the second generation sensor development path.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

SRNL Report on Vendor Solicitation and Selective Ion-Electrode Testing

Effective operation of the Hanford Tank Waste Treatment and Immobilization Plant (WTP) will require information collected from sampling and/or monitoring to maintain environmental compliance, product quality, and operating efficiency. The U.S. Department of Energy (DOE) – Office of River Protection (ORP) recognizes the potential long-term benefit of developing real-time, in-line monitoring (RTIM) at the WTP to improve the current strategy of collecting tens of thousands of samples and analyzing them. In-line monitoring can decrease processing time associated with waiting for sample analysis, reduce workers’ exposure to radiation and chemical hazards, decrease secondary waste volumes, potentially improve product quality, and provide production support and enhance overall operational control. The Assistant Manager, WTP chartered an Integrated Technical Team (ITT), which includes personnel from the Savannah River National Laboratory (SRNL), Bechtel National, Inc., and DOE-ORP, to evaluate the capability and potential benefits of replacing routine sample collection requirements with real-time, in-line monitoring. The initial focus of the ITT is the Direct Feed Low Activity Waste (DFLAW) Program. This work scope is being performed in multiple phases. Phase 1 is Requirements and Opportunities Analysis, Phase 2 is Applications and Benefits Determination, and Phase 3 is Qualification and Demonstration. Phase 1 included 6 tasks and was completed by SRNL in 2017. The tasks in Phase 1 were: (1) determining the functional requirements for determining analytes and properties of streams, (2) determining the technical basis for process control, (3) determining the sampling points within the Low Activity Waste (LAW) facility and Effluent Management Facility (EMF), (4) data quality and management, (5) process control challenges, and (6) preparing a Preliminary Analysis Plan. DOE-ORP was briefed on the findings from the Phase 1 tasks and requested that Phase 2 work focus on establishing a basis for a materials balance approach that minimized process sampling. The Phase 2 work scope contains tasks to evaluate a materials balance only approach as well as continuing scoping evaluations for instruments that could be used for RTIM. The Phase 2 work scope was completed by both SRNL and Pacific Northwest National Laboratory (PNNL). The tasks performed in Phase 2 were: 1. Overall program administration and technical oversight 2. Evaluation of a Material Balance Approach, a. Evaluation of uncertainty of this approach compared to uncertainty of current methods b. Evaluation of automating the material balance within the framework of existing control software, c. Development of the methodology to obtain and evaluate data during cold commissioning to support a material balance approach, and d. Development of a framework to utilize during presentation of the revised approach to stakeholders and regulators. 3. Screening Evaluations of Instruments to Supplement the Material Balance Approach, a. AP-105 melter condensate evaluations, and b. Screening testing with simulants. 4. Evaluation of the current DFLAW feed qualification program to identify analytes that could be eliminated, a. Inorganic analytes, b. Radionuclides, and c. Organic analytes. This report describes the results of Task 3b, Screening testing with simulants. The Savannah River National Laboratory requested demonstrations of commercially available analytical instruments by the vendors or laboratory demonstration. The techniques tested included: Raman spectroscopy, Infrared spectroscopy (IR), laser induced breakdown spectroscopy (LIBS), X-Ray Fluorescence Spectroscopy (XRF), and ion-selective electrochemical probes. Additionally, the instrumentation would need to be durable enough to withstand the environment of the plant, preferably with little to no maintenance. The insertion point of the instrument would be dependent upon the instrumentation.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of a Material Balance Only and Material Balance with Real-Time In-line Monitoring Approaches for DFLAW Processing

The Assistant Manager, WTP chartered an Integrated Technical Team (ITT), which includes personnel from the Savannah River National Laboratory (SRNL), Pacific Northwest National Laboratory (PNNL), from the Savannah River National Laboratory (SRNL), Pacific Northwest National Laboratory (PNNL), Bechtel National, Inc., and DOE-ORP, to evaluate the capability and potential benefits of replacing sample collection/analyses requirements with real-time, in-line monitoring. The initial focus of the ITT is the Direct Feed Low Activity Waste (DFLAW) Program. This work scope is being performed in multiple phases. The Phase 2 work scope contains tasks to evaluate a materials balance only approach as well as continuing scoping evaluations for instruments that could be used for Real-Time In-Line Monitoring (RTIM). The Phase 2 work scope for evaluation of a materials balance approach was completed by both SRNL and PNNL and is documented in this report. The material balance evaluation included a review of the WTP Low Activity Waste (LAW) vitrification process as well as the WTP Effluent Management Facility (EMF) process. Sampling requirements and unit operations were reviewed to determine which sample requirements could be met with a material balance without significantly increasing processing or reporting uncertainties.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Time Dependence of Methane Generation Rates from Saltstone

This report documents the tests performed to address the requirements listed in the Technical Request, which resulted in a Task Technical & Quality Assurance Plan (TTQAP) and a Run Plan to obtain the required information. The research expands previous scoping work to better understand methane generation in the Saltstone Disposal Facility (SDF). That scoping work demonstrated that methane is produced when sulfide-containing material is added to methylmercury (MeHg), which is found in the SDF Tank 50 feed waste. When Tank 50 waste is combined with grout premix solids dry feed ingredients of cement, slag cement, and fly ash, sulfides are released from the slag cement component of the premix. The prior testing results showed that while the concentration of total mercury was not affected in the pH 14 waste, the MeHg likely reacted with the sulfide contained in the slag. The scoping tests were performed in sealed reactors and thus, methane generation was not measured continuously; rather, it was measured after one hour and after 24 hours. After 24 hours, a large percentage of the MeHg was converted to methane, but after 1 hour only a small percentage of methane was released. It is noteworthy that the methane generation rate (MGR) was greater at the one-hour measurement. The data compiled from the scoping work needed to be expanded to better understand the generation of methane released from grout mixed with Tank 50 waste. This expanded study developed a more extensive knowledge of how and when methane is generated to inform the Documented Safety Analysis (DSA) of the SDF. As such, employing 8 sealed reactors, the methane generation time periods were extended to 2, 4, 6, 18, 30, 48, 72, and 96 hours (4 days). Results are documented herein to determine the capacity for MeHg, contained within Tank 50 salt solution (T50SS) simulant, to produce methane when mixed with saltstone dry feed ingredients, i.e., individual components (cement, slag, and fly ash) or a combination of those components.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preliminary Design of Reactor Cavity Cooling System for a Horizontal Compact HTGR

The Horizontal Compact High Temperature Gas Reactor (HC-HTGR) is being designed by a multi-disciplinary team of nuclear, mechanical, and structural engineers under the support of a DOE-NE Advanced Reactor Demonstration Program’s Advanced Reactor Concepts-20 (ARC-20) award. The objective of this ARC-20 project is to deliver a conceptual design for the proposed MIGHTR in 3 years and support its commercialization as a safe and low-cost HTGR. Argonne National Laboratory (Argonne) is responsible for the design and analysis of the reactor cavity cooling system (RCCS) as a safety system for passive decay heat removal of the reactor concept. This report documents the preliminary design study of the RCCS for the HC-HTGR. It includes the establishment of the design requirements, a high-level design study by initial scoping calculations, and preliminary performance calculations of the HC-HTGR RCCS design. Design requirements for the HC-HTGR RCCS have been established to guide preliminary design activities and scoping performance calculations. Initial scoping calculations including estimation of the water inventory, estimation of HVAC thermal capability, and a parametric study on loop dimensions by standalone RCCS analysis. Based on scoping calculation results, a set of baseline dimensions of the HC-HTGR RCCS was derived. A water panel modeling approach was investigated to explore various potential design options for the water panel under consideration for the HC-HTGR RCCS using RELAP5-3D. A test case study was performed to assess the prediction capability of two modeling approaches. The results were compared with CFD simulations conducted in constant RPV temperature and heat flux boundary conditions. It confirms the capability of the RELAP5-3D modeling approach to include all important heat transfer mechanisms expected in the HC-HTGR RCCS operation conditions. Then, a reference RELAP5-3D model for the 1/8 th of a compartment of the preliminary design of the HC-HTGR RCCS was developed. A preliminary performance analysis was conducted to evaluate single-phase natural circulation performance with different top tank temperature values and panel conduction performance in various operation conditions. From single-phase natural circulation performance analysis, the system operation mode was investigated in normal operating and limiting design conditions. It showed operation mode in a subcooled state with a proper top tank water cooling system. Parasitic heat loss by both internal air flow and RCCS was estimated, showing it satisfies maintaining below target maximum heat loss of the HC-HTGR RCCS. From the panel conduction performance analysis, two candidate materials for the riser tube such as carbon steel and stainless steel were compared in the thermal performance of HC-HTGR RCCS. From a single water panel test compared with CFD simulation results, it was confirmed that the current capability of the RELAP5-3D modeling approach for the water panel predicts the thermal conduction of two different materials of the water panel. Then, system-level thermal performance analysis was performed for 1/8 th of the compartment of the preliminary HC-HTGR RCCS design. It was first observed that the current preliminary HC-HTGR RCCS design had minimal impact on the overall thermal performance of the water panel by changing pipe material from carbon steel to stainless steel. From Argonne’s effort on the ongoing water-based NSTF testing program, several considerations other than the thermal performance point of view were addressed to be considered in selecting pipe materials.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Flexible Perovskite-Perovskite PV for Mobile Power Applications (Final Technical Report)

This is the final report for the referenced TCF award which ran from Oct. 2019 through Jan. 2024 in conjunction with the industry partner Swift Solar. The long duration of the program was due to several factors including the pandemic and a technical work stoppage due to changes in the scope. Additionally, Swift’s business focus shifted during the course of the program. As a result of these factors, this program underwent two distinct modifications that dramatically changed the work scope. The following report is organized into three separate sections, each of which addresses a distinct work scope. Those scope changes, what necessitated them, and any new tasks/milestones are given, briefly, at the top of each section. The work performed was research on the hybrid halide perovskites (HHP), both the absorber material itself as well as other material layers that are required in a full device stack. At the start of the period of performance, there were two distinct challenges that we sought to address: (1) a wide band gap absorber (>1.6 eV), and (2) a recombination layer for tandem devices that provided good sequestration of the individual cell absorber materials in their respective device layers. NREL had previously published, and patented, advancements in both of these areas and they were the focus of much of the work throughout the program.

14 SOLAR ENERGY↗

Business Opportunities in Clean Energy Supply Chains: Guidebook for Small and Medium-Sized Automotive Suppliers

This is the final report for the referenced TCF award which ran from Oct. 2019 through Jan. 2024 in conjunction with the industry partner Swift Solar. The long duration of the program was due to several factors including the pandemic and a technical work stoppage due to changes in the scope. Additionally, Swift’s business focus shifted during the course of the program. As a result of these factors, this program underwent two distinct modifications that dramatically changed the work scope. The following report is organized into three separate sections, each of which addresses a distinct work scope. Those scope changes, what necessitated them, and any new tasks/milestones are given, briefly, at the top of each section. The work performed was research on the hybrid halide perovskites (HHP), both the absorber material itself as well as other material layers that are required in a full device stack. At the start of the period of performance, there were two distinct challenges that we sought to address: (1) a wide band gap absorber (>1.6 eV), and (2) a recombination layer for tandem devices that provided good sequestration of the individual cell absorber materials in their respective device layers. NREL had previously published, and patented, advancements in both of these areas and they were the focus of much of the work throughout the program. The auto manufacturing space is evolving quickly. Sales of various electrified vehicles (xEVs) continue to grow steadily, which has medium to long-term ramifications for the thousands of U.S. manufacturers and hundreds of thousands of workers that contribute to the domestic automotive supply chain. In tandem with this growth in xEV sales, domestic clean energy manufacturing is surging (both for the xEV supply chain and other technologies), with public incentives spurring billions in private sector investment. Moreover, the next 2–3 years will see new and expanded industrial facilities come online to make products like hydrogen electrolyzers, solar panels, batteries, advanced electronics—and will create new supply chain needs and business opportunities as they do. DOE’s Office of Manufacturing and Energy Supply Chains (MESC) and Argonne National Laboratory developed this report to help automotive manufacturers—alongside various business support partners— understand these trends and their response options, and to make the most of current federal assistance programs for manufacturers. These market changes may create opportunities for small- and medium-sized manufacturers (SMMs) to expand production, grow profit margins, and diversify their businesses. For instance, SMMs could take advantage of engineering and process design similarities with new end-use industries that might enable greater business growth and stability as markets continue to change.

14 SOLAR ENERGY↗

Presto 2.9 user's guide.

Presto is a Lagrangian, three-dimensional explicit, transient dynamics code that is used to analyze solids subjected to large, suddenly applied loads. The code is designed for a parallel computing environment and for problems with large deformations, nonlinear material behavior, and contact. Presto also has a versatile element library that incorporates both continuum elements and structural elements. This user's guide describes the input for Presto that gives users access to all the current functionality in the code. The environment in which Presto is built allows it to be coupled with other engineering analysis codes. Using a concept called scope, the input structure reflects the fact that Presto can be used in a coupled environment. The user's guide describes how scope is implemented from the outermost to the innermost scopes. Within a given scope, the descriptions of input commands are grouped based on functionality of the code. For example, all material input command lines are described in a chapter of the user's guide for all the material models that can be used in Presto.

36 MATERIALS SCIENCE↗

Idaho National Laboratory Radioisotope Power Systems Nuclear Operations: Readiness Assessments Supporting a Nuclear-enabled NASA Mission

Idaho National Laboratory Radioisotope Power Systems Nuclear Operations: Preparations, Documentation, Readiness Assessments and Conduct of Operations Supporting a Nuclear-enabled NASA Mission Kelly L. Lively, Eric S. Clarke, Robert P. Gomez Idaho National Laboratory, Idaho Falls, ID 83415 208-533-7388; Kelly.Lively@inl.gov Abstract. The Radioisotope Power Systems (RPS) Program, located at Idaho National Laboratory (INL), is responsible for assembling, testing, and delivering plutonium oxide-fueled RPSs for use in powering missions in remote, harsh environments such as deep space. An informative presentation will be given discussing the preparations, documents, readiness assessments, human capital and conduct of operations involved in performing nuclear operations to support providing these systems to end users for the Department of Energy (DOE). DOE is the start-up authority for performing nuclear operations. Readiness for start-up is determined through independent assessment against established acceptance criteria to ensure activities can be performed safely and within a well defined nuclear safety envelope. There is also an RPS Program approval element requiring additional readiness review before nuclear operations can begin. The programmatic readiness review is performed to ascertain readiness to proceed with nuclear operations from the perspective of product quality. The assessments and reviews are conducted in series in the following order of progression: Management Self Assessment (MSA), Contractor Readiness Assessment (CRA), DOE Readiness Assessment (DOE RA) and lastly, the Programmatic Production Readiness Review (PRR). The CRA, DOE RA, and PRR requires an independent technical review team. Twelve assessment criteria are reviewed and a selection of the criteria is identified for review on a graded approach. Typically, the assessments/review criteria requires, at a minimum, review of operating instructions to ensure technical safety requirements are adequately identified, review of training records to ensure personnel are adequately trained to perform the specified work scope, personnel are interviewed to determine adequacy of level of knowledge for work scope, and a high-fidelity performance of the operation to ensure the operating instructions and conduct of operations are adequate to perform the work scope. As each assessment/review is conducted a formal report delineating any issues in the form of findings, observations, and noteworthy practices will be issued. Before start-up approval is obtained all issues must be resolved to the satisfaction of the individual teams. Start-up notification is formally communicated by memorandum from DOE. Programmatic approval is documented in a Segmented Readiness Review where vested Program representatives in the RPS community (to include DOE NE 75 and DOE ID representatives) ensure personnel, documentation, and materials are in place to perform the activity. The four assessments/reviews can be completed in a 16-week period of time, provided ample resources and a relatively small work scope is identified. RPS assembly and testing operations to support the Mars 2020 Mission, the next planned space mission using a nuclear power system, will require about of year of assessments/reviews before the nuclear operations are performed. Keywords: INL, Operations, Assessments, DOE

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Managing Through Continuous Improvement: If it doesn’t challenge you, it won’t change you

The past 24 months has been one of non-stop continuous improvement – every month, every week, every day, and every hour. It has been filled with continuously re-examining and challenging business systems, work processes, and legacy culture. The journey was difficult, but well worth it. It began by examining the existing conditions in each organization and building the case for change. When we stepped back and looked at our processes, systems, tools, and performance objectively, we realized we were struggling with frequent organizational, resource, and schedule conflicts, work processes that were not well-defined or expert based, project delays were common, management methods were predominantly reactive, advanced planning was limited to the near-term, no integration in scheduling across organizations, limited to no performance metrics to measure and manage performance, and internal and external customers did not feel like we were meeting their quality and performance expectations. It was a wake-up call. Change began at the top with a change leadership with where a new vision, expectations, and commitment were established. Leaving no stone left unturned, every aspect of the business was challenged which opened up communication and exposed the gaps. This was done in a ‘safe’ environment allowing for honest and solution-oriented discussion and action. The leadership team committed to managing through continuous improvement. The organizational structure was realigned to better align scope, responsibilities, execution, and customer focus. Visibility and transparency became the norm as higher levels of leadership and supporting organizations were invited to be part of regular strategy meetings and partnership discussion, effectively opening up the dialogue. This required a tremendous amount of trust and faith in a short period of time. Health assessments were conducted on each organization with specific lines of inquiry. These self-assessments helped to identify better define the scope of the organization and where targeted improvements were needed. Frequent organizational reviews were implemented to answer three fundamental questions: 1) What is your organization paid to do (scope)?, 2) How does your organization, or you, demonstrate that you are doing the job effectively?, and 3) What are you doing to improve your performance? To answer the first question, leaders defined the scope of the organization. Leaders were required to provide a path forward, with specific actions, where performance was not at expected levels internally at first and then from the stakeholders. Where business processes were not clearly understood, process maps were developed to provide this clarity for both those performing the work and those utilizing the process – the customers. To help answer the second question, numerous automated or semi-automated real-time, dynamic performance metrics were developed and implement to help leaders gain the visibility and demonstrate performance in six areas of operational excellence: safety, security, quality, effectiveness, productivity, and sustainability. Analysis of the performance provided windows of transparency and trends of work performance, work delays, cycle times, utilization, and much more that revealed many areas of improvement that were either not visible or desired to be visible. At the same time, they provided real-time progress which generated initial performance improvements by just beginning to measure. To address the third question, where systems did not support effectiveness of an existing or new process, then systems and tools were developed and implemented to drive the right behaviors and reinforce the processes. Tools and metrics were one of the major catalysts for culture shift and change. Risk assessments were leveraged into continuous improvement strategies, plans, and schedules. Targeted initiatives were identified and performed. Change and improvement was not, and is not, without significant and common challenges including limited/fixed budgets, resource availability, data access, natural resistance to change, and numerous other reasons or excuses – we called them ‘off-ramps’ and began to close them one-by-one. The results and outputs were significant and impactful in each organization and across the business with increased productivity, efficiency, visibility, accountability, management, and performance. Stakeholder satisfaction also increased. Cost and time savings allowed to more continuous improvement efforts to be performed. The effort clearly provided clear and measurable return on investment and value. Efforts that once seemed impossible, not feasible, or not achievable were performed. Decades-long issues were solved. ‘Impossible things are simply those which so far have never been done’ said Elbert Hubbard. So what will the next year be for you and your organization? Are you satisfied with the ‘same ‘ol, same ‘ol?’ Will you fall into the complacency trap and believe that change is too difficult, too expensive, and not necessary (or any number of possible excuses) or will you make this year your year or continuous improvement (and every year thereafter…)? Remember – what you do today can improve all your tomorrows’ (Ralph Marston).

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗