Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “planning scheduling optimization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

Materials for Advanced Ultrasupercritical Steam Turbines Task 4: Cast Superalloy Development

The Steam Turbine critical stationary structural components are high integrity Large Shell and Valve Casing heavy section Castings, containing high temperature steam under high pressures. Hence to support the development of advanced materials technology for use in an AUSC steam turbine capable of operating with steam conditions of 760°C (1400°F) and 35 Mpa (5000 psia), Casting alloy selection and evaluation of mechanical, metallurgical properties and castability with robust manufacturing methods are mandated. Alloy down select from Phase 1 based on producability criteria and creep rupture properties tested by NETL-Albany and ORNL directed the consortium to investigate cast properties of Haynes 282 and Haynes 263. The goals of Task 4 in Phase 2 are to understand a broader range of mechanical properties, the impact of manufacturing variables on those properties. Scale up the size of heats to production levels to facilitate the understanding of the impact of heat and component weight, on metallurgical and mechanical behavior. GE Power & Water Materials and Processes Engineering for the Phase 2, Task 4.0 Castings work, systematically designed and executed casting material property evaluation, multiple test programs. Starting from 15 lbs. cylinder castings to world’s first 17,000 lbs. poured weight, heavy section large steam turbine partial valve Haynes 282 super alloy casting. This has demonstrated scalability of the material for steam Turbine applications. Activities under Task 4.0, Investigated and characterized various mechanical properties of Cast Haynes 282 and Cast Nimonic 263. The development stages involved were: 1) Small Cast Evaluation: 4 inch diam. Haynes 282 and Nimonic 263 Cylinders. This provided effects of liquidus super heat range and first baseline mechanical data on cast versions of conventional vacuum re-melted and forged Ni based super alloys. 2) Step block castings of 300 lbs. and 600 lbs. Haynes 282 from 2 foundry heats were evaluated which demonstrated the importance of proper heat treat cycles for Homogenization, and Solutionizing parameters selection and implementation. 3) Step blocks casting of Nimonic 263: Carried out casting solidification simulation analysis, NDT inspection methods evaluation, detailed test matrix for Chemical, Tensile, LCF, stress rupture, CVN impact, hardness and J1C Fracture toughness section sensitivity data and were reported. 4) Centrifugal Casting of Haynes 282, weighing 1400 lbs. with hybrid mold (half Graphite and half Chromite sand) mold assembly was cast using compressor casing production tooling. This test provided Mold cooling rates influence on centrifugally cast microstructure and mechanical properties. Graphite mold section out performs sand mold across all temperatures for 0.2% YS; %Elongation, %RA, UTS at 1400°F. Both Stress-LMP and conditional Fracture toughness plots data were in the scatter band of the wrought alloy. 5) Fundamental Studies on Cooling rates and SDAS test program. Evaluated the influence of 6 mold materials Silica, Chromite, Alumina, Silica with Indirect Chills, Zircon and Graphite on casting solidification cooling rates. Actual Casting cooling rates through Liquidus to Solidus phase transition were measured with 3 different locations based thermocouples placed in each mold. Compared with solidification simulation cooling rates and measurement of SDAS, microstructure features were reported. The test results provided engineered casting potential methods, applicable for heavy section Haynes 282 castings for optimal properties, with foundry process methods and tools. 6) Large casting of Haynes 282 Drawings and Engineering FEM models and supplemental requirements with applicable specifications were provided to suppliers for the steam turbine proto type feature valve casing casting. Molding, melting and casting pouring completed per approved Manufacturing Process Plan during 2014 Q4. The partial valve casing was successfully cast after casting methods were validated with solidification simulation analysis and the casting met NDT inspection and acceptance criteria. Heat treated and sectioned to extract trepan samples at different locations comparing with cast on coupons test data. Material properties requisite for design, such as tensile, creep/rupture, LCF, Fracture Toughness, Charpy V-notch chemical analysis testing were carried out. The test results will be presented in the final report. The typical Haynes 282 large size Steam Turbine production casting from Order to Delivery foundry schedule with the activity break up is shown in Figures 107 and 108. • From Purchase Order placement to Casting pouring ~ 26 weeks. 1. Sales and commercial review 3 2. Engineering Drawings/models review 4 3. Pattern and core box manufacturing 6 4. Casting process engineering review 4 5. FEM and solidification simulation analysis 4 6. Gating & Feeder Attachments, Ceramic tiling 2 7. Molding and coremaking production scheduling 6 8. Melting planning and schedule 3 9. Pouring, cooling and shake out 2 • From Pouring to casting Delivery ~ 29 weeks 10. Shot blast and riser cutting, gates removal 3 11. Homogenizing , solutionizing HT furnace prep 4 12. Grinding, Fettling 2 13. Aging HT Cycle, cooling 2 14. VT and LPT NDT inspections 2 15. Radiographic inspection 4 16. Mechanical testing, Chemical analysis test certs 4 17. Casting weld repair upgrades and Aging PWHT 4 18. NDT after weld repairs and casting upgrades 3 19. Casting Final Inspection and test certifications 3 20. Package and delivery 2 Hence the Total Lead time from P.O to Casting delivery is approximately 55 weeks. The Task 4.2 and Task 4.3 activities and reporting completed.

Thangirala, Mani↗

Assessment of wind power scenario creation methods for stochastic power systems operations

Probabilistic scenarios of renewable energy production, such as wind, have been gaining popularity for use in stochastic variants of power systems operations scheduling problems, allowing for optimal decision-making under uncertainty. The quality of the scenarios has a direct impact on the value of the resulting decisions, but until now, methods for creating scenarios have not been compared under realistic operational conditions. Here, we compare the quality of scenario sets created using three different methods, based on a simulated re-enactment of stochastic day-ahead unit commitment and subsequent dispatch for a realistic test system. We create scenarios using a dataset of forecasted and actual wind power values, scaled to evaluate the effects of increasing wind penetration levels. We show that the choice of scenario set can significantly impact system operating cost, renewable energy use, and the ability of the system to meet demand. This result has implications for the ability of system operators to efficiently integrate renewable production into their day-ahead planning, highlighting the need for the use of performance-based assessments for scenario evaluation.

17 WIND ENERGY↗

Deployment of Dynamic Neural Network Optimization to Minimize Heat Rate During Ramping for Coal Power Plants (Final Technical Report)

Much success was achieved throughout the course of this project. A successful implementation of Dynamic Neural Network Optimization (D-NNO) was coupled with Adaptive Predictive Controls (APC) and a novel hardware installation comprised of an advanced sensor network (ASN) measuring mass-weighted averages of flue gas constituents above the horizontal superheater of a coal-fired utility boiler. From 2019 through 2023 (including an extension due to COVID delays), the team was able to prototype, evaluate, deploy, iterate, and ultimately finalize an advanced closed-loop control D-NNO system which demonstrated the ability to: •improve unit efficiency ~2.0% relative to unoptimized operation (represented as total fuel fired per MWh generated) •improve unit NOx emission rates 10%+ beyond static optimization baselines •improve unit temperature stability as much as 58% and on average 12% •improve operating load stability as much as 35% The culmination of this project has generated an advanced methodology of deploying specially designed recurrent neural networks (long short-term memory, gated recurrent unit, encoder-decoder networks, transformers, etc.), customized trajectory planning and closed-loop optimization modules capable of adapting to live electric grid responses and demands, self-tuning and adaptive expert controls constantly adjusting prediction parameters to real-time unit behavior, and a hardware/software package able to reliably calculate net unit heat rate (NUHR) in real-time using flue gas constituents, machine learning, and known combustion relationships. Through this real-time NUHR value, immediate feedback on system adjustments relative to operating efficiency was available, allowing for rapid improvements to system performance. In addition to development and deployment of the advanced D-NNO system, the approach methodology has been readily commercialized through the project platform Griffin Open Systems, LLC, the D-NNO software platform host. Similar methodologies to those developed by this project have already been deployed at 5 other units across the United States, with another 6 implementations scheduled, and more expected. Over the course of the project, multiple academic papers were submitted and accepted for publication within esteemed academic journals, and PhD students were trained and graduated, as well as undergraduate students becoming involved and participating to project objectives.

01 COAL, LIGNITE, AND PEAT↗

HyTES: Thermal Imaging Spectrometer Development

The Jet Propulsion Laboratory has developed the Hyperspectral Thermal Emission Spectrometer (HyTES). It is an airborne pushbroom imaging spectrometer based on the Dyson optical configuration. First low altitude test flights are scheduled for later this year. HyTES uses a compact 7.5-12 micrometer m hyperspectral grating spectrometer in combination with a Quantum Well Infrared Photodetector (QWIP) and grating based spectrometer. The Dyson design allows for a very compact and optically fast system (F/1.6). Cooling requirements are minimized due to the single monolithic prism-like grating design. The configuration has the potential to be the optimal science-grade imaging spectroscopy solution for high altitude, lighter-than-air (HAA, LTA) vehicles and unmanned aerial vehicles (UAV) due to its small form factor and relatively low power requirements. The QWIP sensor allows for optimum spatial and spectral uniformity and provides adequate responsivity which allows for near 100mK noise equivalent temperature difference (NEDT) operation across the LWIR passband. The QWIP's repeatability and uniformity will be helpful for data integrity since currently an onboard calibrator is not planned. A calibration will be done before and after eight hour flights to gage any inconsistencies. This has been demonstrated with lab testing. Further test results show adequate NEDT, linearity as well as applicable earth science emissivity target results (Silicates, water) measured in direct sunlight.

remote sensing↗

Calculation of Operations Efficiency Factors for Mars Surface Missions

For planning of Mars surface missions, to be operated on a sol-by-sol basis by a team on Earth (where a "sol" is a Martian day), activities are described in terms of "sol types" that are strung together to build a surface mission scenario. Some sol types require ground decisions based on a previous sol's results to feed into the activity planning ("ground in the loop"), while others do not. Due to the differences in duration between Earth days and Mars sols, for a given Mars local solar time, the corresponding Earth time "walks" relative to the corresponding times on the prior sol/day. In particular, even if a communication window has a fixed Mars local solar time, the Earth time for that window will be approximately 40 minutes later each succeeding day. Further complexity is added for non-Mars synchronous communication relay assets, and when there are multiple control centers in different Earth time zones. The solution is the development of "ops efficiency factors" that reflect the efficiency of a given operations configuration (how many and location of control centers, types of communication windows, synchronous or non-synchronous nature of relay assets, sol types, more-or-less sustainable operations schedule choices) against a theoretical "optimal" operations configuration for the mission being studied. These factors are then incorporated into scenario models in order to determine the surface duration (and therefore minimum spacecraft surface lifetime) required to fulfill scenario objectives. The resulting model is used to perform "what-if" analyses for variations in scenario objectives. The ops efficiency factor is the ratio of the figure of merit for a given operations factor to the figure of merit for the theoretical optimal configuration. The current implementation is a pair of models in Excel. The first represents a ground operations schedule for 500 sols in each operations configuration for the mission being studied (500 sols was chosen as being a long enough time to capture variations in relay asset interactions, Earth/Mars time phasing, and seasonal variations in holidays). This model is used to estimate the ops efficiency factor for each operations configuration. The second model in a separate Excel spreadsheet is a scenario model, which uses the sol types to rack up the total number of "scenario sols" for that scenario (in other words, the ideal number of sols it would take to perform the scenario objectives). Then, the number of sols requiring ground in the loop is calculated based on the soil types contained in the given scenario. Next, the scenario contains a description of what sequence of operations configurations is used, for how many days each, and this is used with the corresponding ops efficiency factors for each configuration to calculate the "ops duration" corresponding to that scenario. Finally, a margin is applied to determine the minimum surface lifetime required for that scenario. Typically, this level of analysis has not been performed until much later in the mission, and has not been able to influence mission design. Further, the notion of moving to sustainable operations during Prime Mission - and the effect that that move would have on surface mission productivity and mission objective choices - has not been encountered until the most recent rover missions (MSL and Mars 2018).

Layback, Sharon L.↗

Nuclear aircraft carrier inactivation - Execution of waste management initiatives - 15565

After 6 years of planning efforts, in June 2013, Newport News Shipbuilding (NNS) began the execution phase of the inactivation of the USS Enterprise. The USS Enterprise decommissioning involves implementation of a new approach to defueling aircraft carriers, utilizing new processes for defueling and shipment of spent nuclear fuel and waste. During planning for this complex endeavor, NNS developed several process improvement initiatives including streamlining waste management processes and technology insertion using modeling and simulation (M and S) capabilities. One of the new approaches involves the establishment of a Waste Packaging Area (WPA) onboard the ship. The process assists with maximizing waste loading and shipments directly from the ship. Another waste management initiative includes the NNS/ Waste Vendor teaming effort to facilitate more efficient loading and shipment of inactivation waste. With execution underway, these initiatives are being put to the test to see if they can withstand the rigors of day-to-day production. NNS has implemented the use of the Modeling and Simulation (M and S) technology. During the planning phase, the M and S 3D Spatial Arrangement Tool was utilized to determine the optimal equipment layout within the new M-290 facility used for spent fuel packaging and ship-out and to determine the appropriate shipping container placement on the ship to maximize waste loading. The M and S technology proved to be a beneficial application resulting in continued utilization through the execution phase of the carrier inactivation. NNS is currently expanding the M-290 Facility Model to provide a visual representation of the facility, its processes, resources, and variable parameters that can be utilized as a decision support tool through simulation of the spent fuel packaging and ship-out process through the facility's life-cycle. NNS is also expanding the application of the waste management model to effectively predict waste forecast. The simulation model is linked with the defueling schedule which captures the operational elements of the waste flow process. The model extrapolates the data to provide waste generation output to assess the most efficient and cost effective path for radiological waste shipments offsite. The ability to conduct waste forecasting allows streamlining of the waste management process in support of complex defueling operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Prosumer-Based Distributed Autonomous Cyber-Physical Architecture for Ultra-reliable Green Electricity Internetworks

This project, the first of its kind, proposes a new architecture for decentralized management and control of future electricity grids with millions of decision-makers. These economically motivated decision-makers are called prosumers (producer-consumers). Prosumers can produce, consume, and/or store electricity and make strategic decisions enabled by communication networks. Prosumers can be as large as a utility or as small as an electric vehicle or a smart house with a home energy management system. The report first provides an impression of the functionality envisioned in prosumer-based smart grids and the philosophy behind their design. The architecture is intended to provide a platform for many possibilities in service definition and trading. The functionality of the architecture is identified by functional and non-functional requirements related to decentralized control and optimization. In this report, three key technologies are proposed for enabling distributed operation and control in prosumer-based smart grids. The first technology is a cyber-infrastructure model, which provides an underlying framework for distributed communication and computation in smart grids. The model is based on service-oriented computing paradigm and is compatible with the existing service-oriented technologies, used in enterprise computing, such as Web Services. However, it extends these technologies for handling the hard-to-predict real-time aspects of smart grids by introducing resource-aware service deployment and quality-of-service (QoS)-aware service monitoring phases. The second technology is a distributed frequency regulation (DFR) framework, which can ensure midterm frequency stability while avoiding inter-area oscillations and using a limited control effort. DFR can complement today’s Automatic Generation Control (AGC) systems by providing an advanced protocol for coordination between AGC systems of different prosumers. The main advantage of the DFR technology is that each frequency regulator only needs to communicate with its neighbors in the network. The efficacy of DFR is shown through simulations on real-world electric energy systems of different scale and complexity. The third technology introduced in this project is decentralized unit commitment (DUC) for heterogeneous prosumers. The DUC technology is a new scalable method for formulating and solving a distributed energy scheduling problem. The algorithm extends the alternating direction method of multipliers (ADMM) and includes several heuristics to mitigate oscillations and traps in local optimality that result from the nonconvexity of unit commitment. The main advantages of DUC is that it can solve the unit commitment problem for large-scale power systems of more than 3,000 nodes faster than the state-of-the-art, centralized methods, and that it is scalable to energy scheduling problems of prosumer systems of any size. In summary, this report illustrates that the distributed architecture for prosumer-based power grids is an enabler of transforming aging power grids into sustainable, resilient, reliable, and efficient smart grids with some desirable functionalities similar to the Internet.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Dispatch Optimization, System Design and Cost Benefit Analysis of a Nuclear Reactor with Molten Salt Thermal Storage

Variable renewable energy availability has increased the volatility in energy prices in most markets. Nuclear power plants, with a large ratio of capital to variable costs, have historically operated as base load energy suppliers but the need for more flexible operation is increasing. We simulate the techno-economic performance of a 950 MWt nuclear power plant, based on the Westinghouse lead-cooled fast reactor, coupled with molten salt thermal storage as a method for flexible energy dispatch. We use the System Advisor Model to model the nuclear reactor thermal power input and power cycle operating modes. We combine this robust engineering model with a mixed-integer linear program model for optimized dispatch scheduling. We then simulate the coupled nuclear and thermal storage system under different market scenarios with varying price volatility. We find that the coupled plant outperforms the base plant under markets where energy price peaks fluctuate by a factor of two or more about the mean price. We show that a calculated power purchase agreement price for the plant improves by up to 10% when operating under California energy market conditions. Sensitivity analysis on the thermal storage cost shows that the optimal design remains unchanged even when doubling costs.

25 ENERGY STORAGE↗

Application of Banking Scoring and Rating for Coherent Risk Measures in Electricity Systems ABSCORES

This project developed a framework for asset and system risk management that can be incorporated into current electricity system operations to improve economic efficiency and establish an Electric Assets Risk Bureau. We leveraged scoring and ratings from banking and financial institutions alongside current optimization methods in dispatching power systems to help system operators and electricity markets schedule resources. This approach is based on the observation that there are major discrepancies between the power scheduled by a system operator and the actual power generated/consumed. These discrepancies—exacerbated by unplanned contingencies (e.g., natural disasters)—are caused by multiple factors, including the different financial, environmental and risk preferences of power producers, consumers, and aggregators. We developed a framework that counteracts two failures in electricity system operations: imperfect information and missing markets for products. The technical approach included five tasks. Tasks 1 and 2 supported the development of risk scores at the asset level with historical data collected for this project. Tasks 3, 4, and 5 incorporated scoring into decision-making at the system level. The proposed effort achieved PERFORM's Program Objectives because the proposed outputs and algorithms do not exist in the electricity industry and are an innovative approach to managing risk. Since the acknowledged need to better assess and act upon risk profiles for grid assets has not been met by the industry, this project will also impact ARPA-E's Mission Areas, including improving energy efficiency and giving the U.S. a technological lead in advanced energy technologies.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Geosynchronous Orbit Optical Communications Relay Architecture

NASA is planning to fly a Next Generation Tracking and Data Relay Satellite (TDRS) next decade. While the requirements and architecture for that satellite are unknown at this time, NASA is investing in communications technologies that could be deployed on the satellite to provide new communications services. One of those new technologies is optical communications. The Laser Communications Relay Demonstration (LCRD) project, scheduled for launch in December 2017 as a hosted payload on a commercial communications satellite, is a critical pathfinder towards NASA providing optical communications services on the Next Generation TDRS. While it is obvious that a small to medium sized optical communications terminal could be flown on a GEO satellite to provide support to Near Earth missions, it is also possible to deploy a large terminal on the satellite to support Deep Space missions. Onboard data processing and Delay Tolerant Networking (DTN) are two additional technologies that could be used to optimize optical communications link services and enable additional mission and network operations. This paper provides a possible architecture for the optical communications augmentation of a Next Generation TDRS and touches on the critical technology work currently being done at NASA. It will also describe the impact of clouds on such an architecture and possible mitigation techniques.

optics↗

Distributed Energy Resource Optimization Using a Software as Service (SaaS) Approach at the University of California, Davis Campus

Together with OSIsoft LLC as its private sector partner and matching sponsor, the Lawrence Berkeley National Laboratory (Berkeley Lab) won an FY09 Technology Commercialization Fund (TCF) grant from the U.S. Department of Energy. The goal of the project is to commercialize Berkeley Lab's optimizing program, the Distributed Energy Resources Customer Adoption Model (DER-CAM) using a software as a service (SaaS) model with OSIsoft as its first non-scientific user. OSIsoft could in turn provide optimization capability to its software clients. In this way, energy efficiency and/or carbon minimizing strategies could be made readily available to commercial and industrial facilities. Specialized versions of DER-CAM dedicated to solving OSIsoft's customer problems have been set up on a server at Berkeley Lab. The objective of DER-CAM is to minimize the cost of technology adoption and operation or carbon emissions, or combinations thereof. DER-CAM determines which technologies should be installed and operated based on specific site load, price information, and performance data for available equipment options. An established user of OSIsoft's PI software suite, the University of California, Davis (UCD), was selected as a demonstration site for this project. UCD's participation in the project is driven by its motivation to reduce its carbon emissions. The campus currently buys electricity economically through the Western Area Power Administration (WAPA). The campus does not therefore face compelling cost incentives to improve the efficiency of its operations, but is nonetheless motivated to lower the carbon footprint of its buildings. Berkeley Lab attempted to demonstrate a scenario wherein UCD is forced to purchase electricity on a standard time-of-use tariff from Pacific Gas and Electric (PG&E), which is a concern to Facilities staff. Additionally, DER-CAM has been set up to consider the variability of carbon emissions throughout the day and seasons. Two distinct analyses of value to UCD are possible using this approach. First, optimal investment choices for buildings under the two alternative objectives can be derived. Second, a week-ahead building operations forecaster has been written that executes DER-CAM to find an optimal operating schedule for buildings given their expected building energy services requirements, electricity prices, and local weather. As part of its matching contribution, OSIsoft provided a full implementation of PI and a server to install it on at Berkeley Lab. Using the PItoPI protocol, this gives Berkeley Lab researchers direct access to UCD's PI data base. However, this arrangement is in itself inadequate for performing optimizations. Additional data not included in UCD's PI database would be needed and the campus was not able to provide this information. This report details the process, results, and lessons learned of this commercialization project.

25 ENERGY STORAGE↗

GreenThrift: Optimizing Carbon and Cost for Flexible Residential Loads

Reducing buildings’ carbon emissions is an important sustainability challenge. While scheduling flexible building loads has been previously used for a variety of grid and energy optimizations, carbon footprint reduction using such flexible loads poses new challenges since such methods need to balance both energy and carbon costs while also reducing user inconvenience from delaying such loads. This paper highlights the potential conflict between electricity prices and carbon emissions and the resulting trade-offs in carbon-aware and cost-aware load scheduling. To address this trade-off, we propose GreenThrift, a home automation system that leverages the scheduling capabilities of smart appliances and knowledge of future carbon intensity and cost to reduce both the carbon emissions and costs of flexible energy loads. At the heart of GreenThrift is an optimization technique that automatically computes schedules based on user configurations and preferences. We evaluate the effectiveness of GreenThrift using real-world carbon intensity data, electricity prices, and load traces from multiple locations and across different scenarios and objectives. Our results show that GreenThrift can replicate the offline optimal and retains 97% of the savings when optimizing the carbon emissions. Moreover, we show how GreenThrift can balance the conflict between carbon and cost and retain 95.3% and 85.5% of the potential carbon and cost savings, respectively.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Estimating the Need for Medical Intervention due to Sleep Disruption on the International Space Station

During ISS and shuttle missions, difficulties with sleep affect more than half of all US crews. Mitigation strategies to help astronauts cope with the challenges of disrupted sleep patterns can negatively impact both mission planning and vehicle design. The methods for addressing known detrimental impacts for some mission scenarios may have a substantial impact on vehicle specific consumable mass or volume or on the mission timeline. As part of the Integrated Medical Model (IMM) task, NASA Glenn Research Center is leading the development of a Monte Carlo based forecasting tool designed to determine the consumables required to address risks related to sleep disruption. The model currently focuses on the International Space Station and uses an algorithm that assembles representative mission schedules and feeds this into a well validated model that predicts relative levels of performance, and need for sleep (SAFTE Model, IBR Inc). Correlation of the resulting output to self-diagnosed needs for hypnotics, stimulants, and other pharmaceutical countermeasures, allows prediction of pharmaceutical use and the uncertainty of the specified prediction. This paper outlines a conceptual model for determining a rate of pharmaceutical utilization that can be used in the IMM model for comparison and optimization of mitigation methods with respect to all other significant medical needs and interventions.

Myers, Jerry G.↗

Design Requirements and Software Specification for the Autonomous Energy Management Software System for Small Commercial Buildings

Commercial buildings are responsible for approximately 20 percent of the total United States energy consumption and greenhouse gas emissions. Over 85 percent of these buildings lack building automation systems. Many of these buildings are small (<50,000 square feet), underserved, and use rooftop units for heating, ventilation, and air-conditioning needs. Because these buildings lack proper energy management systems, they have several operational deficiencies that lead to excess energy consumption. Studies have shown that managing the rooftop units heating and cooling set points, schedules, setbacks, and optimal start can result in 20 to 25 percent reduction in electricity consumption in small commercial buildings. In addition, improving demand flexibility of these buildings will result additional cost savings for the building owner. Therefore, the Department of Energy’s Building Technologies Office approved a project to address the needs for small commercial buildings. The project is led by Pacific Northwest National Laboratory (PNNL) with Intellimation LLC as the cooperative research and development agreement partner. The primary goal of the project is to develop and validate an autonomous energy management software (AEMS) system that will continuously optimize small commercial building operations by minimizing energy consumption and cost, while providing a solution for maximizing decarbonization benefits from electrification of buildings. The work will leverage the vast experience of PNNL research and development staff who have over two decades of experience in developing and successfully transferring software technologies to the private sector. This solution will be jointly developed with Intellimation, a company that plans to use it to scale their building energy efficiency (EE) and grid services offering. Widespread deployment of the AEMS system will improve the EE and demand flexibility of the building commercial building stock. It should also support cities and states in meeting their climate change mitigation goals. This document describes the various EE and grid service features of the AEMS system, infrastructure and data required to implement those features, and how the features should be automated. It also details how the various features will be tested and validated, including field validation. The document also details what flexibility the users have and how they will be able to leverage those capabilities exercise those. The intent is to create an AEMS system that would support scalable deployment, requires minimal configuration, and is easy to maintain over its expected lifespan. The initial alpha release of AEMS system is planned for March 2023, and the beta release is planned for the summer of 2023. The final release is planned for March 2024. Section 2 of the report documents the relevant building types that AEMS is suitable for. Section 3 documents EE features that will be supported. It will also include the data requirements, hardware requirements, implementation details, and how EE features will be tested and validated. Grid service features will be documented in section 4, including data requirements, hardware requirements, implementation details, and how the services will be tested and validated. Planned next steps are described in section 5.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Alchemy: A Model-Based Approach for 2D to 3D Autonomous Nuclear System Design

Engineering design of nuclear power plant (NPP) piping and equipment systems frequently bypasses crucial 2D system planning, instead moving straight to 3D modeling. This often leads to designs that exceed building envelope constraints, forcing expensive and time-consuming redesigns. When 2D modeling is employed, it typically involves labor-intensive manual workflows that convert 2D drawings into 3D models, resulting in inefficiencies and errors across design iterations. These workflows further suffer from poor software interoperability and dependence on proprietary software ecosystems, thereby contributing to schedule delays and cost overruns. This paper presents Alchemy, an autonomous framework that transforms 2D system definitions into Industry Foundation Classes (IFC)-compliant 3D building information models (BIMs) for expediting nuclear facility design at the conceptual preliminary phase. Using a model-based approach, the framework treats the 2D system diagram as the central reference model employed to automatically generate all subsequent outputs, ensuring consistency between the system definition and the resulting physical design. A web-based interface enables engineers to define hierarchical system topologies including associated equipment, geometric properties, and connectivity requirements. A two-phase equipment layout optimization algorithm automatically computes collision-free spatial configurations within predefined building envelopes. An artificial intelligence (AI)-assisted pipe routing module then generates orthogonal, collision-free routing paths, allowing the user to select either an A* search-based method or an Ant Colony Optimization (ACO)-based method. All outputs are authored natively in IFC format, relying on open-source technologies and standardized formats in order to ensure extensibility and eliminate proprietary software dependencies. The proposed framework is validated on two representative pressurized-water reactor (PWR)-based case studies, for which it autonomously generates IFC-compliant 3D models in minutes, drastically reducing workflows that typically require hours of manual effort. The generated model demonstrates topologically correct equipment placement, physically plausible spatial relationships, and collision-free pipe routing consistent with known PWR loop configurations. This work represents a foundational step toward digital engineering for nuclear facility preliminary design, with future ongoing development targeting design code compliance and expanded system complexity.

97 - MATHEMATICS AND COMPUTING↗

In-service Inspection of Radioactive Waste Tanks at the Savannah River Site – 15410

Liquid radioactive wastes from the Savannah River Site (SRS) separation process are stored in large underground carbon steel tanks. The high level wastes are processed in several of the tanks and then transferred by piping to other site facilities for further processing before they are stabilized in a vitrified or grout waste form. Based on waste removal and processing schedules, many of the tanks will be required to be in service for times exceeding the initial intended life. Until the waste is removed from storage, transferred, and processed, the materials and structures of the tanks must maintain a confinement function by providing a barrier to the environment and by maintaining acceptable structural stability during design basis events, which include loadings from both normal service and abnormal (e.g., earthquake) conditions. A structural integrity program is in place to maintain the structural and leak integrity functions of these waste tanks throughout their intended service life. In-service inspection (ISI) is an essential element of a comprehensive structural integrity program for the waste tanks at the Savannah River Site (SRS). The ISI program was developed to determine the degree of degradation the waste tanks have experienced due to service conditions. As a result of the inspections, an assessment can be made of the effectiveness of corrosion controls for the waste chemistry, which precludes accelerated localized and general corrosion of the waste tanks. Ultrasonic inspections (UT) are performed to detect and quantify the degree of general wall thinning, pitting and cracking as a measure of tank degradation. The results from these inspections through 2013, for the 27 Type III/IIIA tanks, indicate no reportable in-service corrosion degradation in the primary tank (i.e., general, pitting, or cracking). The average wall thickness for all tanks remains above the manufactured nominal thickness minus 0.25 millimeter and the largest pit identified is approximately 1.70 millimeter deep (i.e., less than 10% through-wall). Improvements to the inspection program were recently instituted to provide additional confidence in the degradation rates. Thickness measurements from a single vertical strip along the accessible height of the primary tank have been used as a baseline to compare historical measurements. Changes in wall thickness and pit depths along this vertical strip are utilized to estimate the rate of corrosion degradation. An independent review of the ISI program methodology, results, and path forward was held in August 2009. The review recommended statistical sampling of the tanks to improve the confidence of the single strip inspection program. The statistical sampling plan required that SRS increase the amount of area scanned per tank. Therefore, in addition to the baseline vertical strip that is obtained for historical comparisons, four additional randomly selected vertical strips are inspected. To date, a total of 104 independent vertical strips along the height of the primary tank have been completed. A statistical analysis of the data indicates that at this coverage level there is a 99.5% confidence level that one of the worst 5% of all the vertical strips was inspected. That is, there is a relatively high likelihood that the SRS inspection program has covered one of the most corroded areas of any of the Type III/IIIA waste tanks. These data further support the conclusion that there are no significant indications of wall thinning or pitting. Random sampling will continue to increase the confidence that one of the worst 5% has been inspected. In order to obtain the additional vertical strips, and minimize budget and schedule impacts, data collection speed for the UT system was optimized. Prior to 2009, the system collected data at a rate of 32 square centimeters per minute. The scan rate was increased to 129 - 160 square centimeters per minute by increasing the scanner step and pixel sizes in the data acquisition set-up. Laboratory testing was utilized to optimize the scan index/pixel size such that the requirements for wall thinning and pit detection were still maintained. SRS continues to evaluate improvements to ultrasonic equipment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

In-service inspection of radioactive waste tanks at the Savannah River Site - 15410

Liquid radioactive wastes from the Savannah River Site (SRS) separation process are stored in large underground carbon steel tanks. The high level wastes are processed in several of the tanks and then transferred by piping to other site facilities for further processing before they are stabilized in a vitrified or grout waste form. Based on waste removal and processing schedules, many of the tanks, will be required to be in service for times exceeding the initial intended life. Until the waste is removed from storage, transferred, and processed, the materials and structures of the tanks must maintain a confinement function by providing a barrier to the environment and by maintaining acceptable structural stability during design basis events, which include loadings from both normal service and abnormal (e.g., earthquake) conditions. A structural integrity program is in place to maintain the structural and leak integrity functions of these waste tanks throughout their intended service life. In-service inspection (ISI) is an essential element of a comprehensive structural integrity program for the waste tanks at the Savannah River Site (SRS). The ISI program was developed to determine the degree of degradation the waste tanks have experienced due to service conditions. As a result of the inspections, an assessment can be made of the effectiveness of corrosion controls for the waste chemistry, which precludes accelerated localized and general corrosion of the waste tanks. Ultrasonic inspections (UT) are performed to detect and quantify the degree of general wall thinning, pitting and cracking as a measure of tank degradation. The results from these inspections through 2013, for the 27 Type III/IIIA tanks, indicate no reportable in-service corrosion degradation in the primary tank (i.e., general, pitting, or cracking). The average wall thickness for all tanks remains above the manufactured nominal thickness minus 0.25 millimeter and the largest pit identified is approximately 1.70 millimeter deep (i.e., less than 10% through-wall). Improvements to the inspection program were recently instituted to provide additional confidence in the degradation rates. Thickness measurements from a single vertical strip along the accessible height of the primary tank have been used as a baseline to compare historical measurements. Changes in wall thickness and pit depths along this vertical strip are utilized to estimate the rate of corrosion degradation. An independent review of the ISI program methodology, results, and path forward was held in August 2009. The review recommended statistical sampling of the tanks to improve the confidence of the single strip inspection program. The statistical sampling plan required that SRS increase the amount of area scanned per tank. Therefore, in addition to the baseline vertical strip that is obtained for historical comparisons, four additional randomly selected vertical strips are inspected. To date, a total of 104 independent vertical strips along the height of the primary tank have been completed. A statistical analysis of the data indicates that at this coverage level there is a 99.5% confidence level that one of the worst 5% of all the vertical strips was inspected. That is, there is a relatively high likelihood that the SRS inspection program has covered one of the most corroded areas of any of the Type III/IIIA waste tanks. These data further support the conclusion that there are no significant indications of wall thinning or pitting. Random sampling will continue to increase the confidence that one of the worst 5% has been inspected. In order to obtain the additional vertical strips, and minimize budget and schedule impacts, data collection speed for the UT system was optimized. Prior to 2009, the system collected data at a rate of 32 square centimeters per minute. The scan rate was increased to 129 - 160 square centimeters per minute by increasing the scanner step and pixel sizes in the data acquisition set-up. Laboratory testing was utilized to optimize the scan index/pixel size such that the requirements for wall thinning and pit detection were still maintained. SRS continues to evaluate improvements to ultrasonic equipment. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Wind power forecasting : state-of-the-art 2009.

Many countries and regions are introducing policies aimed at reducing the environmental footprint from the energy sector and increasing the use of renewable energy. In the United States, a number of initiatives have been taken at the state level, from renewable portfolio standards (RPSs) and renewable energy certificates (RECs), to regional greenhouse gas emission control schemes. Within the U.S. Federal government, new energy and environmental policies and goals are also being crafted, and these are likely to increase the use of renewable energy substantially. The European Union is pursuing implementation of its ambitious 20/20/20 targets, which aim (by 2020) to reduce greenhouse gas emissions by 20% (as compared to 1990), increase the amount of renewable energy to 20% of the energy supply, and reduce the overall energy consumption by 20% through energy efficiency. With the current focus on energy and the environment, efficient integration of renewable energy into the electric power system is becoming increasingly important. In a recent report, the U.S. Department of Energy (DOE) describes a model-based scenario, in which wind energy provides 20% of the U.S. electricity demand in 2030. The report discusses a set of technical and economic challenges that have to be overcome for this scenario to unfold. In Europe, several countries already have a high penetration of wind power (i.e., in the range of 7 to 20% of electricity consumption in countries such as Germany, Spain, Portugal, and Denmark). The rapid growth in installed wind power capacity is expected to continue in the United States as well as in Europe. A large-scale introduction of wind power causes a number of challenges for electricity market and power system operators who will have to deal with the variability and uncertainty in wind power generation when making their scheduling and dispatch decisions. Wind power forecasting (WPF) is frequently identified as an important tool to address the variability and uncertainty in wind power and to more efficiently operate power systems with large wind power penetrations. Moreover, in a market environment, the wind power contribution to the generation portofolio becomes important in determining the daily and hourly prices, as variations in the estimated wind power will influence the clearing prices for both energy and operating reserves. With the increasing penetration of wind power, WPF is quickly becoming an important topic for the electric power industry. System operators (SOs), generating companies (GENCOs), and regulators all support efforts to develop better, more reliable and accurate forecasting models. Wind farm owners and operators also benefit from better wind power prediction to support competitive participation in electricity markets against more stable and dispatchable energy sources. In general, WPF can be used for a number of purposes, such as: generation and transmission maintenance planning, determination of operating reserve requirements, unit commitment, economic dispatch, energy storage optimization (e.g., pumped hydro storage), and energy trading. The objective of this report is to review and analyze state-of-the-art WPF models and their application to power systems operations. We first give a detailed description of the methodologies underlying state-of-the-art WPF models. We then look at how WPF can be integrated into power system operations, with specific focus on the unit commitment problem.

17 WIND ENERGY↗