Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “installations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

Rapid Prediction of Installed Jet Noise From RANS

A new method of computing jet noise, called mSrc, was developed on the general principles of acoustic analogies. In the method, the problem of translating turbulent flow energy into acoustic energy at a far-field observer is broken into two parts, a calculation of acoustic source strengths and then their propagation. The acoustic sources are related to turbulent quantities in the jet plume in a robust manner. The propagation, which is more properly computed using a Green's function accounting for nonuniform speed of sound and solid surfaces, is instead modeled using commonly observed features of jet acoustic far field directivity, and by diffraction barrier theory for surfaces. The mSrc method does not require gradients of the predicted flow field, allowing it to make use of robust unstructured RANS CFD methods, including embedded boundary codes. Such codes do not require specification of surface meshes, and auto-refine their grid to resolve flow gradients, putting resolution where it is required without a priori user input. The ability of mSrc to use such radically unstructured flow input results in an efficient method of estimating noise from jet flows from complex nozzles installed on aircraft. Many validation cases are presented to demonstrate the accuracy and range of applicability of the mSrc method for representative jet noise applications.

Bridges, James↗

Simulation-Based Assessment of a Full-Scale Installed Quiet Landing Gear

Full-scale simulations of a Gulfstream G-III aircraft, performed in support of the NASA Acoustic Research Measurements flights, are presented to complement results discussed in earlier studies. The flow solver employed in those studies, Dassault Systèmes’ lattice Boltzmann PowerFLOW®, was also used during this investigation to conduct time-dependent simulations of the entire aircraft in landing configuration with a fully dressed landing gear. The high-fidelity simulations, performed at a Mach number of 0.23 and a Reynolds number of 10.5 × 106 based on mean aerodynamic chord, captured all relevant airframe noise sources. The computations were used to assess the aeroacoustic performance of the main landing gear, with and without noise reduction fairings installed, of a G-III aircraft equipped with Adaptive Compliant Trailing Edge technology and conventional Fowler flaps. To facilitate comparison of predicted noise signatures with effective perceived noise levels obtained from flight test measurements, the “as-flown” nose landing gear geometry, missing in our earlier studies, was added to the simulated G-III aircraft configurations. The high fidelity, synthetic data were post-processed using a Ffowcs-Williams and Hawkings integral approach to estimate farfield acoustic behavior, with pressures on the model solid surface or pressure and velocity components on a permeable surface enveloping the acoustic near field used as input.

Duda, Benjamin↗

Visualization of Upcoming ISS Changes - Featuring MLM Install

The MAGIK Robotic analysis team provides kinematic feasibility assessments and robotic visualizations for the ISS. The latest visualization displays ISS planned operations in increments 65 and 66 as of the 7/6/21 flight plan. Featured events include the arrival of the Multipurpose Laboratory Module (MLM) and surrounding visiting vehicle actions. The complete list of actions shown include: Repeated ISS attitude adjustment maneuvers from: starting position with positive X Velocity Vector (+XVV), yaw to -XVV, and pitch to final position with -ZVV. Then subsequent return to -XVV and nominal position +XVV. Crew-2 relocation from Node 2 Forward (N2F) to Node 2 Zenith (N2Z). 77 Progress with Docking Compartment 1 (DC1) undock and departure. MLM install. Boe-OFT2 arrival and departure at N2F. NG-16 arrival and berth at Node 1 Nadir (N1N). SpX-23 arrival at N2F. 64 Soyuz relocation and fly-around. SpX-23 departure from N2F. 65 Soyuz approach and dock to MRM-1. 64 Soyuz undock and departure. 78 Progress relocation.

ISS↗

Identification of Best Practices for Predicting Inlet Performance Using FUN3D Part 2: Installed Inlets.

A series of studies were performed to assess the impacts of boundary condition type and placement, grid refinement, and modeling parameters such as turbulence model and flux limiter on the predicted inlet performance for installed inlet configurations using the FUN3D flow solver. Two configurations were considered for the study; a wall-mounted Boundary Layer Ingestion (BLI) inlet and the C607 propulsion model tested in the 8x6 Supersonic Wind Tunnel at the NASA Glenn Research Center. The results of the studies were to be used to recommend best practices, as well as to assess the accuracy of FUN3D for inlet predictions. The results of BLI inlet stud-ies showed a minimal impact of grid refinement on the predicted inlet performance for a constant mass flow rate through the inlet. For the C607 propulsion model, the results showed that while the FUN3D predictions at the Aerodynamic Inter-face Plane (AIP) qualitatively agree with the experimental data, FUN3D showed a tendency to overpredict the circumferential distortion metric (IDCmax) and un-derpredict both the radial distortion metric (IDRmax) and the pressure recovery at the AIP (PRAIP ), with the differences between FUN3D and the experimental data increasing with increasing grid refinement and Mach number. Additionally, the outflow boundary location studies performed for both geometries showed that the solution at the AIP was not significantly impacted by the outflow boundary location as long as it was not placed at the location of the AIP. The modeling parameter studies did not indicate a path forward for improved predictions for either inlet con-figuration. Finally, comparisons between the mass flow plug and outflow geometry versions of the C607 propulsion model illustrated favorable agreement, which indi-cates that the differences observed are not caused by the outflow boundary model for this problem. This problem poses significant challenges to Reynolds-averaged Navier-Stokes (RANS) solvers due to the presence of shocks and flow separation in the inlet.

FUN3D↗

Pre-Installation Acceptance (PIA) Functional Performance of the Design Verification Test (DVT) Exploration Extra-vehicular Mobility Unit (xEMU)

In an effort that began with technology investment by NASA in a few key components during the Constellation Program and then evolved to demonstrate a packaged Portable Life Support System (PLSS) as part of the Advanced Exploration Systems (AES) Program, the next evolution of the PLSS is now a key component of the Exploration Extra-vehicular Mobility Unit (xEMU) and is assembled as a Design Verification Test (DVT) unit. The xEMU has been detailed with respect to completing a demonstration on the International Space Station (ISS) with support of units for initial lunar capability. The xEMU completed the Preliminary Design Review (PDR) with subsequent Safety Review Panel (SRP) Phase I reviews in 2019-2020. The objectives for DVT are to validate requirements, train the team, learn how to fabricate the hardware with appropriate process controls, assemble the hardware, test the hardware, determine the failure mechanisms/limits of the hardware design and buy down the most risk possible for the qualification and flight phases of the development. With completion of the assembly and initial functional testing of the DVT PLSS in laboratory ambient conditions and vacuum conditions the xEMU has progressed significantly into the DVT objectives. A key part of the test sequences for DVT and all future phases is the Pre-Installation Acceptance (PIA) functional testing which validates the performance of integrated systems including: primary thermal control, auxiliary thermal control, suit ventilation, primary oxygen, secondary oxygen, power distribution, as well as caution and warning all with respect to the applied requirements. This discussion will include an overview of the assembly, summary of the PIA functional testing, lessons learned, and corrective actions implemented moving forward into the remainder of the DVT phase for xEMU.

Colin Campbell↗

Technology Demonstration Mission (TDM) evolvable Cryogenics (eCryo) Project Structural Heat Intercept, Insulation and Vibration Evaluation Rig (SHIIVER) Diode Rake Assembly and Installation

NASA designed, assembled and installed a temperature diode rake into the SHIIVER test article for use of measuring liquid and gaseous hydrogen temperatures. Several special steps were taken to ensure that fluid temperatures were measured as opposed to structural temperatures. This document outlines design practices and methodologies that have become standard practice at Glenn Research Center to ensure the measurement of fluid temperatures for cryogenic systems research.

Cryogenic Fluid Management↗

Building a lifeboat: MSL’s uplink and installation campaign to restore a failing backup computer

Flight software updates are among the hardest andmost dangerous activities for the Mars Science Laboratory(MSL) Curiosity team. While danger is often mitigated bybackups, fallback strategies, and incremental installation withground-in-the-loop cycles which provide a safety net for theinstallation process, the software update described in this paperwas unable to use many of the common practices due to thenature of the fault addressed by the update. The MSL rover(landed August 2012) encountered a problem with one of itscomputer’s non-volatile storage chips in 2019, requiring a swapto its backup computer and an urgent software upgrade calledR-Hope. R-Hope, a lifeboat to be used in the event of primarycomputer issues, was written, tested, and sent to the rover inlightning speed of just 19 months. Multi-mission and teamcoordination allowed the 49 flight software image files to beuplinked to the rover over a 6-week period, using multiple pathsand backup options for speedy delivery. In the end, the RHopesoftware upgrade returned the computer to operation asa backup flight computer. The flight software transition wasdesigned to impact science return as little as possible, and installationplans included science activities for the majority of MSLinstruments. This paper describes the uplink and installationcampaigns for R-Hope, and discusses the notable lessons learnedby the operations team.

Byrne, DJ↗

Installation Torque Tables for Noncritical Applications

The objective of this project is to define torque values for bolts and screws when loading is not a concern. Fasteners require a certain torque to fulfill its function and prevent failure. NASA Glenn Research Center did not have a set of fastener torque tables for non-critical applications without loads, usually referring to hand-tight or wrench-tight torqueing. The project is based on two formulas, torque and pullout load. Torque values are calculated giving way to preliminary data tables. Testing is done to various bolts and metal plates, torqueing them until the point of failure. Around 640 torque tables were developed for UNC, UNF, and M fasteners. Different lengths of thread engagement were analyzed for the 5 most common materials used at GRC. The tables were put together in an Excel spreadsheet and then formatted into a Word document. The plan is to later convert this to an official technical publication or memorandum.

installation↗