Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “request for proposals”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

Extending the Licklider Transmission Protocol to Multi-Band Links

Most deep space missions return data to Earth using links operating at a single frequency band. Indeed, their data requirements are low enough that bandwidth regulations do not constrain the system. In contrast, spacecraft such as Kepler or Europa Clipper are transitioning to a new operational paradigm where engineering and science data are transmitted through simultaneous links operating at different frequency bands (henceforth termed multi-band links). This ensures, for instance, that critical data is correctly received using a well characterized X-band link, while science data at a much larger data rate can be returned efficiently (both in terms of bandwidth and energy) through a Ka-band link.Having a spacecraft establish two simultaneous links with a ground station opens a large span of potential improvements for space communications and mission operations. In this paper, we consider the problem of running a Licklider Transmission Protocol (LTP) session over a multi-band link. LTP is an implementation of a selective Automatic Repeat reQuest (ARQ) protocol, i.e. it ensures correct delivery of data over an error prone link with potentially long propagation delays. To maximize its efficiency in deep space environments, LTP operates in deferred-ACK mode and is typically included as one of the core protocols in the Delay Tolerant Networking (DTN) suite.The contributions of this paper are as follows: First, we propose an extension to LTP for multi-band links (denoted MBLTP) and sketch how it can be implemented without modifying the current definition of LTP data units. Next, we develop bounds on the performance of MBLTP when transmitting a single data file over a multi-band link. Three metrics are considered, file expected delivery time, total energy spent and bundle jitter. The results of the analytic model are first benchmarked against simulations to ensure validity, and then compared against the performance of both traditional LTP and Parallel LTP (PLTP).We demonstrate that MBLTP can significantly reduce the latency and jitter with which data products are delivered to destination over a deep space link compared to LTP at moderate energy cost. Similarly, we also demonstrate that MBLTP outperforms PLTP in all considered metrics.

Sanchez Net, Marc↗

BuildingSync® v.2.7.0 (released 9.11.2025) [SWR-18-28]

BuildingSync® is a building data exchange schema to better enable integration between software tools and building data workflows. The schema's original use case was focused on commercial building energy audits; however, several additional use cases have been realized including building energy modeling and more high-level generic building data exchange. Version 2.7.0 adds new elements for file attachment feature and FederalBuilding, and generalizes usage of Optional Elements (e.g. EquipmentCondition, EquipmentID) to all assets/systems. BuildingSync helps streamline the data exchange process, improving the value of the data, minimizing duplication of effort for subsequent building data collection efforts (including audits), and facilitating the achievement of greater energy efficiency. This in done in part by standardizing on (a) reporting audits in an electronic format, (b) tracking proposed, implemented, and discarded energy conservation measures, and (c) storing building characteristics (at multiple levels) for audits, benchmarking, and building energy analysis. BuildingSync has several documents and tools available to help users understand how to best leverage BuildingSync. The list below are only a subset of the resources available. If new resources are discovered, then feel free to create a new pull request with the additions. Generic BuildingSync information is available on the DOE website and the project website. BuildingSync Examples - These examples are kept up to date and show a wide range of implementations. Any new update to BuildingSync is required to pass validation on these example files. BuildingSync Use Case Validator allows for users to determine if their instance complies with a specific use case for BuildingSync by checking if the required elements are implemented in an uploaded instance. An API is also provided for automated integration into other tools. Also, the website contains an easy way to view the entirety of the schema and how elements relate to the Building Exchange Data Exchange Specification. The Validator is open sourced here Use Case TestSuite provides a Python package for easier generation of BuildingSync use cases. BuildingSync use cases depend on the generation of schematron documents, which is time-consuming and difficult to implement well. The TestSuite allows users to define a use case using a more palatable CSV template, which it then turns into a Schematron document. The source code is available here. BuildingSync to OpenStudio/EnergyPlus. The translator is open sourced here. This project will translate a Level 1 (and partial Level 2) ASHRAE Energy Audit to a fully defined OpenStudio and EnergyPlus model. This project is in early Beta testing and any feedback is welcome!

Long, Nicholas [National Renewable Energy Lab. (NR↗

Target Multiwire for the Fermilab Booster Neutrino Beamline

The Booster Neutrino Beamline experiment requested a new secondary electron emission multiwire profile monitor installation. The device had to be durable in high radiation conditions and mounted within a large 10 foot airtight steel fixture for installation near the beam target. Previous iterations of multiwire suffered radiation damage to both the connectors and wires. To ensure accurate horizontal and vertical beam profile measurements, an updated design was proposed, designed, and constructed. The new BNB multiwire utilizes 3 mil diameter gold-plated tungsten sense wires soldered to vertical and horizontal Alumina-96 ceramic planes, 50 wires per plane. Radiation hard Kapton insulated 30 gauge wires carry the output signals. Profiles are readout through charge integrator scanner electronics. This paper will detail the design and functionality of the BNB target multiwire and present relevant beam profile data.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

SYS-5620-Project - Achieving Robust Laser Performance utilizing Historical Shot Experiments - A Systems Engineering Proposal

The National Ignition Facility (NIF) at Lawrence Livermore National Laboratory precisely guides, amplifies, reflects, and focuses 192 powerful laser beams into a target about the size of a pencil eraser in a few billionths of a second, delivering more than 2 million joules of ultraviolet energy and 500 trillion watts of peak power. A crucial goal of the system is to trigger precise implosions of fuel capsules. This is achieved by delivering all 192 beams at user-specified times and locations on the target, minimizing any deviation from the requested performance. Power requirements can vary substantially on each experiment and the facility supports numerous amplifier pumping configurations and their attendant nonlinear effects. To achieve the tight performance required across such a broad array of configurations, constant comparison of measured and requested power delivery are tracked and long-term trends analyzed as a guide to understanding future performance. A very common question asked is given the current state of the laser today – how well would a similar experiment from the past perform today? Additionally, if one were to specify an alternate amplifier configuration using today’s model would and damage limits be exceeded and would there be an increase in performance. The physics model used to make these predictions and equipment protection checks is called the Virtual Beamline (VBL). VBL is used with an incoming desired pulse shape and energy to be delivered on target, and then does an iterative solve to predict the needed injected pulse in the front-end of the system to achieve this result. To effectively guide and predict future NIF experiment performance, laser scientists explore current amplifier configurations and compare them with historical data utilizing a tool called the Reverify Toolbox.

42 ENGINEERING↗

Queued Up: Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2020

Proposed large-scale electric generation and storage projects must apply for interconnection to the bulk power system via interconnection queues. While many projects that apply for interconnection are not subsequently built, data from these queues nonetheless provide a general indicator for mid-term trends in developer interest. Berkeley Lab compiled and analyzed data from all seven ISOs/RTOs in concert with 35 non-ISO utilities, representing an estimated 85% of all U.S. electricity load. We include all "active" projects in these generation interconnection queues through the end of 2020, as well as data on "completed" and "withdrawn" projects for five of the ISOs (CAISO, ISO-NE, MISO, NYISO, PJM). We find that the total capacity active in the queues is growing year-over-year, with over 750 GW of generation and an estimated 200 GW of storage capacity as of the end of 2020. Solar (462 GW) accounts for a large – and growing – share of generator capacity in the queues. Substantial wind (209 GW) capacity is also in development, 29% of which is for offshore projects (61 GW). In total, about 680 GW of zero-carbon capacity is currently seeking transmission access, as is 74 GW of natural gas capacity. Hybrids now comprise a large – and increasing – share of proposed projects, particularly in CAISO and the non-ISO West. 159 GW of solar hybrids (primarily solar+battery) and 13 GW of wind hybrids are currently active in the queues. However, much of this proposed capacity will not ultimately be built. Among a subset of queues for which data are available, only 24% of the projects seeking connection from 2000 to 2015 have subsequently been built. Completion percentages appear to be declining, and are even lower for wind and solar than other resources. Additionally, wait times are on the rise: in four ISOs, the typical duration from connection request to commercial operation increased from ~1.9 years for projects built in 2000-2009 to ~3.5 years for those built in 2010-2020. There are growing calls for queue reform to reduce cost, lead times, and speculation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A classification procedure for the effective management of changes during the maintenance process

During software operation, maintainers are often faced with numerous change requests. Given available resources such as effort and calendar time, changes, if approved, have to be planned to fit within budget and schedule constraints. In this paper, we address the issue of assessing the difficulty of a change based on known or predictable data. This paper should be considered as a first step towards the construction of customized economic models for maintainers. In it, we propose a modeling approach, based on regular statistical techniques, that can be used in a variety of software maintenance environments. The approach can be easily automated, and is simple for people with limited statistical experience to use. Moreover, it deals effectively with the uncertainty usually associated with both model inputs and outputs. The modeling approach is validated on a data set provided by NASA/GSFC which shows it was effective in classifying changes with respect to the effort involved in implementing them. Other advantages of the approach are discussed along with additional steps to improve the results.

Briand, Lionel C.↗

Multi-modal Energy-optimal Trip Scheduling in Real-time (METS-R) for Transportation Hubs (Final Report)

This report summarizes the work performed under the award number EE0008524. The project develops the Multi-modal Energy-optimal Trip Scheduling in Real-time (METS-R) platform as the next-generation transportation solution based on autonomous electric vehicles (AEV) serving passenger trips from and to urban transportation hubs, to substantially reduce transportation energy consumption. Extensive data collection and analyses were first conducted to understand the demand patterns and energy consumption of hub-based on-road trips. Then, a data-driven framework that consists of an analytical module and a simulation module was proposed. For the analytical module, five planning + operation tools were developed to support the planning and energy-efficient operations of urban AEV services: the charging station planning that robotically allocates charging supplies based on the stationary charging demand distribution; the transit planning and demand adaptive scheduling model that efficiently generates\ candidate transit routes from hubs to other places and dynamically adjusts the transit time table to fit the current demand; the online energy-efficient routing that learns the energy-optimal paths from observations of link-level energy consumption in real-time; the hub-based ridesharing that matches trip requests together with account for the uncertainty of future trip demand and vehicle supply; and finally, the integrated demand prediction and anomaly detection pipeline that leverages the flight/train time table and support other planning/operation tools. To demonstrate the performance of these tools, a scalable high-performance agent-based simulator was built. We divided the urban space into multiple service zones where each zone was considered as an agent for passenger generation and vehicle charging. Two types of AEV agents were coded to model two types of mobility services: AEV taxi and AEV transit. For the AEV taxi, the team implemented the functions of pickup/drop-off passengers, energy-efficient routing, ridesharing, fleet rebalancing, and recharging. For the AEV bus, the team implemented the functions of demand-adaptive route scheduling, passenger boarding, and recharging. A high-performance computing framework was introduced to receive various profiling information (such as link energy updates, vehicle speed) from the simulator instances and communicate the operational commands back to the instances. The numerical experiments show that each of the proposed operational algorithms can reduce energy consumption and improve system efficiency. Furthermore, there exists the need to collectively consider multiple planning + operational strategies as multiple strategies can influence each other in terms of performance impacts. Recommendations for future work related to AEV planning and simulation are discussed.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Inverter Intensive Hybrid Power Plant Modeling with Small-Signal Stability Augmentation through Flexible Operation Mode Transition

Hybrid power plants (HPPs) prompt the penetration of inverter-based renewable energy sources (RES) in transmission systems; however, given their low-inertia nature, HPPs are dominated by power electronic inverters, so there are inevitable challenges in system stability when increasing numbers of HPPs are integrated into the modern power grids. To boost the penetration level of HPPs without jeopardizing system stability, it is desirable to equip them with operational characteristics (i.e., grid-forming capabilities) that are comparable to those of conventional power plants dominated by synchronous generators (SGs). In this paper, a holistic model of inverter intensive HPP is derived and a bi-level hierarchical control is developed to allow HPPs to flexibly switch among the designed operation modes (i.e., P-Q, P-V, and isochronous modes). Compared to SGs, which have limited controllability, the operation mode of each HPP could vary as requested. Such flexible mode transitions could be integrated into the secondary plant-level control and be leveraged as an additional control degree to further augment system stability. Further, the system small-signal stability margin is quantified with varying HPP operation modes. More importantly, modal analysis is thereby conducted to quantify the impacts of mode transition on the system oscillatory modes. The effectiveness of the proposed HPP bi-level hierarchical control is verified using extensive case studies based on the simplified real-world island power grid, and the results validate that the system small-signal stability margin can be enhanced with the additional degree of control flexibility enabled by HPP operation mode transition. The real-time hardware-in-the-loop (HIL) results are also provided to verify the proposed method.

grid-forming control↗

A Dual Polarization, Active, Microstrip Antenna for an Orbital Imaging Radar System Operating at L-Band

A highly successful Earth orbiting synthetic antenna aperture radar (SAR) system, known as the SIR-C mission, was carried into orbit in 1994 on a U.S. Shuttle (Space Transportation System) mission. The radar system was mounted in the cargo bay with no need to fold, or in any other way reduce the size of the antennas for launch. Weight and size were not limited for the L-Band, C-Band, and X-Band radar systems of the SIR-C radar imaging mission; the set of antennas weighed 10,500 kg, the L-Band antenna having the major share of the weight. This paper treats designing an L-Band antenna functionally similar to that used for SIR-C, but at a fraction of the cost and at a weight in the order of 250 kg. Further, the antenna must be folded to fit into the small payload shroud of low cost booster rocket systems. Over 31 square meters of antenna area is required. This low weight, foldable, electronic scanning antenna is for the proposed LightSAR radar system which is to be placed in Earth orbit on a small, dedicated space craft at the lowest possible cost for an efficient L- Band radar imaging system. This LightSAR spacecraft radar is to be continuously available for at least five operational years, and have the ability to map or repeat-map any area on earth within a few days of any request. A microstrip patch array, with microstrip transmission lines heavily employed in the aperture and in the corporate feed network, was chosen as the low cost approach for this active dual-polarization, 80 MHz (6.4%) bandwidth antenna design.

Kelly, Kenneth C.↗

A zero-gravity demonstration of the collision and coalescence of water droplets

The mechanics of the collision and coalescence of liquid droplets is one of the main research areas in the fields of nuclear physics, astrophysics, meteorology and fluid mechanics. The crew members on the Skylab 3 and 4 missions were requested to perform demonstrations of the collision and coalescence of water droplets under the low gravity environment at orbital altitude. In Skylab 4 two water droplets with equal volumes, 30 cu cm each, were used. A dark colored droplet (contaminated with grape drink) moving with a velocity of 3.14 cm/sec collided with a stationary pink colored droplet (contaminated with strawberry drink) and coalescence occurred. Theoretical models are proposed to study the various stages of the collision-coalescence processes. Special considerations are concentrated in the investigation of the bounce-coalescence and coalescence-instability processes. The surface tension of the coalesced droplets was calculated to be 52 dynes/cm in perfect agreement with laboratory measurements made after the flight using a reproduction of the liquids.

Hung, R. J.↗

A Dual Polarization, Active, Microstrip Antenna for an Orbital Imaging Radar System Operating at L-Band

A highly successful Earth orbiting synthetic antenna aperture radar (SAR) system, known as the SIR-C mission, was carried into orbit in 1994 on a U.S. Shuttle (Space Transportation System) mission. The radar system was mounted in the cargo bay with no need to fold, or in any other way reduce the size of the antennas for launch. Weight and size were not limited for the L-Band, C-Band, and X-Band radar systems of the SIR-C radar imaging mission; the set of antennas weighed 10,500 kg, the L-Band antenna having the major share of the weight. This paper treats designing an L-Band antenna functionally similar to that used for SIR-C, but at a fraction of the cost and at a weight in the order of 250 kg. Further, the antenna must be folded to fit into the small payload shroud of low cost booster rocket systems. Over 31 square meters of antenna area is required. This low weight, foldable, electronic scanning antenna is for the proposed LightSAR radar system which is to be placed in Earth orbit on a small, dedicated space craft at the lowest possible cost for an efficient L-Band radar imaging system. This LightSAR spacecraft radar is to be continuously available for at least five operational years, and have the ability to map or repeat-map any area on earth within a few days of any request. A microstrip patch array, with microstrip transmission lines heavily employed in the aperture and in the corporate feed network, was chosen as the low cost approach for this active dual-polarization, 80 MHz (6.4%) bandwidth antenna design.

Kelly, Kenneth C.↗

Analysis of Atmospheric Aerosol Data Sets and Application of Radiative Transfer Models to Compute Aerosol Effects

The Bay Area Environmental Research Institute (BAER) scientists have worked with the NASA Ames Research Center sunphotometer group led by Dr. Philip Russell for many years researching the climatic effects of aerosol particles in the stratosphere and troposphere. We have continued to work with the NASA Ames sunphotometer group in research activities representing funded, peer-reviewed proposals to NASA, NOAA and DOE. The activities are described in those proposals and also in the documents provided to the Grants Office earlier. This is the final report from January 1,2002 - June 30, 2005. The report consists of a compilation of 41 peer-reviewed publications (published, in press or submitted) produced under this Cooperative Agreement and 43 first-authored conference presentations. To save paper, reprints are not included but will, of course, be provided upon request.

Schmid, Beat↗

On Performance Prediction of Big Data Transfer in High-performance Networks

Big data generated by large-scale scientific and industrial applications need to be transferred between different geographical locations for remote storage, processing, and analysis. High-speed dedicated connections provisioned in High-performance Networks (HPNs) are increasingly utilized to carry out such big data transfer. HPN management highly relies on an important capability of performance (mainly throughput) prediction to reserve sufficient bandwidth and meanwhile avoid over-provisioning that may result in unnecessary resource waste. This capability is critical to improving the resource (mainly bandwidth) utilization of dedicated connections and meeting various user requests for data transfer. Conventional methods conduct performance prediction by fitting prior observed transfer history with predefined loss functions, without considering unobservable latent factors such as competing loads on end hosts. Such latent factors also have a significant impact on the application-level data transfer performance, which may result in an inaccurate prediction model. In this paper, we first investigate the impact of latent factors and propose a clustering-based method to eliminate their negative impact on performance prediction. We then develop a robust machine learning-based performance predictor by: i) incorporating the proposed latent factor elimination method into data preprocessing, and ii) adopting a customized domain guided loss function. Extensive experimental results show that our predictor achieves significantly higher prediction accuracy than several other state-of-the-art methods.

Liu, Wuji↗

Performance Targets for Perovskite Photovoltaic Research, Development, and Demonstration Programs

On October 15, 2021, the U.S. Department of Energy Solar Energy Technologies Office (SETO) released the Performance Targets for Perovskite Photovoltaic Research, Development, and Demonstration Programs Request for Information (RFI) for public response and comment. The RFI sought feedback from industry, academia, research laboratories, government agencies, and other stakeholders on efficiency, stability and replicability performance targets for perovskite (PVSK) photovoltaic devices that could be utilized to align community efforts, ensure relevance of potential future funding programs, and accelerate technical and commercial development and de-risking of perovskite technologies. The RFI included the following proposed target matrix for power conversion efficiency (PCE), area, stability, and sample sizes, and included questions on relevance, completeness, and challenges.

14 SOLAR ENERGY↗

Simulation of Mission Phases

This position with the Simulation and Graphics Branch (ER7) at Johnson Space Center (JSC) provided an introduction to vehicle hardware, mission planning, and simulation design. ER7 supports engineering analysis and flight crew training by providing high-fidelity, real-time graphical simulations in the Systems Engineering Simulator (SES) lab. The primary project assigned by NASA mentor and SES lab manager, Meghan Daley, was to develop a graphical simulation of the rendezvous, proximity operations, and docking (RPOD) phases of flight. The simulation is to include a generic crew/cargo transportation vehicle and a target object in low-Earth orbit (LEO). Various capsule, winged, and lifting body vehicles as well as historical RPOD methods were evaluated during the project analysis phase. JSC core mission to support the International Space Station (ISS), Commercial Crew Program (CCP), and Human Space Flight (HSF) influenced the project specifications. The simulation is characterized as a 30 meter +V Bar and/or -R Bar approach to the target object's docking station. The ISS was selected as the target object and the international Low Impact Docking System (iLIDS) was selected as the docking mechanism. The location of the target object's docking station corresponds with the RPOD methods identified. The simulation design focuses on Guidance, Navigation, and Control (GNC) system architecture models with station keeping and telemetry data processing capabilities. The optical and inertial sensors, reaction control system thrusters, and the docking mechanism selected were based on CCP vehicle manufacturer's current and proposed technologies. A significant amount of independent study and tutorial completion was required for this project. Multiple primary source materials were accessed using the NASA Technical Report Server (NTRS) and reference textbooks were borrowed from the JSC Main Library and International Space Station Library. The Trick Simulation Environment and User Training Materials version 2013.0 release was used to complete the Trick tutorial. Multiple network privilege and repository permission requests were required in order to access previous simulation models. The project was also an introduction to computer programming and the Linux operating system. Basic C++ and Python syntax was used during the completion of the Trick tutorial. Trick's engineering analysis and Monte Carlo simulation capabilities were observed and basic space mission planning procedures were applied in the conceptual design phase. Multiple professional development opportunities were completed in addition to project duties during this internship through the System for Administration, Training, and Education Resources for NASA (SATERN). Topics include: JSC Risk Management Workshop, CCP Risk Management, Basic Radiation Safety Training, X-Ray Radiation Safety, Basic Laser Safety, JSC Export Control, ISS RISE Ambassador, Basic SharePoint 2013, Space Nutrition and Biochemistry, and JSC Personal Protective Equipment. Additionally, this internship afforded the opportunity for formal project presentation and public speaking practice. This was my first experience at a NASA center. After completing this internship I have a much clearer understanding of certain aspects of the agency's processes and procedures, as well as a deeper appreciation from spaceflight simulation design and testing. I will continue to improve my technical skills so that I may have another opportunity to return to NASA and Johnson Space Center.

Carlstrom, Nicholas Mercury↗

Third-Party Supplier Risk Re-Classification Using Multi-Model Semantic Voting and External Web Augmentation

Risk decisions in many third-party risk management (TPRM) workflows rely on static inherent risk questionnaires (IRQ). These static forms provide a snapshot of the vendor from the business users’ perspective, as these requests are processed without cross-referencing for evidence. Consequently, responses can be misinformed or embellished with inaccuracies, thereby masking the vendor’s true risk to the enterprise. This paper presents a multi-stage verification framework to augment IRQs with web evidence and a deterministic ensemble of large language model assessors to reclassify risk. In a case study of 100 submissions previously misclassified as low risk, the proposed framework correctly identified 76% of the cases as high risk, while the existing workflow identified none. McNemar’s continuity corrected statistics of 74 were obtained with a two sided p-value of 2.65 × 10-23, indicating a significantly more effective workflow compared to the legacy model.

99 - GENERAL AND MISCELLANEOUS↗

(abstract) Deep Space Network Radiometric Remote Sensing Program

Planetary spacecraft are viewed through a troposphere that absorbs and delays radio signals propagating through it. Tropospheric water, in the form of vapor, cloud liquid,and precipitation , emits radio noise which limits satellite telemetry communication link performance. Even at X-band, rain storms have severely affected several satellite experiments including a planetary encounter. The problem will worsen with DSN implementation of Ka-band becausecommunication link budgets will be dominated by tropospheric conditions. Troposphere-induced propagation delays currently limit VLBI accuracy and are significant sources of error for Doppler tracking. Additionally, the success of radio science programs such as satellite gravity wave experiments and atmospheric occultation experiments depends on minimizing the effect of watervapor-induced prop agation delays. In order to overcome limitations imposed by the troposphere, the Deep Space Network has supported a program of radiometric remote sensing. Currently, water vapor radiometers (WVRs) and microwave temperature profilers (MTPs) support many aspects of the Deep Space Network operations and research and development programs. Their capability to sense atmospheric water, microwave sky brightness, and atmospheric temperature is critical to development of Ka-band telemetry systems, communication link models, VLBI, satellite gravity waveexperiments, and r adio science missions. During 1993, WVRs provided data for propagation mode development, supp orted planetary missions, and demonstrated advanced tracking capability. Collection of atmospheric statistics is necessary to model and predict performance of Ka-band telemetry links, antenna arrays, and radio science experiments. Since the spectrum of weather variations has power at very long time scales, atmospheric measurements have been requested for periods ranging from one year to a decade at each DSN site. The resulting database would provide reliable statistics on daily, monthly, and seasonal variations. Only long-term monitoring will prevent biases from being introduced by an exceptionally wet or dry year. Support for planetary missions included tropospheric calibration for the recent Mars Observer gravity wave experiments and Ka-band link experiment (KaBLE). Additionally, several proposed radio science experiments such as profiling planetary atmospheres using satellite occultations and Ka-band gravitational wave searches require advanced radiometer technology development. Finally, there has been a consistent advanced technology program to advance satellite navigational and tracking capabilities. This year that included an experiment with radiometer based tropospheric calibration for a series of VLBI catalog measurements.

microwave propagation Ka-band weather variations r↗

Deep Space Network Radiometric Remote Sensing Program

Planetary spacecraft are viewed through a troposphere that absorbs and delays radio signals propagating through it. Tropospheric water, in the form of vapor, cloud liquid, and precipitation, emits radio noise which limits satellite telemetry communication link performance. Even at X-band, rain storms have severely affected several satellite experiments including a planetary encounter. The problem will worsen with DSN implementation of Ka-band because communication link budgets will be dominated by tropospheric conditions. Troposphere-induced propagation delays currently limit VLBI accuracy and are significant sources of error for Doppler tracking. Additionally, the success of radio science programs such as satellite gravity wave experiments and atmospheric occultation experiments depends on minimizing the effect of water vapor-induced propagation delays. In order to overcome limitations imposed by the troposphere, the Deep Space Network has supported a program of radiometric remote sensing. Currently, water vapor radiometers (WVRs) and microwave temperature profilers (MTPs) support many aspects of the Deep Space Network operations and research and development programs. Their capability to sense atmospheric water, microwave sky brightness, and atmospheric temperature is critical to development of Ka-band telemetry systems, communication link models, VLBI, satellite gravity wave experiments, and radio science missions. During 1993, WVRs provided data for propagation model development, supported planetary missions, and demonstrated advanced tracking capability. Collection of atmospheric statistics is necessary to model and predict performance of Ka-band telemetry links, antenna arrays, and radio science experiments. Since the spectrum of weather variations has power at very long time scales, atmospheric measurements have been requested for periods ranging from one year to a decade at each DSN site. The resulting database would provide reliable statistics on daily, monthly, and seasonal variations. Only long-term monitoring will prevent biases from being introduced by an exceptionally wet or dry year. Support for planetary missions included tropospheric calibration for the recent Mars Observer gravity wave experiments and Ka-band link experiment (KaBLE). Additionally, several proposed radio science experiments such as profiling planetary atmospheres using satellite occultations and Ka-band gravitational wave searches require advanced radiometer technology development. Finally, there has been a consistent advanced technology program to advance satellite navigational and tracking capabilities. This year that included an experiment with radiometer based tropospheric calibration for a series of VLBI catalog measurements.

tropospheric calibration atmospheric water radio s↗