Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “fleet managers”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

Integrated PEV Charging Solutions and Reduced Energy for Occupant Comfort [Brochure]

Brochure on Vehicle Testing and Integration Facility, featuring the Vehicle Modification Facility, Vehicle Test Pad and ReCharge Integrated Demonstration System. Plug-in electric vehicles (PEVs) offer the opportunity to shift transportation energy demands from petroleum to electricity, but broad adoption will require integration with other systems. While automotive experts work to reduce the cost of PEVs, fossil fueled cars and trucks continue to burn hundreds of billions of gallons of petroleum each year - not only to get from point A to point B, but also to keep passengers comfortable with air conditioning and heat. At the National Renewable Energy Laboratory (NREL), three installations form a research laboratory known as the Vehicle Testing and Integration Facility (VTIF). At the VTIF, engineers are developing strategies to address two separate but equally crucial areas of research: meeting the demands of electric vehicle-grid integration and minimizing fuel consumption related to vehicle climate control. Part of NREL's Center for Transportation Technologies and Systems (CTTS), the VTIF is dedicated to renewable and energy efficient solutions. This facility showcases technology and systems designed to increase the viability of sustainably powered vehicles. NREL researchers instrument every class of on-road vehicle, conduct hardware and software validation for electric vehicle (EV) components and accessories, and develop analysis tools and technology for the Department of Energy, other government agencies and industry partners. Research conducted at the VTIF examines the interaction of building energy systems, utility grids, renewable energy sources and PEVs, integrating energy management solutions, and maximizing potential greenhouse gas (GHG) reduction, while smoothing the transition and reducing costs for EV owners. NREL's collaboration with automakers, charging station manufacturers, utilities and fleet operators to assess technologies using VTIF resources is designed to enable PEV communication with the smart grid and create opportunities for vehicles to play an active role in building and grid management. Ultimately, this creates value for the vehicle owner and will help renewables be deployed faster and more economically, making the U.S. transportation sector more flexible and sustainable.

02 PETROLEUM↗

Theoretical and Simulated Capacity of Urban Air Mobility Airspace Characteristics

As interest in urban air mobility grows, as are the optimistic predictions for potentially hundreds of simultaneous operations within a given metropolitan airspace. This high density of traffic poses a challenge for safe, efficient, and timely operations, particularly when realistic airspace restrictions, fleet sizes, and fluctuating demand are considered. Routes for urban air mobility aircraft, similar to automotive roadways more than other types of airways, are one proposed solution for traffic management. This paper identifies several potential components of urban air mobility routes and compares their numerically predicted maximum capacity with what is achieved in a realistic simulation that includes airspace restrictions, parking limitations, fleet sizes, and uneven demand.

Urban Air Mobility↗

Theoretical and Simulated Capacity of Urban Air Mobility Airspace Characteristics

As interest in urban air mobility grows, as are the optimistic predictions for potentially hundreds of simultaneous operations within a given metropolitan airspace. This high density of traffic poses a challenge for safe, efficient, and timely operations, particularly when realistic airspace restrictions, fleet sizes, and fluctuating demand are considered. Routes for urban air mobility aircraft, similar to automotive roadways more than other types of airways, are one proposed solution for traffic management. This paper identifies several potential components of urban air mobility routes and compares their numerically predicted maximum capacity with what is achieved in a realistic simulation that includes airspace restrictions, parking limitations, fleet sizes, and uneven demand.

Urban Air Mobility↗

EXODUS: Integrating intelligent systems for launch operations support

Kennedy Space Center (KSC) is developing knowledge-based systems to automate critical operations functions for the space shuttle fleet. Intelligent systems will monitor vehicle and ground support subsystems for anomalies, assist in isolating and managing faults, and plan and schedule shuttle operations activities. These applications are being developed independently of one another, using different representation schemes, reasoning and control models, and hardware platforms. KSC has recently initiated the EXODUS project to integrate these stand alone applications into a unified, coordinated intelligent operations support system. EXODUS will be constructed using SOCIAL, a tool for developing distributed intelligent systems. EXODUS, SOCIAL, and initial prototyping efforts using SOCIAL to integrate and coordinate selected EXODUS applications are described.

Adler, Richard M.↗

Evaluation of Initial and Mid-Term Air Traffic Procedures for Urban Air Mobility Operations

Urban air mobility (UAM) operations are expected to expand in scale over the next several years as novel aircraft types, including electric vertical takeoff and landing aircraft, are certified and begin operations. These new aircraft may increase safety, decrease noise, and lower operating costs compared with helicopters, allowing them to operate in ways existing aircraft do not. It is vital that these expanded operations are compatible with and do not disrupt existing operations or the air traffic management system. To study the ways in which scaled UAM operations can best integrate in the national airspace system, NASA and Joby Aviation partnered to conduct a high-fidelity air traffic controller-in-the-loop study. Building on air traffic procedures used to manage high tempo operations in other parts of the airspace, new procedures, routes, and communications protocols were developed and tested by retired controllers in NASA’s Future Flight Central tower simulation facility. In addition, new cooperative airspace constructs in the form of corridors were developed to understand their potential contributions to even greater scales of operation. The controllers managed traffic scenarios in the Dallas-Fort Worth and Dallas Love Field airports consisting of fleets of up to 100 UAM aircraft operating alongside traditional traffic . Metrics for air traffic controller workload, duration of communications, departure delays, and other measures of allowable aircraft throughput were collected. The analysis indicates that using today’s procedures for initial UAM operations under nominal conditions could enable up to 40 operations per hour to an airport’s central terminal area if that involved crossing a runway and up to 55operations per hour if reaching the central terminal did not involve crossing a runway. Operations at these tempos did not delay or otherwise interfere with simulated runway traffic and were rated acceptable by the air traffic controllers. The new corridor constructs dramatically lowered controller workload in certain circumstances, suggesting they may be effective in further increasing the allowable scale of operations.

Urban Air Mobility↗

Evaluation of Initial and Mid-Term Air Traffic Procedures for Urban Air Mobility

Urban air mobility (UAM) operations are expected to expand in scale over the next several years as novel aircraft types, including electric vertical takeoff and landing aircraft, are certified and begin operations. These new aircraft may increase safety, decrease noise, and lower operating costs compared with helicopters, allowing them to operate in ways existing aircraft do not. It is vital that these expanded operations are compatible with and do not disrupt existing operations or the air traffic management system. To study the ways in which scaled UAM operations can best integrate in the national airspace system, NASA and Joby Aviation partnered to conduct a high-fidelity air traffic controller-in-the-loop study. Building on air traffic procedures used to manage high tempo operations in other parts of the airspace, new procedures, routes, and communications protocols were developed and tested by retired controllers in NASA’s Future Flight Central tower simulation facility. In addition, new cooperative airspace constructs in the form of corridors were developed to understand their potential contributions to even greater scales of operation. The controllers managed traffic scenarios in the Dallas-Fort Worth and Dallas Love Field airports consisting of fleets of up to 100 UAM aircraft operating alongside traditional traffic. Metrics for air traffic controller workload, duration of communications, departure delays, and other measures of allowable aircraft throughput were collected. The analysis indicates that using today’s procedures for initial UAM operations under nominal conditions could enable up to 40 operations per hour to an airport’s central terminal area if that involved crossing a runway and up to 55 operations per hour if reaching the central terminal did not involve crossing a runway. Operations at these tempos did not delay or otherwise interfere with simulated runway traffic and were rated acceptable by the air traffic controllers. The new corridor constructs dramatically lowered controller workload in certain circumstances, suggesting they may be effective in further increasing the allowable scale of operations.

Advanced Air Mobility↗

Comprehensive Well to Wheel Analysis for Plug-in-Hybrid Electric Vehicles in the U.S.

The U.S. electric power infrastructure is a strategic national asset that is underutilized most of the time. With the proper changes in the operational paradigm, it could generate and deliver the necessary energy to fuel the majority of the U.S. light-duty vehicle (LDV) fleet. In doing so, it would reduce greenhouse gas emissions, improve the economics of the electricity industry, and reduce the U.S. dependency on foreign oil. This paper estimates the regional percentages of the energy requirements for the U.S. LDV stock that could potentially be supported by the existing infrastructure, based on the 12 modified North American Electric Reliability Council regions, as of 2002. For the United States as a whole, about 70% of LDV fleet in the U.S. could be supported by the existing infrastructure with some degree of load management. This has an estimated gasoline displacement potential of 6.5 million barrels of oil equivalent per day, or approximately 52% of the nation's oil imports. The paper also discusses the impact on overall emissions of criteria gases and greenhouse gases as a result of shifting emissions from millions of individual vehicles to a few hundred power plants. Overall, PHEVs could reduce greenhouse gas emissions with regional variations dependent on the local generation mix. Total NOX emissions may or may not increase, dependent on the use of coal generation in the region. Any additional SO2 emissions associated with the expected increase in generation from coal power plants would need to be cleaned up to meet the existing SO2 emissions constraints. Particulate emissions would increase in 8 of the 12 regions. The emissions in urban areas are found to improve across all pollutants and regions as the emission sources shift from millions of tailpipes to a smaller number of large power plants in less-populated areas. This paper concludes with a discussion about possible grid impacts as a result of the PHEV load as well as the likely impacts on the plant and technology mix of future generation-capacity expansions.

01 COAL, LIGNITE, AND PEAT↗

Plug-in Electric Vehicle Charging Response Characterization for Grid Integration: Implications for Smart Charge Management

The rapid expansion of plug-in electric vehicles (PEVs) has created a unique challenge for electrical grids due to their significant power demand. At the same time, PEVs also create a unique opportunity to ease their own burden on the power grid, as they create a growing fleet of distributed energy resources capable of providing grid services such as demand response, frequency regulation, and renewable balancing. For aggregators and grid operators to effectively integrate PEVs into grid management, it is essential to first understand and characterize how they would respond in such situations. This study examines 25 models of PEVs across 25 makes, spanning model years from 2013 to 2025, to characterize their responses to the basic controls used in vehicle-grid integration (VGI): stopping, starting, and modulating the charge rate. Each vehicle was tested in a controlled laboratory setting to evaluate its performance in response to varying the maximum allowable current via the SAE J1772 control pilot signal, as well as its response to wake-up commands outlined in SAE J1772. Results show measurable differences across vehicle makes in the accuracy, latency, and precision with which PEVs respond to changes in ampacity, as well as varying sleep and wake-up behavior. The test results show that all vehicles respond to changes in ampacity, though with varying accuracy, precision, latency, and resolution. Wake-up behavior also differs across makes and models. These findings indicate that effective grid integration strategies must account for these differences. The results provide a foundation for understanding current vehicle behavior and advancing smart-charging methods while also highlighting the need for further testing, broader standardization, and manufacturer collaboration to ensure the successful integration of PEVs into the electrical grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

New developments and prospects on COSI, the simulation software for fuel cycle analysis

COSI, software developed by the Nuclear Energy Direction of the CEA, is a code simulating a pool of nuclear power plants with its associated fuel cycle facilities. This code has been designed to study various short, medium and long term options for the introduction of various types of nuclear reactors and for the use of associated nuclear materials. In the frame of the French Act for waste management, scenario studies are carried out with COSI, to compare different options of evolution of the French reactor fleet and options of partitioning and transmutation of plutonium and minor actinides. Those studies aim in particular at evaluating the sustainability of Sodium cooled Fast Reactors (SFR) deployment and the possibility to transmute minor actinides. The COSI6 version is a completely renewed software released in 2006. COSI6 is now coupled with the last version of CESAR (CESAR5.3 based on JEFF3.1.1 nuclear data) allowing the calculations on irradiated fuel with 200 fission products and 100 heavy nuclides. A new release is planned in 2013, including in particular the coupling with a recommended database of reactors. An exercise of validation of COSI6, carried out on the French PWR historic nuclear fleet, has been performed. During this exercise quantities like cumulative natural uranium consumption, or cumulative depleted uranium, or UOX/MOX spent fuel storage, or stocks of reprocessed uranium, or plutonium content in fresh MOX fuel, or the annual production of high level waste, have been computed by COSI6 and compared to industrial data. The results have allowed us to validate the essential phases of the fuel cycle computation, and reinforces the credibility of the results provided by the code.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Inventory of Radioactive Waste in Canada - 19336

Since 1999, the Government of Canada has been conducting a regular exercise of gathering and compiling Canada's radioactive waste inventory and projection data from waste owners and making it available to the public in the form of a triennial Inventory Summary Report. The goal of this data collection exercise has been to support federal policy development, support the Canadian Nuclear Safety Commission's regulatory activities, provide consolidated radioactive waste information for the nuclear industry, promote transparency, and meet Canada's international commitments and growing demands internationally for radioactive waste data. The detailed national inventory report provides an overview of the production, accumulation and future projections of radioactive waste in Canada. Since the coming into force of the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management in June 2001, the data collection and reporting cycle has been aligned to provide the waste inventory data required for Canada's triennial National Report for the Joint Convention. This paper presents Canada's radioactive waste inventory and projection data as of the end of December 2016, and summarizes key findings from the analysis of the data. For this reporting cycle, the waste data collected was expanded to include more detailed information on the decommissioning schedules and associated waste volume projections for nuclear power plants, and research and prototype reactors, as well as plans for transitioning waste inventories from storage to long-term management and disposal facilities, based on current schedules for establishing these facilities in Canada. With this additional information, the Government of Canada and Canadian stakeholders are better able to understand the waste disposal capacity and schedules required to accommodate all nuclear fuel waste and radioactive waste that will be produced by Canada's existing fleet of nuclear power plants and research reactors. The collection and analysis of projected waste volumes to be emplaced in long-term management facilities is in line with and will support the proposed methodology of presenting waste inventories in terms of management strategy and disposal routes by the Organization for Economic Cooperation and Development Nuclear Energy Agency Expert Group on Waste Inventorying and Reporting Methodology. The paper describes some of the uses that are made of the waste inventory information, as well as Canada's approach to national inventory data collection and its experience and lessons learned. Canada continues to modernize the format of the Inventory Summary Report with the goal of disseminating the technical information into an attractive and public-friendly report. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

EVs@Scale Next-Gen Profiles - Fleet Utilization 2024

As part of the U.S. Department of Energy’s EVs@Scale initiative, the Next-Gen Profiles (NGP) project provides a comprehensive, data-driven analysis of electric vehicle (EV) and electric vehicle supply equipment (EVSE) operations across real-world fleet deployments. This paper presents findings from the NGP’s Fleet Utilization study, which investigates operational behavior and asset usage across seventeen EV fleets and two EVSE fleets, encompassing a wide range of vehicle types and use cases. Data collected from diverse sources—varying in format and temporal resolution—are first reformatted into a unified structure. From this harmonized dataset, a suite of rigorously defined performance metrics is calculated at an hourly cadence, enabling consistent cross-comparison of charging, routing, and other key operational behaviors. Amid rapidly increasing EV adoption and growing demands for energy-efficient fleet operations, the analysis reveals clear utilization trends—including diurnal and weekly activity cycles, differences in short versus long charging session dependencies, and route-specific energy usage patterns. These findings highlight the need for tailored infrastructure strategies and the deployment of advanced energy management systems, such as Distributed Energy Resource Management Systems (DERMS) and Site Energy Management Systems (SEMS), which can optimize charging schedules and mitigate peak loads. By leveraging anonymized, harmonized datasets and standardized metrics, this study offers critical insights into fleet behavior and performance, providing a foundation to improve operational efficiency, reduce costs, and enable the scalable deployment of electrified transportation.

Wells, Landon↗

Research, Development and Demonstration of Advanced Vehicle Technologies in Clean Motor Fuels (CRADA Final Report)

NREL/DOE has been funding research, development, and demonstration (RD&D) projects to facilitate the deployment of alternative fuels into the marketplace in order to achieve three objectives: 1) enhance the reduction of mobile source emissions in California and the U.S.; 2) increase U.S. competitiveness and economic prosperity; and 3) preserve the environment through the reduction of emissions and toxins from the motor vehicle population. The Lewis-Presley Air Quality Management Act requires the South Coast Air Quality Management District to establish a program to encourage participation in projects to increase the utilization of clean-burning fuels. The parties seek to collaborate on a joint RD&D project to perform a field test on a small vehicle fleet operating on Fischer-Tropsch synthetic diesel fuel. Recently the 106th U.S. Congress designated "gas-to-liquid" (GTL) transportation fuels that are produced from domestic products as alternative fuels under the Energy Policy Act of 1992 (EPACT). Niche markets could develop quickly for these fuel products, perhaps especially for the use of Fischer-Tropsch synthetic fuels in centrally fueled vehicle fleets in California. NREL and its project partners from the U.S. Department of Energy and West Virginia University have recently conducted what we believe to be the first-ever controlled tests of Fischer-Tropsch synthetic fuels in heavy vehicles. These tests have shown that Fischer-Tropsch fuels can be substituted in unmodified trucks and buses without any detectable loss in drivability and performance. Compared to a California diesel fuel baseline, neat Shell Fischer-Tropsch fuel emitted about 12% lower NOx and 24% lower particulate matter over a five-mile driving route while maintaining the same fuel economy on an energy equivalent basis. Whereas these exhaust emissions reductions from these previous studies have been impressive, far greater exhaust emissions reductions can be achieved if the vehicles are retrofitted with emissions control technologies that are enabled by Fischer-Tropsch fuels. For this program, a test fleet would be selected and retrofitted with continuously regenerating traps (CRT’s) or diesel particulate filters (DPF's). The University of West Virginia, under a separate subcontract to SCAQMD will have the responsibility to test and measure the emissions from the test fleet of vehicles.

33 ADVANCED PROPULSION SYSTEMS↗

Charging-management And Infrastructure-planning (cmip) Model

CMIP model explores various charging infrastructure network designs to serve a free-floating car-sharing fleet and determine the charging downtime experienced by the fleet for each design. Development of the CMIP model had two major steps: (1) describing modeling assumptions and (2) developing an integer program (IP) that jointly optimizes decisions about locations to install DC fast chargers and EV-to-charger assignments. The CMIP model integrates an EV charging model, EV energy consumption model, and heterogeneous, real-world vehicle use data with an integer programming optimization model to identify optimal location of new charging stations and calculate vehicle downtime for charging. The CMIP model can be applied to understand: (a) the reduction of EV fleet downtime if an additional fast-charging station is added to the current infrastructure and (b) to what extent total vehicle downtime would be sensitive to additional charging infrastructure.

Roni, MohammadS↗

Light Water Reactor Sustainability Research and Development Program Plan -- Fiscal Year 2009–2013

Nuclear power has reliably and economically contributed almost 20% of electrical generation in the United States over the past two decades. It remains the single largest contributor (more than 70%) of non-greenhouse-gas-emitting electric power generation in the United States. By the year 2030, domestic demand for electrical energy is expected to grow to levels of 16 to 36% higher than 2007 levels. At the same time, most currently operating nuclear power plants will begin reaching the end of their 60-year operating licenses. If current operating nuclear power plants do not operate beyond 60 years, the total fraction of generated electrical energy from nuclear power will begin to decline—even with the expected addition of new nuclear generating capacity. The oldest commercial plants in the United States reached their 40th anniversary this year. U.S. regulators have begun considering extended operations of nuclear power plants and the research needed to support long-term operations. The Light Water Reactor Sustainability (LWRS) Research and Development (R&D) Program, developed and sponsored by the Department of Energy, is performed in close collaboration with industry R&D programs. The purpose of the LWRS R&D Program is to provide technical foundations for licensing and managing long-term, safe and economical operation of the current operating nuclear power plants. The LWRS R&D Program vision is captured in the following statements: Existing operating nuclear power plants will continue to safely provide clean and economic electricity well beyond their first license- extension period, significantly contributing to reduction of United States and global carbon emissions, enhancement of national energy security, and protection of the environment. There is a comprehensive technical basis for licensing and managing the long-term, safe, economical operation of nuclear power plants. Sustaining the existing operating U.S. fleet also will improve its international engagement and leadership on nuclear safety and security issues.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

STS-114: Discovery Return to Flight: Langley Engineers Analysis Briefing

This video features a briefing on NASA Langley Research Center (LaRC) contributions to the Space Shuttle fleet's Return to Flight (RTF). The briefing is split into two sections, which LaRC Shuttle Project Manager Robert Barnes and Deputy Manager Harry Belvin deliver in the form of a viewgraph presentation. Barnes speaks about LaRC contributions to the STS-114 mission of Space Shuttle Discovery, and Belvin speaks about LaRC contributions to subsequent Shuttle missions. In both sections of the briefing, LaRC contributions are in the following areas: External Tank (ET), Orbiter, Systems Integration, and Corrosion/Aging. The managers discuss nondestructive and destructive tests performed on ET foam, wing leading edge reinforced carbon-carbon (RCC) composites, on-orbit tile repair, aerothermodynamic simulation of reentry effects, Mission Management Team (MMT) support, and landing gear tests. The managers briefly answer questions from reporters, and the video concludes with several short video segments about LaRC contributions to the RTF effort.

Source record↗

Systems Engineering Challenges for GSFC Space Science Mission Operations

The NASA Goddard Space Flight Center Space Science Mission Operations (SSMO) project currently manages19 missions for the NASA Science Mission Directorate, within the Planetary, Astrophysics, and Heliophysics Divisions. The mission lifespans range from just a few months to more than20 years. The WIND spacecraft, the oldest SSMO mission, was launched in 1994. SSMO spacecraft reside in low earth, geosynchronous,highly elliptical, libration point, lunar, heliocentric,and Martian orbits. SSMO spacecraft range in size from 125kg (Aeronomy of Ice in the Mesosphere (AIM)) to over 4000kg (Fermi Gamma-Ray Space Telescope (Fermi)). The attitude modes include both spin and three-axis stabilized, with varying requirements on pointing accuracy. The spacecraft are operated from control centers at Goddard and off-site control centers;the Lunar Reconnaissance Orbiter (LRO), the Solar Dynamics Observatory (SDO) and Magnetospheric MultiScale (MMS)mission were built at Goddard. The Advanced Composition Explorer (ACE) and Wind are operated out of a multi-mission operations center, which will also host several SSMO-managed cubesats in 2017. This paper focuses on the systems engineeringchallenges for such a large and varied fleet of spacecraft.

Spacecraft↗

Risk-Informed Safety Margin Characterization Case Study: Selection of Electrical Equipment to Be Subjected to Environmental Qualification

The Risk-Informed Safety Margin Characterization (RISMC) pathway of the DOE’s Light Water Reactor Sustainability (LWRS) program focuses on advancing the state of the art in safety analysis and risk assessment to support decision-making on nuclear power plant operation well beyond the originally designed lifetime of the plants (i.e., beyond 60 years). Among the issues being addressed in RISMC is the significance of SSC aging and how confident we are about our understanding of its impact on the margin between the loads SSCs are expected to see during normal operation and accident conditions, and the SSC capacities (their ability to resist those loads) as the SSCs age. In this paper, a summary is provided of a case study that examines SSC aging from an environmental qualification (EQ) perspective. The case study illustrates how the state of knowledge regarding SSC margin can be characterized given the overall integrated plant design, and was developed to demonstrate a method for deciding on which cables to focus, which cables are not so important from an environmental qualification margin standpoint, and what plant design features or operating characteristics determine the role that environmental qualification plays in establishing a safety case on which decisions regarding margin can be made. The selection of cables for which demonstration of margin with respect to aging and environmental challenges uses a technique known as Prevention Analysis. Prevention Analysis is a Boolean method for optimal selection of SSCs (that is, those combinations of SSCs both necessary and sufficient to meet a predetermined selection criterion) in a manner that allows demonstration that plant-level safety can be demonstrated by the collection of selected SSCs alone. Choosing the set of SSCs that is necessary and sufficient to satisfy the safety objectives, and demonstrating that the safety objectives can be met effectively, determines where resources are best allocated to assure SSC performance margin. The paper describes the resulting component types that were selected by Prevention Analysis and identifies the accident sequence characteristics that cause these component types to be important from an EQ and aging perspective (and, hence, worthwhile evaluating the extent of safety margin). In addition, component types not selected as needing significant margin from an EQ and aging perspective are discussed and an engineering rationale is developed justifying the lack of need to apply resources to demonstrating margin for these component types. This rationale is in terms of design features of the plant and operating characteristics that make these component types less important from an EQ and aging perspective. While the case study focuses on EQ and aging of equipment and cables located inside the containment of this PWR, the prevention analysis method is demonstrated to be an effective technique for identification of minimal collections of components that would be effective in managing safety for a variety of issues associated with aging and long-term operation of the fleet of plants.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Regulation of the Shutdown Defueling and Decommissioning Reactors in the United Kingdom - 16576

Nuclear policy, including for decommissioning, in the United Kingdom is set by the UK Government. The Nuclear Decommissioning Authority, NDA, is responsible for managing the clean-up of the UK's nuclear legacy which includes the first generation of Magnox power stations. Magnox Ltd (MXL), owned by Cavendish Fluor Partnership, is the licensee and the management and operations contractor responsible for ten Magnox reactor sites and two restoration sites in the UK, working for the sites' owner, NDA. The work of the company is diverse covering electricity generation at Wylfa (until December 2015), defueling, and preparation for an interim end state, known as Care and Maintenance (C and M) which will precede the final site clearance. The C and M phase is expected to last over 75 years during which the sites are maintained in a passively safe and secure state while radiation levels are left to decay naturally. Preparations for this phase include removing fuel from the reactors and storage ponds; retrieving intermediate level waste from current stores and treating it or converting it to forms suitable for long-term storage or disposal and making sure of the integrity of critical safety systems of the de-fuelled reactors. The Decommissioning, Fuel and Waste programme within the Office for Nuclear Regulation, ONR, regulates nuclear safety in the 12 Magnox nuclear licensed sites. ONR works with the environmental regulators who are responsible for environmental protection on nuclear sites. The focus of this paper is the regulation of nuclear safety by ONR across the Magnox sites and the interactions with nuclear security and the environmental aspects required to achieve effective, proportionate and efficient regulation of these sites in the UK. ONR's strategy for regulating the Magnox defueling and decommissioning sites is focused on enabling the licensee to complete the initial stages of decommissioning and reduce the nuclear and radioactive hazards on its sites. To this effect, ONR's revised inspection guidance is centred on inspecting the (remaining) important systems for safety identified in the safety cases. Other interventions focus on engaging with the licensee on safety significant decommissioning projects to gain evidence of the licensee's readiness prior to and during these activities rather than formal assessment of the associated safety cases. In light of reduced hazards and risks across the de-fueled and decommissioning Magnox reactors, ONR's revised regulatory expectation regarding evolution of emergency arrangements during decommissioning is based on key transition points that follow electricity generation. Implementation of these revised strategies as well as organisational restructuring within the team responsible for regulation of the Magnox fleet has resulted in improved efficiency and consistency in regulatory approach whilst securing the required safety standards in managing decommissioning activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗