Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “operating costs”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

NASA’s Deep Space Network: Automation in the Follow-the-Sun Era

The Deep Space Network (DSN) comprises three sites, located in California, Spain, and Australia; each site operates one 70m and multiple 34m antennas that provide communications and navigation services to NASA and international partners. As part of a multiyear upgrade in automation of the network, the DSN has undertaken a series of operations efficiency improvements which has fundamentally changed the operations paradigm of the network. At the start of this effort, each site operated only their local antennas and equipment 24 hours/day, 7 days/week, and each spacecraft activity (link) had a single dedicated Link Control Operator. In its final stage, realized in 2020, each one of the three sites operates the entire network during their local day shift, handing off control to the next site as their day ends, and tracks can be run in a fully automated manner with no operator intervention. This paradigm change has realized significant operations cost savings, but has posed some major challenges along the way. This paper describes the system changes that enabled the operations efficiency improvements, some the challenges, and plans for the future.

Levesque, Michael↗

Space Transportation System Availability Relationships to Life Cycle Cost

Future space transportation architectures and designs must be affordable. Consequently, their Life Cycle Cost (LCC) must be controlled. For the LCC to be controlled, it is necessary to identify all the requirements and elements of the architecture at the beginning of the concept phase. Controlling LCC requires the establishment of the major operational cost drivers. Two of these major cost drivers are reliability and maintainability, in other words, the system's availability (responsiveness). Potential reasons that may drive the inherent availability requirement are the need to control the number of unique parts and the spare parts required to support the transportation system's operation. For more typical space transportation systems used to place satellites in space, the productivity of the system will drive the launch cost. This system productivity is the resultant output of the system availability. Availability is equal to the mean uptime divided by the sum of the mean uptime plus the mean downtime. Since many operational factors cannot be projected early in the definition phase, the focus will be on inherent availability which is equal to the mean time between a failure (MTBF) divided by the MTBF plus the mean time to repair (MTTR) the system. The MTBF is a function of reliability or the expected frequency of failures. When the system experiences failures the result is added operational flow time, parts consumption, and increased labor with an impact to responsiveness resulting in increased LCC. The other function of availability is the MTTR, or maintainability. In other words, how accessible is the failed hardware that requires replacement and what operational functions are required before and after change-out to make the system operable. This paper will describe how the MTTR can be equated to additional labor, additional operational flow time, and additional structural access capability, all of which drive up the LCC. A methodology will be presented that provides the decision makers with the understanding necessary to place constraints on the design definition. This methodology for the major drivers will determine the inherent availability, safety, reliability, maintainability, and the life cycle cost of the fielded system. This methodology will focus on the achievement of an affordable, responsive space transportation system. It is the intent of this paper to not only provide the visibility of the relationships of these major attribute drivers (variables) to each other and the resultant system inherent availability, but also to provide the capability to bound the variables, thus providing the insight required to control the system's engineering solution. An example of this visibility is the need to provide integration of similar discipline functions to allow control of the total parts count of the space transportation system. Also, selecting a reliability requirement will place a constraint on parts count to achieve a given inherent availability requirement, or require accepting a larger parts count with the resulting higher individual part reliability requirements. This paper will provide an understanding of the relationship of mean repair time (mean downtime) to maintainability (accessibility for repair), and both mean time between failure (reliability of hardware) and the system inherent availability.

Rhodes, Russel E.↗

Space shuttle main engine definition (phase B). Volume 2: Avionics

The advent of the space shuttle engine with its requirements for high specific impulse, long life, and low cost have dictated a combustion cycle and a closed loop control system to allow the engine components to run close to operating limits. These performance requirements, combined with the necessity for low operational costs, have placed new demands on rocket engine control, system checkout, and diagnosis technology. Based on considerations of precision environment, and compatibility with vehicle interface commands, an electronic control, makes available many functions that logically provide the information required for engine system checkout and diagnosis.

Source record↗

Evaluation of solar thermal power plants using economic and performance simulations

An energy cost analysis is presented for central receiver power plants with thermal storage and point focusing power plants with electrical storage. The present approach is based on optimizing the size of the plant to give the minimum energy cost (in mills/kWe hr) of an annual plant energy production. The optimization is done by considering the trade-off between the collector field size and the storage capacity for a given engine size. The energy cost is determined by the plant cost and performance. The performance is estimated by simulating the behavior of the plant under typical weather conditions. Plant capital and operational costs are estimated based on the size and performance of different components. This methodology is translated into computer programs for automatic and consistent evaluation.

El-Gabawali, N.↗

The B-747 flight control system maintenance and reliability data base for cost effectiveness tradeoff studies

Primary and automatic flight controls are combined for a total flight control reliability and maintenance cost data base using information from two previous reports and additional cost data gathered from a major airline. A comparison of the current B-747 flight control system effects on reliability and operating cost with that of a B-747 designed for an active control wing load alleviation system is provided.

Source record↗

Beam waveguides in the Deep Space Network

A beam waveguide is a mechanism for guiding electromagnetic radiation from one part of an antenna to another through a series of reflectors. Appropriate placement of reflectors on an antenna allows a beam to be guided around the elevation axis and/or below the alidade. The beam waveguide permits placement of all electronics in a room on the alidade below the elevation axis, or below the alidade; feed horn covers to be protected from the weather; and feed electronics to be in spacious rooms rather than in crowded cones, and always level rather than tipping with change in elevation angle. These factors can lead to lower costs in implementation such as Ka-band, better antenna performance at X-band, more efficient and stable performance of transmitters and receivers, and lower maintenance and operating costs. Studies are underway to determine methods for converting the major antennas of the Deep Space Network (DSN) to beam waveguide operations by 1995.

Clauss, R. C.↗

Cost effective launch operations of the SSME

The Space Shuttle Main Engine (SSME) represents the beginning of reusable rocket engine operations in the space transportation system (STS). Steps taken to reduce the overall cost of flight operations of the SSME by improving turnaround operations, extending the life of the engine, and improving the cost effectiveness of overhaul operations at the Canoga Park home plant are described. Ground certification testing to ensure safe launch operations is described, as well as certification extension testing that leads to a service life equivalent to 40 flights. The proven flight record of the SSME, which has demonstrated the utility of the SSME as a key component of America's space transportation system, is discussed.

Klatt, F. P.↗

Turnaround Time Modeling for Conceptual Rocket Engines

Recent years have brought about a paradigm shift within NASA and the Space Launch Community regarding the performance of conceptual design. Reliability, maintainability, supportability, and operability are no longer effects of design; they have moved to the forefront and are affecting design. A primary focus of this shift has been a planned decrease in vehicle turnaround time. Potentials for instituting this decrease include attacking the issues of removing, refurbishing, and replacing the engines after each flight. less, it is important to understand the operational affects of an engine on turnaround time, ground support personnel and equipment. One tool for visualizing this relationship involves the creation of a Discrete Event Simulation (DES). A DES model can be used to run a series of trade studies to determine if the engine is meeting its requirements, and, if not, what can be altered to bring it into compliance. Using DES, it is possible to look at the ways in which labor requirements, parallel maintenance versus serial maintenance, and maintenance scheduling affect the overall turnaround time. A detailed DES model of the Space Shuttle Main Engines (SSME) has been developed. Trades may be performed using the SSME Processing Model to see where maintenance bottlenecks occur, what the benefits (if any) are of increasing the numbers of personnel, or the number and location of facilities, in addition to trades previously mentioned, all with the goal of optimizing the operational turnaround time and minimizing operational cost. The SSME Processing Model was developed in such a way that it can easily be used as a foundation for developing DES models of other operational or developmental reusable engines. Performing a DES on a developmental engine during the conceptual phase makes it easier to affect the design and make changes to bring about a decrease in turnaround time and costs.

Nix, Michael↗

The civil tiltrotor aircraft's potential in developing economies

The civilian tiltrotor (CTR) is analyzed as a new transportation technology with the potential for changing one of the key economic factors linked to Third World economic development. It is contended that efficient, low-cost transport services are a necessary condition for the economic development of Third World countries and that the CTR's capabilities and operating costs can provide more efficient transport services than have heretofore been available to such countries. A case study of potential CTR use among the nations of the Carribean Basin region appears to offer both analytical and empirical support to these contentions. The analysis indicates that normal market mechanisms are adequate for development of air cargo services using the CTR's capabilities. It is suggested that implementation of this service may require new institutional arrangements, but overall it is concluded that tiltrotor technology could make an important contribution to the economic development of Third World countries.

Alton, Larry R.↗

High-Speed, High-Temperature Finger Seal Test Results

Finger seals have significantly lower leakage rates than conventional labyrinth seals used in gas turbine engines and are expected to decrease specific fuel consumption by over 1 percent and to decrease direct operating cost by over 0.5 percent. Their compliant design accommodates shaft growth and motion due to thermal and dynamic loads with minimal wear. The cost to fabricate these finger seals is estimated to be about half the cost to fabricate brush seals. A finger seal has been tested in NASA's High Temperature, High Speed Turbine Seal Test Rig at operating conditions up to 1200 F, 1200 ft/s, and 75 psid. Static, performance and endurance test results are presented. While seal leakage and wear performance are acceptable, further design improvements are needed to reduce the seal power loss.

Proctor, Margaret P.↗

Space Shuttle Upgrades: Long Life Alkaline Fuel Cell

NASA has utilized the alkaline fuel cell technology to provide electrical power for manned launch vehicles such as Gemini, Apollo, and the Space Shuttle. The current Shuttle alkaline fuel cells are procured from UTC Fuel Cells, a United Technologies Company. The alkaline fuel cells are very reliable but the operating life is limited to 2600 hours due to voltage degradation of the individual cells. The main limiting factor in the life of the cells is corrosion of the cell's fiberglass/epoxy frame by the aqueous potassium hydroxide electrolyte. To reduce operating costs, the orbiter program office approved the Long Life Alkaline Fuel Cell (LLAFC) program as a shuttle upgrade in 1999 to increase the operating life of the fuel cell powerplant to 5000 hours. The LLAFC program incorporates improving the cell by extending the length of the corrosion path, which reduces the cell frame corrosion. UTCFC performed analysis to understand the fundamental mechanisms that drive the cell frame corrosion. The analysis indicated that the corrosion path started along the bond line between the cathode and the cell frame. Analysis also showed that the oxygen available at the cathode, the catalyst on the electrode, and the electrode substrate all supported or intensified the corrosion. The new cell design essentially doubled the corrosion path to mitigate the problem. A 10-cell stack was tested for 5000 hours during the development phase of this program to verify improved cell performance. A complete 96-cell stack was then tested for 5000 hours during the full manned-space qualification phase of this program. Additional upgrades to the powerplant under this program are: replacing the aluminum body in the pressure regulator with stainless steel to reduce corrosion, improving stack insulator plate with improved resistance to stress failure and improved temperature capability, and replacing separator plate elastomer seals with a more durable material and improved seal retention.

Kerri McCurdy↗

DSN Co-Observing Operations to Support Space VLBI Missions

Reliable radio astronomy support of Space Very-Long-Baseline- Interferometry missions by ground radio telescopes is mandatory in order to achieve high scientific return from missions, The 70m DSN antennas along with other ground radio telescopes will perform as the ground segment of the Earth-space interferometer. Improvements of radio astronomy VLBI operations at the DSN to achieve higher reliability, efficiency, flexibility, and lower operations costs is a major goal in preparing for radio astronomy support of SVLBI. To help realize this goal, a remote control and monitoring mode for radio astronomy operations at the DSN is being developed.

radio↗

Lessons learned from the introduction of autonomous monitoring to the EUVE science operations center

The University of California at Berkeley's (UCB) Center for Extreme Ultraviolet Astrophysics (CEA), in conjunction with NASA's Ames Research Center (ARC), has implemented an autonomous monitoring system in the Extreme Ultraviolet Explorer (EUVE) science operations center (ESOC). The implementation was driven by a need to reduce operations costs and has allowed the ESOC to move from continuous, three-shift, human-tended monitoring of the science payload to a one-shift operation in which the off shifts are monitored by an autonomous anomaly detection system. This system includes Eworks, an artificial intelligence (AI) payload telemetry monitoring package based on RTworks, and Epage, an automatic paging system to notify ESOC personnel of detected anomalies. In this age of shrinking NASA budgets, the lessons learned on the EUVE project are useful to other NASA missions looking for ways to reduce their operations budgets. The process of knowledge capture, from the payload controllers for implementation in an expert system, is directly applicable to any mission considering a transition to autonomous monitoring in their control center. The collaboration with ARC demonstrates how a project with limited programming resources can expand the breadth of its goals without incurring the high cost of hiring additional, dedicated programmers. This dispersal of expertise across NASA centers allows future missions to easily access experts for collaborative efforts of their own. Even the criterion used to choose an expert system has widespread impacts on the implementation, including the completion time and the final cost. In this paper we discuss, from inception to completion, the areas where our experiences in moving from three shifts to one shift may offer insights for other NASA missions.

Lewis, M.↗

How Public Private Partnerships Enable NASA Future Space Communication Needs

The NASA Space Communications and Navigation (SCaN) Program is responsible for providing communication and navigation services to scientific and human space exploration missions. SCaN's current Space Network provides radio frequency (RF) relay services to near Earth space missions via Tracking and Data Relay Satellites (TDRS). SCaN plans to offer a new generation of relay services beginning in 2025, including the addition of optical communications capabilities and enhanced RF capabilities. The primary drivers behind the development of these next generation relay network services are to enhance communication and navigation services with significantly reduced development and operational costs. Several approaches being considered for implementation of these services are through government owned capabilities, through commercial service providers, or a combination of the two. One approach receiving a great deal of attention is the use of Public-Private Partnerships (PPP) to develop and provide capabilities or services. Utilizing Public-Private Partnerships allows NASA and commercial entities to share the investment, standards, and risks of developing and testing new or enhanced capabilities which can benefit both NASA and the commercial space communication industry. The capabilities developed under the PPP can then be used to support the growth of the commercial satellite communications industry while simultaneously being introduced into NASA operations to provide service to future NASA missions as part of the NASA Next Generation Architecture. Partnerships formed for this purpose can also serve as the basis for further NASA acquisition activities where government and industry can continue to share the cost, risk, and benefits of space communications capability development and operations. This objective is consistent with the 2010 National Space Policy stated principles: "The United States is committed to encouraging and facilitating the growth of a U.S. commercial space sector that supports U.S. needs, is globally competitive, and advances U.S. leadership in the generation of new markets and innovation-driven entrepreneurship." [1]NASA has conducted several internal studies as well as externally funded studies with industry to define the next generation space communication architecture. NASA has approached the commercial industry through a Request for Information (RFI) to define further the next generation architecture and has conducted numerous internal and external studies. The results are promising and are shaping the approach to utilize Public Private Partnership to achieve NASA's objectives while reducing costs. The commercial satellite industry has begun to deploy high performance, high throughput global satellite constellations which have the potential to provide communication services to NASA Missions. Commercial satellite manufacturers have advanced their processes to rapidly design, build, and deliver, reliable communication satellites using minimum government oversight. In this paper, we will 1) describe the NASA Next Generation Architecture, Concept of Operations (ConOps), and salient characteristics; 2) Discuss the rational of Public-Private Partnerships to achieve NASA’s next generation communication architecture; and 3) Summarize the preliminary analysis performed to date and describe the path forward.

Stegeman, James↗

Systems Engineering Approach to Technology Integration for NASA's 2nd Generation Reusable Launch Vehicle

The overall goal of the 2nd Generation RLV Program is to substantially reduce technical and business risks associated with developing a new class of reusable launch vehicles. NASA's specific goals are to improve the safety of a 2nd generation system by 2 orders of magnitude - equivalent to a crew risk of 1-in-10,000 missions - and decrease the cost tenfold, to approximately $1,000 per pound of payload launched. Architecture definition is being conducted in parallel with the maturating of key technologies specifically identified to improve safety and reliability, while reducing operational costs. An architecture broadly includes an Earth-to-orbit reusable launch vehicle, on-orbit transfer vehicles and upper stages, mission planning, ground and flight operations, and support infrastructure, both on the ground and in orbit. The systems engineering approach ensures that the technologies developed - such as lightweight structures, long-life rocket engines, reliable crew escape, and robust thermal protection systems - will synergistically integrate into the optimum vehicle. To best direct technology development decisions, analytical models are employed to accurately predict the benefits of each technology toward potential space transportation architectures as well as the risks associated with each technology. Rigorous systems analysis provides the foundation for assessing progress toward safety and cost goals. The systems engineering review process factors in comprehensive budget estimates, detailed project schedules, and business and performance plans, against the goals of safety, reliability, and cost, in addition to overall technical feasibility. This approach forms the basis for investment decisions in the 2nd Generation RLV Program's risk-reduction activities. Through this process, NASA will continually refine its specialized needs and identify where Defense and commercial requirements overlap those of civil missions.

Thomas, Dale↗

Systems Engineering Approach to Technology Integration for NASA's 2nd Generation Reusable Launch Vehicle

The overall goal of the 2nd Generation RLV Program is to substantially reduce technical and business risks associated with developing a new class of reusable launch vehicles. NASA's specific goals are to improve the safety of a 2nd-generation system by 2 orders of magnitude - equivalent to a crew risk of 1-in-10,000 missions - and decrease the cost tenfold, to approximately $1,000 per pound of payload launched. Architecture definition is being conducted in parallel with the maturating of key technologies specifically identified to improve safety and reliability, while reducing operational costs. An architecture broadly includes an Earth-to-orbit reusable launch vehicle, on-orbit transfer vehicles and upper stages, mission planning, ground and flight operations, and support infrastructure, both on the ground and in orbit. The systems engineering approach ensures that the technologies developed - such as lightweight structures, long-life rocket engines, reliable crew escape, and robust thermal protection systems - will synergistically integrate into the optimum vehicle. To best direct technology development decisions, analytical models are employed to accurately predict the benefits of each technology toward potential space transportation architectures as well as the risks associated with each technology. Rigorous systems analysis provides the foundation for assessing progress toward safety and cost goals. The systems engineering review process factors in comprehensive budget estimates, detailed project schedules, and business and performance plans, against the goals of safety, reliability, and cost, in addition to overall technical feasibility. This approach forms the basis for investment decisions in the 2nd Generation RLV Program's risk-reduction activities. Through this process, NASA will continually refine its specialized needs and identify where Defense and commercial requirements overlap those of civil missions.

Thomas, Dale↗

Overview of the Planetary Observer Program

An overview of the Planetary Observer Program formulated by the Solar System Exploration Committee, including the key assumptions intended to constrain the cost of each program mission, is presented. Several candidate missions for the program and their scientific objectives and launch opportunities are described. A missions operations concept for controlling the operations costs of these projects is presented.

Blume, W. H.↗