Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “planning under uncertainty”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

Initial Validation of a Simulation System for Studying Interoperability in Future Air Traffic Management Systems

Future air traffic management systems will need to accommodate large numbers of increasingly diverse air vehicles with different operating paradigms. To support this trend, they will digitally share copious amounts of information via a common communication architecture. Operators will deploy programs that create and negotiate flight plans via the architecture’s communication protocols. These programs will autonomously make decisions that must be arbitrated by the architecture and robust to uncertainty. To study interoperability in air traffic management, a new airspace simulation system was composed by integrating a legacy airspace simulation, an air traffic control model, and a new research communication architecture. It was used to evaluate air traffic management concepts by adapting it to handle congested arrival traffic at Newark Liberty International Airport and executing simulations. Results demonstrated the ability of the simulation system to model in detail strategic traffic flow management, predeparture flight planning, and air traffic control working in concert. Subsequent studies can use the simulation system to study interoperability, autonomy, digital communication, and uncertainty in future air traffic management systems.

air traffic control↗

Deploying Intra-hour Uncertainty Analysis Tools to ABB’s GridView - CRADA 445

The quickly-changing generation resource mix in the US grid, with large additions of variable resources, retirements of traditional thermal generation, distributed generation and demand response, are creating new challenges on the traditional operation of both the generation and transmission systems. The ability to perform intra-hour high fidelity production cost modeling (PCM) is needed to allow grid operators and grid planners to integrate high penetration (more than 50%) of variable energy resources, and to make prompt well informed decisions in market operations and planning. In the last decade, PNNL has developed several stand-alone tools to enable grid operators and planners to understand the impact of high variable generation on their systems. These tools have been used is studies such as: (1) Evaluation the benefits of WECC balancing authorities coordination under high variable generation penetration , (2) Benefits of Energy Imbalance Market in the North West Power Pool and (3) Duke Energy and NV Energy solar integration studies. ABB’s GridView is a widely used commercial PCM tool. It is the tool used by WECC and their stakeholders to develop the WECC PCM planning model on bi-annual basis. This proposal is focused on the integrating of PNNL intra-hour uncertainty analysis tools to GridView.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Pliocene Model Intercomparison Project Phase 3 (PlioMIP3) – Science Plan and Experimental Design

The Pliocene Model Intercomparison Project (PlioMIP) was initiated in 2008. Over two phases PlioMIP has helped co-ordinate the experimental design and publication strategy of the community, which has included an increasing number of climate models and modelling groups from around the world. It has engaged with palaeoenvironmental scientists to foster new data synthesis supporting the construction of new model boundary conditions, as well as to facilitate new data-model comparisons. The work has advanced our understanding of Pliocene climates and environments, enhanced our knowledge regarding the ability of complex climate and Earth System models to accurately simulate climate change, and helped to refine our estimates of how sensitive the climate system is to forcing conditions. In this community protocol paper, we outline the scientific plan for PlioMIP Phase 3 (PlioMIP3). This plan provides the required guidance to participating modelling groups from around the world to successfully set up and perform PlioMIP3 climate model experiments. The project is open to new participants from the scientific community (both from the climate modelling and geosciences communities). In PlioMIP3, we retain the PlioMIP2 Core experiments (Eoi 400 , E 280 ) and extend the Core requirements to include either an experiment focussed on the Early Pliocene or an alternative Late Pliocene simulation (or both). These additions (a) allow a comparison of Early and Late Pliocene warm intervals and help build research connections and synergy with the MioMIP (Miocene Model Intercomparison Project - also known as DeepMIP-Miocene) and PlioMioVAR projects (Pliocene-Miocene Variability Working Group), and (b) create an alternative time slice simulation for 3.205 Ma (MIS KM5c) through removal of some of the largest palaeogeographic differences introduced between PlioMIP1 and 2 resulting in minimal land-sea mask variations from the modern. In addition, we present ten optional experiments designed to enhance our assessment of climate sensitivity and to explore the uncertainty in greenhouse gas-related forcing. For the first time, we introduce orbital sensitivity experiments into the science plan, as well as simulations incorporating dynamic vegetation-climate feedbacks and an experiment designed to examine the potential significance of East Antarctic Ice Sheet boundary condition uncertainty. These changes enhance palaeo-to-future scientific connections and enable an exploration of the significance of palaeogeographic uncertainties on climate simulations.

Climate modelling↗

Conflict Resolution for Wind-Optimal Aircraft Trajectories in North Atlantic Oceanic Airspace with Wind Uncertainties

Air traffic in the North Atlantic oceanic airspace (NAT) experiences very strong winds caused by jet streams. Flying wind-optimal trajectories increases individual flight efficiency, which is advantageous when operating in the NAT. However, as the NAT is highly congested during peak hours, a large number of potential conflicts between flights are detected for the sets of wind-optimal trajectories. Conflict resolution performed at the strategic level of flight planning can significantly reduce the airspace congestion. However, being completed far in advance, strategic planning can only use predicted environmental conditions that may significantly differ from the real conditions experienced further by aircraft. The forecast uncertainties result in uncertainties in conflict prediction, and thus, conflict resolution becomes less efficient. This work considers wind uncertainties in order to improve the robustness of conflict resolution in the NAT. First, the influence of wind uncertainties on conflict prediction is investigated. Then, conflict resolution methods accounting for wind uncertainties are proposed.

wind uncertainties↗

A unified ensemble soil moisture dataset across the continental United States

Abstract A unified ensemble soil moisture (SM) package has been developed over the Continental United States (CONUS). The data package includes 19 products from land surface models, remote sensing, reanalysis, and machine learning models. All datasets are unified to a 0.25-degree and monthly spatiotemporal resolution, providing a comprehensive view of surface SM dynamics. The statistical analysis of the datasets leverages the Koppen-Geiger Climate Classification to explore surface SM’s spatiotemporal variabilities. The extracted SM characteristics highlight distinct patterns, with the western CONUS showing larger coefficient of variation values and the eastern CONUS exhibiting higher SM values. Remote sensing datasets tend to be drier, while reanalysis products present wetter conditions. In-situ SM observations serve as the basis for wavelet power spectrum analyses to explain discrepancies in temporal scales across datasets facilitating daily SM records. This study provides a comprehensive soil moisture data package and an analysis framework that can be used for Earth system model evaluations and uncertainty quantification, quantifying drought impacts and land–atmosphere interactions and making recommendations for drought response planning.

54 ENVIRONMENTAL SCIENCES↗

Human Health Risk Assessment for Improper Landfill Disposal of End-of-Life CdTe PV

The present work is a continuation of the 2020 IEA PVPS Task 12 Human Health Risk Assessment Methods for PV Part 3: Module Disposal Risks. The 2020 report performed a human health risk assessment (HHRA) for disposal of a cadmium telluride (CdTe) PV module in an unlined landfill, focusing solely on risks from cadmium. This study extends the 2020 HHRA on CdTe PV, analyzing eleven constituent elements: Cd, Se, Te, Cu, Si, Cr(III), Mo, Sn, Zn, Ni, and Al. The present HHRA was performed through two methods: utilization of the U.S. Environmental Protection Agency's (USEPA) Delisting Risk Assessment Software (DRAS V.4.0) on eight exposure pathways for cancer risk and non-cancer hazards; and comparison of exposure point concentrations to federal standards for groundwater, surface water, air, and soil exposure pathways. Cancer risks and non-cancer hazards posed by elemental leaching through all evaluated exposure pathways, using both methods, were found to be several orders of magnitude below USEPA health-protective thresholds. Cadmium exhibited both the highest risks and lowest uncertainty considering data availability on chemical content, leachate, and federal screening levels.

chemicals↗

Scalable Risk Assessment of Rare Events in Power Systems With Uncertain Wind Generation and Loads

Risk assessment of rare events has become increasingly important in power system planning and operation with the increasing integration of renewable energy and the presence of system uncertainties. However, quantifying the risk posed by rare events via the traditional method, i.e., Monte Carlo sampling (MCS), incurs substantial computational expense stemming from the vast ensemble of power flow simulations. To accelerate the assessment, this paper proposes a Deep Neural Network (DNN)-kernelized vector-valued Gaussian Process (VVGP) approach with excellent computational efficiency while maintaining high accuracy. Consequently, serving as a surrogate model for the power flow solver, the DNN-kernelized VVGP enables significantly faster but accurate risk assessment compared to the power flow solver. The developed surrogate model evaluates low-order N - k events that contain more than 90% instances by adeptly capturing the topological features while the high-order N - k events are assessed via a power flow solver, thereby striking a balance between computational efficiency and uncertainty quantification accuracy. Moreover, the model incorporates a Support Vector Machine (SVM) classifier to resample concerning low-probability tail events to counteract the biases potentially introduced during the DNN-kernelized VVGP evaluations. Simulations conducted on the modified IEEE 24-bus, 118-bus, and European 1354-bus systems demonstrate that the proposed method maintains the accuracy benchmark set by MCS while significantly reducing computational demands in large-scale power systems as compared to other state-of-the-art methods.

17 WIND ENERGY↗

Probabilistic Modeling of Climate Change Impacts on Renewable Energy and Storage Requirements for NM's Energy Transition Act (SAND Report)

This report provides a study of the potential impacts of climate change on intermittent renewable energy resources, battery storage, and resource adequacy in Public Service Company of New Mexico’s Integrated Resource Plan for 2020 – 2040. Climate change models and available data were first evaluated to determine uncertainty and potential changes in solar irradiance, temperature, and wind speed in NM in the coming decades. These changes were then implemented in solar and wind energy models to determine impacts on renewable energy resources in NM. Results for the extreme climate-change scenario show that the projected wind power may decrease by ~13% due to projected decreases in wind speed. Projected solar power may decrease by ~4% due to decreases in irradiance and increases in temperature in NM. Uncertainty in these climate-induced changes in wind and solar resources was accommodated in probabilistic models assuming uniform distributions in the annual reductions in solar and wind resources. Uncertainty in battery storage performance was also evaluated based on increased temperature, capacity fade, and degradation in round-trip efficiency. The hourly energy balance was determined throughout the year given uncertainties in the renewable energy resources and energy storage. The loss of load expectation (LOLE) was evaluated for the 2040 No New Combustion portfolio and found to increase from 0 days/year to a median value of ~2 days/year due to potential reductions in renewable energy resources and battery storage performance and capacity. A rank-regression analyses revealed that battery round-trip efficiency was the most significant parameter that impacted LOLE, followed by solar resource, wind resource, and battery fade. An increase in battery storage capacity to ~25,000 – 30,000 MWh from a baseline value of ~14,000 MWh was required to reduce the median value of LOLE to ~0.2 days/year with consideration of potential climate impacts and battery degradation.

54 ENVIRONMENTAL SCIENCES↗

Annual Report on NCSP Technical Support task in BNL during FY24

This work reports on the investigations done during FY 24 in collaboration with two 2024 Summer undergraduate interns through the DOE SULI and BNL SURP programs. These efforts were partially funded by the Nuclear Criticality Safety Program through the Technical Support Succession Plan task. The first project, developed by Ian Snider, focused on testing the impact of uncertainties in thermal cross sections for multiple materials in nuclear reactor simulations. The second project aimed implement concurrent into BNL’s machine-learning code to correct spin mis-assignments in neutron resonances, the Bayesian Resonance Reclassifier (BRR).

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Sierra/SD – Verification Test Manual – 5.22

Verification and validation (V&V) of scientific computing programs are important at Sandia National Labs due to the expanding role of computational simulation in managing the United States nuclear stockpile. The complexities of structural response calculations used to analyze physical problems, the varieties of codes applied to the calculations, and the importance of accurate predictions when assessing field conditions demand confidence in the consistency and accuracy of computer codes. Confidence in the accuracy of the predictions arising from computer simulations must ultimately be gained through verification and validation. The Sierra salinas structural dynamics analysis code, Sierra/SD, is used at the DOE Laboratories, and in several DOD projects. The roles of Sierra/SD in the qualification of weapon systems and components for normal and hostile environments throughout the Stockpile-to-Target Sequence include to, • Redesign weapon components. • Certify weapon components and systems for target environments such as hypersonic vehicles. • Certify that components will survive the thermal mechanical shock loads associated with hostile environments. • Evaluate current stockpile issues, including issues associated with uncertainty quantification. • Address many other problems that are encountered in stockpile management. The Sierra/SD verification plan is described, and an evolving set of key verification tests are described in detail. The verification tests ensure the correctness of the mathematics and numerical algorithms associated with functionality describing engineering phenomena. Development is in accordance with a set of tailored Software Quality Engineering (SQE) practices. SQE practices guide the overall verification and validation effort.

97 MATHEMATICS AND COMPUTING↗

A Boltzmann machine for the organization of intelligent machines

A three-tier structure consisting of organization, coordination, and execution levels forms the architecture of an intelligent machine using the principle of increasing precision with decreasing intelligence from a hierarchically intelligent control. This system has been formulated as a probabilistic model, where uncertainty and imprecision can be expressed in terms of entropies. The optimal strategy for decision planning and task execution can be found by minimizing the total entropy in the system. The focus is on the design of the organization level as a Boltzmann machine. Since this level is responsible for planning the actions of the machine, the Boltzmann machine is reformulated to use entropy as the cost function to be minimized. Simulated annealing, expanding subinterval random search, and the genetic algorithm are presented as search techniques to efficiently find the desired action sequence and illustrated with numerical examples.

Moed, Michael C.↗

Understanding Maneuver Uncertainties during Inclination Maneuvers of the Aqua Spacecraft

During the Fall 2006 inclination campaign for the Aqua spacecraft it was discovered that there was significant uncertainty in the prediction of the semimajor axis change during a maneuver. The low atmospheric drag environment at the time of the maneuvers amplified the effects of this uncertainty leading to a potential violation of the spacecraft ground-track requirements. In order to understand the uncertainty, a Monte Carlo simulation was developed to characterize the expected semi-major axis change uncertainty given the observed behavior of the spacecraft propulsion and attitude control systems during a maneuver. This expected uncertainty was then used to develop new analysis tools to ensure that future inclination maneuver plans will .meet ground-track control requirements in the presence of the error.

McKinley, David P.↗

Lidar Wind Profiler Comparison to Weather Balloon for Support of Orion Crew Exploration Vehicle Landings

A comparison study by the National Aeronautics and Space Administration Dryden Flight Research Center, Edwards, CA and the Naval Post Graduate School Center for Interdisciplinary Remotely-Piloted Aircraft Studies, Marina, CA was conducted to show the advantages of an airborne wind profiling lidar system in reducing drift uncertainty along a reentry vehicle descent trajectory. This effort was in support of the once planned Orion Crew Exploration Vehicle ground landing. A Twin Otter Doppler Wind Lidar was flown on multiple flights along the approximate ground track of an ascending weather balloons launched from the Marina Municipal Airport. The airborne lidar used was a 5-milli-Joules, 2-micron infrared laser with a 10-centimeter telescope and a two-axis scanner. Each lidar wind profile contains data for an altitude range between the surface and flight altitude of 2,700 meters, processed on board every 20 seconds. In comparison, a typical weather balloon would traverse that same altitude range with a similar data set available in approximately 15-20 minutes. These tests were conducted on November 15 & 16, 2007. Results comparing the balloon and a 10 minute multiple lidar profile averages show a best case absolute difference of 0.18 m/s (0.35 knots) in speed and 1 degree in direction during light and variable (less than 5 knots, without constant direction) wind conditions. These limited test results indicated a standard deviation wind velocity and direction differences of 0.71 m/s (1.3 knots) and 7.17 degrees for 1800Z, and 0.70 m/s (1.3 knots) and 6.79 degrees, outside of cloud layer.

Houtas, Franzeska↗

Lidar Wind Profiler Comparison to Weather Balloon for Support of Orion Crew Exploration Vehicle Landings

A comparison study by the National Aeronautics and Space Administration Dryden Flight Research Center (Edwards, California) and the Naval Post Graduate School Center for Interdisciplinary Remotely-Piloted Aircraft Studies (Marina, California) was conducted to show the advantages of an airborne wind profiling light detection and ranging (lidar) system in reducing drift uncertainty along a reentry vehicle descent trajectory. This effort was in support of the once planned Orion Crew Exploration Vehicle ground landing. A Twin Otter Doppler Wind Lidar was flown on multiple flights along the approximate ground track of each ascending weather balloon launched from the Marina Municipal Airport (Marina, California). The airborne lidar used was a 5-mJ, 2-micron infrared laser with a 10-cm telescope and a two-axis scanner. Each lidar wind profile contains data for an altitude range between the surface and flight altitude of 2.7 km, processed on board every 20 s. In comparison, a typical weather balloon would traverse that same altitude range with a similar data set available in approximately 15 to 20 min. These tests were conducted on November 15 and 16, 2007. Results show a best-case absolute difference of 0.18 m/s (0.35 knots) in speed and 1 degree in direct

Houtas, Franzeska F.↗

Underestimation of Project Costs

Large projects almost always exceed their budgets. Estimating cost is difficult and estimated costs are usually too low. Three different reasons are suggested: bad luck, overoptimism, and deliberate underestimation. Project management can usually point to project difficulty and complexity, technical uncertainty, stakeholder conflicts, scope changes, unforeseen events, and other not really unpredictable bad luck. Project planning is usually over-optimistic, so the likelihood and impact of bad luck is systematically underestimated. Project plans reflect optimism and hope for success in a supposedly unique new effort rather than rational expectations based on historical data. Past project problems are claimed to be irrelevant because "This time it's different." Some bad luck is inevitable and reasonable optimism is understandable, but deliberate deception must be condemned. In a competitive environment, project planners and advocates often deliberately underestimate costs to help gain project approval and funding. Project benefits, cost savings, and probability of success are exaggerated and key risks ignored. Project advocates have incentives to distort information and conceal difficulties from project approvers. One naively suggested cure is more openness, honesty, and group adherence to shared overall goals. A more realistic alternative is threatening overrun projects with cancellation. Neither approach seems to solve the problem. A better method to avoid the delusions of over-optimism and the deceptions of biased advocacy is to base the project cost estimate on the actual costs of a large group of similar projects. Over optimism and deception can continue beyond the planning phase and into project execution. Hard milestones based on verified tests and demonstrations can provide a reality check.

Cost estimation↗

Megadroughts in the Common Era and the Anthropocene

Megadroughts, often lasting multiple decades, have caused major ecological and societal disturbances in the past. While most research has focused on megadroughts in North America, the concept has gained increased international attention in recent years. In this Review, we discuss shared causes and features of Common Era and future megadroughts. Paleoclimate reconstructions spanning the last 2,000 years document the occurrence of megadroughts on every continent, save Antarctica. Megadroughts are often linked to decadal variations in sea surface temperatures, with radiative forcing and land-atmosphere interactions acting as secondary factors. Anthropogenic climate change has already contributed to recent megadroughts in southwestern North America and Chile-Argentina and will likely increase future megadrought risk and severity in many regions. Notably, future megadroughts will be differentiated from past events through higher temperatures, which act as the main driver of increased risk, severity, and impacts. Major deficiencies in our understanding of natural and anthropogenic megadrought processes remain, however. These include 1) sparse high-resolution paleoclimate information over some regions, 2) incomplete representations of internal variability and land-surface processes in climate models, and 3) the undetermined capacity of water-resource management systems to manage megadrought impacts. Resolving these key uncertainties will be necessary to increase confidence in projections of future megadrought risk and resiliency planning.

Droughts↗

Multi-Period Active Distribution Network Planning Using Multi-Stage Stochastic Programming and Nested Decomposition by SDDIP

This paper presents a multi-period active distribution network planning (ADNP) with distributed generation (DG). The objective of the proposed ADNP is to minimize the total planning cost, subject to both investment and operation constraints. The paper proposes a multi-stage stochastic optimization model to address DG uncertainties over several periods, in which the decisions are made sequentially by only using the present-stage information. A nested decomposition method is proposed which applies the stochastic dual dynamic integer programming (SDDIP) method to address computational intractabilities of the proposed ADNP approach. The presented numerical results and discussions on a 33-bus distribution system and a large-scale 906-bus system verify the effectiveness of the proposed ADNP method and its solution method.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Multi-center Airborne Coherent Atmospheric Wind Sensor (MACAWS)

This effort involves development of a calibrated, pulsed coherent CO2 Doppler lidar, followed by a carefully-planned and -executed program of multi-dimensional wind velocity and aerosol backscatter measurements from the NASA DC-8 research aircraft. The lidar, designated as the Multi-center Airborne Coherent Atmospheric Wind Sensor (MACAWS), will be applicable to two research areas. First, MACAWS will enable specialized measurements of atmospheric dynamical processes in the planetary boundary layer and free troposphere in geographic locations and over scales of motion not routinely or easily accessible to conventional sensors. The proposed observations will contribute fundamentally to a greater understanding of the role of the mesoscale, helping to improve predictive capabilities for mesoscale phenomena and to provide insights into improving model parameterizations of sub-grid scale processes within large-scale circulation models. As such, it has the potential to contribute uniquely to major, multi-institutional field programs planned for the mid 1990's. Second, MACAWS measurements can be used to reduce the degree of uncertainty in performance assessments and algorithm development for NASA's prospective Laser Atmospheric Wind Sounder (LAWS), which has no space-based instrument heritage. Ground-based lidar measurements alone are insufficient to address all of the key issues. To minimize costs, MACAWS is being developed cooperatively by the lidar remote sensing groups of the Jet Propulsion Laboratory, NOAA Wave Propagation Laboratory, and MSFC using existing lidar hardware and manpower resources. Several lidar components have already been exercised in previous airborne lidar programs (for example, MSFC Airborne Doppler Lidar System (ADLS) used in 1981,4 Severe Storms Wind Measurement Program; JPL Airborne Backscatter Lidar Experiment (ABLE) used in 1989,90 Global Backscatter Experiment Survey Missions). MSFC has been given responsibility for directing the overall program of instrument development and scientific measurement. The focus of current research and plans for next year are presented.

Rhothermel, Jeffry↗