Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “grid connected”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

Solar cell grid patterns

A grid pattern is described for a solar cell of the type which includes a semiconductive layer doped to a first polarity and a top counter-doped layer. The grid pattern comprises a plurality of concentric conductive grids of selected geometric shapes which are centered about the center of the exposed active surface of the counter-doped layer. Connected to the grids is one or more conductors which extend to the cell's periphery. For the pattern area, the grids and conductors are arranged in the pattern to minimize the maximum distance which any injected majority carriers have to travel to reach any of the grids or conductors. The pattern has a multiaxes symmetry with respect to the cell center to minimize the maximum temperature differentials between points on the cell surface and to provide a more uniform temperature distribution across the cell face.

Yasui, R. K.↗

Generator Interconnection Cost Analysis in the Midcontinent Independent System Operator (MISO) territory

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data from interconnection studies for the Midcontinent Independent System Operator (MISO), representing nearly 50% of all projects requesting interconnection from 2010 to 2020. Project-level cost summary data are available for download on this page. We find: -Average interconnection costs have grown as the number of interconnection requests have escalated -Projects that have completed all required interconnection studies have the lowest cost compared to applicants still actively working through the interconnection process or those that have withdrawn. -Broader network upgrade costs are the primary driver of recent cost increase. -Potential interconnection costs for wind, storage, and solar are larger than for natural gas -Larger generators have greater interconnection costs in absolute terms, but economies of scale exist on a per kW basis. -Interconnection costs vary by location Berkeley Lab will publish a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Interconnection Cost Analysis in the PJM Territory

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data from interconnection studies for the PJM Territory, representing nearly 86% of all new unique generators requesting interconnection from 2000 to 2022. Project-level cost summary data are available for download on this page. We find: -Average interconnection costs have grown as the number of interconnection requests have escalated -Projects that have completed all required interconnection studies have the lowest cost compared to applicants still actively working through the interconnection process or those that have withdrawn. -Broader network upgrade costs are the primary driver of recent cost increase. -Potential interconnection costs for wind, storage, and solar are larger than for natural gas -Larger generators have greater interconnection costs in absolute terms, but economies of scale exist on a per kW basis. -Interconnection costs vary by location Berkeley Lab will publish a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Generator Interconnection Cost Analysis in the Southwest Power Pool (SPP) Territory

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data for 845 projects from interconnection studies for the Southwest Power Pool (SPP) Territory. The studies were performed between 2002 and 2023 and include all of the most refined cost estimates available. Project-level cost summary data are available for download on this page. We find: -Project-specific interconnection costs can differ widely. -Average interconnection costs are stable for projects that complete all interconnection studies but have escalated for those that withdraw. -Broader network upgrade costs are the primary driver of recent cost increases, especially for withdrawn projects. -Potential interconnection costs of all solar and wind requests have been greater than those of storage and natural gas projects. -Economies of scale exist for completed wind and solar projects but not for other fuel types or withdrawn projects. -Interconnection costs vary by location. Berkeley Lab publishes a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Interconnection Cost Analysis in ISO-New England

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data for 194 projects in New England from interconnection studies performed between 2010 and 2021. Project-level cost summary data are available for download on this page. We find: -Interconnection costs have grown over time, especially for projects that withdraw. -Interconnection costs are highest for onshore wind, followed by solar and storage. Natural gas and offshore wind projects tend to cost less to interconnect, in comparison. -Economies of scale exist for solar and possibly storage projects, but not for other resource types. -Wind and solar projects requesting capacity network resource interconnection service have higher interconnection costs, despite being evaluated using the same interconnection standard in the analyzed studies. -Low and high interconnection costs can be found throughout the ISO-NE footprint. -Costs are split fairly evenly between investments at the point of interconnection and within the broader network for active and withdrawn projects, while complete projects incur most costs at the point of interconnection.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Surfer: An Extensible Pull-Based Framework for Resource Selection and Ranking

Grid computing aims to connect large numbers of geographically and organizationally distributed resources to increase computational power; resource utilization, and resource accessibility. In order to effectively utilize grids, users need to be connected to the best available resources at any given time. As grids are in constant flux, users cannot be expected to keep up with the configuration and status of the grid, thus they must be provided with automatic resource brokering for selecting and ranking resources meeting constraints and preferences they specify. This paper presents a new OGSI-compliant resource selection and ranking framework called Surfer that has been implemented as part of NASA's Information Power Grid (IPG) project. Surfer is highly extensible and may be integrated into any grid environment by adding information providers knowledgeable about that environment.

Zolano, Paul Z.↗

Adaptive Grids For Computations Of Three-Dimensional Flows

Self-adaptive-grid method devised and enhanced for efficient computation of complicated three-dimensional flows. Extension of method developed for two-dimensional flows. Fictitious springs connecting points of computational grid used to determine optimum grid spacing. Each point connected to neighboring points by tension and torsion springs. Stiffnesses of tension springs related to flow-field quantities. Stiffnesses of torsion springs resist departure of grid from orthogonality.

Djomehri, M. Jahed↗

Formulation of Three-Phase State Estimation Problem Using a Virtual Reference

State Estimation (SE) is the backbone of modern Energy Management System (EMS) due its capability of processing real time measurements and provide reliable information to system operators. Since its introduction to power systems in the 70’s, SE has been widely used in transmission networks. Distribution grids on the other hand lack sufficient number of real time measurements, and for that reason SE has not been widely implemented on these systems. The recent increase in the number of renewable energy sources connected to the grid at lower voltage levels, the advent of Distribution Automation (DA) and Smart Grids necessitate closer monitoring of distribution networks and thus forcing utilities to upgrade their operations and deploy Advanced Distribution Management Sytems (ADMS). Therefore, Distribution System State Estimation (DSE) is paramount to provide real time monitoring of active distribution grids. This papers investigates the formulation of the three-phase distribution state estimation where in the most general case, none of the system buses may have balanced three phase voltages. In such a case, the choice and definition of the slack bus need to be revisited. Most of the existing work arbitrarily assign the root bus of the distribution feeder as the balanced three-phase reference which may not be realistic for today’s active distribution systems. This paper addresses this shortcoming of the existing SE formulations by introducing a virtual reference bus. Here, the proposed approach is effectively validated by simulations carried out on distribution test systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Cybersecurity Certification Recommendations for Interconnected Grid Edge Devices and Inverter Based Resources

Escalating deployment of PV and grid-edge devices on the distribution grid has increased the sustainability and efficiency of the electric grid. However, the increasing number of distributed energy resources (DERs) deployed creates a heightened cyber-physical interdependency on the distribution grid and thus creates more vectors for cyber-attacks to exploit through information and communication technology (ICT) systems and networks. For example, control signal packets can be modified, intercepted, or corrupted due to vulnerabilities in communication protocols used by microgrid controllers and grid edge devices for power control. Therefore, to mitigate and prevent cyber-attacks on grid edge devices and the inverter-based resources connected to the distribution grid, the U.S. Department of Solar Energy Technologies Office (SETO) awarded funding to the National Renewable Energy Laboratory and Sandia National Laboratory (SNL) to research, develop, and harmonize cybersecurity standards for Photovoltaic (PV) systems and for other kinds of DERs. To help develop a standard for DER cybersecurity, NREL established certification recommendations and test cases, in consensus with the solar industry and UL, for ensuring intrinsic design security for DERs. These recommendations were developed to bolster the cybersecure functionalities such as TLS, MAC, CRL, session resumption/renegotiation, and password, system, and service security management within the DER devices. The proposed test cases verify authentication, authorization, confidentiality, and data integrity for data and communications of DERs that use Transmission Control Protocol/Internet Protocol (TCP/IP). They were also developed to protect DER communications from eavesdropping, replay, man-in-the-middle, denial of service (DoS), spoofing through security certificates, least-privilege violation, and brute-force credentials. This report, which has been validated and reviewed by UL, expands upon those test cases to provide DER cybersecurity certification recommendations which increase DER resiliency and help to mitigate cyber-attacks. UL's collaboration with NREL and approval of this document will accelerate the adoption of a UL standard for DER cybersecurity.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Roadmap and Benchmarking: Privacy in Federated Load Forecasting

Data-driven techniques for energy demand forecasting continue to emerge with promising impacts on distribution grid planning. However, the development of robust and generalizable machine learning models requires that representative high quality training data are available. Distributed energy resources have begun to embed intelligence, gathering large amounts of data on customer demand, behavior, and household devices that are connected to the grid. Though utilities aggregate meter-level demand data for load shaping, demand response, outage management, reliability planning, and billing applications, there lies an inherent privacy concern in sharing consumption data that may identify individual consumer behavioral patterns. Hence, while sharing the data is crucial, the private sensitive customer data must be safeguarded from being exposed or manipulated. In this study, we propose a roadmap for implementing a based privacy preserving framework to support the advancement of data-driven analytics in data-sensitive distributed energy resources environments. The roadmap incorporates federated learning–a distributed training framework, differential privacy–a statistical framework that provides guarantees to safeguard the leakage of sensitive data, secure multiparty computation and homomorphic encryption– techniques for encrypting model gradients and applying secure aggregation on the server. Moreover, we perform baseline experiments on the federated short-term load forecasting (STLF) task using open-source residential load profile datasets, offering insights into the challenges of integrating differential privacy into federated learning.

Abebe, Waqwoya [Oak Ridge National Laboratory (ORN↗

Intelligent Patching of Conceptual Geometry for CFD Analysis

The iPatch computer code for intelligently patching surface grids was developed to convert conceptual geometry to computational fluid dynamics (CFD) geometry (see figure). It automatically uses bicubic B-splines to extrapolate (if necessary) each surface in a conceptual geometry so that all the independently defined geometric components (such as wing and fuselage) can be intersected to form a watertight CFD geometry. The software also computes the intersection curves of surface patches at any resolution (up to 10.4 accuracy) specified by the user, and it writes the B-spline surface patches, and the corresponding boundary points, for the watertight CFD geometry in the format that can be directly used by the grid generation tool VGRID. iPatch requires that input geometry be in PLOT3D format where each component surface is defined by a rectangular grid {(x(i,j), y(i,j), z(i,j)):1less than or equal to i less than or equal to m, 1 less than or equal to j less than or equal to n} that represents a smooth B-spline surface. All surfaces in the PLOT3D file conceptually represent a watertight geometry of components of an aircraft on the half-space y greater than or equal to 0. Overlapping surfaces are not allowed, but could be fixed by a utility code "fixp3d". The fixp3d utility code first finds the two grid lines on the two surface grids that are closest to each other in Hausdorff distance (a metric to measure the discrepancies of two sets); then uses one of the grid lines as the transition line, extending grid lines on one grid to the other grid to form a merged grid. Any two connecting surfaces shall have a "visually" common boundary curve, or can be described by an intersection relationship defined in a geometry specification file. The intersection of two surfaces can be at a conceptual level. However, the intersection is directional (along either i or j index direction), and each intersecting grid line (or its spine extrapolation) on the first surface should intersect the second surface. No two intersection relationships will result in a common intersection point of three surfaces. The output files of iPatch are IGES, d3m, and mapbc files that define the CFD geometry in VGRID format. The IGES file gives the NURBS definition of the outer mold line in the geometry. The d3m file defines how the outer mold line is broken into surface patches whose boundary curves are defined by points. The mapbc file specifies what the boundary condition is on each patch and the corresponding NURBS surface definition of each non-planar patch in the IGES file.

Li, Wu↗

Queued Up: 2025 Edition – Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2024 [Slides]

Electric transmission system operators (ISOs, RTOs, or utilities) require proposed power plants seeking to connect to the transmission grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. The lists of projects in this process are known as “interconnection queues”. In collaboration with interconnection.fyi, Berkeley Lab compiled, aggregated, and cleaned interconnection queue data from >50 transmission grid operators (7 ISO/RTOs and 49 non-ISO balancing areas), which collectively represent ~97% of currently installed U.S. electric generating capacity. The dataset includes requests submitted to queues through the end of 2024, and only includes requests seeking to connect to the transmission grid (not distribution-connected or behind-the-meter projects). The files below include both a PDF report and an Excel data file. The PDF report analyzes interconnection data and metrics through the end of 2024. The Excel data file includes (a) the full project-level interconnection queue dataset through 2024, (b) a codebook (data dictionary) describing each data field, and (c) 35 additional tabs featuring tables summarizing a range of interconnection metrics. Key highlights from the Queued Up: 2025 Edition (featuring data through 2024) include: • As of the end of 2024, there were ~10,300 projects actively seeking grid interconnection in the U.S., representing 1,400 GW of generation and approximately 890 GW of storage. • Historic withdrawal rates alongside relatively fewer new requests resulted in a 12% decrease in total active queue volume compared to the prior year. • Active natural gas capacity (136 GW, +72% year-over-year) increased in 2024, while solar (956 GW, -12%), storage (890 GW, -13%), and wind (271 GW, -26%) capacity decreased. • 408 GW of capacity already has a draft or executed interconnection agreement (IA) but has not yet reached commercial operations. • The time projects spend in queues before reaching COD is increasing. For the regions with available data, the median duration from IR to COD has doubled from <2 years for projects built in 2000-2007 to over 4 years for those built in 2018-2024. • Ultimately, most of this proposed capacity will not be built. Only 13% of capacity that submitted interconnection requests from 2000-2019 had reached commercial operations by the end of 2024; 77% of that capacity had been withdrawn and 10% was still active. • FERC Order 2023 and various other reforms are being implemented. These are important measures to reduce interconnection bottlenecks and enhance grid system reliability, but it is too early to measure and assess their full impact. • New additions for the 2025 edition include: (a) additional detail on data processing and gaps; (b) updates on interconnection reforms; (c) new analysis on interconnection agreements, and more.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Quantification of storage required for preserving frequency security in wind‐integrated systems

Abstract The penetration of wind power generation into the power grid has been accelerated in recent times due to the aggressive emission targets set by governments and other regulatory authorities. Although wind power has the advantage of being environment‐friendly, wind as a resource is intermittent in nature. In addition, wind power contributes little inertia to the system as most wind turbines are connected to the grid via power electronic converters. These negative aspects of wind power pose serious challenges to the frequency security of power systems as penetration increases. In this work, an approach is proposed where an energy storage system (ESS) is used to mitigate frequency security issues of wind‐integrated systems. ESSs are well equipped to supply virtual inertia to the grid due to their fast‐acting nature, thus replenishing some of the energy storage capability of displaced inertial generation. In this work, a probabilistic approach is proposed to estimate the amount of inertia required by a system to ensure frequency security. Reduction in total system inertia due to the displacement of conventional synchronous generation by wind power generation is considered in this approach, while also taking into account the loss of inertia due to forced outages of conventional units. Monte Carlo simulation is employed for implementing the probabilistic estimation of system inertia. An ESS is then sized appropriately, using the system swing equation, to compensate for the lost inertia. The uncertainty associated with wind energy is modeled into the framework using an autoregressive moving average technique. Effects of increasing the system peak load and changing the wind profile on the expected system inertia are studied to illustrate various factors that might affect system frequency security. The proposed method is validated using the IEEE 39‐bus test system.

17 WIND ENERGY↗

Fault-tolerant grid frequency measurement algorithm during transients

A system determines the frequency of grid signals corresponding to an electrical grid in real time. The system includes a transient detector that monitors a grid signal from a voltage meter or a current meter connected to the electrical grid. The system produces, in real time and at a sampling rate, a deviation signal indicative of a periodicity of the monitored grid signal. The system determines, over one or more cycles of the monitored grid signal, a measurement signal corresponding to the deviation signal. The system determines a frequency signal that corresponds a frequency estimation of the monitored signal by applying a frequency estimation when values of the measurement signal are less than a deviation threshold and maintaining the frequency signal at a constant value when values of the measured signal equal or exceeds the deviation threshold.

Zhan, Lingwei↗

Today's Energy Challenges, Tomorrow's Solutions: Integrated Energy Pathways: Modernizing Our Energy Systems

Integrated Energy Pathways Today's electric grid was built for century-old needs, not the needs of tomorrow's emerging system. As the cost of generating electricity falls, products and systems that previously operated on other types of fuels are becoming increasingly "electrified." Instead of a one-way flow of electricity to systems that operate independently from one another, we are seeing more bi-directional connectivity between the grid and multiple end points. Integrated Energy Systems require a fundamental rethinking of grid infrastructure and the path electricity takes from the source of generation to the end point of use. Inevitably, the way the grid is managed today won't be the way it is managed 10-15 years from now. NREL is pioneering the fundamental research needed to guide this transition through renewable energy fuels and low-carbon electricity generation. Working with industry partners, we can collaboratively develop a fresh approach to energy generation, security, resilience, and advanced mobility.

energy security↗

The National Grid Project: A system overview

The National Grid Project (NGP) is a comprehensive numerical grid generation software system that is being developed at the National Science Foundation (NSF) Engineering Research Center (ERC) for Computational Field Simulation (CFS) at Mississippi State University (MSU). NGP is supported by a coalition of U.S. industries and federal laboratories. The objective of the NGP is to significantly decrease the amount of time it takes to generate a numerical grid for complex geometries and to increase the quality of these grids to enable computational field simulations for applications in industry. A geometric configuration can be discretized into grids (or meshes) that have two fundamental forms: structured and unstructured. Structured grids are formed by intersecting curvilinear coordinate lines and are composed of quadrilateral (2D) and hexahedral (3D) logically rectangular cells. The connectivity of a structured grid provides for trivial identification of neighboring points by incrementing coordinate indices. Unstructured grids are composed of cells of any shape (commonly triangles, quadrilaterals, tetrahedra and hexahedra), but do not have trivial identification of neighbors by incrementing an index. For unstructured grids, a set of points and an associated connectivity table is generated to define unstructured cell shapes and neighboring points. Hybrid grids are a combination of structured grids and unstructured grids. Chimera (overset) grids are intersecting or overlapping structured grids. The NGP system currently provides a user interface that integrates both 2D and 3D structured and unstructured grid generation, a solid modeling topology data management system, an internal Computer Aided Design (CAD) system based on Non-Uniform Rational B-Splines (NURBS), a journaling language, and a grid/solution visualization system.

Gaither, Adam↗

TRANSENSOR: Transformer Real-time Assessment INtelligent System with Embedded Network of Sensors and Optical Readout. Final Report

Utilities across the world are wrestling with evolving market dynamics, population growth and climate change. Distributed Energy Resources (DERs) such as solar photovoltaics, distributed generators and energy storage systems are becoming important parts of the U.S. energy mix. These factors are driving an increasing need for low-cost grid asset monitoring. Aside from being costly, traditional utility monitoring systems are not sufficiently robust and do not provide real-time visibility into the condition of grid assets such as transformers. Lack of accurate real-time measurements on performance has resulted in the use of lagging indicators, such as oil sample analysis. To address this need, an innovative embedded optical sensing technology, Transformer Real-time Assessment Intelligent System (TRANSENSOR) was developed, validated and demonstrated in this project. To date, TRANSENSOR has focused on transformers but is extendable to other grid assets. In addition to the technology being embedded into new transformers during manufacturing, a retrofit configuration that can be installed on existing transformers in the field was also developed. It is anticipated that the ability to retrofit existing transformers will help accelerate adoption of the underlying TRANSENSOR technology. Phase 1 of the project focused on laboratory development and qualification of the technology. Following iterations and exploration of relevant optical sensing modalities and multiplexed configurations of interest for the transformer environment, an effective candidate configuration was agreed upon, down-selected and custom-designed for embedding into General Electric (GE) network transformers. Two new GE 500 kilovolt ampere (kVA), 27 kilovolt (kV) distribution network transformers were built with embedded fiber-optic (FO) sensors and successfully qualified per industry standards at GE’s Shreveport, Louisiana facility during Phase 1 of the project. Following the successful completion of Phase 1, the team proceeded to Phase 2, which focused on a field demonstration of the technology. Over Phase 2, the first new GE transformer built with embedded fiber-optic sensors was installed in an above-ground cage and connected to the grid at Con Edison’s Astoria facility. A second transformer equipped with TRANSENSOR was installed in an underground vault. Additionally, an older (1982 year model) GE transformer in an above-ground cage was retrofitted with fiber- optic sensors and reconnected to the grid at ConEd’s facility. Analysis of data acquired from the sensors showed interesting correlations with transformer loading. Additionally, key events such as transformer low-voltage network connection, primary-side energizing, and a pressure loss event from an oil sampling were detected by the TRANSENSOR system. Online data processing/feature extraction algorithms for the second transformer in the underground vault detected key features and event alerts that were transmitted through a wireless 4G connection. The remote deployment concept showed promising results with data collection running for a total of 8 months across the three (3) GE transformers instrumented for the Phase 2 field demonstration. This sets the stage well for further development and commercialization.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Three-dimensional algorithms for grid restructuring in Free-Lagrangian calculations

Grid restructuring algorithms which lower the price of three-dimensional Free-Lagrange calculations are presented. The algorithms are first given for the case of planar triangulated surfaces embedded in and spanning a three-dimensional region. The tetrahedra generated by this technique form a Delaunay mesh if the interplane spacing is comparable to the resolution within the planes. The algorithm can therefore be used for efficient determinations of Voronoi connections for initial grids. Modifications of the algorithm for the case of closely spaced surfaces are demonstrated in the context of restructuring algorithms which can accommodate colliding surfaces. Then, the restriction to planar surfaces is removed and regular surfaces are examined. The basic algorithm is the same, with an additional operation to project the vertices of one surface onto another. Finally, vertices on the surface are allowed to migrate anywhere in space.

Fritts, M.↗