Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “observation scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

Coordinated XTE/EUVE Observations of Algol

We performed a coordinated RXTE observation of the prototypical eclipsing binary Algol in conjunction with EUVE and ASCA observations. Observing the x-ray spectrum of Algol with ASCA, EUVE, and RXTE provides critical, near-simultaneous constraints on the distribution of the hottest temperature plasma in the Agol system: this is required to unambiguously determine the coronal Fe abundance. After some initial shuffling of observatory schedules with the help of mission planners, the coordinated multiwavelength observation was successfully performed in February, 1996. Analysis of the data, including development of new, IDL-based global model fitting routines, was accomplished from mid-1996 to mid-1997. The results indicate that the initial estimates of [Fe/H] approximately 0.3 dex (Stern et al.) are confirmed, and the Algol high temperature plasma thus has an Fe deficiency relative to the (Anders and Grevesse) solar abundance.

Stern, Robert A.↗

A constraint-logic based implementation of the coarse-grained approach to data acquisition scheduling of the International Ultraviolet Explorer orbiting observatory

The International Ultraviolet Explorer (IUE) satellite observatory has been in operation continuously since 1978. It typically carries out several thousand observations per year for over a hundred different science projects. These observations, which can occur in one of four different data-taking modes, fall under several satellite-related constraints and many other constraints which derive from the science goals of the projects being undertaken. One strategy which has made the scheduling problem tractable has been that of 'coarse-graining' the time into discrete blocks of equal size (8 hours), each of which is devoted to a single science program, and each of which is sufficiently long for several observations to be carried out. We call it 'coarse-graining' because the schedule is done at a 'coarse' level which ignores fine structure; i.e., no attempt is made to plan the sequence of observations occurring within each time block. We have incorporated the IUE's coarse-grained approach in new software which examines the science needs of the observations and produces a limited set of alternative schedules which meet all of the instrument and science-related constraints. With this algorithm, the IUE can still be scheduled by a single person using a standard workstation, as it has been. We believe that this software could could be adapted to a more complex mission while retaining the IUE's high flexibility and efficiency and scientific return of future satellite missions.

Mccollum, Bruce↗

The development and validation of command schedules for SeaWiFS

An automated method for developing and assessing spacecraft and instrument command schedules is presented for the Sea-viewing Wide Field-of-view Sensor (SeaWiFS) project. SeaWiFS is to be carried on the polar-orbiting SeaStar satellite in 1995. The primary goal of the SeaWiFS mission is to provide global ocean chlorophyll concentrations every four days by employing onboard recorders and a twice-a-day data downlink schedule. Global Area Coverage (GAC) data with about 4.5 km resolution will be used to produce the global coverage. Higher resolution (1.1 km resolution) Local Area Coverage (LAC) data will also be recorded to calibrate the sensor. In addition, LAC will be continuously transmitted from the satellite and received by High Resolution Picture Transmission (HRPT) stations. The methods used to generate commands for SeaWiFS employ numerous hierarchical checks as a means of maximizing coverage of the Earth's surface and fulfilling the LAC data requirements. The software code is modularized and written in Fortran with constructs to mirror the pre-defined mission rules. The overall method is specifically developed for low orbit Earth-observing satellites with finite onboard recording capabilities and regularly scheduled data downlinks. Two software packages using the Interactive Data Language (IDL) for graphically displaying and verifying the resultant command decisions are presented. Displays can be generated which show portions of the Earth viewed by the sensor and spacecraft sub-orbital locations during onboard calibration activities. An IDL-based interactive method of selecting and testing LAC targets and calibration activities for command generation is also discussed.

Woodward, Robert H.↗

Asset - An application in mission automation for science planning

Recent advances in computer technology were used to great advantage in planning science observation sequences for the Voyager 2 encounter with Uranus in 1986. Despite a loss of experienced personnel, a challenging schedule, workforce limitations, and the complex nature of the Uranus encounter itself, the resultant science observation timelines were the most highly optimized of the five Voyager encounters with the outer planets. In part, this was due to the development of a microcomputer-based system, called ASSET (Automated Science Sequence Encounter Timelines generator), which was used to design those science observation timelines. This paper details the development of that system. ASSET demonstrates several features essential to the design of the first expert systems for science planning which will be applied for future missions.

Finnerty, D. F.↗

The EUVE proposal database and scheduling system

The proposal database and scheduling system for the Extreme Ultraviolet Explorer will be described. The proposal database has been implemented to take input for approved observations selected by the EUVE Peer Review Panel and output target information suitable for the scheduling system to digest. The scheduling system is a hybrid of the SPIKE program and EUVE software which checks spacecraft constraints, produces a proposed schedule and selects spacecraft orientations with optimal configurations for acquiring star trackers, etc. This system has been used to schedule the In Orbit Calibration activities that took place this summer, following the EUVE launch in early June 1992. The implemented strategy has implications for the selection of approved targets, which have impacted the Peer Review process. In addition, it will be discussed how the proposal database, founded on Sybase, controls the processing of EUVE Guest Observer data.

Christian, C.↗

ORCAS – Orbiting Configurable Artificial Star Mission Architecture

In this paper, we establish the mission operation concept for the Orbiting Configurable Artificial Star mission, a hybrid space-ground observatory, which aims to enable ground observations of near-diffraction limited resolution and exquisite sensitivity. We present the mission requirements, introduce a potential orbit solution that can meet them, detail the concrete operational steps to be taken to enable such observations, and develop a mission planning tool which generates a mission schedule that meets all mission requirements and can be altered in real time in the case of disruptions to the mission. Finally, we show the the mission could enable 300 adaptive optics and 1500 flux calibration observations throughout its lifetime.

Eliad Peretz↗

Impaired driving performance in shiftworkers: the role of the circadian system in a multifactorial model

A substantial and growing percentage of the U.S. work force now works on a rotating shift schedule. The repeated changes in sleep-wake, meal and work times inherent in such schedules conflict with the dictates of the internal biological clock and have adverse consequences for the health of the shiftworker population. An important consequence of this conflict is impaired performance, both on and off the job, as indexed by the increased incidence of motor vehicle accidents in shift workers. In this paper we report the results of a survey administered to rotating shift and straight day workers at a manufacturing plant in the eastern U.S. This survey documents an increased incidence of motor vehicle accidents or "near misses" in which sleepiness was implicated as a cause by the respondent. Complaints of poor sleep and increased sleepiness were also significantly more common in shiftworkers than day workers. Last, shiftworkers reported higher caffeine and alcohol consumption, and were more likely to use alcohol as a sleep aid. Although causal links cannot be established using these associative observations alone, previously reported experience with alteration of shift schedules, improvement of levels of alertness, and reduction in adverse performance outcomes corroborate the possibility of a causal link and suggest potential interventions.

NASA Discipline Regulatory Physiology↗

Tuning the Legacy Survey of Space and Time (LSST) Observing Strategy for Solar System Science

Abstract The Vera C. Rubin Observatory is expected to start the Legacy Survey of Space and Time (LSST) in early to mid-2025. This multiband wide-field synoptic survey will transform our view of the solar system, with the discovery and monitoring of over five million small bodies. The final survey strategy chosen for LSST has direct implications on the discoverability and characterization of solar system minor planets and passing interstellar objects. Creating an inventory of the solar system is one of the four main LSST science drivers. The LSST observing cadence is a complex optimization problem that must balance the priorities and needs of all the key LSST science areas. To design the best LSST survey strategy, a series of operation simulations using the Rubin Observatory scheduler have been generated to explore the various options for tuning observing parameters and prioritizations. We explore the impact of the various simulated LSST observing strategies on studying the solar system’s small body reservoirs. We examine what are the best observing scenarios and review what are the important considerations for maximizing LSST solar system science. In general, most of the LSST cadence simulations produce ±5% or less variations in our chosen key metrics, but a subset of the simulations significantly hinder science returns with much larger losses in the discovery and light-curve metrics.

79 ASTRONOMY AND ASTROPHYSICS↗

Future ultraviolet observations from space

Astronomical facilities to observe from space in the ultraviolet are reviewed. For the immediate future, IUE and the extreme ultraviolet spectrometers of Voyager 1 and Voyager 2 are available for furthering knowledge of cataclysmic variables. The Hubble Space telescope is scheduled for launch in 1986 and will be available to guest observers. The Far Ultraviolet Spectroscopic Explorer, which is expected to provide the capability to observe in the far and extreme ultraviolet, is planned for launch in the 1990s.

Kondo, Y.↗

Near perihelion observations of Comet Halley from Shuttle orbiter

Intercept missions and the space telescope will return unique data on Comet Halley, but will leave important gaps in the observational coverage of the comet's activity, especially around the time of perihelion passage. A small package of instruments, which could be scheduled to fly on several shuttle missions, would be an effective means of extending observational coverage of Comet Halley to include the critical part of the apparition near perihelion passage. This approach would certainly be "second best" to a dedicated orbital comet observatory. However, it would be feasible in the sense that payload space appears to be available for at least two flights during the apparition, and instruments exist, or could be modified, or are being developed, which could be integrated into a package of the required size, and which would return useful physical data on the comet.

Bergstralh, J. T.↗

Gravity Wave Energetics Determined From Coincident Space-Based and Ground-Based Observations of Airglow Emissions

Significant progress was made toward the goals of this proposal in a number of areas during the covered period. Section 5.1 contains a copy of the originally proposed schedule. The tasks listed below have been accomplished: (1) Construction of space-based observing geometry gravity wave model. This model has been described in detail in the paper accompanying this report (Section 5.2). It can simulate the observing geometry of both ground-based, and orbital instruments allowing comparisons to be made between them. (2) Comparisons of relative emission intensity, temperatures, and Krassovsky's ratio for space- and ground-based observing geometries. These quantities are used in gravity wave literature to describe the effects of the waves on the airglow. (3) Rejection of Bates [1992], and Copeland [1994] chemistries for gravity wave modeling purposes. Excessive 02(A(sup 13)(Delta)) production led to overproduction of O2(b(sup 1)(Sigma)), the state responsible for the emission of O2. Atmospheric band. Attempts were made to correct for this behavior, but could not adequately compensate for this. (4) Rejection of MSX dataset due to lack of coincident data, and resolution necessary to characterize the waves. A careful search to identify coincident data revealed only four instances, with only one of those providing usable data. Two high latitude overpasses and were contaminated by auroral emissions. Of the remaining two mid-latitude coincidences, one overflight was obscured by cloud, leaving only one ten minute segment of usable data. Aside from the statistical difficulties involved in comparing measurements taken in this short period, the instrument lacks the necessary resolution to determine the vertical wavelength of the gravity wave. This means that the wave cannot be uniquely characterized from space with this dataset. Since no observed wave can be uniquely identified, model comparisons are not possible.

Source record↗

Optimal Time Advance In Terminal Area Arrivals: Throughput vs. Fuel Savings

The current operational practice in scheduling air traffic arriving at an airport is to adjust flight schedules by delay, i.e. a postponement of an aircrafts arrival at a scheduled location, to manage safely the FAA-mandated separation constraints between aircraft. To meet the observed and forecast growth in traffic demand, however, the practice of time advance (speeding up an aircraft toward a scheduled location) is envisioned for future operations as a practice additional to delay. Time advance has two potential advantages. The first is the capability to minimize, or at least reduce, the excess separation (the distances between pairs of aircraft immediately in-trail) and thereby to increase the throughput of the arriving traffic. The second is to reduce the total traffic delay when the traffic sample is below saturation density. A cost associated with time advance is the fuel expenditure required by an aircraft to speed up. We present an optimal control model of air traffic arriving in a terminal area and solve it using the Pontryagin Maximum Principle. The admissible controls allow time advance, as well as delay, some of the way. The cost function reflects the trade-off between minimizing two competing objectives: excess separation (negatively correlated with throughput) and fuel burn. A number of instances are solved using three different methods, to demonstrate consistency of solutions.

Sadovsky, Alexander V .↗

Discerning the effect of various irradiation modes on the corrosion of Zircaloy-4

Using proton irradiation, this study investigates the individual influence of several factors on the corrosion kinetics of Zircaloy-4 in a hydrogenated water environment simulating a Pressurized Water Reactor (PWR). Using both simultaneous irradiation-corrosion and autoclave corrosion, we separately examine: (i) the effect of pre-irradiation on modifying the structure of the material, (ii) the impact of irradiation on creating defects in the growing oxide layer during corrosion, and (iii) the influence of irradiation on increasing the corrosion potential through radiolysis during corrosion. To replicate neutron-irradiated microstructure, two proton pre-irradiation schedules were employed: Schedule 1 (isothermal irradiation at 350 °C to 5 dpa) to simulate high-temperature PWR conditions, and Schedule 2 (two-step process: irradiation to 2.5 dpa at -10 °C followed by 2.5 dpa at 350 °C) to simulate lower temperature PWR and Boiling Water Reactor (BWR) conditions. Long-term autoclave corrosion testing over 360 days at 320 °C revealed no significant difference between unirradiated samples and those pre-irradiated according to either schedule, with all samples exhibiting sub-cubic kinetics within the pre-transition regime. Irradiated samples underwent Simultaneous Irradiation Corrosion (SIC) tests, corroding in 320 °C water while being irradiated with protons. Corrosion was found to accelerate in all SIC-tested samples relative to autoclave conditions, with the greatest increase observed in non-pre-irradiated samples. Pre-irradiation with either schedule resulted in a slower corrosion rate compared to non-pre-irradiated regions under SIC conditions. The degree of radiolysis observed in the SIC tests surpassed typical PWR conditions, approaching levels found in BWRs. Radiolysis products were identified as the primary contributors to accelerated corrosion, corroborated by radiolysis bar tests. Furthermore, these findings underscore the intricate interactions between irradiation, corrosion, and water chemistry in determining Zircaloy-4 corrosion kinetics within nuclear reactor environments.

Pressurized Water Reactor↗

Wave-Front Error Measurements and Alignment of CLASP2 Telescope with a Dual-Band Pass Cold Mirror Coated Primary Mirror

"Chromospheric LAyer Spectro-Polarimeter (CLASP2)" is the next sounding rocket experiment of the "Chromospheric Lyman-Alpha Spectro-Polarimeter (CLASP)" that succeeded in observing for the first time the linear polarization spectra in the hydrogen Lyman- line (121.6 nm) and is scheduled to be launched in 2019. In CLASP2, we will carry out full Stokes-vector spectropolarimetric observations in the Mg II h & k lines near 280 nm with the spectro-polarimeter (SP), while imaging observations in the Lyman- line will be conducted with the slitjaw optics (SJ). For the wavelength selection of CLASP2, the primary mirror of the telescope uses a new dual-band pass cold mirror coating targeting both at 121.6 nm and 280 nm. Therefore, we have to perform again the alignment of the telescope after the installation of the recoated primary mirror. Before unmounting the primary mirror from the telescope structure, we measured the wave-front error (WFE) of the telescope. The measured WFE map was consistent with what we had before the CLASP flight, clearly indicating that the telescope alignment has been maintained even after the flight. After the re-coated primary mirror was installed the WFE was measured, and coma aberration was found to be larger. Finally, the secondary mirror shim adjustments were carried out based on the WFE measurements. In CLASP2 telescope, we improved a fitting method of WFE map (applying 8th terms circular Zernike polynomial tting instead of 37th terms circular Zernike fitting) and the improved method enables to achieve better performance than CLASP telescope. Indeed, WFE map obtained after the final shim adjustment indicated that the required specification (< 5:5 m RMS spot radius) that is more stringent than CLASP telescope was met.

chromosphere; polarimetry; sounding rocket↗

Integration of On-board EOS Schedule Revision with Space Communication Emulation System

The need for on-board decision-making for planning science observations on Earth Observing Satellites is based on the fact that the desirability of acquiring an image can change dynamically, because of changes in meteorological conditions (e.g. cloud cover), unforeseen events such as fires, floods, or volcanic eruptions, or unexpected changes in satellite or ground station capability. In such cases, satellite resources, such as power and SSR capacity can potentially be better utilized taking another image that is of higher quality. Currently, typical Earth observing satellites cannot communicate directly with each other, and can only communicate with ground stations about 5% to 10% of the time. Because of the limited communication windows, as well as the cost and effort that would need to be expended in revising a mission schedule, a ground-based scheduler would have little or no opportunity to revise the schedule in response to the contingencies that may arise. For this reason, a distributed science planning system combining a ground-based scheduler with on-board schedule revision capabilities is warranted. This paper will describe algorithms for on-board decision-making for science planning and their integration with the advanced satellite control and communications technology developed at the Space Communication Emulation Facility (SCEF) at NASA Glenn Research Center. Our objective of demonstrating how advanced communications and scheduling technology can be combined to improve the scientific utility of images acquired by Earth observing systems will be discussed via a description of a number of realistic flight scenarios.

Khatib, Lina↗

The Mass Change Designated Observable Study: Overview and Results

The 2017–2027 United States National Academy of Sciences Decadal Survey (DS) for Earth Science and Applications from Space identified Mass Change (MC) as one of five Designated Observables (DOs) having the highest priority in terms of Earth observations required to advance Earth system science over the next decade. In response to this designation, NASA initiated several multi-center studies, with the goal of recommending observing system architectures for each DO for implementation within this decade. This paper provides an overview of the Mass Change Designated Observable (MCDO) Study along with key findings. The study process included: (a) generation of a Science and Applications Traceability Matrix (SATM) that maps required measurement parameters to the DS Science and Applications Objectives; (b) identification of three architecture classes relevant for measuring mass change: Precise Orbit Determination (POD), Satellite-Satellite-Tracking (SST) and Gravity Gradiometry (GG), along with variants within each architecture class; and (c) creation of a Value Framework process that considers science value, cost, risk, schedule, and partnership opportunities, to identify and recommend high value observing systems for further in-depth study. The study team recommended the implementation of an SST architecture, and identified variants that simultaneously (a) satisfy the baseline measurement parameters of the SATM; (b) maximize the probability of providing overlap with the Gravity Recovery and Climate Experiment Follow-On (GRACE-FO) mission currently in operation, accelerating science return from both missions; and (c) provide a pathway towards substantial improvements in resolution and accuracy of mass change data products relative to the program of record.

D N Wiese↗

Optically pumped submillimeter laser heterodyne receivers - Astrophysical observations and recent technical developments

NASA's prospective sub-mm-wave astrophysical missions encompass the Small Explorer Submillimeter Wave Astronomy Satellite, scheduled for launch in 1995, the Submillimeter Intermediate Mission, and the Large Deployable Reflector; until these are operational, sub-mm observations will be conducted at mountain sites and aboard aircraft platforms. Attention is presently given to the technical challenges faced by terahertz-range receiver developers, and it is noted that optically pumped sub-mm lasers furnish the only practical local oscillation source for heterodyne receivers in the 600-3000 GHz range. An account is given of ground-based and airborne astrophysical applications of heterodyne receivers.

Chin, Gordon↗

Multi Wave Link: An interactive database for co-ordination of multiwavelength programs

Multi Wave Link is an operational database used by the international astronomical community to plan and coordinate multiwavelength observational campaigns on various celestial objects. This facility has been and continues to be an essential tool for the organization of numerous simultaneous ground-based and satellite observations. The Multi Wave Link system has both an interactive component and an electronic mail alert notice component. The interactive portion contains a database of schedules from several of the world's larger observatories and orbiting satellites. Lists of observers, observatories, and their available instrumentation are additionally contained in the system. Another feature added to the software allows the user to search the Royal Greenwich Observatory e-mail listing of international astronomers. This capability is often used by astronomers to find the electronic address of colleagues for improved communication. However, the most productive aspect of the Multi Wave Link system appears to be one of the simplest parts of the system: the electronic mail alert notices for observing campaigns. Information useful in planning the structure of future astronomical databases can be obtained by studying patterns of use of the Multi Wave Link system. This paper analyzes 22 months of Multi Wave Link usage from Sep. 1991 - Jul. 1993.

Cordova, France↗