Design Limit Loads and Verification Approach for the TESS Observatory
The Transiting Exoplanet Survey Satellite (TESS) is a NASA Explorer mission. The TESS Observatory is scheduled to launch on Falcon 9 in April 2018. This presentation covers the process used to define and update design limit loads for the observatory, instrument, and components throughout the life of the program. The limit loads that drove the need for a SoftRide isolation system are highlighted. The testing performed to qualify the observatory for launch loads at the instrument and observatory level is also detailed. In addition, exchanges with the launch vehicle provider in terms of loads predictions and hardware for test are discussed along with the associated issues encountered and lessons learned. The loads development and verification success on TESS was a team effort. Orbital ATK is the spacecraft provider, NASA GSFC provides project management and technical oversight, the instrument is managed by MIT Kavli Institute and the instrument cameras are built and tested by MIT Lincoln Laboratory. Since the instrument was designed in parallel with the spacecraft, the instrument design limit loads were developed in partnership with NASA and the instrument team. The three teams collaborated on a regular basis starting in the early design phase and continuing through observatory level testing.