Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “issues management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

Environmental effects consideration: A case study - Lessons learned

This paper discusses the importance for serious consideration of environmental effects and associated risks by management early in the development cycle of a facility. A case study on the Space Shuttle provides information with regard to some of the environmental effects issues encountered and the lesson learned. The importance of early management action to enable the acceptance of known environmental risks, or to make program adjustments to avoid their potential consequences, is emphasized.

Vaughan, William W.↗

C2-Related Incidents Reported by UAS Pilots

It has been estimated that aviation accidents are typically preceded by numerous minor incidents arising from the same causal factors that ultimately produced the accident. Accident databases provide in-depth information on a relatively small number of occurrences, however incident databases have the potential to provide insights into the human factors of Remotely Piloted Aircraft System (RPAS) operations based on a larger volume of less-detailed reports. Currently, there is a lack of incident data dealing with the human factors of unmanned aircraft systems. An exploratory study is being conducted to examine the feasibility of collecting voluntary critical incident reports from RPAS pilots. Twenty-three experienced RPAS pilots volunteered to participate in focus groups in which they described critical incidents from their own experience. Participants were asked to recall (1) incidents that revealed a system flaw, or (2) highlighted a case where the human operator contributed to system resilience or mission success. Participants were asked to only report incidents that could be included in a public document. During each focus group session, a note taker produced a de-identified written record of the incident narratives. At the end of the session, participants reviewed each written incident report, and made edits and corrections as necessary. The incidents were later analyzed to identify contributing factors, with a focus on design issues that either hindered or assisted the pilot during the events. A total of 90 incidents were reported. This presentation focuses on incidents that involved the management of the command and control (C2) link. The identified issues include loss of link, interference from undesired transmissions, voice latency, accidental control transfer, and the use of the lost link timer, or lost link OK features.

unmanned aircraft systems↗

A rapid prototyping/artificial intelligence approach to space station-era information management and access

Applications of rapid prototyping and Artificial Intelligence techniques to problems associated with Space Station-era information management systems are described. In particular, the work is centered on issues related to: (1) intelligent man-machine interfaces applied to scientific data user support, and (2) the requirement that intelligent information management systems (IIMS) be able to efficiently process metadata updates concerning types of data handled. The advanced IIMS represents functional capabilities driven almost entirely by the needs of potential users. Space Station-era scientific data projected to be generated is likely to be significantly greater than data currently processed and analyzed. Information about scientific data must be presented clearly, concisely, and with support features to allow users at all levels of expertise efficient and cost-effective data access. Additionally, mechanisms for allowing more efficient IIMS metadata update processes must be addressed. The work reported covers the following IIMS design aspects: IIMS data and metadata modeling, including the automatic updating of IIMS-contained metadata, IIMS user-system interface considerations, including significant problems associated with remote access, user profiles, and on-line tutorial capabilities, and development of an IIMS query and browse facility, including the capability to deal with spatial information. A working prototype has been developed and is being enhanced.

Carnahan, Richard S., Jr.↗

Science operations management

The operation teams engaged in the IR Astronomical Satellite (IRAS) project included scientists from the IRAS International Science Team. The detailed involvement of these scientists in the design, testing, validation, and operations phases of the IRAS mission contributed to the success of this project. The Project Management Group spent a substantial amount of time discussing science-related issues, because science team coleaders were members from the outset. A single scientific point-of-contact for the Management Group enhanced the depth and continuity of agreement reached in decision-making.

Squibb, G. F.↗

A Management Model for International Participation in Space Exploration Missions

This paper proposes an engineering management model for NASA's future space exploration missions based on past experiences working with the International Partners of the International Space Station. The authors have over 25 years of combined experience working with the European Space Agency, Japan Aerospace Exploration Agency, Canadian Space Agency, Italian Space Agency, Russian Space Agency, and their respective contractors in the design, manufacturing, verification, and integration of their elements electric power system into the United States on-orbit segment. The perspective presented is one from a specific sub-system integration role and is offered so that the lessons learned from solving issues of technical and cultural nature may be taken into account during the formulation of international partnerships. Descriptions of the types of unique problems encountered relative to interactions between international partnerships are reviewed. Solutions to the problems are offered, taking into consideration the technical implications. Through the process of investigating each solution, the important and significant issues associated with working with international engineers and managers are outlined. Potential solutions are then characterized by proposing a set of specific methodologies to jointly develop spacecraft configurations that benefits all international participants, maximizes mission success and vehicle interoperability while minimizing cost.

George, Patrick J.↗

An investigation of transitional management problems for the NSTS at NASA, executive summary

A summary is given of the work of the University of Houston research team for the third quarter of effort in a yearly grant for the National Space Transportation System (NSTS). As such it serves as a resting place for the ideas and concepts developed this quarter with the collaboration of the Management Integration Offices of NASA. Another objective is the hope that the report will help to stimulate the healthy problem solving process already present at NASA. The main goal of the contractual work is to help NASA to find ways and means of moving into a truly operational era with the shuttle program. This work is a continuation of early work and the reader is encouraged to read the final reports of earlier years. Chapter One of the report is an introduction. Chapter Two deals with industrial adaptation and is in two parts: theory and application. In the theory section, impressions of the management system immediately after reflight are discussed. A key issue, in the author's opinion is the seeming lack of purpose of the program. The application section has six appendices: 1988 Demographic Survey, Field Notes of Interview with HL/P South Texas Nuclear Project, a comparison of the Agendas of the current manager with that of a previous manager, a note on compartmentalization to assist in manifesting, a study on launch prediction for STS-26, and a discussion of a statistical decision-making course for upper level managers. Chapter Three deals with theoretical results returned on flow shop scheduling which will be of use downstream. Chapter Four deals with a statistical model developed to predict the flight rate in future years and indicates the program will have trouble making its schedule. Chapter Five covers the constructural effort and shows the work to be on schedule.

Hunsucker, John↗

Integrated Risk Management Within NASA Programs/Projects

As NASA Project Risk Management activities continue to evolve, the need to successfully integrate risk management processes across the life cycle, between functional disciplines, stakeholders, various management policies, and within cost, schedule and performance requirements/constraints become more evident and important. Today's programs and projects are complex undertakings that include a myriad of processes, tools, techniques, management arrangements and other variables all of which must function together in order to achieve mission success. The perception and impact of risk may vary significantly among stakeholders and may influence decisions that may have unintended consequences on the project during a future phase of the life cycle. In these cases, risks may be unintentionally and/or arbitrarily transferred to others without the benefit of a comprehensive systemic risk assessment. Integrating risk across people, processes, and project requirements/constraints serves to enhance decisions, strengthen communication pathways, and reinforce the ability of the project team to identify and manage risks across the broad spectrum of project management responsibilities. The ability to identify risks in all areas of project management increases the likelihood a project will identify significant issues before they become problems and allows projects to make effective and efficient use of shrinking resources. By getting a total team integrated risk effort, applying a disciplined and rigorous process, along with understanding project requirements/constraints provides the opportunity for more effective risk management. Applying an integrated approach to risk management makes it possible to do a better job at balancing safety, cost, schedule, operational performance and other elements of risk. This paper will examine how people, processes, and project requirements/constraints can be integrated across the project lifecycle for better risk management and ultimately improve the chances for mission success.

Connley, Warren↗

Report on the 2011 and 2012 NASA Ames Research Center (ARC) / Alaska State Cargo Airship Workshops

This presentation will summarize the Cargo Airships for Northern Operations workshop that was held August 24-25, 2011. This workshop co-sponsored by NASA ARC and the Alaska State Department of Transportation was initiated by interest from Alaska Lt. Governor Mead Treadwell for assistance in investigating the potential benefits of proposed cargo airships for the Alaskan economy and societal needs. The workshop provided a brief background on the technology and operational aspects of conventional airships and hybrids followed by presentations on issues affecting cargo airship operations such as weather management, insurance, regulations, crew duty/rest rules, and available support infrastructures. Speakers representing potential cargo airship users from Alaskan State and commercial organizations presented the needs they felt could be met by cargo airship services. Presenters from Canadian private and military interests also detailed applications and missions that cargo airships could provide to remote regions of Canada. Cost drivers of cargo airship operations were also addressed and tools for modeling and analyzing operational factors and costs affecting cargo airship operations were discussed. Four breakout sessions were held which allowed workshop participants to contribute inputs to four topic areas: Business Approaches and Strategies (financing incentives public/private partnerships etc) for Airship Development and Operation, Design, Development, Production Challenges, and Possible Solutions, Regulatory, Certification, Legal, and Insurance Issues, and Operational Issues, Customer Requirements, and Airship Requirements. A follow on to the 2011 cargo airship workshop is being planned for July 31 August 2, 2012. A status update on this second workshop will also be presented.

Hochstettler, Ronald↗

Thermal Design and Analysis for the Cryogenic MIDAS Experiment

The Materials In Devices As Superconductors (MIDAS) spaceflight experiment is a NASA payload which launched in September 1996 on the Shuttle, and was transferred to the Mir Space Station for several months of operation. MIDAS was developed and built at NASA Langley Research Center (LaRC). The primary objective of the experiment was to determine the effects of microgravity and spaceflight on the electrical properties of high-temperature superconductive (HTS) materials. The thermal challenge on MIDAS was to maintain the superconductive specimens at or below 80 K for the entire operation of the experiment, including all ground testing and 90 days of spaceflight operation. Cooling was provided by a small tactical cryocooler. The superconductive specimens and the coldfinger of the cryocooler were mounted in a vacuum chamber, with vacuum levels maintained by an ion pump. The entire experiment was mounted for operation in a stowage locker inside Mir, with the only heat dissipation capability provided by a cooling fan exhausting to the habitable compartment. The thermal environment on Mir can potentially vary over the range 5 to 40 C; this was the range used in testing, and this wide range adds to the difficulty in managing the power dissipated from the experiment's active components. Many issues in the thermal design are discussed, including: thermal isolation methods for the cryogenic samples; design for cooling to cryogenic temperatures; cryogenic epoxy bonds; management of ambient temperature components self-heating; and fan cooling of the enclosed locker. Results of the design are also considered, including the thermal gradients across the HTS samples and cryogenic thermal strap, electronics and thermal sensor cryogenic performance, and differences between ground and flight performance. Modeling was performed in both SINDA-85 and MSC/PATRAN (with direct geometry import from the CAD design tool Pro/Engineer). Advantages of both types of models are discussed. Correlation of several models to ground testing and flight data (where available) is presented. Both SINDA and PATRAN models predicted the actual thermal performance of the experiment well, even without post-flight correlation adjustments of the models.

Amundsen, Ruth McElroy↗

Run-time implementation issues for real-time embedded Ada

A motivating factor in the development of Ada as the department of defense standard language was the high cost of embedded system software development. It was with embedded system requirements in mind that many of the features of the language were incorporated. Yet it is the designers of embedded systems that seem to comprise the majority of the Ada community dissatisfied with the language. There are a variety of reasons for this dissatisfaction, but many seem to be related in some way to the Ada run-time support system. Some of the areas in which the inconsistencies were found to have the greatest impact on performance from the standpoint of real-time systems are presented. In particular, a large part of the duties of the tasking supervisor are subject to the design decisions of the implementer. These include scheduling, rendezvous, delay processing, and task activation and termination. Some of the more general issues presented include time and space efficiencies, generic expansions, memory management, pragmas, and tracing features. As validated compilers become available for bare computer targets, it is important for a designer to be aware that, at least for many real-time issues, all validated Ada compilers are not created equal.

Maule, Ruth A.↗

Challenges of Developing New Classes of NASA Self-Managing Mission

NASA is proposing increasingly complex missions that will require a high degree of autonomy and autonomicity. These missions pose hereto unforeseen problems and raise issues that have not been well-addressed by the community. Assuring success of such missions will require new software development techniques and tools. This paper discusses some of the challenges that NASA and the rest of the software development community are facing in developing these ever-increasingly complex systems. We give an overview of a proposed NASA mission as well as techniques and tools that are being developed to address autonomic management and the complexity issues inherent in these missions.

Hinchey, M. G.↗

Implementing Earned Value Management in the CxP EVA Systems Project Office

Earned Value Management (EVM), like project management, is as much art as it is science to develop an implementation plan for a project. This presentation will cover issues that were overcome and the implementation strategy to deploy Earned Value Management (EVM) within the Constellation Program (CxP), EVA Systems Project Office (ESPO), as well as discuss additional hurdles that currently prevent the organization from optimizing EVM. Each organization and each project within an organization needs to mold an EVM implementation plan around existing processes and tools, while at the same time revising those existing processes and tools as necessary to make them compatible with EVM. The ESPO EVM implementation covers work breakdown structure, organizational breakdown structure, control account, work/planning package development; integrated master schedule development using an integrated master plan; incorporating reporting requirements for existing funding process such as Planning, Programming, Budgeting, and Execution (PPBE) and JSC Internal Task Agreements (ITA); and interfacing with other software tools such as the Systems Applications and Products (SAP) accounting system and the CxP wInsight EVM analysis tool. However, there are always areas for improvement and EVM is no exception. As EVM continues to mature within the NASA CxP, these areas will continue to be worked to resolution to provide the Program Managers, Project Managers, and Control Account Managers the best EVM data possible to make informed decisions.

Sorge, Les L.↗

Ultra-efficient Engine Diameter Study

Engine fan diameter and Bypass Ratio (BPR) optimization studies have been conducted since the beginning of the turbofan age with the recognition that reducing the engine core jet velocity and increasing fan mass flow rate generally increases propulsive efficiency. However, performance tradeoffs limit the amount of fan flow achievable without reducing airplane efficiency. This study identifies the optimum engine fan diameter and BPR, given the advanced Ultra-Efficient Engine Technology (UEET) powerplant efficiencies, for use on an advanced subsonic airframe. Engine diameter studies have historically focused on specific engine size options, and were limited by existing technology and transportation infrastructure (e.g., ability to fit bare engines through aircraft doors and into cargo holds). This study is unique in defining the optimum fan diameter and drivers for future 2015 (UEET) powerplants while not limiting engine fan diameter by external constraints. This report follows on to a study identifying the system integration issues of UEET engines. This Engine Diameter study was managed by Boeing Phantom Works, Seattle, Washington through the NASA Glenn Revolutionary Aero Space Engine Research (RASER) contract under task order 10. Boeing Phantom Works, Huntington Beach, completed the engine/airplane sizing optimization, while the Boeing Commercial Airplane group (BCA) provided design oversight. A separate subcontract to support the overall project was issued to Tuskegee University.

Daggett, David L.↗

Study of systems and techniques for data base management

Data management areas were studied to identify pertinent problems and issues that will affect future NASA data users in terms of performance and cost. Specific topics discussed include the identifications of potential NASA data users other than those normally discussed, consideration affecting the clustering of minicomputers, low cost computer system for information retrieval and analysis, the testing of minicomputer based data base management systems, ongoing work related to the use of dedicated systems for data base management, and the problems of data interchange among a community of NASA data users.

Source record↗

Communicating Medical Needs to Non-Medical Managers

Differences in communication styles and languages between groups often lead to miscommunication, confusion, and/or frustration. Engineers, computer specialists, clinicians, and managers often utilize the English language in very different ways, with different groups using the same words to represent different concepts ("complaint" is a typical example). In addition, medical issues are often perceived as "off-nominal" and not "primary mission tasks" by managers, which can cause them to assign lower priorities to medical training time and resources. Knowledge bases differ due to variations in training and skill sets, and the goals (both immediate and long-term) of the communicators may also vary, with managers being primarily concerned with overall mission objectives, while clinicians focus on individual or group health issues. Furthermore, true communication is only possible when clinicians possess a deep understanding of mission requirements as well as the ability to communicate medical requirements on a priority basis using risk assessment, added value, and cost benefit analysis. These understandable differences may contribute to difficulties in expressing concerns and ideas in an efficient manner, particularly in projects, such as the space program or many military operations, where these varied groups must collaborate, and where the final decisions must be made by fully informed mission commanders. Methods: Three scenario-based approaches were developed utilizing decision trees and problem based learning, to help define and integrate these concepts. Results: Use of these techniques by NASA and military personnel will be presented. Discussion: To enhance communication, particularly of medical needs, one must identify the concerns and motivating factors for the other groups; for example, members of management may focus on financial concerns, a desire for risk mitigation, public perceptions, mission objectives, etc. Training clinicians to frame issues in these terms may lead to better understanding of the medical concerns by other groups.

Bacal, Kira↗

Flying Drones Beyond Visual Line of Sight Using 4G LTE: Issues and Concerns

The purpose of this paper is to address the extent in which 4G LTE can be used for air traffic management of small Unmanned Air Vehicles (sUAVs) and the limitations and enhancements that may be necessary. We provide a brief overview of the communications aspects of the Unmanned Aerial System (UAS) Traffic Management Project followed by the evolving trends in air traffic management including beyond visual line of sight (BVLOS) operations concepts and current BVLOS operational systems. Issues and Concerns are addressed including the rapidly evolving global regulations and the resulting communications requirements as well LTE downlink and uplink interference at altitude and how that interference affects command and control reliability as well as application data capabilities and mobility performance.

Ivancic, William D.↗

Flying Drones Beyond Visual Line of Sight Using 4G LTE: Issues and Concerns

The purpose of this paper is to address the extent in which 4G LTE can be used for air traffic management of small Unmanned Air Vehicles (sUAVs) and the limitations and enhancements that may be necessary. We provide a brief overview of the communications aspects of the Unmanned Aerial System (UAS) Traffic Management Project followed by the evolving trends in air traffic management including beyond visual line of sight (BVLOS) operations concepts and current BVLOS operational systems. Issues and Concerns are addressed including the rapidly evolving global regulations and the resulting communications requirements as well LTE downlink and uplink interference at altitude and how that interference affects command and control reliability as well as application data capabilities and mobility performance.

Ivancic, William D.↗

Creating a GIS-Based Decision-Support System

Tilting the Balance: Climate Variability and Water Resource Management in the Southwest, a regional conference hosted by the Pan American Center for Environmental Studies, will be held at The University of Texas at El Paso on March 2-4, 1998. The conference is supported through the US Global Change Research Program (USGCRP) established by the President in 1989, and codified by Congress in the Global Change Research Act of 1990. The NASA Mission to Planet Earth program is one of the workshops sponsors. The purpose of the regional workshops is to improve understanding of the consequences of global change. This workshop will be focused on issues along the border and the Rio Grande River and thus will bring together stakeholders from Mexico, California, Texas, New Mexico, Arizona and Colorado representing federal, state, and local governments; universities and laboratories; industry, agricultural and natural resource managers; and non-governmental organizations. This paper discusses the efforts of the NASA PACES center create a GIS-based decision-support system that can be used to facilitate discussion of the complex issues of resource management within the targeted international region.

Alvarado, Lori↗