Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “peaking capacity”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

390 records · Page 22

SATS Enhanced Capabilities and Demonstration of Improved Ramp Rates for In-Cell Testing

This report presents the development of the second-generation Severe Accident Test Station, referred to as SATS 2.0. SATS 2.0 represents a major advancement in addressing critical research needs for the United States nuclear industry, particularly in relation to fuel fragmentation, relocation, and dispersal (FFRD) concerns associated with the nuclear industry’s goal to extend fuel burnup beyond a peak rod average of 62 GWd/tU. The central objective of SATS 2.0 was the deployment a new furnace capable of achieving heating rates up to 100°C/s. This achievement addresses critical capability gaps, enabling assessment of prioritized research objectives established by the Electric Power Research Institute’s (EPRI) Collaborative Research on Advanced Fuel Technologies (CRAFT) working group. These research objectives are directly related to high-burnup loss-of-coolant accident (LOCA) conditions and the effects of prolonged exposure to elevated temperatures, both of which are crucial to enhancing nuclear safety and efficiency. The SATS 2.0 system builds upon prior experience with the original SATS system, which focused on evaluating accident-tolerant fuel (ATF) cladding concepts during accident conditions. However, the new system not only expands upon prior core capabilities by achieving higher heating rates with a better furnace but also plans to incorporate novel auxiliary systems to create a versatile platform for addressing current research needs. For example, a system was developed for the quantification and characterization of fission gas released during high-temperature transients. Additionally, in situ measurement capabilities were developed, such as digital image correlation which enabled the real-time capture of strain related to balloon and burst events and fiber-optic sensors that allowed for high-fidelity characterization of temperature gradients. Demonstration tests of the new 12-lamp furnace achieved heating rates up to 120°C/s. Notably, SATS 2.0 demonstrated its capacity to simulate LOCA burst tests at different pressures, yielding burst data that align with historical empirical models. Moreover, the system exhibited its capability to simulate complex conditions observed in anticipated operational occurrences, while effectively mitigating temperature overshoots. These accomplishments mark significant progress toward overcoming FFRD challenges and advancing the United States nuclear industry's safety basis and technical capabilities for extended burnup.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

FY24 Report on Water NSTF Testing: Lower Tank Inlet Piping Configuration

The following report serves as a summary of the accomplishments and testing results by the Natural convection Shutdown heat removal Test Facility (NSTF) experimental program over the past 12-month period. A major activity included reconfiguration of the chimney piping geometry which altered the discharge position into the tank from the original 50% tank height to a new lower position at a 10.9% tank height. This modification increases the volume of available coolant thus extending long-term operating capacity, however also results in a decreased liquid driving head which has the potential to reduce the natural circulation efficiency and decrease overall performance. Examination of the tradeoffs for these two configurations is an area of interest for RCCS designers and drove planned test activities this year. Ten matrix tests were performed in FY24, totaling 195 hours of heated operations and 12.9 MWh of electrical heating throughout the year, with eight classified as Accepted per NQA-1 and two classified as Trending. Testing prior to the facility reconfiguration examined the facility response to throttling at the tank inlet, demonstrating increased sensitivity of flow instabilities to throttling within the two-phase region when compared to throttling at the lower sensitivity single-phase inlet region. Testing after the chimney reconfiguration began with a baseline test at conditions of 80% inventory fill and prototypic thermal power input of 2.1 MW t . In addition to establishing a reference for nominal system behavior and performance, repeat testing with multiple subsequent runs demonstrated strong repeatability between tests performed at the same conditions in this new configuration. These tests also examined if influences would occur to system behavior with installation of new higher-resolution instrumentation within the upper chimney. In this critical region where boiling and flashing phenomena dominate, the test results provided confidence that the new instrumentation does not uncharacteristically influence the observed behaviors. An inventory parametric series was then initiated to examine system behavior with the new chimney configuration at six varying initial inventory levels, ranging from high 80% to low 20% fill. Two-phase oscillations with similar peak and mean flow rates were observed when comparing to the previous mid tank configuration. Generally, similar system response trends with inventory were also observed, such as two phase oscillations suppressing as inventories were lowered. However, in one absolute inventory comparison at the highest fill of 80%, flow oscillations saw a gradual growth over the 4 hours of two-phase operation in the new lower tank inlet configuration, opposite of the gradual dampening observed in the mid tank inlet configuration. This can be attributed to, in part, a greater hydrostatic head pressure above the two-phase discharge region where the boiling front is developed. Furthermore, the change resulted in greater sensitivity to liquid degassing phenomena during single-phase heating, causing loop instabilities to form which trigged moderate flow degradation during the period approaching saturation and boiling conditions. This behavior had been observed previously under some conditions but was a common occurrence in recent testing with the newer lower tank inlet configuration. Initial observations from these first data sets suggest an overall larger window of stability for the mid tank inlet configuration compared to the lower tank inlet. Lastly, the lowest inventory fill test was repeated over an extended testing window to examine depletion behavior. Natural circulation flow and effective heat removal performance were observed during most of the testing period; only after the tank became fully drained (0% fill) did flow stagnate and violent geysering events occur. This early observation confirms one relative advantage over the mid tank inlet configuration, which stagnated under comparable conditions at ~20% inventory remaining in the tank.

42 ENGINEERING↗

EERC Final Topical Report – Findings on Subtask 3.2 – Produced Water Management Through Geologic Homogenization, Conditions, and Reuse

The Energy & Environmental Research Center (EERC) was awarded a contract by the North Dakota Industrial Commission (NDIC) Oil and Gas Research Program (NDIC No. G-051-101) to conduct a study on the recycling of water used in oil and gas operations, also known as produced water, from oil- and gas-producing regions of North Dakota as directed by Section 19 of North Dakota House Bill 1014. This final report provides a compilation of results of the study, which include regulatory, scientific, technological, and feasibility methods and considerations associated with North Dakota produced water management. The report provides a synopsis of this project’s previously submitted produced water assessment report entitled “Produced Water Management and Recycling Options in North Dakota” (Energy & Environmental Research Center, 2020), with updated values provided as appropriate. The report provides the results from the investigation of a novel produced water management strategy, referred to as geologic homogenization, conditioning, and reuse (GHCR), which aims to use a subsurface geologic formation as a natural medium for managing produced water recycling and reuse. Water management is a significant technical and economic challenge for sustainable oil and gas production, and water volumes are intrinsically linked to oil production volumes. North Dakota oil production rose to over 1.5 million barrels (MMbbl)/day in 2019, and despite a downturn in oil price in early 2020, North Dakota oil production has recovered to 1.1 MMbbl/day as of August 2021. Bakken petroleum system development between 2008 and 2020 has resulted in a nearly fourfold increase in produced water volumes to 642 MMbbl/yr in 2020 after peaking at 740 MMbbl/yr in 2019 and a fivefold increase in saltwater disposal (SWD) volumes to 565 MMbbl/yr in 2020 after a peak of 682 MMbbl/yr in 2019. Produced water and SWD volumes are forecasted to double by 2030. SWD is the primary method of produced water management used in North Dakota, with approximately 95% of the SWD volume occurring through subsurface injection into sandstones of the Dakota Group (Dakota). Localized pressurization of the Dakota resulting from SWD and projected increases in produced water volumes could impact the economics of North Dakota oil production. As a result, there is an emerging need to pursue alternative produced water management approaches, including recycling and reuse. While produced water recycling is not yet widespread, commercial operators are making strides in overcoming the technical challenges of using high salinity produced water in completion operations (Marathon Oil, 2020). As water management continues to be a key focal point in companies’ environmental, social, and governance (ESG) initiatives, focus on water management, including recycling, will likely continue to increase. Laboratory column testing, field sample collection, geologic modeling and numerical simulation, and techno-economic analysis all indicate that GHCR could feasibly be implemented as a potential water management option. Laboratory column testing and field sample collection indicate that the Inyan Kara sandstone and native formation fluid are capable of homogenizing with the Bakken produced water to a point where the fluid composition appears to stabilize. Extracting that stabilized fluid could be considered homogeneous and capable of providing individual batches of hydraulic fracturing fluid. Numerical simulation results indicate that extraction of fluids from the Inyan Kara in a GHCR implementation scenario is capable of reducing formation pressure, which would help ease localized pressurization of the Inyan Kara and extend the available capacity for nearby existing SWD wells. Economic analysis indicates that there are scenarios where GHCR implementation can be a competitive or even lower-cost option than a conventional water management approach. Site-specific conditions will dictate the economic potential of GHCR, but potentially attractive sites for GHCR implementation will be those that are located above a pressurized zone of the Inyan Kara, need six or more Bakken infill wells, and face high costs for conventional SWD and/or freshwater. Based on the regulatory review, drilling into the Inyan Kara for SWD and to harness as a source water for industrial use have precedent in North Dakota, and a workable regulatory solution for GHCR seems likely. However, restrictions in the state regarding surface storage and transport of produced fluids may limit some activities, which will affect how GHCR could ultimately be implemented. In summary, this study reveals pursuing GHCR can be a viable approach to water management in North Dakota. The GHCR concept addresses some of the challenges that hinder the more traditional approaches to recycling in the industry. Furthermore, an assessment of the current landscape of water management within the state reveals the ongoing trend of increasing volumes of produced water and SWD. Projections reveal that the volumes of produced water that need to be managed are expected to double over the next decade (Energy & Environmental Research Center, 2020). With the continued development of the Bakken and continuing driving factors related to ESG initiatives, implementing a practice such as GHCR is a feasible approach to adding recycling of produced water to industry within the state. This subtask was cofunded through the EERC–U.S. Department of Energy Joint Program on Research and Development for Fossil Energy-Related Resources Cooperative Agreement No. DE-FE0024233. Nonfederal funding was provided by the North Dakota Industrial Commission Oil and Gas Research Program. References Energy & Environmental Research Center, 2020, Produced water management and recycling options in North Dakota: Final Report for North Dakota Legislative Management Energy Development and Transmission Committee and North Dakota Industrial Commission. Marathon Oil, 2020, Sustainability report: https://cdn.sanity.io/files/ghcnw9z2/website/ 91744eb6ef8fbe59505a911c6b8d2e8dd9a537fa.pdf?dl (accessed November 2021).

02 PETROLEUM↗

Transition Core Planning and Safety Analyses in Support of LEU Fuel Conversion of the University of Missouri Research Reactor (MURR)

The University of Missouri Research Reactor (MURR®) is one of six U.S. High Performance Research Reactors (USHPRR), including one critical facility, that is working with the National Nuclear Security Administration (NNSA) Office of Material Management and Minimization (M3) Reactor Conversion Program to convert from highly enriched uranium (HEU) to low-enriched uranium (LEU) fuel. The M3 Reactor Conversion USHPRR Project objectives include the development of LEU fuel element designs that will ensure safe reactor operations and to maintain the existing experimental performance of each facility. The work is being conducted through many inter-related activities being completed by four Project Pillars: Fuel Qualification (FQ), Fuel Fabrication (FF), Reactor Conversion (RC), and Cross Cutting (CC). A new type of LEU fuel based on an alloy of uranium-10 wt% molybdenum (U-10Mo) is expected to allow the conversion of those USHPRR, like MURR, requiring higher density fuels. The very-high-density LEU U-10Mo monolithic fuel is currently undergoing irradiation testing and post-irradiation examination under a planned and documented fuel qualification effort. The FQ Pillar will document fuel property and fuel performance data and qualify the fuel for use in these reactors. The FF Pillar is fabricating fuel for ongoing and future irradiation tests, as well as conducting fabrication demonstrations to validate or update preliminary fabrication assumptions. The FF Pillar is also working to develop and install commercial manufacturing capacity with the U-10Mo monolithic fuel to produce prototypic fuel. Working with the RC Pillar at Argonne, MURR has progressed through a preliminary fuel element design using preliminary data for the proposed monolithic alloy of U-10Mo. Analyses were completed in previous work that found for typical equilibrium operations with the preliminary LEU fuel element design, in conjunction with a power uprate to 12 MW and appropriate changes to the MURR Limiting safety system settings (LSSS), MURR will have adequate margins to safety for steady-state operations and postulated transient accidents and will have experimental performance in key locations that meets or exceeds current operations with HEU fuel. The purpose of this work is to develop a sequence of transition cycles that will enable MURR to transition from operation with the reactor core loaded with fresh LEU fuel elements only to typical equilibrium operations with mixed-burnup cores following conversion while meeting operational requirements on safety and experimental performance. It is expected that the use of fresh LEU fuel at conversion and subsequent low burnup of the LEU fuel elements that will initially be available for use following conversion will result in critical control blade positions that will substantially change the axial power distribution in the core and the neutron flux available in key experimental locations relative to equilibrium LEU operations. Given the constraints of MURR safety margins, operational practices, and production and research, a novel method has been developed to identify a transition sequence that minimizes the time MURR operates atypically compared to the current prototypic cycles using HEU fuel. The proposed transition sequence moves quickly to the same sort of equilibrium cycles for the LEU fuel that have already been evaluated in documented preliminary safety analyses. Although shifting the neutron flux peak to the lower half of the core during initial cycles with LEU at 12 MW reduces the experiment performance in some key locations relative to current HEU operations at 10 MW, all LEU cores provide an average performance that meets or exceeds that of HEU. An LEU cycle is reached that meets or exceeds the level of experimental performance predicted for current HEU and equilibrium LEU operations in more than 450 key locations identified by a reactor specialist at MURR by the 23rd cycle following conversion and that afterwards will enable MURR to consistently meet its experimental performance requirements. The proposed transition sequence only requires the fabrication of 34 fresh LEU elements in the first year of operation and does not exceed the anticipated availability of fresh elements that can be produced by the fuel fabricator. By the third year after conversion, 22 fresh LEU elements will be required each year, which is the same as expected for equilibrium LEU operations and the same as current operations with HEU fuel. The proposed transition sequence thus combines a relatively short time period before equilibrium burnup is achieved, a temporary increase of fuel elements needed annually relative to typical operations that are within the production capabilities of the fuel fabricator, and demonstrates comparable experimental performance of the LEU cores relative to current HEU operations. Further measures may be taken to reduce any initial experimental performance penalty even further, where possible, by repositioning certain experiments to leverage the increased performance in the lower axial experimental positions in the initial cycles following conversion or leaving the experiments in the irradiation facilities longer in order to achieve the required neutron fluence. This analysis may require refinement depending on the experimental facilities in use at the time of conversion. Nonetheless, the results presented here, including the experimental performance, core burnup, and critical control blade positions throughout the transition cycles, show that the proposed transition cycle fuel management patterns are consistent with what is expected and desired for MURR operation with LEU U-10Mo fuel. Detailed core power distributions from the neutronics models were also used to evaluate safety margins during steady-state operations for the selected transition cycles and the equilibrium LEU core. It is shown that there are adequate safety margins for both steady-state operations and postulated accident scenarios. For the steady-state operations with the preliminary LEU fuel element design the analysis predicts at least 2.49 MW margin to the onset of flow instability at the LSSS power of 15 MW. Considering the LSSS power is 125% of full license power, the margin to OFI is sufficient. In addition, the critical heat flux ratio at LSSS power is well above the requirement of CHFR > 2.0 from NUREG-1537 for all considered cases. For postulated transient accidents, the minimum margin to the fuel temperature safety limit is at least 109 °C. In summary, the proposed sequence of core loadings for MURR operations following conversion to LEU fuel and a power uprate to 12 MW provides sufficient safety margins for both steady-state operations and postulated transient accidents during a proposed sequence of transition cycles to equilibrium operations. Analysis has shown that there are some local experimental performance penalties during the initial cycles. Although there are local shifts in the experimental performance, on average all LEU cores at 12 MW have equal or higher performance than HEU at 10 MW. Temporary adjustments are being planned that will produce suitable experimental performance during these cycles. The results indicate that for the equilibrium LEU core the experimental performance exceeds that of current HEU operations in all key locations while also demonstrating sufficient safety margins.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Biopower: Impact of Biofuels Deployment to Replace Petroleum Liquids in Stationary Power Applications

Petroleum-based liquids are used in a portion of power generation applications in the United States, predominantly in the New England, Middle Atlantic, South Atlantic, and Pacific-Noncontiguous regions. Power plants that burn petroleum liquids, such as distillate or residual fuel oils, are generally used for short periods to accommodate peak electricity demands. The Energy Information Administration (EIA) estimated the U.S. consumption of petroleum liquids for electricity generation at 27 million barrels in 2018, representing a cost of $2.4 billion annually. This study assesses the potential to displace all or part of the petroleum liquids in U.S. power generation with biofuels. The biofuels for this application are assumed to be derived from terrestrial feedstocks, with conversion routes of both fast pyrolysis (bio-oil) and hydrothermal liquefaction (bio-crude). Regional models were used to assess the availability and cost of three different base materials: clean wood, forest residues, and corn stover; each was evaluated in the laboratory at small or experimental scales for conversion to bio-oil or bio-crude. The estimated biofuel production quantities depend on equivalent heating versus the current heavy fuel. In this report, the availability of each type of biomass for each section of the U.S. Census division is estimated using a conservative broker price (in each case) of $ 80 per dry tonne. The results show that the petroleum-liquid power generation in each of the Census Divisions could be supplied by one or more of the feedstocks evaluated. For all regions, clean wood supplies (only) could provide ample supply. For all but two regions (Middle Atlantic and New England), forest residues alone are sufficient. Finally, for all regions but three (Middle Atlantic, New England, and South Atlantic), corn stover alone is adequate. The Minimum Fuel Selling Price (MFSP) of bio-oil and bio-crude were also estimated for each feedstock type and Census Division. This analysis showed that fast pyrolysis bio-oil projections to be lower (14% on average) than current wholesale petroleum-based heating oil prices in each of the regions, assuming 100 dry tonnes/day processing capacity. However, bio-crude predictions were significantly higher (2X) in all cases. The effect of biorefinery size was also quantified. Based on the preliminary results in this study, it is apparent the biofuels could be an economical alternative for current petroleum liquids in U.S. power generation. However, additional research is needed to determine the necessary biofuel characteristics to support existing generation equipment. It is recommended that both power generation and biofuel production stakeholders to be engaged to outline the research and testing needed to identify the technical hurdles to enable the opportunity.

02 PETROLEUM↗

Performance Testing of an Integrated Magnetic Power Take-Off

A wave energy converter (WEC) and the power take-off (PTO) generator system can be represented by using a mass-spring-dampener model. By incorporating a negative stiffness spring within the PTO, the overall stiffness of the PTO can be lowered allowing the impedance of the PTO to be more closely matched with the WEC. By designing for impedance matching the WEC can greatly enhance its power generation capability. This project has involved the design, fabrication and testing of a new type of linear-stroke length and rotary stroke length adjustable negative stiffness magnetic springs for use within a wave energy converter (WEC). The magnetic springs were studied by using 3-D finite element analysis with the objective of creating high energy density and a long linear stroke length. After the construction and testing of both a proof-of-principle adjustable linear and rotary magnetic spring prototype the rotary (torsional) magnetic spring was selected for scaling up analysis. The selected scaled-up proof-of-principle magnetic spring had a peak torque of 850 Nm with a ±45 degree stroke length. By translating the inner rotor relative to the outer rotor, the stiffness could be adjusted to be either negative or positive stiffness. During this project a magnetic lead screw was also studied, and it was shown that by combining the magnetic lead screw with a linearly translating magnetic spring a very long rotary stroke length could be attained. However, as the magnetic lead screw increased complexity and reduced overall energy density relative to a rotary (torsional) spring, this design approach was not further pursed. Dynamometer testing of the variable stiffness magnetic springs was first completed by Portland State University and following this the magnetic spring performance was independently verified by Sandia National Laboratory (Sandia). A WEC analysis when using a variable stiffness magnetic spring was completed by using the WecOptTool. WecOptTool is an open-source WEC optimization software developed by Sandia that supports efficient power take-off (PTO) and control optimization. Wave condition data from the Oregon PacWave test-site was used in this study. The analysis showed that a WEC with a tunable stiffness value could consistently achieve about 80% of its maximum theoretical power production. The use of a tunable stiffness WEC, rather than zero-stiffness or a constant stiffness WEC was also shown to lead to a smaller maximum PTO force requirement. The variable stiffness magnetic spring was integrated into an experimental WEC developed by Sandia, called a Wave-Bot. Sandia successfully completed water-tank testing of the Wave-Bot at the Navy’s Carderock, Maryland, wave-basin test site. The wave-basin testing helped to experimentally demonstrate the operating capabilities and increased power generation capability of a WEC containing an integrated variable stiffness magnetic spring. A WEC capacity factor analysis was also completed. The capacity factor was defined as the ratio of annual average WEC generator power to the maximum (RMS) generated power. This capacity factor provided a means of identifying the ratio of potential revenue to cost. It was calculated that if a tunable variable stiffness magnetic spring has RMS constraints it could operate with a capacity factor above 30%. This is comparable to a wind turbine’s capacity factor.

16 TIDAL AND WAVE POWER↗

Cooling Egypt: Cost and benefits of room air conditioner efficiency improvement in Egypt

Egypt is one of the largest countries in the Middle East and North Africa region with a population of a total of 106 million (as of July 2022). Increasing urbanization, population growth, and increasing temperatures will likely continue to drive demand for electricity from air conditioning, with corresponding negative impacts on the peak load, air quality, and greenhouse gas emissions from refrigerant use and energy consumption. Since 2003, Egypt has adopted a standards and labeling program for various appliances, and has improved its room air conditioner (RAC) energy efficiency requirements in 2016 and 2017. However, its market is still dominated by inefficient fixed-speed drive (FSD) RACs due to a price-sensitive market. Seasonal metrics such as Cooling Season Performance Factor (CSPF) measure the energy efficiency of FSD and variable-speed drive (VSD) RACs on the same scale. Leading markets, most notably China, have already adopted a new MEPS in 2020 and 2022, which align largely with the United for Efficiency (U4E) Model Regulations Guidelines. India has also adopted a CSPF metric. Both India and China are now experiencing (1) increased demand and consumption of higher efficiency VSD RACs, as well as (2) a corresponding drop in prices from the economies of scale of production of these higher efficiency RACs. Because China is a leading manufacturer in the global air conditioner (AC) market, its adoption of the model U4E regulations have effectively raised the energy efficiency of the ACs in the global market. To achieve the benefits of taking a similar approach to Egypt’s market, we offer the following recommendations: 1. Adopt a common metric to measure the efficiency of both FSD and VSD RACs 2. Raise the stringency of MEPS to the level of the U4E Model Regulation Guidelines 3. Restructure the labeling program from the “A++” labeling scheme to a simpler A through E or a star-rating program 4. Strengthen the compliance regime governing the Egyptian AC MEPS 5. Assist small and medium AC manufacturers in Egypt to transition manufacturing lines to produce low-cost, high-efficiency VSD RACs. Adopting these recommendations would reduce Egypt’s electricity consumption to 11 TWh in 2030 and 89 TWh in 2050—with corresponding carbon dioxide (CO2) emissions reductions and avoided generation capacity requirements compared to the baseline.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

GPU-enabled extreme-scale turbulence simulations: Fourier pseudo-spectral algorithms at the exascale using OpenMP offloading

Fourier pseudo-spectral methods for nonlinear partial differential equations are of wide interest in many areas of advanced computational science, including direct numerical simulation of three-dimensional (3-D) turbulence governed by the Navier-Stokes equations in fluid dynamics. This paper presents a new capability for simulating turbulence at a new record resolution up to 35 trillion grid points, on the world's first exascale computer, Frontier, comprising AMD MI250x GPUs with HPE's Slingshot interconnect and operated by the US Department of Energy's Oak Ridge Leadership Computing Facility (OLCF). Key programming strategies designed to take maximum advantage of the machine architecture involve performing almost all computations on the GPU which has the same memory capacity as the CPU, performing all-to-all communication among sets of parallel processes directly on the GPU, and targeting GPUs efficiently using OpenMP offloading for intensive number-crunching including 1-D Fast Fourier Transforms (FFT) performed using AMD ROCm library calls. With 99% of computing power on Frontier being on the GPU, leaving the CPU idle leads to a net performance gain via avoiding the overhead of data movement between host and device except when needed for some I/O purposes. Memory footprint including the size of communication buffers for MPI_ALLTOALL is managed carefully to maximize the largest problem size possible for a given node count. Detailed performance data including separate contributions from different categories of operations to the elapsed wall time per step are reported for five grid resolutions, from 2048 3 on a single node to 32768 3 on 4096 or 8192 nodes out of 9408 on the system. Both 1D and 2D domain decompositions which divide a 3D periodic domain into slabs and pencils respectively are implemented. The present code suite (labeled by the acronym GESTS, GPUs for Extreme Scale Turbulence Simulations) achieves a figure of merit (in grid points per second) exceeding goals set in the Center for Accelerated Application Readiness (CAAR) program for Frontier. The performance attained is highly favorable in both weak scaling and strong scaling, with notable departures only for 2048 3 where communication is entirely intra-node, and for 32768 3 , where a challenge due to small message sizes does arise. Communication performance is addressed further using a lightweight test code that performs all-to-all communication in a manner matching the full turbulence simulation code. Performance at large problem sizes is affected by both small message size due to high node counts as well as dragonfly network topology features on the machine, but is consistent with official expectations of sustained performance on Frontier. Overall, although not perfect, the scalability achieved at the extreme problem size of 32768 3 (and up to 8192 nodes — which corresponds to hardware rated at just under 1 exaflop/sec of theoretical peak computational performance) is arguably better than the scalability observed using prior state-of-the-art algorithms on Frontier's predecessor machine (Summit) at OLCF. New science results for the study of intermittency in turbulence enabled by this code and its extensions are to be reported separately in the near future.

3D fast Fourier transform↗

Hydroelectric Power and Hydrogen Production Integration

Hydropower-based hydrogen production could introduce opportunities for new revenue streams for hydropower plants, including from energy storage and regeneration as well as from sale of the hydrogen product to external markets. Hydrogen-based energy storage and regeneration could also help support Idaho Power’s decarbonization goals by decreasing dependence on fossil-based peaking power plants. Additionally, integration of hydrogen production with hydropower generation could help address the issue of low dissolved oxygen river water conditions that commonly accompany hydropower plant operations by utilizing the oxygen byproduct from an electrolytic hydrogen production process as a resource for mitigation of low dissolved oxygen water conditions. Comprehensive techno-economic analysis of the hybrid hydroelectric and hydrogen energy storage system has revealed critical insights into the pathways and considerations for optimizing the economic value and environmental benefits of such systems. Among the three identified pathways of natural gas blending, regeneration, and direct sale of hydrogen, the direct sale of hydrogen emerges as the most profitable, particularly given the current pricing dynamics of hydrogen and electricity. However, as we anticipate a future grid characterized by higher renewable energy penetration, the landscape may evolve, featuring lower average electricity prices, heightened fluctuations, and more significant seasonal variations. Consequently, the attractiveness of electricity regeneration through hydrogen and the benefits of long-duration hydrogen storage are expected to increase substantially in such a dynamic energy scenario. The careful selection of component sizes within the hybrid system proves to be paramount for ensuring cost-effectiveness. Notably, the size of the hydrogen market has emerged as a critical determinant for the optimal size of the electrolyzer. Hydrogen storage should be sized to meet energy shifting requirements. The appropriate size of the fuel cell/microturbine generator hinges on the shape of electricity prices and the available revenue streams derived from participating in grid services. Striking the right balance among these components is essential for maximizing the overall efficiency and profitability of the hydrogen facility. Furthermore, the by-product of electrolysis, namely oxygen, introduces an additional dimension to the system's functionality. The oxygen generated can be effectively utilized for dissolved oxygen (DO) mitigation, particularly with larger electrolyzer sizes capable of satisfying the complete oxygen demand for this purpose. While the economic benefits derived from saved oxygen purchase costs may be relatively modest compared to other revenue streams, the environmental advantages of repurposing oxygen for DO mitigation could help Idaho Power meet their environmental obligations. In addition to the identified factors shaping the viability of hybrid hydrogen production and hydroelectric generation, it is noteworthy that the integration of hydrogen energy storage offers a unique advantage during unusually wet years. In such periods of increased water inflow, the hydrogen storage capacity serves as a valuable supplement to the reservoir. By utilizing hydrogen energy storage as a complementary reservoir, the system gains flexibility in reservoir management when dealing with fluctuations in water availability.

08 HYDROGEN↗

TRAILS Output Files

Overview This data repository contains ZIP files that store compressed versions of the output of running the WaterPaths utility planning and management tool in the DU Re-Evaluation mode (to download the tool, please see this GitHub repository). The tool was used to simulate the six-utility North Carolina Research Triangle problem. Details on the contents of each ZIP file can be seen below. Data details Temporal range: Weekly data for 2,344 weeks from 2015 to 2060 (45 years). Spatial range: Six water utilities in the North Carolina Research Triangle region (0: Chapel Hil/OWASA, 1: Durham, 2: Cary, 3: Raleigh, 4: Pittsboro, and 5: Chatham) File types: CSV and OUT Different solutions available The solution numbers correspond to the different pathway strategies (henceforth referred to as "solutions") discussed in paper's main and supporting text (abstract and link to the paper here). They are as follows: Sol92: The Durham-focused pathway strategy Sol132: The Raleigh-focused pathway strategy Sol140: The regionally-robust pathway strategy Objectives files These files can be accessed by unzipping solXX_objectives_pathways.zip that contains 1,000 Objectives_RDMXX_solsXX_to_XX.csv files. Each CSV file will consist of a row representing all the objective values for that specific solution, while every six columns represents the reliability, restriction frequency, infrastructure net present value ($ mil), peak financial cost, worst-case cost, and unit cost ($ per MG; in that order) for each of the six utilities. There will be 1,000 such files, denoting the performance of the six utilities across the 1,000 deeply uncertain states of the world (DU SOWs). Pathway files These files can be accessed by unzipping solXX_objectives_pathways.zip that contains 1,000 Pathways_sXX_RDMXX.out file. Each OUT corresponds to the set of infrastructure being triggered in a specific DU SOW, and each file will have the name file will consist of four tab-delimited columns that are described as follows: Realization: The realization in which an infrastructure options being triggered utility: The utility currently triggering infrastructure week: The week in which a specific infrastructure option is being triggered infra.: The infrastructure option being triggered If the OUT file contains only the header line, no infrastructure was triggered for that specific DU SOW. Policies files These files can be obtained by unzipping Policies.zip. Each of the 1,000 CSV files within the unzipped folder will contain weekly water use restriction policies for all 1,000 hydroclimatic realizations within a specific DU SOW. The column structure is as follows: 0rest_m: restriction multiplier for utility 0 (values between 0 and 1) 1rest_m: restriction multiplier for utility 1 (values between 0 and 1) 2rest_m: restriction multiplier for utility 2 (values between 0 and 1) 3rest_m: restriction multiplier for utility 3 (values between 0 and 1) 4rest_m: restriction multiplier for utility 4 (values between 0 and 1) 5rest_m: restriction multiplier for utility 5 (values between 0 and 1) 0transf: transfer volume for utility 0 (in MGD) 1transf: transfer volume for utility 1 (in MGD) 2transf: transfer volume for utility 2 (in MGD) 3transf: transfer volume for utility 3 (in MGD) 4transf: transfer volume for utility 4 (in MGD) 5transf: transfer volume for utility 5 (in MGD) Water Sources files These files can be obtained by unzipping WaterSources_subset.zip. Each of the 100 CSV files within the unzipped folder will contain weekly state variables at each water source for all 1,000 hydroclimatic realizations within a specific DU SOW. The column structure is as follows: Xvolume: available water volume from source X (in MGD) Xs_area: surface area of source X (in ACF) Xdemand: demand drawn from a water source from source X (in MGD) Xup_spill: upstream spillage from source X (in MGD) Xww_inflow: wastewater inflow from source X (in MGD) Xcatch_inflow: upstream catchment inflow to source X (in MGD) Xevap: evaporation multiplier for source X (values between 0 and 1) Xds_spill: downstream spillage from source X (in MGD) X_Y_alloc_cap: the allocated capacity from source X to utility Y (values between 0 and 1) X_Y_alloc_dem: the allocated demand from source X to utility Y (values between 0 and 1) Xtrmt_alloc_Y: the allocated treatment capacity from source X to utility Y (values between 0 and 1) Utilities files These files can be obtained by unzipping Utilities_subset.zip. Each of the 100 CSV files within the unzipped folder will contain weekly state variables at each utility for all 1,000 hydroclimatic realizations within a specific DU SOW. The column structure is as follows: Xst_vol: total available storage volume of utility X (in MG) Xcapacity: total storage capacity of utility X (in MG) Xnet_inf: : net inflow for all storage infrastructure for utility X (in MGD) Xst_rof: short term ROF for utility X (values between 0 and 1) Xst_stor_rof: short-term storage ROF for utility X (values between 0 and 1) Xst_trmt_rof: short-term treatment ROF for utility X (values between 0 and 1) Xlt_rof: long-term ROF for utility X (values between 0 and 1) Xlt_stor_rof: long-term storage ROF for utility X (values between 0 and 1) Xlt_trmt_rof: long-term treatment ROF for utility X (values between 0 and 1) Xrest_demand: restricted demand for utility X (in MGD) Xunrest_demand: unrestricted demand for utility X (in MGD) Xunfulf_demand: unfulfilled demand for utility X (in MGD) Xwastewater: wastewater return for utility X (in MGD) Xtreat_capacity: total treatment capacity for utility X (in MG) Xcont_fund: reserve (contingency) fund balance for utility X Xins_pout: insurance payout for utility X (% annual volumetric revenue) Xins_price: insurance price for utility X (% annual volumetric revenue) Xinfra_npv: infrastructure net present value for utility ($mil) Xst_vol: total available storage volume of utility X (in MG) Xdebt_serv: debt service for utility X (usually once per year if the infrastructure is triggered; % annual volumetric revenue) Xstor_vol: total stored volume (in MGD) Xobs_ann_dem: observed annual demand for utility X (in MGD) Xproj_dem: projected annual demand for utility X (in MGD) Xpv_debt_serv: present value of debt service payments for utility X (% annual volumetric revenue) Xgross_rev: gross revenue for utility X ($mil) Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program.

Artificial Intelligence↗

Insights into Methodologies and Stochastic Optimization of Thermal Energy Storage-Coupled Advanced Reactor Systems: A Comparison of Methods for Accessing Long-Term Sub-System Sizing Adequacy

This paper investigates the potential of coupling Thermal Energy Storage (TES) with Advanced Reactors (ARs) to address uncertainties posed by climate change in deep decarbonized power systems. The TES Use-case Team at Idaho National Laboratory (INL) has examined the potential of storing thermal energy from ARs during low demand periods and optimizing discharge during peak-priced hours, in both steady-state and transient conditions. Building on this groundwork, this study bridges the gaps in optimal sizing of the sub-system of TES-coupled AR systems using Risk Analysis Virtual Environment (RAVEN) and Holistic Energy Resource Optimization Network (HERON), INL?s framework for grid optimization. By applying this framework, we present statistically-robust optimal charge, discharge including balance of plant (BOP), and storage sizing for the High-Temperature Gas-Cooled Reactor (HTGR) with 203 MWth output. To this end, we generated synthetic price samples for 30 years using 2018 ? 2021 real-time market data from ERCOT, PJM and MISO. Our results reveals that the TES-coupled HTGR system is highly effective in maximizing revenue from electricity sales. We observed a substantial increase of 40 % in ERCOT and a noteworthy 15 % increase in PJM and MISO when compared to the conventional BOP without TES. This improvement is achieved through regionally-tailored sub-system sizing, which ranges from 398 to 416 MWth for the discharge system and 610 to 1029 MWth for the TES. We find that the average electricity price directly impacts the overall economics, while price volatility influences storage size. Additional sensitivity analyses were performed to access the impact of key assumptions on system economics and sizing, differentiating the optimization window (i.e., 24 ? 219 hours of chronological observations) and by imposing storage continuity condition in tracking TES cycles. We observed that at the 120-hour of the optimization window, a reasonable balance between computation time and accuracy was achieved. Our analysis also highlights the significance of conducting multi-day cycle analysis (> 120-hour) for TES to capture interaction between electricity prices and storage dynamics, providing a comprehensive understanding of TES behavior that AR developers should integrate into their plant designs.

25 ENERGY STORAGE↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗