Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “flight hardware”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

Non-contact temperature measurement requirements of ground-based research and flight programs at JPL

The Modular Containerless Processing Facility project is responsible for the development of flight equipment and of the accompanying scientific and technological research necessary to carry out containerless investigations in the low gravity of earth orbit. The requirement for sample temperature measurement is just one of the many physical properties determination needs that must be satisfied before the useful exploitation of low gravity and containerless experimentation techniques can be achieved. The specific implementation of temperature measurement for the ground-based research program is different from that of the flight hardware development project. The needs of the latter must also be differentiated according to the chronological order of the relevant space flight missions. Immediate demands of Spacelab instruments must be addressed by the adaptation of existing reliable technology to the special and restrictive on-orbit environment, while more advanced and yet unperfected techniques will be assigned to enterprises further in the future. The wide range of application of the containerless methods to the study of phenomena involving different states of matter and environmental conditions requires the satisfaction of a variety of boundary conditions through different approaches. An important issue to be resolved will be whether an integrated program dedicated to solve the problems of all the microgravity experimental effort will allow the solution of specific demands of existing as well as future flight equipment.

Trinh, E. H.↗

Locomotor Dysfunction after Spaceflight: Characterization and Countermeasure Development

Astronauts returning from space flight show disturbances in locomotor control manifested by changes in various sub-systems including head-trunk coordination, dynamic visual acuity, lower limb muscle activation patterning and kinematics (Glasauer, et al., 1995; Bloomberg, et al., 1997; McDonald, et al., 1996; 1997; Layne, et al., 1997; 1998, 2001, 2004; Newman, et al., 1997; Bloomberg and Mulavara, 2003). These post flight changes in locomotor performance, due to neural adaptation to the microgravity conditions of space flight, affect the ability of crewmembers especially after a long duration mission to egress their vehicle and perform extravehicular activities soon after landing on Earth or following a landing on the surface of the Moon or Mars. At present, no operational training intervention is available pre- or in- flight to mitigate post flight locomotor disturbances. Our laboratory is currently developing a gait adaptability training program that is designed to facilitate recovery of locomotor function following a return to a gravitational environment. The training program exploits the ability of the sensorimotor system to generalize from exposure to multiple adaptive challenges during training so that the gait control system essentially "learns to learn" and therefore can reorganize more rapidly when faced with a novel adaptive challenge. Ultimately, the functional goal of an adaptive generalization countermeasure is not necessarily to immediately return movement patterns back to "normal". Rather the training regimen should facilitate the reorganization of available sensorimotor sub-systems to achieve safe and effective locomotion as soon as possible after space flight. We have previously confirmed that subjects participating in adaptive generalization training programs, using a variety of visuomotor distortions and different motor tasks from throwing to negotiating an obstacle course as the dependent measure, can learn to enhance their ability to adapt to a novel sensorimotor environment (Roller et al., 2001; Cohen et al. 2005). Importantly, this increased adaptability is retained even one month after completion of the training period. Our laboratory is currently developing adaptive generalization training procedures and the associated flight hardware to implement such a training program, using variations of visual flow, subject loading, and treadmill speed; during regular in-flight treadmill operations.

Mulavara, A. P.↗

Bayes Analysis and Reliability Implications of Stress-Rupture Testing a Kevlar/Epoxy COPV Using Temperature and Pressure Acceleration

Composite Overwrapped Pressure Vessels (COPVs) that have survived a long service time under pressure generally must be recertified before service is extended. Flight certification is dependent on the reliability analysis to quantify the risk of stress rupture failure in existing flight vessels. Full certification of this reliability model would require a statistically significant number of lifetime tests to be performed and is impractical given the cost and limited flight hardware for certification testing purposes. One approach to confirm the reliability model is to perform a stress rupture test on a flight COPV. Currently, testing of such a Kevlar49 (Dupont)/epoxy COPV is nearing completion. The present paper focuses on a Bayesian statistical approach to analyze the possible failure time results of this test and to assess the implications in choosing between possible model parameter values that in the past have had significant uncertainty. The key uncertain parameters in this case are the actual fiber stress ratio at operating pressure, and the Weibull shape parameter for lifetime; the former has been uncertain due to ambiguities in interpreting the original and a duplicate burst test. The latter has been uncertain due to major differences between COPVs in the database and the actual COPVs in service. Any information obtained that clarifies and eliminates uncertainty in these parameters will have a major effect on the predicted reliability of the service COPVs going forward. The key result is that the longer the vessel survives, the more likely the more optimistic stress ratio model is correct. At the time of writing, the resulting effect on predicted future reliability is dramatic, increasing it by about one "nine," that is, reducing the predicted probability of failure by an order of magnitude. However, testing one vessel does not change the uncertainty on the Weibull shape parameter for lifetime since testing several vessels would be necessary.

Phoenix, S. Leigh↗

Flight Analysis of an Autonomously Navigated Experimental Lander for High Altitude Recovery

First steps have been taken to qualify a family of parafoil systems capable of increasing the survivability and reusability of high-altitude balloon payloads. The research is motivated by the common risk facing balloon payloads where expensive flight hardware can often land in inaccessible areas that make them difficult or impossible to recover. The Autonomously Navigated Experimental Lander (ANGEL) flight test introduced a commercial Guided Parachute Aerial Delivery System (GPADS) to a previously untested environment at 108,000ft MSL to determine its high-altitude survivability and capabilities. Following release, ANGEL descended under a drogue until approximately 25,000ft, at which point the drogue was jettisoned and the main parachute was deployed, commencing navigation. Multiple data acquisition platforms were used to characterize the return-to-point technology performance and help determine its suitability for returning future scientific payloads ranging from 180 to 10,000lbs to safer and more convenient landing locations. This report describes the test vehicle design, and summarizes the captured sensor data. Various post-flight analyses are used to quantify the system's performance, gondola load data, and serve as a reference point for subsequent missions.

Parafoil↗

Flight Analysis of an Autonomously Navigated Experimental Lander

First steps have been taken to qualify a family of parafoil systems capable of increasing the survivability and reusability of high-altitude balloon payloads. The research is motivated by the common risk facing balloon payloads where expensive flight hardware can often land in inaccessible areas that make them difficult or impossible to recover. The Autonomously Navigated Experimental Lander (ANGEL) flight test introduced a commercial Guided Parachute Aerial Delivery System (GPADS) to a previously untested environment at 108,000 feet Mean Sea Level (MSL) to determine its high-altitude survivability and capabilities. Following release, ANGEL descended under a drogue until approximately 25,000 feet, at which point the drogue was jettisoned and the main parachute was deployed, commencing navigation. Multiple data acquisition platforms were used to characterize the return-to-point technology performance and help determine its suitability for returning future scientific payloads ranging from 180 to 10,000 pounds to safer and more convenient landing locations. This report describes the test vehicle design, and summarizes the captured sensor data. Various post-flight analyses are used to quantify the systems performance, gondola load data, and serve as a reference point for subsequent missions.

Parafoil↗

NASA's Space Launch System Moves into Testing and Integration

NASA's Space Launch System (SLS) has moved from design and manufacturing into testing and integration for its first flight as early as December 2019. In 2017, the NASA/industry team completed manufacturing of all major structural elements for the launch vehicle for Exploration Mission-I (EM-1 ). That work included shipping the first major flight hardware element to the launch site. The team processed all four RS-25 engines for stage integration, cast all 10 booster flight motor segments, and manufactured all five major sections of the core stage. The program also completed major structural work on the B-2 test stand at Stennis Space Center, which will be used for the core stage "green run" test; delivered the core stage and engine simulators used for training; and much of the transportation equipment for the core stage. Engineers completed structural testing on the upper stage/payload section of the vehicle as well as the engine section test article. In 2018, the program will deliver the Orion Stage Adapter (OSA) to Exploration Ground Systems (EGS) at KSC and send the test articles for the core stage liquid hydrogen tank, liquid oxygen tank, and intertank to NASA's Marshall Space Flight center for structural testing. Additionally, workers will begin the challenging process of integrating the major sections of the 212-foot EM-1 core stage. This work is focused on the initial Block 1 variant of SLS, capable of launching more than 70 metric tons (t) to low Earth orbit (LEO). However, work concurrently is underway on the Block lB variant, which will enable 105 t to LEO and more than 37t to trans-lunar injection (TLI). Block lB will be the workhorse vehicle of NASA's lunar exploration plans. As the needs of the nation's deep space exploration program grow, SLS performance is designed to evolve to a payload mass of 130 t to LEO and up to 45t to TLI. The advantages of this mass - as well as volume- are critical to the entire exploration architecture for deep space exploration. They translate to greater capability, greater infrastructure and operational simplicity, less overall mission risk, and opportunities to accomplish unprecedented exploration and discovery. This paper will discuss SLS progress to date and planned future work.

Honeycutt, John↗

Development of a Portable Oxygen Monitoring System for Operations in the International Space Station Airlock

NASA is currently engaged in an activity to facilitate effective operations on the International Space Station (ISS) after the Space Shuttle retires. Currently, the Space Shuttle delivers crew and cargo to and from ISS. The Space Shuttle provides the only large scale method of hardware return from ISS to the ground. Hardware that needs to be periodically repaired, refurbished, or recalibrated must come back from ISS on the Shuttle. One example of NASA flight hardware that is used on ISS and refurbished on the ground is the Compound Specific Analyzer for Oxygen (CSA-O2). The CSA-O2 is an electrochemical sensor that is used on orbit for about 12 months (depending on Shuttle launch schedules), then returned to the ground for sensor replacement. The shuttle is scheduled to retire in 2010, and the ISS is scheduled to operate until 2016. NASA needs a hand held sensor that measures oxygen in the ISS environment and has a 5-10 year service life. After conducting a survey of oxygen sensor systems, NASA selected a Tunable Diode Laser Absorption Spectrometer (TDLAS) as the method of measurement that best addresses the needs for ISS. These systems are compact, meet ISS accuracy requirements, and because they use spectroscopic techniques, the sensors are not consumed or altered after making a measurement. TDLAS systems have service life ratings of 5-10 years, based on the lifetime of the laser. NASA is engaged in modifying a commercially available sensor, the Vaisala OMT 355, for the ISS application. The Vaisala OMT 355 requires three significant modifications to meet ISS needs. The commercial sensor uses a wall mount power supply, and the ISS sensor needs to use a rechargeable battery as its source of power. The commercial sensor has a pressure correction setpoint: the sensor can be adjusted to operate at reduced pressure conditions, but the sensor does not self correct dynamically and automatically. The ISS sensor needs to operate in the airlock, and make accurate measurements in an environment that can change from 14.7 psia to 10.2 psia in 15 minutes. The commercial sensor needs to be repackaged into a configuration that is more compact, and better suited for ISS airlock operations. NASA has recently completed a prototype of the reconfigured system. The unit has been repackaged in a way that the optical path of the spectrometer is unchanged, but the electronics has been integrated into a case measuring 10.7 X 7.2 X 3.0 inches. Two flight qualified rechargeable batteries have been integrated into system. The batteries can power the sensor for 10 hours on a single charge. A pressure sensor has been added to the system. The modified unit automatically compensates for changes in pressure, and meets 0.2% accuracy requirements for oxygen measurements in an environment with 18 to 32% oxygen across a pressure range of 10.0 to 15.0 psia.

Graf, John↗

NASA's Space Launch System Gains Momentum Toward Integration and Testing

NASA's Space Launch System (SLS) entered a new phase in 2017, completing major structural manufacturing on the core stage and delivering the first flight hardware to NASA's Kennedy Space Center (KSC). The program is now transitioning to integration, assembly and testing in preparation for launch readiness in late 2019. Core stage prime contractor Boeing concluded welding of the major core stage components for Exploration Mission 1 (EM-1) with the liquid hydrogen flight tank, following completion of the engine section, liquid oxygen tank, and forward skirt. Technicians also completed assembly of the bolted intertank, and all sections are currently in hardware integration. The engine section structural test article was shipped to NASA's Marshall Space Flight Center (MSFC) and began testing in 2017. The core stage pathfinder shipped to NASA's Michoud Assembly Facility (MAF). Booster prime contractor Orbital ATK made significant progress casting motor segments for SLS, with several segments finishing processing and in storage. Forward and aft sections of the boosters are being refurbished at KSC. RS-25 prime contractor Aerojet Rocketdyne completed SLS adaptation testing and qualification of four new EM-1 controllers. The four EM-1 engines are ready and waiting for shipment from NASA's Stennis Space Center (SSC) to Michoud Assembly Facility (MAF) for core stage integration in preparation for green run testing at SSC. The EM-1 Interim Cryogenic Propulsion System (ICPS) became the first major piece of SLS to arrive at KSC. Welding is complete on the EM-1 Launch Vehicle Stage Adapter (LVSA) and the flight Orion Stage Adapter (OSA). SLS is critical to U.S. leadership in future human and robotic space exploration, including a presence on the moon in preparation for missions deeper into space. This paper will elaborate on 2017 SLS progress and progress envisioned for 2018.

Askins, Bruce R.↗

The Skylab sleep monitoring experiment - Methodology and initial results

The sleep monitoring experiment permitted an objective evaluation of sleep characteristics during the first two manned Skylab flights. Hardware located onboard the spacecraft accomplished data acquisition, analysis, and preservation, thereby permitting near-real-time evaluation of sleep during the flights and more detailed postmission analysis. The crewman studied during the 28-Day Mission showed some decrease in total sleep time and an increase in the percentage of Stage 4 sleep, while the subject in the 59-Day Mission exhibited little change in total sleep time and a small decrease in Stage 4 and REM sleep. Some disruption of sleep characteristics was seen in the final days of both missions, and both subjects exhibited decreases in REM-onset latency in the immediate postflight period. The relatively minor changes seen were not of the type nor magnitude which might be expected to be associated with significant degradation of performance capability.

Frost, J. D., Jr.↗

Cometary Matter Analyser (COMA/CRAF)

This project was part of an international program under which the chemical composition of cometary dust particles was to be measured 'in situ' during a rendezvous and flyby mission of a Mariner Mark 2 space probe and a comet (depending on the time of launch). Two necessary tasks, preliminary hardware development and interface definition, have been completed within the projects submitted for approval. As a result a model close to the flight configuration has been created, which was to be made available to the flight hardware contractor and his purposes. The Comet Rendezvous and Asteroid Flyby (CRAF) mission was abandoned after joint resolution adopted by NASA and the Federal Ministry for Research and Technology in 1992. Since an instrument like CoMA is an important contribution both to future cometary rendezvous missions, such as ROSETTA, as well as for accompanying laboratory activities, this project was terminated in a 'qualified conclusion'. In the process, components suitable for the laboratory developed from the preliminary units were produced and put into operation.

COMETARY MATTER↗

Deducing Electronic Unit Internal Response During a Vibration Test Using a Lumped Parameter Modeling Approach

During random vibration testing of electronic boxes there is often a desire to know the dynamic response of certain internal printed wiring boards (PWBs) for the purpose of monitoring the response of sensitive hardware or for post-test forensic analysis in support of anomaly investigation. Due to restrictions on internally mounted accelerometers for most flight hardware there is usually no means to empirically observe the internal dynamics of the unit, so one must resort to crude and highly uncertain approximations. One common practice is to apply Miles Equation, which does not account for the coupled response of the board in the chassis, resulting in significant over- or under-prediction. This paper explores the application of simple multiple-degree-of-freedom lumped parameter modeling to predict the coupled random vibration response of the PWBs in their fundamental modes of vibration. A simple tool using this approach could be used during or following a random vibration test to interpret vibration test data from a single external chassis measurement to deduce internal board dynamics by means of a rapid correlation analysis. Such a tool might also be useful in early design stages as a supplemental analysis to a more detailed finite element analysis to quickly prototype and analyze the dynamics of various design iterations. After developing the theoretical basis, a lumped parameter modeling approach is applied to an electronic unit for which both external and internal test vibration response measurements are available for direct comparison. Reasonable correlation of the results demonstrates the potential viability of such an approach. Further development of the preliminary approach presented in this paper will involve correlation with detailed finite element models and additional relevant test data.

random vibration response↗

Apollo experience report: Television system

The progress of the Apollo television systems from the early definition of requirements through the development and inflight use of color television hardware is presented. Television systems that have been used during the Apollo Program are discussed, beginning with a description of the specifications for each system. The document describes the technical approach taken for the development of each system and discusses the prototype and engineering hardware built to test the system itself and to perform the testing to verify compatibility with the spacecraft systems. Problems that occurred during the design and development phase are described. Finally, the flight hardware, operational characteristics, and performance during several Apollo missions are described, and specific recommendations for the remaining Apollo flights and future space missions are made.

Coan, P. P.↗

TDRSS Onboard Navigation System (TONS) flight qualification experiment

The National Aeronautics and Space Administration (NASA) Goddard Space Flight Center (GSFC) is currently developing an operational Tracking and Data Relay Satellite (TDRS) System (TDRSS) Onboard Navigation System (TONS) to provide realtime, autonomous, high-accuracy navigation products to users of TDRSS. A TONS experiment was implemented on the Explorer Platform/Extreme Ultraviolet Explorer (EP/EUVE) spacecraft, launched June 7, 1992, to flight qualify the TONS operational system using TDRSS forward-link communications services. This paper provides a detailed evaluation of the flight hardware, an ultrastable oscillator (USO) and Doppler extractor (DE) card in one of the TDRSS user transponders and the ground-based prototype flight software performance, based on the 1 year of TONS experiment operation. The TONS experiment results are used to project the expected performance of the TONS 1 operational system. TONS 1 processes Doppler data derived from scheduled forward-link S-band services using a sequential estimation algorithm enhanced by a sophisticated process noise model to provide onboard orbit and frequency determination and time maintenance. TONS 1 will be the prime navigation system on the Earth Observing System (EOS)-AM1 spacecraft, currently scheduled for launch in 1998. Inflight evaluation of the USO and DE short-term and long-term stability indicates that the performance is excellent. Analysis of the TONS prototype flight software performance indicates that realtime onboard position accuracies of better than 25 meters root-mean-square are achievable with one tracking contact every one to two orbits for the EP/EUVE 525-kilometer altitude, 28.5 degree inclination orbit. The success of the TONS experiment demonstrates the flight readiness of TONS to support the EOS-AM1 mission.

Gramling, C. J.↗

Design Criteria for Controlling Stress Corrosion Cracking

This document sets forth the criteria to be used in the selection of materials for space vehicles and associated equipment and facilities so that failure resulting from stress corrosion will be prevented. The requirements established herein apply to all metallic components proposed for use in space vehicles and other flight hardware, ground support equipment, and facilities for testing. These requirements are applicable not only to items designed and fabricated by MSFC (Marshall Space Flight Center) and its prime contractors, but also to items supplied to the prime contractor by subcontractors and vendors.

Franklin, D. B.↗

A Low Cost GPS System for Real-Time Tracking of Sounding Rockets

This paper describes the development as well as the on-ground and the in-flight evaluation of a low cost Global Positioning System (GPS) system for real-time tracking of sounding rockets. The flight unit comprises a modified ORION GPS receiver and a newly designed switchable antenna system composed of a helical antenna in the rocket tip and a dual-blade antenna combination attached to the body of the service module. Aside from the flight hardware a PC based terminal program has been developed to monitor the GPS data and graphically displays the rocket's path during the flight. In addition an Instantaneous Impact Point (IIP) prediction is performed based on the received position and velocity information. In preparation for ESA's Maxus-4 mission, a sounding rocket test flight was carried out at Esrange, Kiruna, on 19 Feb. 2001 to validate existing ground facilities and range safety installations. Due to the absence of a dedicated scientific payload, the flight offered the opportunity to test multiple GPS receivers and assess their performance for the tracking of sounding rockets. In addition to the ORION receiver, an Ashtech G12 HDMA receiver and a BAE (Canadian Marconi) Allstar receiver, both connected to a wrap-around antenna, have been flown on the same rocket as part of an independent experiment provided by the Goddard Space Flight Center. This allows an in-depth verification and trade-off of different receiver and antenna concepts.

Markgraf, M.↗

Hazard Analysis for Pneumatic Flipper Suitport/Z-1 Manned Evaluation, Chamber B, Building 32

One of the characteristics of an effective safety program is the recognition and control of hazards before mishaps or failures occur. Conducting potentially hazardous tests necessitates a thorough hazard analysis in order to protect our personnel from injury and our equipment from damage. The purpose of this hazard analysis is to define and address the potential hazards and controls associated with the Z1 Suit Port Test in Chamber B located in building 32, and to provide the applicable team of personnel with the documented results. It is imperative that each member of the team be familiar with the hazards and controls associated with his/her particular tasks, assignments, and activities while interfacing with facility test systems, equipment, and hardware. The goal of this hazard analysis is to identify all hazards that have the potential to harm personnel and/or damage facility equipment, flight hardware, property, or harm the environment. This analysis may also assess the significance and risk, when applicable, of lost test objectives when substantial monetary value is involved. The hazards, causes, controls, verifications, and risk assessment codes have been documented on the hazard analysis work sheets in appendix A of this document. The preparation and development of this report is in accordance with JPR 1700.1, JSC Safety and Health Handbook.

Source record↗

Bootstrapping Multi-Agent Unmanned Aerial Vehicle (UAV) System Integration Using Ground-Based Assets: Lessons Learned

In support of the Autonomy Teaming and TRAjectories for Complex Trusted Operational Reliability (ATTRACTOR) project, a fleet of unmanned ground vehicles (UGVs) was developed as a test and evaluation (T\&E) platform to reduce system integration gaps between simulation and live flight hardware. While simulation and hardware-in-the-loop bench testing provide adequate environments for preliminary validation, differences in system deployment architecture, software interfaces, and hardware infrastructure increase the risks to safety, property, and the project. Given ATTRACTOR’s goal of establishing a basis of certification of trust and trustworthiness in multi-agent autonomous systems, bridging these gaps was critical to successful project execution and feasibility assessment. In this paper we present the UGV fleet and its role in speeding up system integration, smoothing the transition from simulation to flight, and providing researchers an easy-to-use hardware test bed. An overview of the hardware and software on-board the vehicles is provided along with supporting infrastructure. The system integration process is documented including results in supporting both the overarching design reference mission (DRM) of ATTRACTOR and individual research efforts conducted since the creation of the fleet. Finally, we discuss the practical lessons learned regarding the testing, deployment, and operation of multi-agent autonomous systems.

Matthew P. Vaughan↗

The JPL/KSC telerobotic inspection demonstration

An ASEA IRB90 robotic manipulator with attached inspection cameras was moved through a Space Shuttle Payload Assist Module (PAM) Cradle under computer control. The Operator and Operator Control Station, including graphics simulation, gross-motion spatial planning, and machine vision processing, were located at JPL. The Safety and Support personnel, PAM Cradle, IRB90, and image acquisition system, were stationed at the Kennedy Space Center (KSC). Images captured at KSC were used both for processing by a machine vision system at JPL, and for inspection by the JPL Operator. The system found collision-free paths through the PAM Cradle, demonstrated accurate knowledge of the location of both objects of interest and obstacles, and operated with a communication delay of two seconds. Safe operation of the IRB90 near Shuttle flight hardware was obtained both through the use of a gross-motion spatial planner developed at JPL using artificial intelligence techniques, and infrared beams and pressure sensitive strips mounted to the critical surfaces of the flight hardward at KSC. The Demonstration showed that telerobotics is effective for real tasks, safe for personnel and hardware, and highly productive and reliable for Shuttle payload operations and Space Station external operations.

Mittman, David↗