Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “multiple time stepping”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

383 records · Page 22

Pilot-Scale Testing of an Integrated Circuit for the Extraction of Rare Earth Minerals and Elements from Coal and Coal Byproducts Using Advanced Separation Technologies

The primary objective of this project was to develop and demonstrate an integrated pilot-scale circuitry for recovering high-value rare earth elements (REEs) from coal and coal byproducts. The target performance was to produce a mixed REE product with content of at least two percent by weight on a dry mass basis in a cost-effective and environmentally benign manner. During the first nine months of the project period (Phase 2 Budget Period 2), pilot plant construction was completed including all field site startup activities such as permitting, engineering design, procurement/bidding, unit fabrication, site construction, equipment installation, module assembly, safety training, and circuit shakedown. During the remaining 21 months of project period (Phase 2 Budget Period 3), detailed field-testing activities were performed including feedstock sample collection and preparation, exploratory testing, circuit modification, detailed parametric study, and performance optimization. A detailed techno-economic analysis was performed based on the pilot plant testing findings which provided various scenarios for REE production. The project successfully accomplished the proposed target performance by producing mixed rare earth oxide (REO) with greater than 90% purity by weight in a continuous pilot scale operation from two distinctly different coarse refuse materials (i.e., West Kentucky No. 13 and Fire Clay coal seams), and at least three secondary sources (i.e., heap leach process and naturally formed acid mine drainage system). Project partners included the University of Kentucky, Virginia Tech, West Virginia University, Alliance Coal, Blackhawk Mining, Mineral Refining Company, and Mineral Separation Technologies. The pilot scale test facility was constructed at a former mining complex owned by Alliance Natural Resource Partners (Alliance Coal). The site was rehabilitated to accommodate the equipment installation, construction and fabrication, electrical power requirement, water line management and containment. The process units constructed and installed included X-ray sorting unit, crushing and grinding unit, physical separation unit, acid leaching unit, solvent extraction unit, and wastewater management unit. A rare earth mineral concentration unit was constructed as a standalone unit for flexible operation. A detailed environmental assessment and control plan was carried out to identify and quantify any potential impacts of the pilot-scale processing circuitry on the human and eco-system health and well-being. Corresponding mitigation strategies and control measures were provided. A conceptual flowsheet was developed to effectively remove thorium and uranium from high purity rare earth oxide mix or any potential radionuclide enriched stream. The two distinct feedstock materials were secured from the Blackhawk Mining Complex in eastern Kentucky where the Fire Clay (Hazard No. 4) seam is processed. The West Kentucky No. 13 (Baker) coarse refuse material was collected from an active process stream at an Alliance coal preparation plant located in western Kentucky. Characterization analysis indicated that both of feed materials generated from the two sources contained >300 ppm of TREEs on a dry whole mass basis which met the requirements for a qualified feed stock. The two feedstocks were further upgraded using a dual x-ray sorter to prepare the feed material for hydrometallurgical circuit. Thermal treatment on feed material prior to leaching was found to: 1) improve the leaching recovery of REEs, 2) increase the leaching kinetics, and 3) allow the leaching reaction to occur at lower acidity. Roasting at 600°C was selected as the pre-treatment condition for both West Kentucky No. 13 and Fire Clay coarse refuse material. Over 40% of leaching recovery was achieved by roasting West Kentucky No. 13 material having a top particle size of 3 mm in the pilot scale operation using 1.2M sulfuric acid leaching at 75OC. Initial pilot scale testing involved continuous operation of the pilot plant for 94 hours. The leaching unit was operated at solid-to-liquid ratio of 1 to 10 (w/v) using 0.5M sulfuric acid solution at a temperature of 75°C. The continuous solvent extraction circuit utilized rougher and cleaner units with DEHPA and TBP as the extractants. An innovative stripping circuit was developed to accumulate the REE concentration in the stripping solution to a level above 600 ppm. A bleed stream from the recycled strip solution was treated using oxalic acid precipitation which produced a high grade rare earth oxalate. The oxalate product was roasted to remove the oxalate which produced a rare earth oxide product having a purity greater 90%. Due to high concentrations of contaminant ions in the pregnant leach solution (PLS), a modified flowsheet was developed that involved pre-concentration of the REEs using multiple stages of precipitation and redissolution. The advantage of this process was improved removal of contamination before the downstream purification process and a significant cost reduction relative to the circuit that utilized the solvent extraction process. The modified circuitry included processes involving leaching, multistage precipitation, redissolution, and oxalate precipitation followed by roasting of the oxalate product. The circuit produced a mixed REO that was 92.96% pure from the initial test. A detailed parametric test plan was carried out which involved varying key parameters including solids feed rate, acid flowrate, acid concentration, multistage precipitation pH, redissolution pH, oxalate precipitation dosage and pH. The response variables included REE recovery, contaminant recovery, REO product grade and overall chemical consumption. Test results indicated that the acid-to-solid ratio is the key parameter to leaching efficiency as performance deteriorated with an increase in solids concentration. The optimal pH determined for REE precipitation and redissolution was 6.5 and 2.5, respectively. Additional tests were conducted to further improve the flowsheet. Recirculating a portion of the PLS to the feed of the leach tanks improved the leaching performance by lowering the pH of the leaching system and reducing the contamination recovery by shortening the residence time. Moreover, the removal of Al prior to REE precipitation significantly reduced the oxalic acid consumption in the oxalate precipitation circuit. The modified circuit produced over 90% grade REO by weight from both West Kentucky No. 13 and Fire Clay coarse refuse material in pilot scale continuous test programs. A case analysis model was developed to project the REE and major contaminants concentration in each PLS stream based on the leaching condition, pH cut point, and oxalic acid dosage. A correlation was established using empirical and semi-empirical models. Using the models, chemical consumption required for each stage was predicted based on the projected performance of the hydrometallurgy circuit. After identifying the optimum conditions, validation tests were carried out for the treatment of both West Kentucky No. 13 and Fire Clay coarse refuse materials in the pilot plant. The actual circuit performance and chemical consumptions were very close to the model predictions. Other than the two coarse refuse sources, several secondary feedstocks were also tested in the pilot plant facility. A “heap leach” system was constructed using the coarse refuse material generated from cleaning the West Kentucky No. 13 seam coal. Using the two stage SX rougher and cleaner circuit, a concentrate with a grade >90% REO was produced while recovering >97% of the REEs from the heap leach PLS. Naturally generated acid mine drainage (AMD) from West Kentucky No.13 mine was processed using the multistage precipitation circuit in the pilot plant in a test conducted for a period of 32 hours. The final grade of the mix RE oxide produced from the AMD was 90.84% with an overall circuit recovery of 64%. The primary source of REE was the selective precipitation steps involving iron and aluminum rejection. The hydrophobic-hydrophilic separation (HHS) process was proven to effectively recover coal from fine waste materials. For REM recovery, the HHS process was able to produce concentrates at grades of approximately 1.8% REE on an ash basis; however, recovery values were typically low, <10%, under the optimal conditions determined in the laboratory-scale testing. Staged testing of the pilot-scale HHS process for coal recovery and semi-continuous laboratory testing for REM testing showed that a total concentration ratio of more than 15x was observed for the REM recovery process. A circuit simulation package was developed for REE extraction and purification using a spreadsheet-based platform (Microsoft Excel). The REESim circuit simulation package is configured to track the mass and volume flows of components passing through a series of unit operations specified and configured by the user. The mass rates can then be utilized by the user to determine important performance indicators such as product mass yields, concentrate purity levels, element-by-element recoveries, and so forth. The techno-economic analysis showed that the roasting and leaching operations were the most expensive capital items, each contributing approximately 30% to the total capital cost. One notable contributor to the high production costs was the low REE recovery observed in the pilot scale trials. The product basket price was shown to have a strong influence on the economic viability of the scenarios, with the scandium price being the most significant influencer. Operating cost was shown to be extremely sensitive to REE recovery, REE feed grade, and leaching acid consumption. An analysis of ten different scenarios for a 500 t/h commercial operation revealed that three were economically favorable, producing internal rates of return varying from 27.7% to 33.1% and payback periods of 4 to 5 years. The project successfully developed and demonstrated a process to recover REEs from coal and coal byproducts in a pilot-plant operation which consistently produced over 90% grade REO mix from varies types of feedstocks. Commercialization analysis showed that the technology readiness level successfully achieved TRL 6 at the end of the project and demonstrated the need and the potential for scaling the process to further advance the technologies toward the goal of providing a domestic supply of REEs at a commercial scale.

01 COAL, LIGNITE, AND PEAT↗

Grid Resiliency with a 100% Renewable Microgrid

San Diego Gas & Electric Company (SDG&E) installed America’s first and largest utility-scale microgrid in Borrego Springs in 2013. The first generation Borrego Springs Microgrid utilized diesel generators to form and stabilize the microgrid island, with support from grid-scale batteries and local solar photovoltaic (PV) generation. In this project, SDG&E in partnership with National Renewable Energy Laboratory (NREL) demonstrated through modeling, simulation and utility field testing that blackstart and islanding of the microgrid can be led with 100% renewable, inverter based resources (IBRs), to help reduce community reliance on conventional generation resources. Through equipment upgrades, grid-forming island leader capability was transitioned to a battery IBR instead of the Borrego Springs Microgrid diesel generators. A new microgrid controller was integrated to the microgrid and programmed to control and manage multiple energy storage systems. Synchrophasor and other power quality data verified autonomous, high-speed response of the IBRs through blackstart, islanding, and load step testing. Results of project field evaluations provide distribution systems operators (DSO) with increased confidence that renewable, IBR can replace traditional generators to blackstart and island microgrids and rapidly establish stable island frequency with rapid changes in peak power demand. Importantly, the project validated the integration feasibility of a distributed energy resource management system (DERMS) controller that manages multiple grid-forming and grid-following IBRs, establishing a standard design interface to reduce the complexity of integrating new DERs in the future and supporting replication by the industry. As a result of learnings in this project, SDG&E has implemented the microgrid controller strategy at multiple other microgrid sites, thereby validating the replicability of the solution. Hardware-in-the-loop (HIL) simulations including power and controller HIL hardware — along with electromagnetic transient (EMT) simulations of Borrego Springs Microgrid —informed adjustments to inverter parameters and were important to characterize the performance of the IBRs in relevant operating conditions before deployment. The EMT and HIL simulations of islanding the entire community are important contributions in providing confidence in IBR performance prior to future islanding of the community in the field. High-fidelity EMT and/or HIL simulation of IBRs can de-risk field operations, and its relevance and importance as a tool is increasing as distribution grids and microgrids become more complex and dynamic with an increasing proportion of renewable generation, distributed energy storage, and two-way power and energy flows.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Plasma Wall Interaction with 3-D Plasma Boundaries

The interaction of the edge plasma and the material surfaces is one of the most critical challenges on the path to harness fusion power as new, fundamental energy source. This challenge typically combines the thrust to reach high density, low temperature (detached) plasmas in front of the divertor target plates as well as understanding the plasma material interaction (PMI) in particular in this regime. The combination of both research thrusts represents an extraordinarily challenging subject encompassing spatial scales spanning nanometers to meters in all states of matter and across a broad energy range. Modeling capabilities, which help to interpret data from nowadays experiments and enable extrapolation to future devices are urgently required. This is in particular true for toroidal magnetic confinement devices with three-dimensional (3D) plasma boundaries. Such plasma boundary geometries occur in tokamaks, when small amplitude magnetic perturbations are used to stabilize the unruly edge plasma or in stellarators, that are inherently 3D plasma confinement devices. In this project, the impact of 3D plasma boundaries on the plasma material interaction (PMI) was assessed. This work focused on plasma boundary conditions, in which high-density conditions at the material surfaces yield mitigation of the otherwise immense heat and particle loads that these materials would see. These so-called high recycling and eventually detached plasma regimes are of great interest for future reactor operation. In the project, key features that are unique to 3D boundaries were explored in comparison to canonically assumed axisymmetric plasma edge situations in tokamaks. In particular, the relevance of the 3D boundary situation in the extrapolation to the plasma boundary solution at ITER, the next step fusion energy experiment under construction as a multi-national, world-wide large-science experiment in southern France, has been explored. The EMC3-EIRENE plasma edge fluid and kinetic neutral transport code has been advanced to cope with the challenging and unprecedented conditions in the ITER boundary plasma including 3D fields that are planned to be used to suppress harmful edge instabilities, the so-called edge localized modes. This is a vital integration challenge for ITER and the results from this grant have provide a leading capability for this assessment. It was shown that the detachment process in a 3D edge solution for ITER follows the recycling regimes that are known from axisymmetric solutions, but that multiple plasma exhaust channels connected to the material surfaces are established which feature individual recycling characteristics. Because these channels touch the material surfaces in the divertor in a 3D geometry, the compatibility with the plasma material interaction (PMI), including erosion and impurity generation has been found to be an important part of the integration challenge. To address this, the fully 3D plasma material interaction code ERO2 has been adapted to these ITER specific geometries and a homogeneous mixing model was implemented, that allows to consider the mixing of Be and Was used at ITER in the PMI modeling. This model enhancement has been used to study non-local migration of Be in the JET ITER like wall configuration and it has been shown that with this model such complex migration processes in ITER relevant plasma shapes and with ITER relevant plasma boundary conditions can be addressed. The combined modeling approach using EMC3-EIRENE as a plasma boundary transport code and the ERO2 specialized PMI model will be an asset for the continued preparations of ITER operation as well as for Fusion Pilot Plant efforts that have emerged in the U.S. during the evolution of this grant. The predictive capability of this numerical tool has been validated at the DIII-D US national fusion facility. Here, dedicated plasma edge diagnostics were implemented to measure the impurity household around a 3D edge plasma during ELM suppression by 3D fields. Dedicated experiments with local material probes using these diagnostics and the state-of-the-art suite of boundary measurements at DIII-D have shown that the 3D perturbation of the plasma edge that is excreted by such 3D control fields yield a perturbation of the plasma boundary flux structure and hence also of the resulting PMI. The 3D boundary plasma is composed out of helical magnetic flux channels that intersect the divertor targets at an angle relative to the main guiding field, i.e., the toroidal magnetic field component of the tokamak. A similar effect has been measured as well on limiter surfaces during the startup campaign at the new stellarator experiment Wendelstein 7-X. These experiments ad initial analysis with the ERO plasma material interaction model, suggested that the place of erosion for a given particle from the surface and its re-deposition can be different in such 3D field geometries yielding potentially a significant level of net-erosion. This is not the case for axisymmetric solutions, where it was shown in the past that the eroded particles are effectively re-deposited into gaps produced by erosion at the same position and hence the net-erosion levels are small. For ITER, the quest to suppress the ELMs and at the same time maintain the integrity of the divertor is an issue, which these fundamental findings will help to resolve. The coupling of this work to the extrapolation in the ITER program has been addressed by both the PI and the lead numerical scientist being ITER Science Fellows in the duration of the contract and forward. A second focus in the exploration of 3D boundary effects on tokamaks and stellarators has been set on the measurement of helium exhaust features with such 3D fields. This is important because He represents the ash of the fusion process and needs to be exhausted. It was shown that 3D field application compatible with suppression of ELMs yields an increase of the helium exhaust performance. The ratio of the effective helium confinement time over the energy confinement time was reduced by almost 50% which demonstrated that the impact of helium accumulation in the plasma core with respect to the confinement of energy to sustain the fusion reaction is significantly improved with such 3D control fields. It was shown that this is the case for tokamaks as well as stellarators. At the Large helical Device in Japan, a similar enhancement of the helium exhaust features when small amplitude additional 3D fields were applied was measured. This is an important additional function of 3D field application and its impact on ITER is presently being studied in combination with investigations of helium exhaust in 3D field geometries of stellarator devices.

3D plasma edge transport↗

Development of Digital Twin Predictive Model for PWR Components: Updates on Multi Times Series Temperature Prediction Using Recurrent Neural Network, DMW Fatigue Tests, System Level Thermal-Mechanical-Stress Analysis

The long-term operation (LTO) of nuclear power plant (NPP) beyond their original design life of 40 years, can lead to more material damage associated with cyclic fatigue under thermal-mechanical loading cycles and associated long-term exposure of reactor material to the deleterious reactor-coolant environments. However, under this LTO condition the reactor components can still safely operate but may require more frequent Nondestructive Evaluation (NDE) of reactor components. Frequent NDE requirement may lead to frequent shutdown of the NPP. This in turn can lead to power outage and additional NDE-inspection-cost related economic loss. The economic loss can be minimized by reducing uncertainty in life estimation of safety-critical pressure boundary components and by implementing more digital approach such as by using upcoming digital-twin (DT) technology for predicting the structural states (e.g., time and location dependent inside/outside thickness temperature, stress, strain, plastic deformation, etc.) and associated fatigue life of a component in real time. Towards this goal Argonne National Laboratory (ANL) with the sponsorship of DOE Light Water Reactor Sustainability (LWRS) program is working on the development of a DT framework that can be used for real time environmental fatigue prediction of reactor components. The DT framework is based on limited experiment-data, Artificial-intelligence (AI) – Machine-Learning (ML) - Deep-Learning (DL) based techniques and Multiphysics-computational-mechanics such as finite element (FE) based modeling tools. Towards this overall goal, following are some of the major contributions made during the FY21: 1) Multiple 82/182 dissimilar metal weld (DMW) specimens (both solid-weld and joint-weld representing the actual reactor multi-metal nozzles) were fatigue tested. The resulting fatigue lives were compared to the NUREG-6909 based best-fit and design fatigue curves. Additionally, the results of 52/152 DMW fatigue specimens (which were recently tested at Republic of Korea under the sponsorship of International Nuclear Energy Research Initiative - INERI program) were compared to the NUREG-6909 based best-fit and design fatigue curves. From the comparison of 82/182 and 52/152 DMW test data with NUREG-6909 best-fit curve, most of the reported test data fall way away from the NUREG-6909 suggested best-fit or mean curve. The NUREG-6909 suggested best-fit curve is the best-fit curve of austenitic stainless steel and due to lack of enough data on Nickel-based welds, this is currently being used for predicting the life of Nickel-alloy-based welded components. However, the above observation may require higher scaling factor (e.g., ASME suggested factor of 20 on cycles rather than the current NUREG-6909 suggested factor of 12 on cycles) for scaling the austenitic-stainless-steel best-fit-curve for estimating the design or safe-life of a welded component. Accordingly, for example, if a DMW component experience a strain amplitude of 0.6% the PWR-water life of the component would be 52 cycles instead of 85 cycles. However, more DMW tests are required to further ascertain the above-mentioned observations. 2) A system level CAD and finite element model were developed which consists of reactor pressure vessel (RPV), part of steam generator (SG), part of pressurizer (PRZ), hot leg (HL), and surge line (SL). This is with detailed nozzle geometry and thermal-mechanical material properties of different metals to simulate realistic thermal-mechanical stress under connected system global thermal-mechanical boundary conditions. 3) Different system level heat transfer analyses were performed with estimation of relevant heat transfer coefficients. The resulting data were used in subsequent system level thermal-mechanical stress analysis and for generating spatial-temporal training and validation data for a system level digital-twin based temperature predictor. Transient heat transfer analyses were performed considering thermal boundary condition under design-basis (DB) loading and EDF (Électricité de France) data-based grid-load-following (EDF-GLF) loading cycles. 4) System level thermal-mechanical stress analysis was performed for identifying damage-prone hotspots and for future extension of the model for cyclic state prediction. From the system-level model simulation under DB loading cycle it is found that HL and the SL nozzle that connect to the HL can experience significant stress and strain and could be one of the weakest links in the overall reactor coolant system (RCS). 5) An AI/ML based DT model was developed for multi-time-series temperature prediction at any inside/outside thickness locations of PWR pressure boundary components. This is by using Recurrent-neural-network (RNN) and keras machine learning libraries. The RNN model was validated against two laboratory test-based data sets with one obtained through ANL’s in-air fatigue test system and other through PWR-water test loop. The experimentally validated DT model further validated against FE model results to predict thermal scarification related spatialtemporal temperatures at random locations of a component. The well validated DT model was then used for demonstrating spatial-temporal temperature prediction under 100+ years of reactor operation subjected to combined DB, EDF-GLF and randomized grid-load-following (RANDOMGLF) loading Cycles. The expert-elicitation DT model framework was developed assuming field/input/process measurements can be available from a few existing plant sensors and can readily be used by the NPP operators. The above temperature prediction model will feed to the next-step stress analysis model based on which the life of a component can be predicted in realtime, which is one of our future works.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Liquid Salt Combined-Cycle Pilot Plant Design

The work described in this report is responsive to the Office of Fossil Energy program ‘Energy Storage for Fossil Power Generation.’ This Phase I report has been prepared by Pintail Power LLC, with support from Nexant ECA, Electric Power Research Institute (EPRI) and Southern Company Services as a deliverable for the U.S. Department of Energy for NETL Award DE-FE-00320016. The Liquid Salt Combined Cycle™ (LSCC™) technology provides large-scale energy storage integrated with Fossil Electric Generating Units (FEGUs) to meet critical needs in the energy transition by providing: • the lowest cost large-scale storage for time-shifting of renewable energy, • superior fuel efficiency to reduce GHGs from dispatchable resources, • flexible capacity and ramping to balance variability of wind and solar resources, • essential grid stability services to assure reliability of a low-carbon grid. The LSCC approach: • employs equipment that has already been proven in utility service, • uses safe, non-toxic, non-degrading, perpetual-life storage medium, • leverages and repurposes existing FEGU assets, • expands the value stack of energy storage to reduce market, financing, and commodity risks. Pintail Power has developed the LSCC technology to meet the need for reliable, efficient, and cost-effective integration of Variable Renewable Energy (VRE) into a low-carbon electric grid by coupling proven thermal energy storage with proven gas turbines, steam turbines, and heat transfer equipment. This novel approach is intended to address the key issues facing the grid and operators of renewable and fossil generating units including: • Overgeneration and curtailment of renewables, • Need for fast ramping dispatchable resources, • Improved efficiency and flexibility of fossil units, • Additional peaking capacity to support electrification of transportation and heating, • Provision of reliability services to support high penetration of VRE, especially synchronous inertia and fast frequency response. A Technology Readiness assessment by EPRI confirmed that LSCC technology consists of commercially proven hardware used in industrial and utility applications. Although the novel LSCC approach has not yet been demonstrated as a complete system, interfaces between major components have been conservatively specified. A Phase III pilot is planned to demonstrate equipment integration and operation. The patented innovation is removal of the evaporator section from the exhaust heat recovery system, with the evaporation performed by stored energy in a separate steam generator. This arrangement couples renewable and fossil power generation via long-duration energy storage to deliver cost, performance, and operational synergies, including superior charging and discharging flexibility, reduced fuel consumption and lower CO 2 emissions compared to conventional Combined Cycle Power Plants, and low-cost, large-scale energy storage. The LSCC technology is composed of proven equipment integrated with gas turbine exhaust heat in a novel system. During charging, electric heaters raise the salt temperature as it flows from the Cold Salt Tank to the Hot Salt Tank. During discharging, hot salt produces steam from feedwater that is heated with gas turbine exhaust, which also superheats steam to drive a steam turbine. LSCC technology can be added to any combustion-turbine to integrate renewable energy, provide needed grid services, and increase the value of fossil electric generating units based on the technology’s following attributes: • Long-duration storage enables time-shifting of VRE to avoid curtailment and impairment of renewable assets. • Long storage duration combined with fast-charging capability increases arbitrage opportunities by storing more energy when the price is low and discharging more hours when the price is high. • Long storage duration allows resource adequacy to be supplied across multiple days to increase reliability and reduce risk. • The stored energy reduces fuel heat rate and GHG emissions, and increases merit, so the LSCC dispatches earlier and longer to increase the plant’s capacity factor and asset value. • The stored energy enables pre-heating and startup of the steam cycle, without operating the gas turbine, to enable fast startup and ramping when dispatched for discharge. • The steam turbine can operate without the gas turbine so it can provide valuable synchronous inertia during charging without consuming fuel. • Fast frequency response and regulation services can be provided during charging using solid-state heater and pump controls to vary the charge power input in response to grid signals. • The LSCC system can be configured for resilience including black start, islanded/micro-grid operation, and even self-recharging of storage using either gas turbine power or gas turbine exhaust heat. The commercialization plan is to add LSCC technology to existing simple cycle gas turbine power plants with the 50MW GE LM6000 aero-derivative gas turbine as the reference design basis. A Techno-economic assessment of the reference design evaluated the benefits (Levelized Avoided Cost of Energy) and costs (Levelized Cost of Energy). The plant definition included all major systems and budgetary vendor quotes. Pintail Power and NexantECA developed the overall cost estimate for the LSCC plant up to the total plant cost level, following the DOE-NETL cost estimate guidelines at AACE Class 3 (-20%/+30%). This includes the equipment cost, bulk material, direct and indirect labor costs to arrive at the bare erected cost. Engineering costs are factored from the BEC and added to it to arrive at the EPC cost. Process and project contingencies were then factored from the EPC cost and rolled-up to yield the total plant cost of $\$$184 million for 1746 MWh of discharge electricity. • At $\$$105/kWh, the reference plant costs less than any of the Energy Storage Systems evaluated by PNNL in 2020 for the Energy Storage Grand Challenge. Operations and Maintenance cost estimates were scaled from combined cycle practice, assuming that the LSCC unit was co-located with and sharing some labor expense with other units, to arrive at $\$$2.2 million per year. Plant economics were evaluated using prices from the ERCOT Day-Ahead Market for calendar year 2019 (excluding the market disruptions from the COVID pandemic and the February 2020 deep freeze event). Assuming economic dispatch in the ERCOT Day-Ahead market, the reference plant capacity factor would have discharged for 2777 hours at 91.9 MW, a 31.66% capacity factor, with a marginal cost of $\$$25.59/MWh, and a LACE of $\$$82.41/MWh. Fixed charges were calculated according to EIA guidelines to arrive at an LCOE of $\$$83.48. The benefit-to-cost ratio of 0.99 suggests that the reference plant would have been cost-effective and competitive in the market. EPRI interviewed selected utilities to gauge the need for, applicability of and interest in the LSCC system. Several utilities are currently managing increased load growth along with the inclusion of increasing levels of renewable generation, putting pressure on conventional generation by requiring increased turndown requirements and ultimately lower capacity factors. All of the utilities interviewed have CO 2 reduction targets in the 2030-2050 timeframe that will severely limit the participation of fossil generation and require better utilization of carbon free generation. While there is limited opportunity for storage in the current markets, the utilities interviewed stated that there will be a substantial need for long duration energy storage in the future given the expected trends. Utilizing an energy storage system will generally be preferred over new gas capacity in some cases, with the capabilities of the LSCC system being a potential option for retrofit to existing simple cycle gas turbine units, allowing them to deliver greater participation in the market with lower carbon intensity. A technology gap assessment and technology maturation plan identified a pilot-scale demonstration as the final step before commercialization. Key gaps to be addressed during the Phase II FEED (Front-End Engineering Design) are component selection and design, commissioning procedures, and operational procedures and the control system for LSCC charging and discharging. The project team has been expanded to include Wood Group PLC as EPC. The proposed Phase II work leads to a pilot-scale engineering demonstration (TRL 6) to be conducted at Southern Company’s Plant Rowan, where the prototype system will perform “all the functions that will be required of the operational system.” The proposed pilot will facilitate commercialization (TRL-9) by scale-up to utility-scale systems integrated with peaking GTs or directly to facility scale systems using industrial GTs. The conceptual design for the pilot plant focuses on the novel integration aspects of LSCC technology. A slipstream of gas turbine exhaust will feed a waste heat recovery unit coupled to a molten salt steam generator heated by stored energy. The pilot is intended to demonstrate all key operating modes of the LSCC technology during charging, discharging and standby. The pilot equipment will be approximately one-seventh scale of the LM6000 commercial target and is expected to have commercial off-ramp potential for facility-scale applications.

01 COAL, LIGNITE, AND PEAT↗