Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “planning and operation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment (CAPSTONE) Mission

NASA has partnered with Advanced Space to develop and build the Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment (CAPSTONE) mission which will serve as a pathfinder for Near Rectilinear Halo Orbit (NHRO) operations around the Moon. The NHRO, (Perilune = 3,200 km; Apolune = 70,000 km) will be the intended orbit for the NASA’s Artemis Gateway lunar orbital platform. The CAPSTONE mission will validate simulations and confirm operational planning for Gateway while also validating performance of navigation and station-keeping requirements for the Power and Propulsion Element. Thus, this mission will provide operational experience to NASA, commercial, and international missions for operations in a demanding orbital regime. The baseline for CAPSTONE is to fly a 12U cubesat developed, integrated, and tested by Tyvak Nanosatellite Systems carrying a payload communications system capable of cross-link ranging with the Lunar Reconnaissance Orbiter (LRO), a dedicated payload flight computer for software demonstration, and a camera. The launch, coordinated by NASA Launch Services Program, will be provided by a Rocket Lab launch vehicle utilizing their new Proton upper stage to deploy the CAPSTONE spacecraft into the lunar orbit. The CAPSTONE mission is targeting a launch no earlier than September 23, 2021. Upon launch, the spacecraft will traverse a highly efficient transfer taking approximately three months to enter a primary demonstration phase in an NRHO for six months followed by a twelve month technology enhancement operations phase. The CAPSTONE Project is lead by Advanced Space, LLC of Boulder Colorado. Spacecraft development and mission operations will be conducted by Tyvak Nanosatellite Systems of Irvine, California. Noted objectives for the CAPSTONE mission will be to demonstrate the accessibility of NHROs, validate key operational concepts in the NHRO environment, lay a foundation for commercial support of future lunar operations and accelerate the availability of peer-to-peer navigation capabilities provided by the Cislunar Autonomous Positioning System (CAPS). The CAPSTONE mission is funded through NASA's Small Spacecraft Technology Program (SSTP), which is one of several programs in NASA’s Space Technology Mission Directorate. SSTP is chartered to develop and demonstrate technologies to enhance and expand the capabilities of small spacecraft with a particular focus on enabling new mission architectures through the use of small spacecraft, expanding the reach of small spacecraft to new destinations, and augmenting future missions with supporting small spacecraft. The launch for the CAPSTONE Mission is provided by Human Exploration & Operations Missions Directorate Advanced Exploration Systems Division. Coordination and Acquisition of the Launch is managed by NASA’s Launch Services Program. The CAPSTONE Mission and project status will be presented.

CAPSTONE↗

STS-78 Space Shuttle Mission Report

The STS-78 Space Shuttle Program Mission Report summarizes the Payload activities as well as the Orbiter, External Tank (ET), Solid Rocket Booster (SRB), Reusable Solid Rocket Motor (RSRM), and the Space Shuttle main engine (SSME) systems performance during the seventy-eighth flight of the Space Shuttle Program, the fifty-third flight since the return-to-flight, and the twentieth flight of the Orbiter Columbia (OV-102). In addition to the Orbiter, the flight vehicle consisted of an ET that was designated ET-79; three SSME's that were designated as serial numbers 2041, 2039, and 2036 in positions 1, 2, and 3, respectively; and two SRB's that were designated BI-081. The RSRM's, designated RSRM-55, were installed in each SRB and the individual RSRM's were designated as 360L055A for the left SRB, and 360L055B for the right SRB. The STS-78 Space Shuttle Program Mission Report fulfills the Space Shuttle Program requirement as documented in NSTS 07700, Volume 7, Appendix E. The requirement stated in that document is that each organizational element supporting the Program will report the results of their hardware (and software) evaluation and mission performance plus identify all related in-flight anomalies. The primary objective of this flight was to successfully perform the planned operations of the Life and Microgravity Spacelab experiments. The secondary objectives of this flight were to complete the operations of the Orbital Acceleration Research Experiment (OARE), Biological Research in Canister Unit-Block II (BRIC), and the Shuttle Amateur Radio Experiment II-Configuration C (SAREX-II). The STS-78 mission was planned as a 16-day, plus one day flight plus two contingency days, which were available for weather avoidance or Orbiter contingency operations. The sequence of events for the STS-78 mission is shown in Table 1, and the Space Shuttle Vehicle Management Office Problem Tracking List is shown in Table 2. The Government Furnished Equipment/Flight Crew Equipment (GFE/FCE) Problem Tracking List is shown in Table 3. The Marshall Space Flight Center (MSFC) Problem Tracking List is shown in Table 4. Appendix A lists the sources of data, both formal and informal, that were used to prepare this report. Appendix B provides the definition of acronyms and abbreviations used throughout the report. All times during the flight are given in Greenwich mean time (G.m.t.) and mission elapsed time (MET).

Fricke, Robert W., Jr.↗

X-ray Cryogenic Facility (XRCF) Handbook

The X-ray & Cryogenic Facility (XRCF) Handbook is a guide for planning operations at the facility. A summary of the capabilities, policies, and procedures is provided to enhance project coordination between the facility user and XRCF personnel. This handbook includes basic information that will enable the XRCF to effectively plan and support test activities. In addition, this handbook describes the facilities and systems available at the XRCF for supporting test operations. 1.2 General Facility Description The XRCF was built in 1989 to meet the stringent requirements associated with calibration of X-ray optics, instruments, and telescopes and was subsequently modified in 1999 & 2005 to perform the challenging cryogenic verification of Ultraviolet, Optical, and Infrared mirrors. These unique and premier specialty capabilities, coupled with its ability to meet multiple generic thermal vacuum test requirements for large payloads, make the XRCF the most versatile and adaptable space environmental test facility in the Agency. XRCF is also recognized as the newest, most cost effective, most highly utilized facility in the portfolio and as one of only five NASA facilities having unique capabilities. The XRCF is capable of supporting and has supported missions during all phases from technology development to flight verification. Programs/projects that have benefited from XRCF include Chandra, Solar X-ray Imager, Hinode, and James Webb Space Telescope. All test programs have been completed on-schedule and within budget and have experienced no delays due to facility readiness or failures. XRCF is currently supporting Strategic Astrophysics Technology Development for Cosmic Origins. Throughout the years, XRCF has partnered with and continues to maintain positive working relationships with organizations such as ATK, Ball Aerospace, Northrop Grumman Aerospace, Excelis (formerly Kodak/ITT), Smithsonian Astrophysical Observatory, Goddard Space Flight Center, University of Alabama Huntsville, and more.

XRCF↗

Systems simulations supporting NASA telerobotics

Two simulation and analysis environments have been developed to support telerobotics research at the Langley Research Center. One is a high-fidelity, nonreal-time, interactive model called ROBSIM, which combines user-generated models of workspace environment, robots, and loads into a working system and simulates the interaction among the system components. Models include user-specified actuator, sensor, and control parameters, as well as kinematic and dynamic characteristics. Kinematic, dynamic, and response analyses can be selected, with system configuration, task trajectories, and arm states displayed using computer graphics. The second environment is a real-time, manned Telerobotic Systems Simulation (TRSS) which uses the facilities of the Intelligent Systems Research Laboratory (ISRL). It utilizes a hierarchical structure of functionally distributed computers communicating over both parallel and high-speed serial data paths to enable studies of advanced telerobotic systems. Multiple processes perform motion planning, operator communications, forward and inverse kinematics, control/sensor fusion, and I/O processing while communicating via common memory. Both ROBSIM and TRSS, including their capability, status, and future plans are discussed. Also described is the architecture of ISRL and recent telerobotic system studies in ISRL.

Harrison, F. W., Jr.↗

Measured vs. Calculated Dose Rates During Ring Injection Dump Replacement

One of the most irradiated Spallation Neutron Source (SNS) accelerator components is the ring injection dump (RID), which is located downstream of the accumulator ring injection section. The unstripped and only partially stripped H - beam, about 5% of the full SNS beam current, is discarded in the injection into the accumulator ring and is redirected to the RID. According to the accelerator operation plan, the beam stop and the window assemblies of the existing RID are removed and replaced when they have reached their end-of-life owing to radiation exposure. This procedure, which includes multiple steps, took place during a facility maintenance period in March 2023. To support work planning and meet as low as reasonably achievable (ALARA) requirements during removal and exchange of the components, dose rates were calculated for each stage of the exchange operation. During each stage, dose rates were measured before and after work. This comparison shows that measured dose rates are within a factor of 2 of the predicted (calculated) dose rates.

43 PARTICLE ACCELERATORS↗

DOE Award No.: DE-FE0023919 Phase 4 Scientific/Technical Report

This is the Phase 4 Report for the ‘Deepwater Methane Hydrate Characterization and Scientific Assessment or Genesis of Methane Hydrates in the Gulf of Mexico (GOM2)’ research project (DOE Award No. DE-FE0023919). The report summarizes activities from October 1, 2019 to September 30, 2020. The project is led by the University of Texas at Austin (UT). The project objective is to gain insight into the nature, formation, occurrence and physical properties of methane hydrate-bearing sediments for the purpose of methane hydrate resource appraisal through the planning and execution of drilling, coring, logging, testing and analytical activities that assess the geologic occurrence, regional context, and characteristics of marine methane hydrate deposits in the Gulf of Mexico outer continental shelf (OCS). We published a dedicated American Association of Petroleum Geologists Bulletin volume describing initial results from the UT-GOM2-1 expedition in Sept. 2020. This is part 1 of a multi-volume commitment by AAPG to this project. We further confirmed that the natural gas in hydrate at GC-955 was formed by primary microbial processes (>76.1 %). The in-situ effective permeability hydrate-bearing sandy silts at the GC-955 reservoir ranges from 0.1 md (1.0×10-16 m2) to 2.4 md (2.4×10-15m2) in cores with 83% to 93% hydrate saturation. The intrinsic permeability (the single phase permeability) is estimated from reconstituted samples to be ~12 md (1.2×10-14 m2) to ~41 md (4.1×10-14 m2). We used observation and models to interpret that the core degradation that is found in pressure cores is due to dissociation of the methane hydrate in the outer circumference of the core and dissolution of that methane into the fresh pore water that the core is stored with. We are designing approaches to minimize this core loss in the future. We spent an enormous amount of effort to further improve the ability of the pressure coring tool (the PCTB) to pressure seal correctly. We completed upgrading the upper section of the PCTB to address poor pressure. We successful tested the modifications at Geotek’s test facility in Salt Lake City (Bench Test II). We completed a Land Test of the PCTB at the Schlumberger Cameron Test and Training Facility (CTTF). The tool did not seal in 6 out of 7 tests and we clearly demonstrated that cuttings were wedging in the ball valve assembly, keeping the ball valve from sealing. We reproduced the failure mechanism observed during the land test at Salt Lake City and confirmed the sensitivity of the ball valve assembly to grit. Geotek designed and tested 9 modifications to address this issue and the PCTB is now 100% successfully sealing in the presence of grit. Our science expedition is scheduled for spring 2022 and we are fully focused on preparing for this. UT and Ohio State completed a Shallow Hazard Assessment report for each proposed UT-GOM2-2 drilling location, pursuant to 30 CFR 250.214(f) and 250.244 (f). The Shallow Hazard Reports will accompany the UT-GOM2-2 Exploration Plan that is submitted to BOEM, and completes the geological and geophysical analysis for UT-GOM2-2 permitting efforts. We updated the UT-GOM2-2 Operations Plan (Version 1). We completed the UT-GOM2-2 Science and Sample Distribution Plan (Version 1). We evaluated the scope, budget, and schedule that would result from using a commercial vessel. We developed detailed drilling schedule, mud volume, and resource estimates. We developed a vessel specification document and a well plan, and sent these documents to prospective vessel contractors.

03 NATURAL GAS↗

Distribution Network Capacity Market Design: Marginal Distribution Capacity Pricing Mechanism for Efficient Investment and Cost Allocation

As electricity markets begin to shift from reliance on large, centralized power plants and towards distributed energy resources (DERs), there is a growing acknowledgement that more efficient planning, operations, and oversight is needed in the distribution system. This paper addresses one step in that direction by proposing an auction mechanism that uses a detailed distribution system planning model that allocates permits to end-used customers who request capacity to install new devices at their location and network upgrade contracts to utilities or 3rd-party companies who offer to upgrade system components. The resulting plan maximizes market surplus, that is, maximizes the total benefit to consumers minus the cost of network upgrades. We apply a marginal pricing scheme to the auction’s results such that the cost of each permits or contracts is differentiated by time and location, based on the Lagrangian multipliers of binding network constraints. These prices are shown to be no greater than the bid price of any awarded contract and no less than the offered cost of any awarded upgrade contract. Furthermore, the nonlinearity of power flows in the planning model result in an additional surplus that would be collected by the entity that hosts the auction, which could then be refunded to market participants or used to cover overhead costs of running the market. We provide four example auction results in a simple three-node distribution feeder to demonstrate the properties of the design. Results suggest that larger or more realistic case studies could be a promising next step.

24 POWER TRANSMISSION AND DISTRIBUTION↗

LANDSAT-D Mission Operations Review (MOR)

The integrated LANDSAT-D systems operation plan is presented and discussed with respect to functional elements, personnel, and procedures. Specifically, a review of the LANDSAT-D program, mission requirements and management, and flight operations is given.

Source record↗

Common Lunar Lander vehicle propulsion system conceptual design

The Common Lunar Lander (CLL) is a concept for a small, unpiloted vehicle which would provide a low-cost capability to land any of a variety of payloads in the 200 kg class at any point on the surface of the moon. Initiated as a precursor mission for the First Lunar Outpost, it also has considerable potential for use by the scientific community at large. A series of studies has been conducted at the NASA Johnson Space Center to define initial requirements and to initiate the design process. This paper describes the propulsion subsystem design as it existed at the CLL System Design Review. The propulsion subsystem design is described in detail along with the planned operations concept, including the unique concept of using pulsing of main engines for thrust modulation. Design options and trades considered and the verification process philosophy which was being planned for the program are discussed.

Hyatt, C. D.↗

Testing and Development of NEA Scout Solar Sail Deployer Mechanism

The Near Earth Asteroid (NEA) Scout is a deep space CubeSat designed to use an 86 square meter solar sail to navigate to a near earth asteroid called VG 1991. The solar sail deployment mechanism aboard NEA Scout has gone through numerous design cycles and ground tests since its conception in 2014. An engineering development unit (EDU) was constructed in the spring of 2016 and since then, the NEA Scout team has completed numerous ground deployments aiming to mature the deployment system and the ground test methods used to validate that system. Testing a large, non-rigid gossamer system in 1G environments has presented its difficulties to numerous solar sailing programs before, but NEA Scout’s size, sail configuration, and budget has led the team to develop new deployment techniques and uncover new practices while improving their test methods. NEA Scout’s spooled sail and boom design differs from any solar sail design to date: a single square sail membrane spooled upon a non-circular mandrel and the booms are spooled on two separate coils. This configuration was necessitated by the 6U footprint and is not common among other solar sailing missions. The program has planned and completed 3 separate full scale sail deployments to date, with a flight sail deployment test scheduled for FY18. The sail deployment tests have helped mature flight operations plans and developed preliminary off-nominal deployment mitigation strategies. The paper entitled “Design and Development of NEA Scout Solar Sail Deployer Mechanism” was presented at the 43rd Aerospace Mechanisms Symposium. Since then, the system has matured and completed ascent vent, random vibration, boom deployment and sail deployment tests. This paper will discuss the lessons learned and advancements made while working on solar sail testing and redesign cycles.

Few, Alex↗

Confidence-Based Buffer for Strategic Deconfliction with Probabilistic Operational Intent

This paper presents a methodology to expand the 95% confidence level of the elliptical geometry given by Unmanned Aircraft System (UAS) operators planning to fly Beyond Visual Line of Sight (BVLOS) to any confidence level before being fed to the strategic deconfliction (SD) module, effectively increasing the separation buffer between Operational Intents (OIs). To assess the performance of this approach, it is integrated within an adaptation of the Rolling Horizon with K-Position Search volume-based strategic deconfliction approach, previously developed at NASA Ames, preventing the 4D overlapping of OIs shaped by ellipses instead of traditional blocks. Safety and efficiency metrics are evaluated through the deconfliction of four simulated package delivery route network structures across the San Francisco Metropolitan Area with increasing numbers of crossing waypoints (network complexity). Safety assessment entails the in-house creation of a metric to quantify collision occurrences per flight hour based on the frequency at which the probabilistic operational volume segments are sampled, whereas efficiency is measured using ground delay. Results indicate that the largest buffer growth occurs when increasing the confidence level beyond 99.9% and demonstrate the negative impact of network complexity on both metrics, regardless of the OI geometry. Further, the ellipse-based SD adaptation more accurately estimates temporal separation at crossings, allowing deconflicted vehicles to be closer together. It is concluded that the proposed methodology enables the desired confidence level to serve as an effective controller of buffer size.

strategic deconfliction↗

Confidence-Based Buffer for Strategic Deconfliction with Probabilistic Operational Intent

This paper presents a methodology to expand the 95% confidence level of the elliptical geometry given by Unmanned Aircraft System (UAS) operators planning to fly Beyond Visual Line of Sight (BVLOS) to any confidence level before being fed to the strategic deconfliction (SD) module, effectively increasing the separation buffer between Operational Intents (OIs). To assess the performance of this approach, it is integrated within an adaptation of the Rolling Horizon with K-Position Search volume-based strategic deconfliction approach, previously developed at NASA Ames, preventing the 4D overlapping of OIs shaped by ellipses instead of traditional blocks. Safety and efficiency metrics are evaluated through the deconfliction of four simulated package delivery route network structures across the San Francisco Metropolitan Area with increasing numbers of crossing waypoints (network complexity). Safety assessment entails the in-house creation of a metric to quantify collision occurrences per flight hour based on the frequency at which the probabilistic operational volume segments are sampled, whereas efficiency is measured using ground delay. Results indicate that the largest buffer growth occurs when increasing the confidence level beyond 99.9% and demonstrate the negative impact of network complexity on both metrics, regardless of the OI geometry. Further, the ellipse-based SD adaptation more accurately estimates temporal separation at crossings, allowing deconflicted vehicles to be closer together. It is concluded that the proposed methodology enables the desired confidence level to serve as an effective controller of buffer size.

safety↗

FCIC Task X - Project Management and Consortium Overview

The objective of the FCIC Program Management Task is to provide scientific direction and leadership to the nine participating labs, and to provide robust project management to ensure robust operational planning and execution. The FCIC directly supports the BETO portfolio by focusing on feedstock variability across the bioenergy value chain, and the Project Management Task ensures the smooth operation of the FCIC, making sure that the 9 independent projects with different objectives have a common focus - understanding and mitigating the impacts of feedstock variability across the value chain.

bioenergy↗

Space Tug - Mission and program planning

An additional propulsive stage, carried in the payload bay, will be necessary for delivery of payloads to orbits beyond those which can be reached by the Shuttle alone. The concept of a reusable third stage, or Space Tug, has been under study for several years. Aspects of space tug operations planning are discussed together with payload studies, shuttle third stage program options, expendable stage studies, growth stage studies, and engine studies. Studies concerning reusable space tugs are considered, giving attention to a minimum development cost tug, a direct developed tug for 1983 operational capability, and a phased developed tug. Payload requirements are examined along with shuttle interface requirements, ground operations, and program options.

Wild, J. W.↗

The cryogenics analysis program for Apollo mission planning and analysis

The cryogenics analysis program was developed as a simplified tool for use in premission planning operations for the Apollo command service module. Through a dynamic development effort, the program has been extended to include real time and postflight analysis capabilities with nominal and contingency planning features. The technical aspects of the program and a comparison of ground test and mission data with data generated by using the cryogenics analysis program are presented. The results of the program capability to predict flight requirements also are presented. Comparisons of data from the program with data from flight results, from a tank qualifications program, and from various system anomalies that have been encountered are discussed. Future plans and additional considerations for the program also are included. Among these plans are a three tank management scheme for hydrogen, venting profile generation for Skylab, and a capability for handling two gas atmospheres. The plan for two gas atmospheres will involve the addition of the capability to handle nitrogen as well as oxygen and hydrogen.

Scott, W.↗

Systems simulations supporting NASA telerobotics

Two simulation and analysis environments have been developed to support telerobotics research at the Langley Research Center. One is a high-fidelity, nonreal-time, interactive model called ROBSIM, which combines user-generated models of workspace environment, robots, and loads into a working system and simulates the interaction among the system components. Models include user-specified actuator, sensor, and control parameters, as well as kinematic and dynamic characteristics. Kinematic, dynamic, and response analyses can be selected, with system configuration, task trajectories, and arm states displayed using computer graphics. The second environment is a real-time, manned Telerobotic Systems Simulation (TRSS) which uses the facilities of the Intelligent Systems Research Laboratory (ISRL). It utilizes a hierarchical structure of functionally distributed computers communicating over both parallel and high-speed serial data paths to enable studies of advanced telerobotic systems. Multiple processes perform motion planning, operator communications, forward and inverse kinematics, control/sensor fusion, and I/O processing while communicating via common memory. This paper describes both ROBSIM and TRSS, including their capability, status, and future plans. Also described is the architecture of ISRL and recent telerobotic system studies in ISRL.

Harrison, F. Wallace, Jr.↗

Spacelab cost reduction alternatives study. Volume 1: Executive summary

Alternative approaches to payload operations planning and control and flight crew training are defined for spacelab payloads with the goal of: lowering FY77 and FY 78 costs for new starts; lowering costs to achieve Spacelab operational capability; and minimizing the cost per Spacelab flight. These alternatives attempt to minimize duplication of hardware, software, and personnel, and the investment in supporting facility and equipment. Of particular importance is the possible reduction of equipment, software, and manpower resources such as comtational systems, trainers, and simulators.

Source record↗

Microgravity science and applications overview - Research, facility and instrumentation development, Space Station Freedom operations and utilization planning

An overview is provided of NASA's Microgravity Science and Applications Program, with emphasis on plans for evolution to the Space Station. The Microgravity Science and Applications Division program consists of two major parts including the ground-based research program and the flight program. Transition to flight experiment status may occur only after the ground-based research and testing demonstrates sufficient technical maturity to assure that scientific objectives can be met in space with a high degree of success. Program strategy calls for a transition to the Space Station Freedom before the end of the century. In this connection, six multi-user facilities are planned to be phased into operation aboard the Space Station over an extended time frame. It is projected that the design of these facilities will evolve based on experience with precursor experiment hardware designed and operated on Skylab and other carriers.

Kicza, M. E.↗