At least 397 records · Page 22

Report on Progress of correlation of in-situ and ex-situ data and the use of artificial intelligence to predict defects

The Transformational Challenge Reactor (TCR) program is leveraging additive manufacturing (AM) technologies to fabricate nuclear components which will be assembled into a fully functional microreactor core. Compared with traditional manufacturing technologies, AM technologies allow (1) real-time observation of the manufacturing process at a much higher resolution using in-situ monitoring technologies to capture the sensor signatures that scientifically describe each event occurring over time and space and (2) validation of the manufacturing process quality using domain-informed data analytics techniques as a potential qualification and certification methodology for the final component. This report provides an update on the program work on in-situ and ex-situ data correlation and associated data analytics results. Examples are provided to illustrate progress with respect to laser powder bed fusion (L-PBF), binder jetting, computed tomography (CT) reconstruction, and mechanical testing. Elements of the Digital Thread and data management infrastructure are discussed in the main document, and an extensive supplemental appendix is provided detailing the Digital Platform, as well as its implementation and subcomponents. In conclusion, the path forward for the next fiscal year is also discussed.

42 ENGINEERING↗

INL transient reactor restart progress

The United States Department of Energy (DOE) has authorized resumption of transient testing and the restart of the Transient Reactor Test (TREAT) facility. The TREAT reactor was used from 1959 to 1994 to conduct more than 2800 nuclear fuel transient tests prior to being placed in standby in 1994. The plant was extensively upgraded shortly before it was placed in standby. Present day assessments revealed that a sound infrastructure remains at the plant. The assessments included extensive walk-downs and subsequent functional testing. The testing was broad in scope, but ensured that any plant operability issues, including age related degradation were discovered and resolved. The primary age related degradation found was capacitors in Reactor Trip System and Automatic Reactor Control System power supplies. The majority of low voltage power supplies required replacement. Although minimal degradation was evident, in some cases elastomers such as hydraulic hoses were preemptively replaced to take advantage of the existing maintenance window and ensure future reliable operation. Configuration management has been extensively reviewed and the plant components re-labeled using modern standards. The re-labeling required extensive work including updates to plant drawings and procedures. The plant organization has been established to restart the reactor and will subsequently seamlessly transition to reactor operations. For the restart effort, the operating organization is being supplemented by subcontractors including some personnel who were involved in TREAT historical operations. During 2015 and the first half of 2016 substantial progress has been made to renew reactor systems and infrastructure, update procedures and configuration management documents, and put in place a qualified operating organization. Reactor startup is anticipated no later than 2018. (author)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

CaloScore v2: single-shot calorimeter shower simulation with diffusion models

Diffusion generative models are promising alternatives for fast surrogate models, producing high-fidelity physics simulations. However, the generation time often requires an expensive denoising process with hundreds of function evaluations, restricting the current applicability of these models in a realistic setting. In this work, we report updates on the CaloScorearchitecture, detailing the changes in the diffusion process, which produces higher quality samples, and the use of progressive distillation, resulting in a diffusion model capable of generating new samples with a single function evaluation. Here we demonstrate these improvements using the Calorimeter Simulation Challenge 2022 dataset.

47 OTHER INSTRUMENTATION↗

A Hartree-Fock Application Using UPC++ and the New DArray Library

The Hartree-Fock (HF) method is the fundamental first step for incorporating quantum mechanics into many-electron simulations of atoms and molecules, and it is an important component of computational chemistry toolkits like NWChem. The GTFock code is an HF implementation that, while it does not have all the features in NWChem, represents crucial algorithmic advances that reduce communication and improve load balance by doing an up-front static partitioning of tasks, followed by work stealing whenever necessary. To enable innovations in algorithms and exploit next generation exascale systems, it is crucial to support quantum chemistry codes using expressive and convenient programming models and runtime systems that are also efficient and scalable. Here, this paper presents an HF implementation similar to GTFock using UPC++, a partitioned global address space model that includes flexible communication, asynchronous remote computation, and a powerful multidimensional array library. UPC++ offers runtime features that are useful for HF such as active messages, a rich calculus for array operations, hardware-supported fetch-and-add, and functions for ensuring asynchronous runtime progress. We present a new distributed array abstraction, DArray, that is convenient for the kinds of random-access array updates and linear algebra operations on block-distributed arrays with irregular data ownership. Finally, we analyze the performance of atomic fetch-and-add operations (relevant for load balancing) and runtime attentiveness, then compare various techniques and optimizations for each. Our optimized implementation of HF using UPC++ and the DArrays library shows up to 20% improvement over GTFock with Global Arrays at scales up to 24,000 cores.

97 MATHEMATICS AND COMPUTING↗

Enabling the Broader Use of MOOSE for Nuclear Energy and Other Simulation

This Final Scientific and Technical Report summarizes work performed under the Phase IIA SBIR project “Enabling the Broader Use of MOOSE for Nuclear Energy and Other Simulation” (DE-SC0020906) from August 2023 through August 2025. The objective of the Phase IIA effort was to mature and harden capabilities developed during Phase II, with the goal of enabling practical interoperability between Coreform’s isogeometric analysis (IGA) technologies and the Multiphysics Object-Oriented Simulation Environment (MOOSE), while improving robustness, performance, and scalability for complex, nuclear-relevant geometries. Over the course of Phase IIA, the project established and validated an extraction-based interoperability pathway between Coreform tools and MOOSE. A combined mesh and matrix format was defined collaboratively with MOOSE developers and integrated into the solver, enabling standard MOOSE workflows to operate on data exported from Coreform’s IGA and Flex Representation Method (FRM) pipelines. Early demonstrations validated architectural compatibility using linear solid mechanics problems, while later efforts focused on benchmark testing and external use. By the end of the project period, engineers at BWXT were able to independently set up and execute a simulation using the Coreform–MOOSE workflow and provide direct feedback that informed further refinement. In parallel, substantial effort was devoted to improving the robustness of trimmed U-spline construction for complex CAD geometries. A growing test suite of nuclear-relevant models was compiled through collaboration with multiple stakeholders and used to drive extensive bug fixing and reliability improvements. These efforts resulted in improved robustness and performance, including the addition of fallback capabilities that enhance reliability when the underlying commercial CAD kernel fails. Performance-oriented work progressed later in the project, with the development and demonstration of methods to decompose complex geometries into structured subregions and updated data representations to support more efficient solver processing. Additionally, extensive enhancements to threadsafe parallel data structures and trimming operations established a foundation for scalable processing of large assemblies. Collaboration with Sandia National Laboratories on the SGM geometric modeling kernel advanced to a functioning interface test case, positioning the workflow for future kernel integration. Overall, the Phase IIA effort successfully transitioned the project from architectural proof-of-concept to externally exercised, solver-integrated capability, while clarifying remaining technical challenges related to standardization, performance optimization, and kernel integration.

42 ENGINEERING↗

An Update on Monitoring Stellar Orbits in the Galactic Center

Using 25 years of data from uninterrupted monitoring of stellar orbits in the Galactic Center, we present an update of the main results from this unique data set: a measurement of mass and distance to Sgr A*. Our progress is not only due to the eight-year increase in time base, but also to the improved definition of the coordinate system. The star S2 continues to yield the best constraints on the mass of and distance to Sgr A*; the statistical errors of 0.13×10{sup 6} M{sub ⊙} and 0.12 kpc have halved compared to the previous study. The S2 orbit fit is robust and does not need any prior information. Using coordinate system priors, the star S1 also yields tight constraints on mass and distance. For a combined orbit fit, we use 17 stars, which yields our current best estimates for mass and distance: M=4.28±0.10|{sub stat.}±0.21|{sub sys}×10{sup 6} M{sub ⊙} and R{sub 0}=8.32±0.07|{sub stat.}±0.14|{sub sys} kpc. These numbers are in agreement with the recent determination of R {sub 0} from the statistical cluster parallax. The positions of the mass, of the near-infrared flares from Sgr A*, and of the radio source Sgr A* agree to within 1 mas. In total, we have determined orbits for 40 stars so far, a sample which consists of 32 stars with randomly oriented orbits and a thermal eccentricity distribution, plus eight stars that we can explicitly show are members of the clockwise disk of young stars, and which have lower-eccentricity orbits.

79 ASTRONOMY AND ASTROPHYSICS↗

250 kWth Pilot Testing in Support of a 10 MWe Coal-Direct Chemical Looping Demonstration Feasibility Study

The Coal-Direct Chemical Looping (CDCL) process is emerging as a promising technology capable of high efficiency for producing electricity with low cost for carbon capture. In the CDCL process, coal is fully combusted to form carbon dioxide (CO2) and water via reaction with Fe2O3-based oxygen-carrier particles in a moving-bed reducer reactor. During reaction with coal, the Fe2O3 is reduced to form a mixture of Fe and FeO. The reduced particles are then transported to the combustor reactor where they are re-oxidized with air. The oxidation of the Fe and FeO mixture generates heat that can be used to produce steam for power generation. Once the particles are fully regenerated, they are pneumatically recycled to the reducer reactor where another reduction-oxidation (Redox) cycle begins. The Babcock & Wilcox Company (B&W) and The Ohio State University (OSU) have been developing the CDCL technology based on iron-based metal oxide particles circulating in a moving-bed reducer coupled with an entrained-flow combustor. As part of a Phase I effort of a DOE-sponsored project, B&W identified scale-up technology gaps for the coal-direct chemical looping reactor process, most of which fall under the moving-bed reactor design and operation. However, after the Phase I research, B&W concluded that the CDCL technology has the potential of generating electricity while meeting the DOE goals of greater than 90% CO2 capture and less than 35% increase in levelized cost of electricity (LCOE). B&W then moved to a Phase II project to design, build and demonstrate the CDCL technology at a 250 kWth capacity. B&W finished the construction and commissioning of the pilot test facility in 2017. The approach used to design a 250 kWth pilot-scale CDCL facility to investigate the technology gaps is presented. Important lessons from the commissioning activities that would transfer to commercial plant start-up are also shared. The findings from the test program are being incorporated into a Pre-FEED study for a 10 MWe large pilot demonstration. Under a separately-funded heat integration project, B&W and OSU are developing a multiphase computational fluid dynamic model (MFIX) of the combustor to quantify heat transfer to embedded steam generation surface, utilizing pinch analysis (ASPEN Energy Analyzer) to identify potential improvements of the heat integration scheme, and developing an integrated dynamic model (ProTRAX) of the steam turbine coupled with the chemical looping process to identify potential start-up and transient operation issues. Under an advanced control system for optimizing operation, B&W is supporting OSU to install a rules-based optimizer (B&W’s FocalPoint) on their 25 kWt bench-scale facility on the OSU West Campus. Finally, B&W and OSU were recently selected to perform a Phase I Feasibility study to evaluate installation of the 10 MWe pilot at the Dover Power & Light Municipal Power Plant in Dover, Ohio. The feasibility study includes compiling an Environmental Information Volume and generating a cost estimate for the design, construction and commissioning of the plant as well as lining up commitments from potential project participants and funding contributors. Updates on each project will be presented. The status of the technology development will be discussed. We focus on the progress made to date towards closing the technology gaps under each project.

20 FOSSIL-FUELED POWER PLANTS↗

Update on Design of 10 MWe Iron-Based Coal Direct Chemical Looping Demonstration Plant

The Coal-Direct Chemical Looping (CDCL) process is emerging as a promising technology capable of high efficiency for producing electricity with low cost for carbon capture. In the CDCL process, coal is fully combusted to form carbon dioxide (CO2) and water via reaction with Fe2O3-based oxygen-carrier particles in a moving-bed reducer reactor. During reaction with coal, the Fe2O3 is reduced to form a mixture of Fe and FeO. The reduced particles are then transported to the combustor reactor where they are re-oxidized with air. The oxidation of the Fe and FeO mixture generates heat that can be used to produce steam for power generation. Once the particles are fully regenerated, they are pneumatically recycled to the reducer reactor where another reduction-oxidation (Redox) cycle begins. The Babcock & Wilcox Company (B&W) and The Ohio State University (OSU) have been developing the CDCL technology based on iron-based metal oxide particles circulating in a moving-bed reducer coupled with an entrained-flow combustor. As part of a Phase I effort of a DOE-sponsored project, B&W identified scale-up technology gaps for the coal-direct chemical looping reactor process, most of which fall under the moving-bed reactor design and operation. However, after the Phase I research, B&W concluded that the CDCL technology has the potential of generating electricity while meeting the DOE goals of greater than 90% CO2 capture and less than 35% increase in levelized cost of electricity (LCOE). B&W then moved to a Phase II project to design, build and demonstrate the CDCL technology at a 250 kWth capacity. B&W finished the construction and commissioning of the pilot test facility in 2017. The approach used to design a 250 kWth pilot-scale CDCL facility to investigate the technology gaps is presented. Important lessons from the commissioning activities that would transfer to commercial plant start-up are also shared. The findings from the test program are being incorporated into a Pre-FEED study for a 10 MWe large pilot demonstration. Under a separately-funded heat integration project, B&W and OSU are developing a multiphase computational fluid dynamic model (MFIX) of the combustor to quantify heat transfer to embedded steam generation surface, utilizing pinch analysis (ASPEN Energy Analyzer) to identify potential improvements of the heat integration scheme, and developing an integrated dynamic model (ProTRAX) of the steam turbine coupled with the chemical looping process to identify potential start-up and transient operation issues. Under an advanced control system for optimizing operation, B&W is supporting OSU to install a rules-based optimizer (B&W’s FocalPoint) on their 25 kWt bench-scale facility on the OSU West Campus. Finally, B&W and OSU were recently selected to perform a Phase I Feasibility study to evaluate installation of the 10 MWe pilot at the Dover Power & Light Municipal Power Plant in Dover, Ohio. The feasibility study includes compiling an Environmental Information Volume and generating a cost estimate for the design, construction and commissioning of the plant as well as lining up commitments from potential project participants and funding contributors. Updates on each project will be presented. The status of the technology development will be discussed. We focus on the progress made to date towards closing the technology gaps under each project.

20 FOSSIL-FUELED POWER PLANTS↗

Forecasting Megaelectron-Volt Electrons Inside Earth's Outer Radiation Belt: PreMevE 2.0 Based on Supervised Machine Learning Algorithms

We present the recent progress in upgrading a predictive model for megaelectron-volt (MeV) electrons inside the Earth's outer Van Allen belt. This updated model, called PreMevE 2.0, provides improved forecasts, particularly at outer L-shells, by adding upstream solar wind speeds to the model's input parameter list that originally includes precipitating electrons observed at low Earth orbits and MeV electron fluxes in situ measured by a geosynchronous satellite. Furthermore, based on several kinds of linear and artificial neural networks algorithms, a list of models was constructed, trained, validated, and tested with 42-month MeV electron observations from Van Allen Probes. Out-of-sample test results from these models show that, with optimized model hyperparameters and input parameter combinations, the top performer from each category of models has the similar capability of making reliable 1-day (2-day) forecasts of 1-MeV electron flux distributions with performance efficiency values ~0.87 (~0.82) averaged over the L-shell range of 2.8–6.6, significantly outperforming the previous version of PreMevE particularly at L-shells > ~4.5. Interestingly, the linear regression model is often the most successful when compared to other models, which suggests the relationship between dynamics of trapped 1-MeV electrons and precipitating electrons is dominated by linear components. Results also show that PreMevE 2.0 can reasonably well predict the onsets of MeV electron events in 2-day forecasts. PreMevE 2.0 is designed to be driven by observations from longstanding space infrastructure to make high-fidelity forecasts for MeV electrons, thus can be an invaluable space weather forecasting tool for the future.

79 ASTRONOMY AND ASTROPHYSICS↗

Status of the WPEC subgroup 46 - Efficient and effective use of integral experiments for nuclear data validation

The present paper summarizes the current status of the activities of the on-going WPEC subgroup 46 which was the last significant initiative of Massimo before he passed away. The goal of WPEC/SG46 is to define, test and document a methodology to provide unambiguous feedback to the nuclear data evaluator community, based on the joint use of integral experiments and data assimilation techniques. Part of this effort resulted in a renewed analysis of the original Target Accuracy Requirement (TAR) exercise of WPEC/SG26, by adding more diverse nuclear systems and parameters, including reaction channels correlations and a coarser energy group structure; and making use of the progress made in the most recent evaluations in terms of both nuclear data and covariance matrices. The preliminary outcomes of the updated TAR exercise, documented by various groups worldwide are clear already: uncertainty reductions are required for many nuclide-reaction pairs in a variety of energy range if the target uncertainty requirements set by the industry are to be met, especially for k{sub eff}. The inclusion of correlations between the various reaction channels had a major impact on the magnitude of the required uncertainty reduction. Those uncertainty reductions are unlikely to be met by differential measurements alone. However, the selection of relevant integral experiment and a subsequent adjustment procedure may help meet these requirements. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

ATDM ASD report for ECP October 2018

In October the team merged in updated ATDM/Trilinos configuration to include SPARC requirements. Assisted and worked on issues identified by the EMPIRE switchover to the ATDM/Trilinos configuration. Progress was made on automating dashboard triaging. Discovered and began addressing issues with mixed language calling with gcc-7.2 on Power8. Worked on new Python tool to filter CDASH reports to only show new issues. Completed ECP ST review. In October the team put an algorithm in place to prevent inverted elements in SPARC during refinement and worked on tests to morph mesher and should be ready for SGM integration soon. The team worked on solver rebalance and corrected issues. Complete SIMD work. Worked out next steps for solver improvements for EMPIRE. Adjusted some solver settings and to improve performance; strong scaling curves are flat instead of ascending etc. Worked on optimizing kernels for SPARC. Completed ECP ST reviews. The team worked on cleaning up branch for merge into SPARC master dev branch. Progress was made building scripts for catalyst builds on all HPC platforms of interest. Worked on adding TuckerMPl reader as plugin for catalyst. Completed ECP project review. Work has continued on NimbleSM, which now runs in a container and can be used modularly with an MPI code. The team also made progress on a qthreads version of NibleSM. Worked on build system issues within NimbleSM and Sierra for GPUs. Progressed on getting kookfied material models in NimbleSM. The team incorporated panel feedback form ECP project reviews into FY19 plans.

97 MATHEMATICS AND COMPUTING↗

Community Planning for Solar: Compiling a Community Solar Action Plan

This document provides an annotated outline for a Community Solar Action Plan. This document is designed to assist community officials, volunteers, and regional planning agency staff in preparing a draft Community Solar Action Plan for a municipality, community, or other jurisdiction. Preparing a Community Solar Action Plan is the fifth step in the Community Planning for Solar process (ag.umass.edu/solarplanning). The plan is intended to be the culmination of the planning process. The contents of the plan will include summaries of information gathered as part of foregoing steps in the process, including completion of a Solar Resource and Infrastructure Assessment, administering of a Community Solar Survey, interpretation of survey results, and review of Solar Financing and Ownership Options and tools. Once the Community Solar Action Plan has been drafted, it should be reviewed by municipal board and commission members and presented at an open community forum. Any important comments or revisions can be incorporated before the final Community Solar Action Plan is approved and implemented. The approved Community Solar Action Plan is a living document that guides community solar planning action over time. As conditions change, new information becomes available, or actions progress over the life of the plan, adjustments may be necessary to maintain the plan's relevance. The Monitoring, Evaluating, and Updating Your Community Solar Action Plan fact sheet (Step 6, Item a) describes some things to consider when updating the Community Solar Action Plan over time.

14 SOLAR ENERGY↗

A Full-Height Axial P 3 Solver for the 2D/1D Method in MPACT

This report encompasses the efforts to complete L3:RTM.PRT.P15.04, which relates to improvements to the axial solvers in MPACT. Over the past few years, a number of convergence issues have been encountered throughout the 2D/1D calculation. While many of these were related to transport-corrected stability, which has been much improved through the development of multigroup MOC kernels, there are still some instabilities that are more directly related to the 1D axial nodal solvers. The primary focus of this milestone is on the development of a full-height P 3 solver, which solves for a single linear system for the entire rod, compared to the one- and two-node solvers previously available in MPACT. To provide an efficient full-height solver, the SuperLU direct linear solver was leveraged and an alternative rod decomposition scheme is used in favor over the typically employed axial decomposition. In addition to the full-height solver, a number of stability observations are discussed pertaining to (1) cases with thin planes in the axial reflectors, (2) quadratic radial leakage interpolation, (3) the reset sol capability, which reinitializes the solution before continuing the calculation, and (4) the flux threshold used in the radial transverse leakage splitting logic. The last of these was improved by identifying an acceptable threshold, which greatly help provide stability to the default one-node P 3 solver approach. Results demonstrating the full-height solver are presented for (1) a single assembly case from the AP1000 reactor design, (2) VERA Progression Problem 5a, and (3) a Watts Bar Unit 1, Cycle 1 case that demonstrated convergence issues due to thin planes in the axial reflector. In total, the full-height solver appears to be 3–5× slower for the nodal solve time, yield a roughly 10–20% increase in total problem run time, and requires ~5% more memory. However, these increases may be justifiable if the solver is proven to be more stable than the current default. Additionally, the VERA Progression Problem 4a case with the 252-group library is shown for the one-node P 3 solver with the updated threshold for radial transverse leakage splitting. This case also previous failed very early in the calculation, but is now able to run to completion. Brief details are also included related to the refactoring the nodal sweeper design. Previously, all nodal sweeper options were available in one large module, which was cumbersome and difficult to extend. Before the work here began, the design was refactored to include a number of abstract and extended types, which will help make future extensions easier. All-in-all, this milestone successfully implemented a new axial solver and improved the stability of the current default axial solver. However, additional testing will be necessary on new cases that demonstrate convergence issues before a decision can be made to change the current default in MPACT.

97 MATHEMATICS AND COMPUTING↗

Muon neutrino CCQE at MINERvA

A precise understanding of quasi-elastic interactions is crucial to measure neutrino oscillations. The MINERvA experiment is currently working on different analyses of muon neutrino charged current quasi-elastic interactions. Here, we present updates to the previous quasi-elastic measurement, using a new flux, and we present the status of several analyses in progress; including double differential cross sections, a study of final state interactions using a sample with muon and a proton and the status of the CCQE analysis in the medium energy neutrino beam.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

OVERVIEW OF RECENT PU-238 PRODUCTION ACTIVITIES AT IDAHO NATIONAL LABORATORY

The Plutonium Fuel Services (PFS) program at Idaho National Laboratory (INL) is active in the qualification of irradiation targets containing Np-237 for irradiation in the Advanced Test Reactor (ATR) to produce Pu-238 for future NASA missions. INL qualified and loaded 7 targets in ATR’s South Flux Trap (SFT) for cycle 169A, which occurred in Spring 2021. This program was reinitiated after two baseline production targets in three positions validated significant production of Pu-238 [ref.1]. The validation model was followed by the PFS-1 experimental test in the ATRC (Critical) facility [ref.2]. This paper outlines the progress and status of the PFS program. The qualification effort, safety analysis, hardware status, and future activities for qualification of an updated target design for use in the ATR will be discussed.

36 MATERIALS SCIENCE↗

Reactor Design and Decommissioning - An Overview of International Activities in Post Fukushima Era1 - 12396

Accidents at the Fukushima Dai-ichi reactors as a result of the devastating earthquake and tsunami of March 11, 2011 have not only dampened the nuclear renaissance but have also initiated a re-examination of the design and safety features for the existing and planned nuclear reactors. Even though failures of some of the key site features at Fukushima can be attributed to events that in the past would have been considered as beyond the design basis, the industry as well as the regulatory authorities are analyzing what features, especially passive features, should be designed into the new reactor designs to minimize the potential for catastrophic failures. It is also recognized that since the design of the Fukushima BWR reactors which were commissioned in 1971, many advanced safety features are now a part of the newer reactor designs. As the recovery efforts at the Fukushima site are still underway, decisions with respect to the dismantlement and decommissioning of the damaged reactors and structures have not yet been finalized. As it was with Three Mile Island, it could take several decades for dismantlement, decommissioning and clean up, and the project poses especially tough challenges. Near-term assessments have been issued by several organizations, including the IAEA, the USNRC and others. Results of such investigations will lead to additional improvements in system and site design measures including strengthening of the anti-tsunami defenses, more defense-in-depth features in reactor design, and better response planning and preparation involving reactor sites. The question also arises what would the effect be on the decommissioning scene worldwide, and what would the effect be on the new reactors when they are eventually retired and dismantled. This paper provides an overview of the US and international activities related to recovery and decommissioning including the decommissioning features in the reactor design process and examines these from a new perspective in the post Fukushima -accident era. Accidents at the Fukushima Daiichi reactors in the aftermath of the devastating earthquake and tsunami of March 11, 2011 have slowed down the nuclear renaissance world-wide and may have accelerated decommissioning either because some countries have decided to halt or reduce nuclear, or because the new safety requirements may reduce life-time extensions. Even in countries such as the UK and France that favor nuclear energy production existing nuclear sites are more likely to be chosen as sites for future NPPs. Even as the site recovery efforts continue at Fukushima and any decommissioning decisions are farther into the future, the accidents have focused attention on the reactor designs in general and specifically on the Fukushima type BWRs. The regulatory authorities in many countries have initiated a re-examination of the design of the systems, structures and components and considerations of the capability of the station to cope with beyond-design basis events. Enhancements to SSCs and site features for the existing reactors and the reactors that will be built will also impact the decommissioning phase activities. The newer reactor designs of today not only have enhanced safety features but also take into consideration the features that will facilitate future decommissioning. Lessons learned from past management and operation of reactors as well as the lessons from decommissioning are incorporated into the new designs. However, in the post-Fukushima era, the emphasis on beyond-design-basis capability may lead to significant changes in SSCs, which eventually will also have impact on the decommissioning phase. Additionally, where some countries decide to phase out the nuclear power, many reactors may enter the decommissioning phase in the coming decade. While the formal updating and expanding of existing guidance documents for accident cleanup and decommissioning would benefit by waiting until the Fukushima project has progressed sufficiently for that experience to be reliably interpreted, the development of structured on-line sharing of information and especially the creation of an on-line compendium of methods, tools, and techniques by which damaged fuel and other unique situations have been addressed can be addressed sooner and maintained as new problems and solutions arise and are resolved. The IAEA's new 'WEB 2.0 tool' CONNECT is expected to play a significant role in this and related information-sharing activities. The trend in some countries such as the United States has been to re-license the existing reactors for additional twenty years, beyond the original design life. Given the advances in technology over the past four decades, and considering that the newer designs incorporate significant improvements in safety systems, it may not be economical or technically feasible to retrofit enhancements into some of the older reactors. In such cases, the reactors may be retired from service and decommissioned. Overall, the energy demand in the world continues to rise, with sharp increases in the Asian countries, and nuclear power's role in the world's energy supply is expected to continue. Events at Fukushima have led to a re-examination on many fronts, including reactor design and regulatory requirements. Further changes may occur in these areas in the post-Fukushima era. These changes in turn will also impact the world-wide decommissioning scene and the decommissioning phase of the future reactors. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 120B: DOE Portsmouth Paducah Project Office (PPPO) Update

This panel focused on the Portsmouth/Paducah Project Office (PPPO) of the US DOE Office of Environmental Management, Lexington, Kentucky, the US DOE Featured Site for Thursday. It showcased recent progress, challenges and planned efforts in radioactive waste management, waste disposition, environmental remediation and D and D at the Portsmouth (Ohio) and Paducah (KY) Gaseous Diffusion Plant Sites, as well as the Depleted Uranium Hexafluoride (DUF6) Conversion Project with facilities at both sites Presentations proposed include: 1 - Portsmouth/Paducah Project Office (PPPO) (Joel Bradburne, US DOE Portsmouth/Paducah Project Office (USA)); 2 - Portsmouth (Jeff Bettinger, US DOE Portsmouth/Paducah Project Office (USA)); 3 - Paducah (Jennifer Woodard, US DOE Portsmouth/Paducah Project Office (USA)); 4 - Depleted Uranium Hexafluoride Conversion Project (Reinhard Knerr, US DOE Portsmouth/Paducah Project Office (USA)); 5 - Portsmouth Deactivation and Demolition Project (Bob Smith, Fluor-BWXT Portsmouth (USA)); 6 - Paducah Deactivation and Remediation Project (Jeff Bradford, Four Rivers Nuclear Partnership - FRNP (USA)); 7 - Seven Lines-One Project (Zack Smith, SNC Lavalin (USA))

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗