Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “load scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

Solar energy thermally powered electrical generating system

A thermally powered electrical generating system for use in a space vehicle is disclosed. The rate of storage in a thermal energy storage medium is controlled by varying the rate of generation and dissipation of electrical energy in a thermally powered electrical generating system which is powered from heat stored in the thermal energy storage medium without exceeding a maximum quantity of heat. A control system (10) varies the rate at which electrical energy is generated by the electrical generating system and the rate at which electrical energy is consumed by a variable parasitic electrical load to cause storage of an amount of thermal energy in the thermal energy storage system at the end of a period of insolation which is sufficient to satisfy the scheduled demand for electrical power to be generated during the next period of eclipse. The control system is based upon Kalman filter theory.

Owens, William R.↗

NASA Advanced Concepts Office, Earth-To-Orbit Team Design Process and Tools

The Earth to Orbit (ETO) Team of the Advanced Concepts Office (ACO) at NASA Marshal Space Flight Center (MSFC) is considered the preeminent group to go to for prephase A and phase A concept definition. The ACO team has been at the forefront of a multitude of launch vehicle studies determining the future direction of the Agency as a whole due, in part, to their rapid turnaround time in analyzing concepts and their ability to cover broad trade spaces of vehicles in that limited timeframe. Each completed vehicle concept includes a full mass breakdown of each vehicle to tertiary subsystem components, along with a vehicle trajectory analysis to determine optimized payload delivery to specified orbital parameters, flight environments, and delta v capability. Additionally, a structural analysis of the vehicle based on material properties and geometries is performed as well as an analysis to determine the flight loads based on the trajectory outputs. As mentioned, the ACO Earth to Orbit Team prides themselves on their rapid turnaround time and often need to fulfill customer requests within limited schedule or little advanced notice. Due to working in this fast paced environment, the ETO team has developed some finely honed skills and methods to maximize the delivery capability to meet their customer needs. This paper will describe the interfaces between the 3 primary disciplines used in the design process; weights and sizing, trajectory, and structural analysis, as well as the approach each discipline employs to streamline their particular piece of the design process.

Waters, Eric D.↗

Exploring Sustained Food Production in the Veggie Vegetable Production System

Since 2014, the Veggie vegetable production system on the International Space Station has intermittently supplied astronaut crews with fresh produce. To assess the potential for continuous crop production in Veggie and develop a baseline for future space crop production systems, a 120-day study was conducted to determine methodology for inputs, optimal yield, food safety standards, and crew involvement. ‘Amara’ mustard and ‘Red Russian’ kale were grown as initial crops, followed by ‘Extra Dwarf’ pakchoi and shungiku as final crops. Previous grow-outs in Veggie have included harvests at 28-35 days after initiation. In this study, a 56-day grow-out with multiple harvests from the same plants was compared to the conventional, single harvest Veggie schedule. Unlike previous Veggie studies which grew all plants simultaneously, this test staggered initiation and harvest, aiming for consistent and increased production. Plant pillows were initiated in pairs weekly and positioned to reduce shading. Completed pillows were immediately replaced with fresh ones. The multi-harvest scheme used fewer pillows, totaling 46% less pillow mass than the single harvest method. Yield varied by crop and harvest scheme, when compared as fresh edible biomass production across 56-day time increments. ‘Red Russian’ kale yielded similarly across harvest schemes. In the multiple-harvest schedule, ‘Amara’ mustard and shungiku yielded 23% to 25% higher, respectively, while ‘Extra Dwarf’ pakchoi had 43% lower yield. Microbial analysis of the plants indicated no culturable human pathogens. Microbial load of a given plant appeared to depend more on system age than plant age; across harvest methods, aerobic plate counts from final crops were higher than those of initial crops. This project also considered the complexity of crew involvement in a continuous production scenario. New crew procedures that periodically remove plant material from the Veggie root mat would be needed under continuous production to prevent potential pathogens and unpleasant odors. This study supports future space crop production scenarios and was funded by NASA’s Human Research Program.

Jess M Bunchek↗

Sustained Veggie: A Continuous Food Production Comparison

The International Space Station’s Veggie system intermittently supplies the crew with fresh produce. To assess the potential for continuous crop production in Veggie and develop a baseline for future space crop production systems, a 120-day study was conducted to determine methodology for inputs, optimal yield, and crew involvement. ‘Amara’ mustard and ‘Red Russian’ kale were grown as initial crops, followed by ‘Extra Dwarf’ pak choi and shungiku as final crops. Previous grow-outs in Veggie have included harvests at 28-35days after initiation. In this study, a 56-day grow-out with multiple harvests from the same plants was compared to the conventional, single harvest Veggie schedule. Unlike previous Veggie studies which grew all plants simultaneously, this test staggered initiation and harvest, aiming for consistent and increased production. Plant pillows were initiated in pairs weekly and positioned to reduce shading. Completed pillows were immediately replaced with fresh ones. The multi-harvest scheme used fewer pillows, totaling 46% less pillow mass than the single harvest method. Scaled to 56-day increments, yield varied by crop and harvest scheme. ‘Red Russian’ kale yielded similarly across harvest schemes. In the multiple-harvest schedule, ‘Amara’ mustard and shungiku yielded 23% to 25% higher, respectively, while ‘Extra Dwarf’ pak choi had43% lower yield. Microbial analysis of the plants indicated no culturable human pathogens. Microbial load of a given plant appears to depend more on system age than plant age. Across harvest methods, aerobic plate counts from final crops were higher than those of initial crops. This project also considered the complexity of crew involvement in a continuous production scenario. New crew procedures that periodically remove plant material from the Veggie root mat are needed under continuous production to prevent potential pathogens and unpleasant odors. This study supports future space crop production scenarios and was funded by NASA’s Human Research Program.

Jess M Bunchek↗

Energy storage-based packetized delivery of electricity

Systems and methods for Energy Storage-based Packetized Delivery of Electricity (ES-PDE) are disclosed that are radically different from the operation of today's grid. Using ES-PDE, the loads are powered by the energy storage systems (ESS) the majority of the time and only receive packets of electricity periodically to charge the ESSs. Therefore, the grid operators can schedule the delivery of electricity packets to utilize the existing grid infrastructure. Since the customers are powered by the co-located ESSs they are not impacted by the grid operation in short term. Therefore, when grid outages occur, the customers still have power for some time, giving the grid more time to be fully restored.

Nguyen, Tu Anh↗

Efficient Parallelization of Irregular Applications on GPU Architectures

With the enlarging computation capacity of general Graphics Processing Units (GPUs), leveraging GPUs to accelerate parallel applications has become a critical topic in academia and industry. However, a wide range of irregular applications with the computation-/memory-intensive nature cannot easily achieve high GPU utilization. The challenges mainly involve the following aspects: first, data dependence leads to coarse-grained kernel and inefficient parallelism; second, heavy GPU memory usage may cause frequent memory evictions and extra overhead of I/O; third, specific computation patterns produce memory redundancies; last, workload balance and data reusability conjunctly benefit the overall performance, but there may exist a dynamic trade-off between them. Targeting these challenges, this dissertation proposes multiple optimizations to accelerate two real-world applications: many-body correlation functions to simulate nuclear physics in a large-scale scientific system; the other is the eALS-based matrix factorization recommendation system. To accelerate the calculations of many-body correlation functions, this dissertation presents three frameworks in GPU memory management and multi-GPU scheduling. Firstly, an optimized systematic GPU memory management framework, MemHC, utilizes a series of new memory reduction designs in GPU memory allocation, CPU/GPU communications, and GPU memory oversubscription. Secondly, an enhanced multi-GPU scheduling framework, MICCO, particularly by taking both data dimension (e.g., data reuse and data eviction) and computation dimension into account. MICCO designs a heuristic scheduling algorithm and a machine learning-based regression model to generate the optimal settings of a proposed new concept to manage the trade-off. Thirdly, a locality-aware multi-GPU scheduling framework. This scheduler leverages pipeline batch generation with a looking-ahead strategy by building local dependency graphs for memory transfer reduction and better data reuse, achieving up to 79.92% memory cost reduction and 1.67x speedup. To parallelize the eALS-based recommendation system, this dissertation proposes an efficient CPU/GPU heterogeneous recommendation system, HEALS. HEALS employs newly designed architecture-adaptive data formats to achieve load balance and good data locality on CPU and GPU. To mitigate the data dependence, HEALS presents a CPU/GPU collaboration model for both task parallelism and data parallelism with multiple kernel computation optimizations. In summary, this dissertation efficiently accelerates two typical irregular applications on GPUs by building four frameworks, including CPU/GPU collaboration, GPU memory management, and multi-GPU scheduling.

Wang, Qihan↗

ORNL Infrastructure: Status Update on BEA Research Reactor Cask Planning Activities Completed During FY 2025

This report documents Oak Ridge National Laboratory’s (ORNL’s) FY 2025 progress toward establishing readiness to use the Battelle Energy Alliance (BEA) Research Reactor (BRR) shipping cask in support of the Nuclear Science User Facilities (NSUF). The BRR cask will provide a new shared infrastructure capability for transporting irradiated fuels and materials between ORNL and Idaho National Laboratory (INL), thereby supporting NSUF’s mission of enabling user access to advanced nuclear research facilities. In FY 2025, ORNL advanced the regulatory, contractual, safety review, and planning activities necessary to qualify its facilities and staff for BRR cask handling. Although loaded shipments were delayed due to fabrication lead times for Orano Federal Services LLC’s internal basket hardware, the program progressed to the point where an empty cask dry run is scheduled for October 2025. This dry run represents a critical step in demonstrating ORNL’s ability to receive, handle, and return the BRR cask.

99 GENERAL AND MISCELLANEOUS↗

Runtime support and compilation methods for user-specified data distributions

This paper describes two new ideas by which an HPF compiler can deal with irregular computations effectively. The first mechanism invokes a user specified mapping procedure via a set of compiler directives. The directives allow use of program arrays to describe graph connectivity, spatial location of array elements, and computational load. The second mechanism is a simple conservative method that in many cases enables a compiler to recognize that it is possible to reuse previously computed information from inspectors (e.g. communication schedules, loop iteration partitions, information that associates off-processor data copies with on-processor buffer locations). We present performance results for these mechanisms from a Fortran 90D compiler implementation.

Ponnusamy, Ravi↗

Operations automation

This is truly the era of 'faster-better-cheaper' at the National Aeronautics and Space Administration/Jet Propulsion Laboratory (NASA/JPL). To continue JPL's primary mission of building and operating interplanetary spacecraft, all possible avenues are being explored in the search for better value for each dollar spent. A significant cost factor in any mission is the amount of manpower required to receive, decode, decommutate, and distribute spacecraft engineering and experiment data. The replacement of the many mission-unique data systems with the single Advanced Multimission Operations System (AMMOS) has already allowed for some manpower reduction. Now, we find that further economies are made possible by drastically reducing the number of human interventions required to perform the setup, data saving, station handover, processed data loading, and tear down activities that are associated with each spacecraft tracking pass. We have recently adapted three public domain tools to the AMMOS system which allow common elements to be scheduled and initialized without the normal human intervention. This is accomplished with a stored weekly event schedule. The manual entries and specialized scripts which had to be provided just prior to and during a pass are now triggered by the schedule to perform the functions unique to the upcoming pass. This combination of public domain software and the AMMOS system has been run in parallel with the flight operation in an online testing phase for six months. With this methodology, a savings of 11 man-years per year is projected with no increase in data loss or project risk. There are even greater savings to be gained as we learn other uses for this configuration.

Boreham, Charles Thomas↗

Atmospheric particulate measurements in Norfolk, Virginia

Characterization of atmospheric particulates was conducted at a site near the center of Norfolk, Virginia. Air quality was measured in terms of atmospheric mass loading, particle size distribution, and particulate elemental composition for a period of 2 weeks. The objectives of this study were (1) to establish a mean level of air quality and deviations about this mean, (2) to ascertain diurnal changes or special events in air quality, and (3) to evaluate instrumentation and sampling schedules. Simultaneous measurements were made with the following instruments: a quartz crystal microbalance particulate monitor, a light-scattering multirange particle counter, a high-volume air sampler, and polycarbonate membrane filters. To assess the impact of meteorological conditions on air quality variations, continuous data on temperature, relative humidity, wind speed, and wind direction were recorded. Particulate elemental composition was obtained from neutron activation and scanning electron microscopy analyses of polycarbonate membrane filter samples. The measured average mass loading agrees reasonably well with the mass loadings determined by the Virginia State Air Pollution Control Board. There are consistent diurnal increases in atmospheric mass loading in the early morning and a sample time resolution of 1/2 hour seems necessary to detect most of the significant events.

Storey, R. W., Jr.↗

Additive manufacturing of nanotube-loaded thermosets via direct ink writing and radio-frequency heating and curing

Direct Ink Writing (DIW) is an extrusion-based additive manufacturing method where the print medium is a liquid-phase ‘ink’ dispensed out of nozzles and deposited along digitally defined paths. Conventional DIW of thermosetting resins relies on viscosity modifying agents, novel crosslinking chemistries, and/or long curing schedules in an oven. Here we demonstrate the use of a co-planar radio frequency applicator to generate an electric field, which can be used to rapidly heat and cure nano-filled composite resins as they are printed. This method avoids the need for an oven or post- curing step. This process consists of a sequential print-and-cure cycle which allows for printing of high-resolution, multi-layered structures. Every extruded layer is partially cured using RF before depositing the next layer; this allows the printed part to maintain structural integrity. The process enables both increased throughput and decreased touch time relative to traditional manufacturing. Commercial epoxy resin with varied nano-filler loadings were examined as DIW candidates. After printing, the thermo-mechanical properties, surface finish, and shape retention of RF-cured samples were comparable to conventionally cured samples. Furthermore, this method of manufacturing establishes RF heating as a suitable alternative to conventional methods, facilitating rapid, free-form processing of thermosetting resins without a mold.

36 MATERIALS SCIENCE↗

A Fast-Time Study of Aircraft Reordering in Arrival Sequencing and Scheduling

In order to ensure that the safe capacity of the terminal area is not exceeded, Air Traffic Management ATM often places restrictions on arriving flights transitioning from en route airspace to terminal airspace. This restriction of arrival traffic is commonly referred to as arrival flow management, and includes techniques such as metering, vectoring, fix-load balancing, and the imposition of miles-in-trail separations. These restrictions are enacted without regard for the relative priority which airlines may be placing on individual flights based on factors such as crew criticality, passenger connectivity, critical turn times, gate availability, on-time performance, fuel status, or runway preference. The development of new arrival flow management techniques which take into consideration priorities expressed by air carriers will likely reduce the economic impact of ATM restrictions on the airlines and lead to increased airline economic efficiency by allowing airlines to have greater control over their individual arrival banks of aircraft. NASA and the Federal Aviation Administration (FAA) have designed and developed a suite of software decision support tools (DSTs) collectively known as the Center TRACON Automation System (CTAS). One of these tools, the Traffic Management Advisor (TMA) is currently being used at the Fort Worth Air Route Traffic Control Center to perform arrival flow management of traffic into the Dallas/Fort Worth airport (DFW). The TMA is a time-based strategic planning tool that assists Traffic Management Coordinators (TMCs) and En Route Air Traffic Controllers in efficiently balancing arrival demand with airport capacity. The primary algorithm in the TMA is a real-time scheduler which generates efficient landing sequences and landing times for arrivals within about 200 no a. from touchdown. This scheduler will sequence aircraft so that they arrive in a first- come - first-served (FCFS) order. While FCFS sequencing establishes a fair order based on estimated times of arrival, it does not take into account individual airline priorities among incoming flights. NASA is exploring the possibility of allowing airlines to express relative arrival priorities to air traffic management through the development of new CTAS scheduling algorithms which take into consideration airline arrival preferences. The accommodation of airline priorities in arrival sequencing and scheduling would under most circumstances result in a deviation from a "natural" or FCFS arrival order. As a First step toward developing airline influenced sequencing algorithms, an investigation was conducted to determine the feasibility of reordering arrival traffic from a strict FCFS sequence. A fast-time simulation has been developed which allows statistical evaluation of sequencing and scheduling algorithms for arrival traffic at the Dallas/Fort Worth Airport. In contrast to real-time simulation or field tests, which would require on the order of ninety minutes to examine a single traffic rush period, the fast-time simulation allows examination of multiple rush periods in a matter of seconds.

Carr, Greg↗

V/STOL tilt rotor aircraft study. Volume 7: Tilt rotor flight control program feedback studies

An exploratory study has been made of the use of feedback control in tilt rotor aircraft. This has included the use of swashplate cyclic and collective controls and direct lift control. Various sensor and feedback systems are evaluated in relation to blade loads alleviation, improvement in flying qualities, and modal suppression. Recommendations are made regarding additional analytical and wind tunnel investigations and development of feedback systems in the full scale flight vehicle. Estimated costs and schedules are given.

Alexander, H. R.↗

Developing integrated parametric planning models for budgeting and managing complex projects

The applicability of integrated parametric models for the budgeting and management of complex projects is investigated. Methods for building a very flexible, interactive prototype for a project planning system, and software resources available for this purpose, are discussed and evaluated. The prototype is required to be sensitive to changing objectives, changing target dates, changing costs relationships, and changing budget constraints. To achieve the integration of costs and project and task durations, parametric cost functions are defined by a process of trapezoidal segmentation, where the total cost for the project is the sum of the various project cost segments, and each project cost segment is the integral of a linearly segmented cost loading function over a specific interval. The cost can thus be expressed algebraically. The prototype was designed using Lotus-123 as the primary software tool. This prototype implements a methodology for interactive project scheduling that provides a model of a system that meets most of the goals for the first phase of the study and some of the goals for the second phase.

Etnyre, Vance A.↗

Milestone 4: Test plan for Reusable Hydrogen Composite Tank System (RHCTS). Task 3: Composite tank materials

This document is the detailed test plan for the series of tests enumerated in the preceding section. The purpose of this plan is to present the test objectives, test parameters and procedures, expected performance and data analysis plans, criteria for success, test schedules, and related safety provisions and to describe the test articles, test instrumentation, and test facility requirements. Initial testing will be performed to screen four composite materials for suitability for SSTO LH2 tank loads and environmental conditions. The laminates for this testing will be fabricated by fiber placement, which is the manufacturing approach identified as baseline for the tank wall. Even though hand layup will be involved in fabricating many of the internal structural members of the tank, no hand-layup laminates will be evaluated in the screening or subsequent characterization testing. This decision is based on the understanding that mechanical properties measured for hand-layup material should be at least equivalent to properties measured for fiber-placed material, so that the latter should provide no less than a conservative approximation of the former. A single material will be downselected from these screening tests. This material will be subsequently characterized for impact-damage tolerance and durability under conditions of mechanical and thermal cycling, and to establish a preliminary design database to support ongoing analysis. Next, testing will be performed on critical structural elements fabricated from the selected material. Finally, the 8-foot diameter tank article, containing the critical structural features of the full-scale tank, will be fabricated by fiber placement and tested to verify its structural integrity and LH2 containment.

Greenberg, H. S.↗

Hierarchical Control of Distributed Battery Energy Storage Systems in a DC Microgrid

Contents - NASA Future Power Systems - DC Microgrid with Distributed Battery Energy Storage - A simplified gateway power system - Droop Control (Primary Control) - Distributed battery units, droop control, and load sharing characteristics - Simulation results - Three-Level Hierarchical Control of Distributed Battery Units During Eclipse - Secondary Control - Objective and definition of unit control error - Implementation of secondary control - Simulation results - Tertiary Control - Schedule BU current sharing with the objective of equal SoC - Simulation results•Conclusions

Jing Zhang↗

Space fabrication demonstration system, technical volume

The automatic beam builder ABB was developed, fabricated, and demonstrated within the established contract cost and schedule constraints. The ABB demonstrated the feasibility of: producing lightweight beams automatically within the required rate of 1 to 5 ft of completed beam per minute and producing structurally sound beams with axial design load of 5538 N based on the Grumman photovoltaic satellite solar power system design reference structure.

Source record↗

Optimal pre-scheduling of problem remappings

A large class of scientific computational problems can be characterized as a sequence of steps where a significant amount of computation occurs each step, but the work performed at each step is not necessarily identical. Two good examples of this type of computation are: (1) regridding methods which change the problem discretization during the course of the computation, and (2) methods for solving sparse triangular systems of linear equations. Recent work has investigated a means of mapping such computations onto parallel processors; the method defines a family of static mappings with differing degrees of importance placed on the conflicting goals of good load balance and low communication/synchronization overhead. The performance tradeoffs are controllable by adjusting the parameters of the mapping method. To achieve good performance it may be necessary to dynamically change these parameters at run-time, but such changes can impose additional costs. If the computation's behavior can be determined prior to its execution, it can be possible to construct an optimal parameter schedule using a low-order-polynomial-time dynamic programming algorithm. Since the latter can be expensive, the performance is studied of the effect of a linear-time scheduling heuristic on one of the model problems, and it is shown to be effective and nearly optimal.

Nicol, David M.↗