Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “new construction”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

Control System Plans for SNS Upgrade Projects

The Spallation Neutron Source at Oak Ridge National Laboratory is planning two major upgrades to the facility. The Proton Power Upgrade project, currently underway, will double the machine power from 1.4 to 2.8 MW by adding seven additional cryomodules and associated equipment. The Second Target Station project, currently in conceptual design, will construct a new target station effectively doubling the potential scientific output of the facility. This paper discusses the control system upgrades required to integrate these projects into the existing EPICS based control systems used for the machine and neutron instrument beamlines. While much of the control system can be replicated from existing solutions, some systems require new hardware and software. Operating two target stations simultaneously will require a new run permit system to safely manage beam delivery.

Hartman, Steven↗

Modeling Assessment of Residential Air-to-Water Heat Pumps Coupled with Cooling Thermal Storage

This study explored the performance and operating cost viability of air-to-water heat pumps (AWHPs) coupled with thermal energy storage (TES) in efficient new residential construction. AWHPs are an emerging technology in this country, but offer promise in terms of high efficiency, fully contained and factory charged outdoor refrigeration system, and hydronic delivery capabilities, which facilitates zoning, ducts in conditioned space, and TES integration for summer load-shifting. Although this AWHP+TES strategy is not yet mainstream, the authors feel that in ten years as decarbonization efforts proceed and TOU rates become more common, strategies such as this will be more accessible. Validated EnergyPlus simulation models were developed based on detailed monitoring data collected over several years at Pacific Gas and Electric's CVRH laboratory test homes located in Stockton, California. One of the CVRH test homes (1,962 ft 2 two-story) had been testing various AWHP systems and configurations over the past six years. The validated model was then updated with high efficiency IECC ZERH envelope and component requirements for climate zones 1-5, including ducts in conditioned space thermal distribution. Simulations were completed for the 1,962 ft 2 home in each climate zone for a minimum efficiency ASHP, an AWHP coupled with a fan coil, and an AWHP coupled with TES sized to eliminate summer on-peak compressor operation. To maintain consistency in reporting energy use estimates, all cases were run with a similar indoor thermostat control strategy to pre-cool the house below the nominal 76 degrees Fahrenheit set point prior to the on-peak period and float slightly above the set point during the peak period. The AWHP+TES configuration was controlled to alternately condition the indoor space or to charge the TES tanks prior to the beginning of the on-peak. Three composite TOU rates were developed based on existing TOU rates across the U.S. to provide differing economic scenarios to evaluate customer bill impacts throughout the summer. Two of the TOU rates had short three-hour peak periods, while the third rate had a longer seven-hour duration peak period. AWHP modeling projections were based on the observed field performance of the Chiltrix CX34 variable speed unit. Other products on the market or entering the market in the near term would likely perform differently.

25 ENERGY STORAGE↗

Broadband multiwavelength properties of the archetypal blazar 3C 279 during the 2017 Event Horizon Telescope campaign

The archetypal blazar 3C 279 hosts a prominent relativistic jet and exhibits strong broadband variability across the electromagnetic spectrum. In April 2017, the Event Horizon Telescope (EHT) observed 3C 279, alongside one of the most extensive quasi-simultaneous multiwavelength (MWL) campaigns ever conducted. With the aim of investigating the physical processes governing 3C 279, we analyzed individual observations and multiband light curves, and constructed a new quasi-simultaneous MWL spectrum. We also performed phenomenological modeling using the turbulent extreme multi-zone (TEMZ) model to constrain the fundamental physical properties of the source. The EHT observations reveal a clear flux increase in the innermost core between April 5 and 11, 2017. Over a broader timescale, radio measurements at longer wavelengths show concurrent enhancements in core flux and polarization around mid-April, coinciding with the ejection of a superluminal knot. Record UV-optical flares with strong polarization variability occurred in late March, followed by gamma-ray activity that declined before the end of the EHT observing period. During this interval, the source remained in a low X-ray state and showed no detectable VHE emission. The TEMZ modeling suggests that the broadband spectrum and variability of 3C 279 can be explained within a jet scenario in which turbulent plasma cells are compressed by a stationary conical shock. However, alternative interpretations, such as magnetic reconnection or a moving shock-in-jet event, remain plausible. This coordinated MWL campaign advances our understanding of the origin of jet and gamma-ray emission in 3C 279, while also providing a comprehensive publicly available dataset that will serve as a valuable reference for future studies.

Principe, G. [Trieste U.; INFN, Trieste; Bologna, ↗

Data Driven Commercial Building Energy Code Compliance and Technology Inventory for New York City

Building Performance Standards (BPS) are gaining national traction. A BPS will require new processes in the design, construction, and operation of buildings that take the occupants into account and enable predictive analysis to ensure compliance with current and future GHG emissions caps. In New York City, most buildings over 25,000 square feet will be regulated by a BPS starting in 2024, regardless of whether it is new construction permitted under current energy codes or an existing building. This research is one of the first to begin the evaluation of a long-term series of building policies in the context of an open data ecosystem, in cooperation with city agencies. Existing building policies enacted in NYC have ranged from building energy benchmarking and labeling to energy audits to the regulation of GHG emission in buildings. Through the development of a dataset related to building technologies and energy consumption, this project can help to evaluate if meaningful conclusions can be drawn for the data that has been largely self-reported in compliance with city regulations. This project will also provide lessons learned from a deep dive into these types of datasets to provide best practices for municipalities or states seeking to embark on policies like those enacted in NYC. In addition, a Building Automation System (BAS) Stretch Standard of Care (SSOC) for owners, designers, and building operators will enable the measurement and predictive analysis of energy consumption and GHG emissions at the plant, system, or component level, in anticipation of regulated GHG limits on buildings based on energy use. The SSOC is expected to be suitable for use on a national level. The primary feature of an SSOC is a standardized format for a set of BAS points that can be used to control and to gather data from individual plants, systems, or components that are related to building energy consumption. This project examined how measurements compare to prescriptive or simulation-based energy code targets, finding little correlation between predictive 8760-hour energy modeling and actual energy consumption for a small sample (n=27) of buildings constructed after 2015. Other analysis found that, while large multifamily housing (MFH) buildings showed a general trend similar to predicted reductions in energy use from the implementation of model commercial energy codes, this trend was not evident in the office, K-12 school, and hotel use groups in NYC. No upward or downward trends in energy consumption were found when buildings were grouped by size. Energy audit data were analyzed and it appears that there is bias by audit company on measures recommended to clients. Further research should be performed to cross-analyze this with other attributes, such as building size, vintage, and number of stories. Analysis found that for 281 buildings that were permitted and completed after 2015 and had submitted benchmarking data in 2022, between 81% and 96% (by use group) were found to be in compliance with the 2024 to 2029 NYC BPS emission caps, and between 55% and 89% were in compliance with the 2030-2034 caps. This work is beneficial to the public in helping policymakers and building stakeholders better understand the wide-ranging implications of a BPS.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Some Aspects of Essentially Nonoscillatory (ENO) Formulations for the Euler Equations, Part 3

An essentially nonoscillatory (ENO) formulation is described for hyperbolic systems of conservation laws. ENO approaches are based on smart interpolation to avoid spurious numerical oscillations. ENO schemes are a superset of Total Variation Diminishing (TVD) schemes. In the recent past, TVD formulations were used to construct shock capturing finite difference methods. At extremum points of the solution, TVD schemes automatically reduce to being first-order accurate discretizations locally, while away from extrema they can be constructed to be of higher order accuracy. The new framework helps construct essentially non-oscillatory finite difference methods without recourse to local reductions of accuracy to first order. Thus arbitrarily high orders of accuracy can be obtained. The basic general ideas of the new approach can be specialized in several ways and one specific implementation is described based on: (1) the integral form of the conservation laws; (2) reconstruction based on the primitive functions; (3) extension to multiple dimensions in a tensor product fashion; and (4) Runge-Kutta time integration. The resulting method is fourth-order accurate in time and space and is applicable to uniform Cartesian grids. The construction of such schemes for scalar equations and systems in one and two space dimensions is described along with several examples which illustrate interesting aspects of the new approach.

Chakravarthy, Sukumar R.↗

Finalizing Transition to the New Data Center at BNL

Computational science, data management and analysis have been key factors in the success of Brookhaven National Laboratory's scientific programs at the Relativistic Heavy Ion Collider (RHIC), the National Synchrotron Light Source (NSLS-II), the Center for Functional Nanomaterials (CFN), and in biological, atmospheric, and energy systems science, Lattice Quantum Chromodynamics (LQCD) and Materials Science, as well as our participation in international research collaborations, such as the ATLAS Experiment at Europe's Large Hadron Collider (LHC) at CERN (Switzerland) and the Belle II Experiment at KEK (Japan). The construction of a new data center is an acknowledgement of the increasing demand for computing and storage services at BNL in the near term and enable the Lab to address the needs of the future experiments at the High-Luminosity LHC at CERN and the Electron-Ion Collider (EIC) at BNL in the long term. The Computing Facility Revitalization (CFR) project is aimed at repurposing the former National Synchrotron Light Source (NSLS-I) building as the new data center for BNL. The construction of the new data center was finished in 2021Q3, and it was delivered for production in early FY2022 for all collaborations supported by the Scientific Data and Computing Center (SDCC), including STAR, PHENIX and sPHENIX experiments at RHIC collider at BNL, the Belle II Experiment at KEK (Japan), and the Computational Science Initiative at BNL (CSI). This paper highlights the key mechanical, electrical, and networking components of the new data center in its final configuration as used in production since 2021Q4 and gives an overview for the extension of the central network systems into the new data center and the migration of a significant portion of IT load and services from the old data center to the new data center carried out in 20212023, with expected completion of the main phase of the gradual IT equipment replacement and migration from the old data center into the new one set to the end of FY2023 (Sep 30, 2023).

99 GENERAL AND MISCELLANEOUS↗

Material flows and GHG emissions from housing stock evolution in US counties, 2020–60

The evolution of housing stocks determines demand for construction materials and energy, and associated emissions of greenhouse gasses (GHGs). The contribution of construction to building life-cycle emissions is growing as buildings become more energy efficient and the energy supply decarbonizes. A housing stock model is developed for counties in the United States using dynamic vacancy rates which endogenously influence stock out- and inflows. Stocks of three house types and 10 construction cohorts are projected for all contiguous US counties for the period 2020–60. Inflows and outflows of construction materials are then estimated along with GHG emissions associated with material production and construction activities in scenarios defined by stock turnover rates, population share by house type, and floor area characteristics of new houses. The results provide new insights into the drivers of construction-related emissions at local and national levels, and identify opportunities for their reduction. Demolition material flows grow in relation to construction material flows over the analysis period. Increasing the stock turnover rate increases future floor area per person, material requirements, and emissions from construction. Scenarios with reduced floor area and more multifamily homes in new construction have lower floor area growth, material requirements, and emissions from construction.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Evaluation of Initial and Mid-Term Air Traffic Procedures for Urban Air Mobility Operations

Urban air mobility (UAM) operations are expected to expand in scale over the next several years as novel aircraft types, including electric vertical takeoff and landing aircraft, are certified and begin operations. These new aircraft may increase safety, decrease noise, and lower operating costs compared with helicopters, allowing them to operate in ways existing aircraft do not. It is vital that these expanded operations are compatible with and do not disrupt existing operations or the air traffic management system. To study the ways in which scaled UAM operations can best integrate in the national airspace system, NASA and Joby Aviation partnered to conduct a high-fidelity air traffic controller-in-the-loop study. Building on air traffic procedures used to manage high tempo operations in other parts of the airspace, new procedures, routes, and communications protocols were developed and tested by retired controllers in NASA’s Future Flight Central tower simulation facility. In addition, new cooperative airspace constructs in the form of corridors were developed to understand their potential contributions to even greater scales of operation. The controllers managed traffic scenarios in the Dallas-Fort Worth and Dallas Love Field airports consisting of fleets of up to 100 UAM aircraft operating alongside traditional traffic . Metrics for air traffic controller workload, duration of communications, departure delays, and other measures of allowable aircraft throughput were collected. The analysis indicates that using today’s procedures for initial UAM operations under nominal conditions could enable up to 40 operations per hour to an airport’s central terminal area if that involved crossing a runway and up to 55operations per hour if reaching the central terminal did not involve crossing a runway. Operations at these tempos did not delay or otherwise interfere with simulated runway traffic and were rated acceptable by the air traffic controllers. The new corridor constructs dramatically lowered controller workload in certain circumstances, suggesting they may be effective in further increasing the allowable scale of operations.

Urban Air Mobility↗

Evaluation of Initial and Mid-Term Air Traffic Procedures for Urban Air Mobility

Urban air mobility (UAM) operations are expected to expand in scale over the next several years as novel aircraft types, including electric vertical takeoff and landing aircraft, are certified and begin operations. These new aircraft may increase safety, decrease noise, and lower operating costs compared with helicopters, allowing them to operate in ways existing aircraft do not. It is vital that these expanded operations are compatible with and do not disrupt existing operations or the air traffic management system. To study the ways in which scaled UAM operations can best integrate in the national airspace system, NASA and Joby Aviation partnered to conduct a high-fidelity air traffic controller-in-the-loop study. Building on air traffic procedures used to manage high tempo operations in other parts of the airspace, new procedures, routes, and communications protocols were developed and tested by retired controllers in NASA’s Future Flight Central tower simulation facility. In addition, new cooperative airspace constructs in the form of corridors were developed to understand their potential contributions to even greater scales of operation. The controllers managed traffic scenarios in the Dallas-Fort Worth and Dallas Love Field airports consisting of fleets of up to 100 UAM aircraft operating alongside traditional traffic. Metrics for air traffic controller workload, duration of communications, departure delays, and other measures of allowable aircraft throughput were collected. The analysis indicates that using today’s procedures for initial UAM operations under nominal conditions could enable up to 40 operations per hour to an airport’s central terminal area if that involved crossing a runway and up to 55 operations per hour if reaching the central terminal did not involve crossing a runway. Operations at these tempos did not delay or otherwise interfere with simulated runway traffic and were rated acceptable by the air traffic controllers. The new corridor constructs dramatically lowered controller workload in certain circumstances, suggesting they may be effective in further increasing the allowable scale of operations.

Advanced Air Mobility↗

Constructing nested coordinates inside strongly shaped toroids using an action principle

A new approach for constructing polar-like boundary-conforming coordinates inside a toroid with strongly shaped cross-sections is presented. A coordinate mapping is obtained through a variational approach, which involves identifying extremal points of a proposed action in the mapping space from [0,2π] 2 ×[0,1] to a toroidal domain in $\mathbb{R}$ 3 . This approach employs an action built on the squared Jacobian and radial length. Extensive testing is conducted on general toroidal boundaries using a global Fourier–Zernike basis via action minimisation. The results demonstrate successful coordinate construction capable of accurately describing strongly shaped toroidal domains. The coordinate construction is successfully applied to the computation of three-dimensional magnetohydrodynamic equilibria in the GVEC code where the use of traditional coordinate construction by interpolation from the boundary failed.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

SSME structural dynamic model development, phase 2

A set of test correlated mathematical models of the SSME High Pressure Oxygen Turbopump (HPOTP) housing and rotor assembly was produced. New analysis methods within the EISI/EAL and SPAR systems were investigated and runstreams for future use were developed. The LOX pump models have undergone extensive modification since the first phase of this effort was completed. The rotor assembly from the original model was abandoned and a new, more detailed model constructed. A description of the new rotor math model is presented. Also, the pump housing model was continually modified as additional test data have become available. This model is documented along with measured test results. Many of the more advanced features of the EAL/SPAR finite element analysis system were exercised. These included the cyclic symmetry option, the macro-element procedures, and the fluid analysis capability. In addition, a new tool was developed that allows an automated analysis of a disjoint structure in terms of its component modes. A complete description of the implementation of the Craig-Bampton method is given along with two worked examples.

Foley, M. J.↗

Comparison of X1 (OLD) and X3 (NEW) Aerosol Observing Systems at the North Slope of Alaska NOAA Observatory

This report describes a comparison of the overlapping X1 and X3 Aerosol Observing Systems (AOS) at the North Slope of Alaska (NSA) observatory. Due to structural issues with the original observatory building, the National Oceanic and Atmospheric Administration (NOAA) funded the design and construction of a new observatory building. Construction began in 2019 and was completed in 2020. The now decommissioned old NOAA Barrow Observatory (BRW) housed the AOS referred to as an NSA external site X1 from October 1997 through August 2021. A new observatory building next door housed the AOS referred to as an NSA external site X3 starting in October 2020. In this document we will refer to the original observatory system measurements as 'OLD' and the measurements in the new building as 'NEW'.

54 ENVIRONMENTAL SCIENCES↗

Exactly solvable lattice Hamiltonians and gravitational anomalies

We construct infinitely many new exactly solvable local commuting projector lattice Hamiltonian models for general bosonic beyond group cohomology invertible topological phases of order two and four in any spacetime dimensions, whose boundaries are characterized by gravitational anomalies. Examples include the beyond group cohomology invertible phase without symmetry in (4+1)D that has an anomalous boundary \mathbb{Z}_2 ℤ 2 topological order with fermionic particle and fermionic loop excitations that have mutual \pi π statistics. We argue that this construction gives a new non-trivial quantum cellular automaton (QCA) in (4+1)D of order two. We also present an explicit construction of gapped symmetric boundary state for the bosonic beyond group cohomology invertible phase with unitary \mathbb{Z}_2 ℤ 2 symmetry in (4+1)D. We discuss new quantum phase transitions protected by different invertible phases across the transitions.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

The Linear Collider Facility (LCF) at CERN

In this paper we outline a proposal for a Linear Collider Facility as the next flagship project for CERN. It offers the opportunity for a timely, cost-effective and staged construction of a new collider that will be able to comprehensively map the Higgs boson's properties, including the Higgs field potential, thanks to a large span in centre-of-mass energies and polarised beams. A comprehensive programme to study the Higgs boson and its closest relatives with high precision requires data at centre-of-mass energies from the Z pole to at least 1 TeV. It should include measurements of the Higgs boson in both major production mechanisms, ee -> ZH and ee -> vvH, precision measurements of gauge boson interactions as well as of the W boson, Higgs boson and top-quark masses, measurement of the top-quark Yukawa coupling through ee ->ttH, measurement of the Higgs boson self-coupling through HH production, and precision measurements of the electroweak couplings of the top quark. In addition, ee collisions offer discovery potential for new particles complementary to HL-LHC.

43 PARTICLE ACCELERATORS↗

Environmental projects, volume 10. Environmental assessment: New 34-meter antenna at Apollo site

The Goldstone Deep Space Communications Complex (GDSCC) is part of NASA's Deep Space Network (DSN), one of the world's largest and most sensitive scientific telecommunications and radio navigation networks. A detailed description of the GDSCC is presented. At present the Venus Station has an unused 9-meter antenna and a 26-meter (85 ft) antenna known as DSS-13. Construction of a new 34-meter (111.5 ft) antenna at the Venus site is under way to replace the present DSS-13 26-meter antenna. The proposed construction at the Apollo Site of a new, high efficiency, 34-meter, multifrequency beam waveguide-type antenna to replace the aging, 20-year old, DSS-12 34-meter antenna located at the Echo Site is analyzed. This new 34-meter antenna, to be constructed at the Apollo Site and to be known as DSS-18, will be of a design similar to the new DSS-13 34-meter antenna now being constructed at the Venus Site. When the new 34-meter antenna is completed and operational at the Apollo Site (planned for 1993), the old DSS-12 34-meter antenna at the Echo Site will be decommissioned, dismantled, and removed.

Source record↗

Remediation of Temporary Storage Sites in Support of the Port Hope Area Initiative - 20295

The Port Hope Area Initiative is a community-based solution for the long-term management of historic low level radioactive waste (LLRW) resulting from 60 years of uranium and radium processing operations in the Town of Port Hope which is located in Ontario, Canada. The Eldorado refinery, on the north shore of Lake Ontario, began refining radium-226 from pitchblende ore, later transitioning to the refining of uranium. Through the history of the operation, LLRW was deposited throughout the town of Port Hope as a result of fugitive emissions from the plant and/or through the re-use of process residues as building material and backfill. Historical clean-up activities conducted in the late 1970's involved the remediation of approximately 400 properties and the relocation of 100,000 cubic metres of contaminated soil to a disposal facility in Chalk River operated by Atomic Energy of Canada Limited (AECL). Owing to space limitations at that disposal facility, any LLRW identified through construction monitoring since that time has been stored in the community at three temporary storage sites located throughout the town. These include: the Centre Pier mound that contained approximately of 19,800 m{sup 3} of LLRW-impacted soil that originated from the construction of a new water treatment plant; two mounds located at a licensed storage facility containing LLRW obtained from residential clean-up activities (11,000 m{sup 3}); and a small pad adjacent to the municipal sewage treatment plant containing 2200 m{sup 3} of LLRW-containing sludge. With the construction of a new long-term waste management facility (LTWMF) that has been designed to house all of the LLRW identified within Port Hope, the three sites were early candidates for remediation. The clean-up of the three temporary storage sites was a significant milestone for the Port Hope Area Initiative. After a decade of planning and consultation, this work represents the first sites in the municipality to be remediated with the waste being safety removed and transferred to the newly constructed LTWMF. This paper discusses the challenges associated with the clean-up activities for these three sites and the strategies employed to address those challenges. These included weather-related challenges, owing to the seasons over which the work was conducted as well as those associated with working within a closely-knit community. Canadian Nuclear Laboratories (CNL), working on behalf of the federal government, has worked diligently to develop a positive and trusting relationship with the community. Consequently, the successful execution of this project needed to be sensitive to, and respectful of the needs of the community. In addition to the usual Health, Safety and Environment training, project staff received community awareness training that spoke to the history of this community-based initiative and the expected behavior when working within the community. Transportation routes were defined based on safety and the need to minimize disruption to local traffic while haul-times where scheduled around school bus hours to enhance public safety. The successful completion of this first of many remediation projects to be completed under the Port Hope Area Initiative reflected years of careful planning. Nevertheless, there were a number of 'lessons learned' that have been applied on other ongoing projects be completed under the Port Hope Area Initiative. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Gravity loop integrands from the ultraviolet

We demonstrate that loop integrands of (super-)gravity scattering amplitudes possess surprising properties in the ultraviolet (UV) region. In particular, we study the scaling of multi-particle unitarity cuts for asymptotically large momenta and expose an improved UV behavior of four-dimensional cuts through seven loops as compared to standard expectations. For N=8 supergravity, we show that the improved large momentum scaling combined with the behavior of the integrand under BCFW deformations of external kinematics uniquely fixes the loop integrands in a number of non-trivial cases. In the integrand construction, all scaling conditions are homogeneous. Therefore, the only required information about the amplitude is its vanishing at particular points in momentum space. This homogeneous construction gives indirect evidence for a new geometric picture for graviton amplitudes similar to the one found for planar N=4 super Yang-Mills theory. We also show how the behavior at infinity is related to the scaling of tree-level amplitudes under certain multi-line chiral shifts which can be used to construct new recursion relations.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗