Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “multiple faults”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

Spaceborne Processor Array

A Spaceborne Processor Array in Multifunctional Structure (SPAMS) can lower the total mass of the electronic and structural overhead of spacecraft, resulting in reduced launch costs, while increasing the science return through dynamic onboard computing. SPAMS integrates the multifunctional structure (MFS) and the Gilgamesh Memory, Intelligence, and Network Device (MIND) multi-core in-memory computer architecture into a single-system super-architecture. This transforms every inch of a spacecraft into a sharable, interconnected, smart computing element to increase computing performance while simultaneously reducing mass. The MIND in-memory architecture provides a foundation for high-performance, low-power, and fault-tolerant computing. The MIND chip has an internal structure that includes memory, processing, and communication functionality. The Gilgamesh is a scalable system comprising multiple MIND chips interconnected to operate as a single, tightly coupled, parallel computer. The array of MIND components shares a global, virtual name space for program variables and tasks that are allocated at run time to the distributed physical memory and processing resources. Individual processor- memory nodes can be activated or powered down at run time to provide active power management and to configure around faults. A SPAMS system is comprised of a distributed Gilgamesh array built into MFS, interfaces into instrument and communication subsystems, a mass storage interface, and a radiation-hardened flight computer.

Chow, Edward T.↗

Update on Development of SiC Multi-Chip Power Modules

Progress has been made in a continuing effort to develop multi-chip power modules (SiC MCPMs). This effort at an earlier stage was reported in 'SiC Multi-Chip Power Modules as Power-System Building Blocks' (LEW-18008-1), NASA Tech Briefs, Vol. 31, No. 2 (February 2007), page 28. The following recapitulation of information from the cited prior article is prerequisite to a meaningful summary of the progress made since then: 1) SiC MCPMs are, more specifically, electronic power-supply modules containing multiple silicon carbide power integrated-circuit chips and silicon-on-insulator (SOI) control integrated-circuit chips. SiC MCPMs are being developed as building blocks of advanced expandable, reconfigurable, fault-tolerant power-supply systems. Exploiting the ability of SiC semiconductor devices to operate at temperatures, breakdown voltages, and current densities significantly greater than those of conventional Si devices, the designs of SiC MCPMs and of systems comprising multiple SiC MCPMs are expected to afford a greater degree of miniaturization through stacking of modules with reduced requirements for heat sinking; 2) The stacked SiC MCPMs in a given system can be electrically connected in series, parallel, or a series/parallel combination to increase the overall power-handling capability of the system. In addition to power connections, the modules have communication connections. The SOI controllers in the modules communicate with each other as nodes of a decentralized control network, in which no single controller exerts overall command of the system. Control functions effected via the network include synchronization of switching of power devices and rapid reconfiguration of power connections to enable the power system to continue to supply power to a load in the event of failure of one of the modules; and, 3) In addition to serving as building blocks of reliable power-supply systems, SiC MCPMs could be augmented with external control circuitry to make them perform additional power-handling functions as needed for specific applications. Because identical SiC MCPM building blocks could be utilized in such a variety of ways, the cost and difficulty of designing new, highly reliable power systems would be reduced considerably. This concludes the information from the cited prior article. The main activity since the previously reported stage of development was the design, fabrication, and testing a 120- VDC-to-28-VDC modular power-converter system composed of eight SiC MCPMs in a 4 (parallel)-by-2 (series) matrix configuration, with normally-off controllable power switches. The SiC MCPM power modules include closed-loop control subsystems and are capable of operating at high power density or high temperature. The system was tested under various configurations, load conditions, load-transient conditions, and failure-recovery conditions. Planned future work includes refinement of the demonstrated modular system concept and development of a new converter hardware topology that would enable sharing of currents without the need for communication among modules. Toward these ends, it is also planned to develop a new converter control algorithm that would provide for improved sharing of current and power under all conditions, and to implement advanced packaging concepts that would enable operation at higher power density.

Lostetter, Alexander↗

Robot Position Sensor Fault Tolerance

Robot systems in critical applications, such as those in space and nuclear environments, must be able to operate during component failure to complete important tasks. One failure mode that has received little attention is the failure of joint position sensors. Current fault tolerant designs require the addition of directly redundant position sensors which can affect joint design. A new method is proposed that utilizes analytical redundancy to allow for continued operation during joint position sensor failure. Joint torque sensors are used with a virtual passive torque controller to make the robot joint stable without position feedback and improve position tracking performance in the presence of unknown link dynamics and end-effector loading. Two Cartesian accelerometer based methods are proposed to determine the position of the joint. The joint specific position determination method utilizes two triaxial accelerometers attached to the link driven by the joint with the failed position sensor. The joint specific method is not computationally complex and the position error is bounded. The system wide position determination method utilizes accelerometers distributed on different robot links and the end-effector to determine the position of sets of multiple joints. The system wide method requires fewer accelerometers than the joint specific method to make all joint position sensors fault tolerant but is more computationally complex and has lower convergence properties. Experiments were conducted on a laboratory manipulator. Both position determination methods were shown to track the actual position satisfactorily. A controller using the position determination methods and the virtual passive torque controller was able to servo the joints to a desired position during position sensor failure.

Aldridge, Hal A.↗

GHOST (Grid Hardware Open Source Testbed) [SWR-18-32]

The software was developed for the purpose of Microgrid Controller Procurement where multiple Microgrid Controller vendors were competing to prove the best performance. Each microgrid controller was connected to Real-Time Simulator (Opal-RT) where the Real-Time model of microgrid was simulated. Microgrid controllers were able to control most of the assets in the model. To be able to fairly compare controller's performance each controller was evaluated using exactly the same model, with the same initial conditions and exactly the same test sequence. The microgrid evaluation test sequence lasted 100 minutes and consist of various grid disturbances to which a microgrid controller must respond. The microgrid and power system will experience multiple types of disturbances while performing dispatch functions. Many functions are tested in grid-connected and islanded modes such as unexpended failures of generators, energy storage trip events, and large load fluctuations. The test sequence focuses on fault scenarios that cause the highest short-circuit fault current contribution; force a swing bus or generator capable of being a swing bus offline; cause the most reconfigurations; and cause conflicting objectives for the microgrid controller. During the test sequence execution multiple datapoints are being recorded and stored. During data postprocessing key performance parameters are extracted allowing quantitative comparison of performance on multiple aspects including: resiliency, fuel utilization, grid interconnection, ancillary services and power quality and eventually after summing all key performance parameters by comparing the overall result. To be able to perform such testing multiple tools had to be developed included in this repository including: - Real time model of microgrid (Urban-Banshee, Remote-smaller model) - Test sequence configuration tools - Test execution real-time scripts - Post processing scripts - Human Machine Interface software

Koralewicz, Przemyslaw↗

Evidence for a Single Holocene Paleoseismic Event on the Pajarito Fault, Northern New Mexico

Low-slip rate fault systems tend to be less studied than their high-slip rate counterparts, and paleoseismic techniques used to study them may pose challenges in interpretation that differ from high-slip rate systems. A good example of this is the Pajarito fault system (PFS), a normal fault complex within the Rio Grande rift. Despite numerous previous paleoseismic trenching studies conducted on the PFS between 1990 and 2003, considerable uncertainty remains regarding its Holocene paleoseismic history, particularly for the primary Pajarito fault (PF). To further clarify the PF paleoseismic history, we present data from paleoseismic investigations of 6 trenches at 3 distinct locations along the PF. Though the totality of the age and structural data obtained in this study is complex and not entirely consistent with any one interpretation, a single Holocene paleoearthquake occurring younger than ∼1,600 to 2,300 kcal yr BP is the simplest interpretation. It is possible that the PF records two Holocene events, with a penultimate event 6.9–2.4 kcal yr BP event and the aforementioned most recent event (MRE) between 2.3 and 1.6 kcal yr BP. However, only a single wall of one trench, out of a total of 12 walls in our 6 trenches, provides evidence supporting that interpretation. This study finds evidence of a single late Holocene paleoseismic event on the PF and sparse evidence for 2 Holocene paleoseismic events on the PF and highlights the benefits of logging multiple trench walls to better understand the complexity that results from this low-slip rate, low-deposition-rate fault system.

58 GEOSCIENCES↗

Detection of High-impedance Arcing Faults in Radial Distribution DC Systems

High voltage, low current arcing faults in DC power systems have been researched at the NASA Glenn Research Center in order to develop a method for detecting these 'hidden faults', in-situ, before damage to cables and components from localized heating can occur. A simple arc generator was built and high-speed and low-speed monitoring of the voltage and current waveforms, respectively, has shown that these high impedance faults produce a significant increase in high frequency content in the DC bus voltage and low frequency content in the DC system current. Based on these observations, an algorithm was developed using a high-speed data acquisition system that was able to accurately detect high impedance arcing events induced in a single-line system based on the frequency content of the DC bus voltage or the system current. Next, a multi-line, radial distribution system was researched to see if the arc location could be determined through the voltage information when multiple 'detectors' are present in the system. It was shown that a small, passive LC filter was sufficient to reliably isolate the fault to a single line in a multi-line distribution system. Of course, no modification is necessary if only the current information is used to locate the arc. However, data shows that it might be necessary to monitor both the system current and bus voltage to improve the chances of detecting and locating high impedance arcing faults

Gonzalez, Marcelo C.↗

Tolerating Correlated Failures for Generalized Cartesian Distributions via Bipartite Matching

Faults are expected to play an increasingly important role in how algorithms and applications are designed to run on future extreme-scale systems. A key ingredient of any approach to fault tolerance is effective support for fault tolerant data storage. A typical application execution consists of phases in which certain data structures are modified while others are read-only. Often, read-only data structures constitute a large fraction of total memory consumed. Fault tolerance for read-only data can be ensured through the use of checksums or parities, without resorting to expensive in-memory duplication or checkpointing to secondary storage. In this paper, we present a graph-matching approach to compute and store parity data for read-only matrices that are compatible with fault tolerant linear algebra (FTLA). Typical approaches only support blocked data distributions with each process holding one block with the parity located on additional processes. The matrices are assumed to be blocked by a cartesian grid with each block assigned to a process. We consider a generalized distribution in which each process can be assigned arbitrary blocks. We also account for the fact that multiple processes might be part of the same failure unit, say an SMP node. The flexibility enabled by our novel application of graph matching extends fault tolerance support to data distributions beyond those supported by prior work. We evaluate the matching implementations and cost to compute the parity and recover lost data, demonstrating the low overhead incurred by our approach.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Preferred orientation of phyllosilicates: Comparison of fault gouge, shale and schist

Samples of fault gouge from the San Andreas Fault drill hole (SAFOD), a shale from the North Sea sedimentary basin and schists from metamorphic rocks in the Alps have been analyzed with high energy synchrotron X-rays to determine preferred orientation of mica and clay minerals. The method relies on obtaining 2D diffraction images which are then processed with the crystallographic Rietveld method, implemented in the software MAUD, allowing for deconvolution of phases and extraction of their orientation distributions. It is possible to distinguish between detrital illite/muscovite and authigenic illite/smectite, kaolinite and chlorite, and muscovite and biotite, with strongly overlapping peaks in the diffraction pattern. The results demonstrate that phyllosilicates show large texture variations in various environments, where different mechanisms produce the rock microfabrics: fault gouge fabrics are quite weak and asymmetric with maxima for (001) in the range of 1.5-2.5 multiples of random distribution (m.r.d.). This is attributed to heterogeneous deformation with randomization, as well as dissolution-precipitation reactions. Shale fabrics have maxima ranging from 3 to 9 m.r.d. and this is due to sedimentation and compaction. The strongest fabrics were observed in metamorphic schists (10-14 m.r.d.) and developed by deformation as well as recrystallization in a stress field. In the analyzed samples, fabrics of co-existing quartz are weak. All phyllosilicate textures can be explained by orientation of (001) platelets, with no additional constraints on a-axes.

43 PARTICLE ACCELERATORS↗

Power Grid Reliability Estimation via Adaptive Importance Sampling

Electricity production currently generates approximately 25% of greenhouse gas emissions in the USA. Thus, increasing the amount of renewable energy is a key step to carbon neutrality. However, integrating a large amount of fluctuating renewable generation is a significant challenge for power grid operating and planning. Grid reliability, i.e., an ability to meet operational constraints under power fluctuations, is probably the most important of them. In this letter, we propose computationally efficient and accurate methods to estimate the probability of line overflow, i.e., reliability constraints violation, under a known distribution of renewable energy generation. To this end, we investigate an importance sampling approach, a flexible extension of Monte-Carlo methods, which adaptively changes the sampling distribution to generate more samples near the reliability boundary. The approach allows to estimate overload probability in real-time based only on a few dozens of random samples, compared to thousands required by the plain Monte-Carlo. Our study focuses on high voltage direct current power transmission grids with linear reliability constraints on power injections and line currents. Herein, we propose a novel theoretically justified physics-informed adaptive importance sampling algorithm and compare its performance to state-of-the-art methods on multiple IEEE power grid test cases.

power system faults↗

Integrated Solutions for Optimized Performance (ISOP) Final Technical Report

The goal of this project was to demonstrate technical feasibility of an integrated approach for deep energy retrofits by packaging innovative technologies with smart communicating controls that represent the next generation of energy efficiency. The integrated solutions for optimized performance (ISOP) package integrates (i) advanced lighting and plug load controls; (ii) intelligent daylight harvesting through automated self-powered shades and window films; (iii) advanced HVAC controls sequences (ASHRAE Guideline (GDL) 36); and (iv) fault detection and diagnosis (FDD) and continuous commissioning (CCx) using advanced analytics. These technologies address energy use across multiple building end uses that represent more than 60% of the energy consumption in all commercial buildings. The project was structured to be implemented over three budget periods: Budget Period 1 scope included site selection, project design, site-specific customization of technology packages, procurement of technologies, initiation of installation of technologies, the development of a measurement and verification plan and collection of pre-retrofit data collection. The first year go/no-go decision was based on securing host sites representing 250,000 sq. ft. of occupied operational spaces, savings analysis, technology procurement and initiation of installation. Budget Period 2 planned to complete technology installations and initiate data collection of post-retrofit performance data. The second year go/no-go was to be the completion of technology installations and commissioning, metering and data collecting to support the requirements laid out in site specific M&V plans. Budget Period 3 planned to collect and analyze post-retrofit performance data and provide data and reporting to support energy efficiency rebate programs. After the team completed activities planned for Budget Period 1, the team reached a Go/No-Go Decision Point. At that point, TRC recommended that DOE discontinue the project without prejudice due to challenges with securing demonstration sites to meet the full 250,000 sf of occupied operational spaces and DOE concurred. In Budget Period 1, the TRC team developed criteria to recruit and evaluate potential demonstration host sites. TRC worked with Princeton University, the project demonstration partner, to identify buildings on their campus as potential candidates for the demonstration. Following the selection of demonstration sites, the TRC team customized energy technology packages according to the needs and characteristics of each site. TRC defined technology specifications, identified vendors, and conducted analysis to estimate energy and cost savings potential. The project team then developed schedules for technology procurement processes and scheduled for installation at all selected demonstration sites. The project team worked with Princeton University and DOE to develop an approach to verify energy savings achieved through measurement and verification (M&V) 2.0 methods. Princeton University initiated open bids to procure the necessary materials and installation contractors. Bid results came back higher than estimates due to a couple of factors – lack of familiarity of the bidders with the proposed technologies and lack of local trained installers to execute the installation of these new measures. Due to the higher bids, projects no longer met the internal cost-effectiveness criteria used by Princeton to proceed with procurement of the full suite of technologies as proposed in ISOP. Princeton had already procured parts of the ISOP package as part of a campus-wide initiative for FDD and lighting retrofits, but with the higher costs for other ISOP components, Princeton could no longer commit to the full ISOP package on the selected sites. Based on this, the team reached the Go/No-Go decision point, where they decided not to proceed with the project. Princeton is separately installing portions of the ISOP package where they individually meet Princeton’s payback criteria but on a different schedule than would have been needed for the DOE ISOP project. The team has learned several lessons from project progress in the first budget period. The team will utilize these lessons in future projects, as should any team which proceeds with a project around the ISOP technology. The first lesson is that more information about the proposed sites is required earlier in the process (perhaps even at the proposal stage) in order to have a successful demonstration. Technical details not evident earlier in the process (such as the TLED limitations for ALCS) can derail project execution. The second lesson is that pricing of emerging technologies is highly variable due to lack of familiarity of local installers and distributor with the proposed technologies as well as alternate bids using products they were more familiar with, but that cost more than the ones proposed by TRC. Finally, the last major lesson is that the host site’s internal project criteria is of critical importance. Based on these higher installed costs and lack of an informed installer base for the products proposed for this project, the project does not meet Princeton’s simple payback goals of five years.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Advanced High-Performance Computational Modeling of the Seismic Response of High-Hazard and/or Nuclear Facilities and Critical Infrastructure at the NNSS

New methods for predicting the amplitude and variability of ground shaking from earthquakes (and explosions) are needed for seismic hazard analysis for buildings, nuclear power plants, and critical infrastructure at the NNSS. We are comparing existing 1-D and new 3-D geophysical methods for estimating the shear-wave velocity structure in the upper 30 meters of the ground surface (Vs30), which plays a major role in ground motion amplification and seismic response of buildings. We evaluate the performance of these methodologies at the U1a Complex at the NNSS and develop simple 1-D and high-resolution 3-D Vs30 models. We then emplace these high-resolution models into a background seismic velocity model. We will collaborate with Lawrence Livermore National Laboratory (LLNL) to conduct numerical modeling of the ground shaking at the NNSS using their high-performance computing technology and state-of-the-art ground motion simulation methodology. The primary work that was completed in FY 2019 was to acquire the seismic systems and familiarize staff at the NNSS with their use. We also worked on developing a collection plan with the Device Assembly Facility (DAF) at the NNSS, but due to time constraints and other ongoing projects at the DAF, we had to use U1a as a backup. We were able to coordinate the seismic survey, and we will complete the collection of seismic data in FY 2020. Additionally, during FY 2019, we completed the geologic framework model (GFM) for the U1a Complex and modeled the Yucca fault. LLNL worked with us through FY 2019 to prepare the data files for their modeling software and tested the software for reliability. In FY 2020 we will develop the end-to-end capability so that any facility could easily be modeled and the expected shaking from a local earthquake understood. The work in FY 2020 will include building fault models from the GFM and finalizing the velocity model analysis. The final simulations will be run for multiple rupture models, and final assessments will demonstrate the seismic hazard at the U1a Complex.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Empirical Modeling of Direct Expansion (DX) Cooling System for Multiple Research Use Cases

This study provides a general procedure to generate a direct expansion (DX) cooling coil system for a roof top unit (RTU), which is a typical heating ventilation and air-conditioning (HVAC) system for commercial buildings in the United States. Experimental data from a full-scale unoccupied 2-story commercial building is used for the HVAC modeling. The regression for identifying the model coefficients was carried out with multiple stages, and the results were validated with measured data. The model’s applicability was evaluated with multiple case studies, including a building energy simulation (BES) program validation, model-based predictive control (MPC), and fault diagnostics and detection (FDD).

42 ENGINEERING↗

Designing application software in wide area network settings

Progress in methodologies for developing robust local area network software has not been matched by similar results for wide area settings. The design of application software spanning multiple local area environments is examined. For important classes of applications, simple design techniques are presented that yield fault tolerant wide area programs. An implementation of these techniques as a set of tools for use within the ISIS system is described.

Makpangou, Mesaac↗

Predicted performance of an Integrated Modular Engine system

Space vehicle propulsion systems are traditionally comprised of a cluster of discrete engines, each with its own set of turbopumps, valves, and a thrust chamber. The Integrated Modular Engine (IME) concept proposes a vehicle propulsion system comprised of multiple turbopumps, valves, and thrust chambers which are all interconnected. The IME concept has potential advantages in fault-tolerance, weight, and operational efficiency compared with the traditional clustered engine configuration. The purpose of this study is to examine the steady-state performance of an IME system with various components removed to simulate fault conditions. An IME configuration for a hydrogen/oxygen expander cycle propulsion system with four sets of turbopumps and eight thrust chambers has been modeled using the Rocket Engine Transient Simulator program. The nominal steady-state performance is simulated, as well as turbopump, thrust chamber, and duct failures. The impact of component failures on system performance is discussed in the context of the system's fault tolerant capabilities.

Binder, Michael↗

Predicted performance of an integrated modular engine system

Space vehicle propulsion systems are traditionally comprised of a cluster of discrete engines, each with its own set of turbopumps, valves, and a thrust chamber. The Integrated Modular Engine (IME) concept proposes a vehicle propulsion system comprised of multiple turbopumps, valves, and thrust chambers which are all interconnected. The IME concept has potential advantages in fault-tolerance, weight, and operational efficiency compared with the traditional clustered engine configuration. The purpose of this study is to examine the steady-state performance of an IME system with various components removed to simulate fault conditions. An IME configuration for a hydrogen/oxygen expander cycle propulsion system with four sets of turbopumps and eight thrust chambers has been modeled using the Rocket Engine Transient Simulator (ROCETS) program. The nominal steady-state performance is simulated, as well as turbopump thrust chamber and duct failures. The impact of component failures on system performance is discussed in the context of the system's fault tolerant capabilities.

Binder, Michael↗

Integrated Hardware and Software for No-Loss Computing

When an algorithm is distributed across multiple threads executing on many distinct processors, a loss of one of those threads or processors can potentially result in the total loss of all the incremental results up to that point. When implementation is massively hardware distributed, then the probability of a hardware failure during the course of a long execution is potentially high. Traditionally, this problem has been addressed by establishing checkpoints where the current state of some or part of the execution is saved. Then in the event of a failure, this state information can be used to recompute that point in the execution and resume the computation from that point. A serious problem arises when one distributes a problem across multiple threads and physical processors is that one increases the likelihood of the algorithm failing due to no fault of the scientist but as a result of hardware faults coupled with operating system problems. With good reason, scientists expect their computing tools to serve them and not the other way around. What is novel here is a unique combination of hardware and software that reformulates an application into monolithic structure that can be monitored in real-time and dynamically reconfigured in the event of a failure. This unique reformulation of hardware and software will provide advanced aeronautical technologies to meet the challenges of next-generation systems in aviation, for civilian and scientific purposes, in our atmosphere and in atmospheres of other worlds. In particular, with respect to NASA s manned flight to Mars, this technology addresses the critical requirements for improving safety and increasing reliability of manned spacecraft.

James, Mark↗

LADEE Preparations for Contingency Operations for the Lunar Orbit Insertion Maneuver

The Lunar Atmosphere and Dust Environment Explorer (LADEE) spacecraft was launched on September 6, 2013, and completed its mission on April 17, 2014 with a directed impact to the Lunar Surface. Its primary goals were to examine the lunar atmosphere, measure lunar dust, and to demonstrate high rate laser communications. The LADEE mission was a resounding success, achieving all mission objectives, much of which can be attributed to careful planning and preparation. This paper discusses the specific preparations for fault conditions that could occur during a highly-critical phase of the mission. To get to the Moon, the spacecraft traversed multiple phasing loops around the Earth, and then executed a breaking maneuver to achieve lunar orbit. This Lunar Orbit Insertion (LOI) maneuver was perhaps the most time-critical phase of the entire mission. The LOI maneuver had to occur within a twenty minute window in order to achieve lunar orbit with an acceptable amount of propellant remaining. Missing this window would have likely resulted in a loss of the entire mission. An additional challenge of the maneuver was that spacecraft was out of view for approximately one hour prior to the main thruster burn, with the burn needing to occur within five minutes after coming into view. These conditions resulted in unique challenges for ground operations and the fault management system. Early in the planning stages of the mission, the criticality and challenges of this maneuver were evident to the system designers. The major concern was that any triggering of the on-board fault management system, whether it is in response to a true fault or a false positive, would result in an unacceptable delay to the burn. Therefore the flight software was designed with a flexible fault management system, such that any or all of the fault management responses could be disabled for the lead up and execution of the maneuver. Later, a triage was conducted to develop a list of fault responses, mapped to various parts of the timeline of the maneuver. Some of these contingency responses were solely ground-based if the time to detect, diagnose, and respond were adequate. Other responses were automated on-board if the response time from the ground would have been inadequate. For instance, in order to recover from a system reboot, on-board automation would have automatically reconfigured the spacecraft for the burn and reoriented the spacecraft to the burn attitude.These contingency responses were practiced, over and over, during numerous rehearsals. Although the LOI maneuver was executed without having to use any of these contingencies, the LADEE team was adequately prepared for this highly critical phase of the mission.

Cannon, Howard↗

Crack fault diagnosis of rotating machine in nuclear power plant based on ensemble learning

Crack faults in rotating machines can cause machine shutdown or scrapping, endangering the normal operation and safety of nuclear power plants. Intelligent diagnostic techniques based on machine learning have the potential to diagnose crack faults. However, problems such as scarcity of field fault data and high noise of plant measurements pose challenges to the application of machine learning. Here this study proposes an ensemble learning approach to mitigate the negative impacts of the problems. Ensemble learning is a strategy for combining multiple machine learning models into a composite model. The basic idea of ensemble learning is that even if one model makes a mistake, other models can correct it. Case studies based on bearing and gear system fault experiments show that the proposed ensemble learning models have better diagnostic results than the single model in the presence of noise and small data.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗