Policy, Regulatory, Legal, and Permitting Case Study Subtask 3.2 – Topical Report

This report summarizes the policy, regulatory, legal, and permitting requirements to-date for the siting of a CO 2 injection and storage project in the CarbonSAFE Illinois East Sub-Basin pre-feasibility study area. Where applicable, the East Sub-Basin case study focuses on a proposed carbon capture and storage (CCS) site location in West Terre Haute, Indiana. Indiana has established the legal mechanisms to obtain rights to the subsurface mineral estate with the expectation to apply to reservoir pore space for CO 2 storage in an analogous manner to storage of natural gas, which is a common practice in Indiana. There is, however, no precedent in Indiana to take liability for stored CO 2 . There are currently no Indiana State incentives for CCS, but at the Federal level, tax credits for carbon capture and storage under 26. U.S. Code § 45Q constitute the greatest incentive targeted at CCS projects. The amendment to these credits put forth in the Bipartisan Budget Act (the FUTURE Act) of 2018 substantially increases the per-ton incentive for CCS—from $22.66 per ton in tax year 2017 up to $50 per ton in tax year 2027, for CO 2 not used as an injectant (i.e. saline storage). Additional economic opportunities may exist for the provision of CO 2 for potential EOR in the Illinois Basin. Policies that may support the development of CO 2 pipelines and/or CCS projects in Indiana include: 1) Title 41 of the FAST Act (2015), which created a new governance structure, procedures, and funding authorities in order to improve and expedite Federal review and authorization of covered infrastructure projects, including pipelines, and 2) the Eminent Domain for Transportation of Carbon Dioxide by Pipeline (IC 14-39, Indiana State, 2011), which declares pipeline transportation of CO 2 exclusively to a carbon management application, including sequestration, enhanced oil recovery, and deep saline injection as a benefit to the welfare of Indiana and the people. The US Environmental Protection Agency’s (EPA) Underground Injection Control (UIC) Program Class VI rule and permit requirements address all components pertaining to CO 2 injection and monitoring for long-term storage, and outline the minimum technical criteria to protect underground sources of drinking water at, and surrounding, injection well sites. The Class VI requirements also address financial responsibility for corrective action, post-injection site care, and site closure. In addition, UIC Program public notice requirements include that the EPA issue notice of the draft permit preparation to key stakeholders, and open a public comment period of not less than 30 days. A public hearing about the permit would also be held, if specifically requested by the public. A potential Class VI CO 2 injection well permit for the East Sub-Basin case study site would be obtained through the US EPA Region 5, because the State of Indiana does not have UIC Class VI primacy. Although no CO 2 injection wells have been permitted in Indiana, the US EPA Region 5 (which covers Illinois and Indiana) and the East Sub-Basin CarbonSAFE team (via the Midwest Geological Sequestration Consortium [MGSC]) have Class VI permitting experience from several projects located in Illinois. Based on our experience, applying for a Class VI permit can be an intensive and iterative process requiring clear communication and numerous interactions with EPA staff. In addition to gathering and preparing the data/models and documentation necessary for a permit application’s initial submittal, the subsequent public comments, EPA response and review, and answering of any follow-up questions/requests by the EPA could significantly increase the timeframe of draft permit issuance. The US EPA offers guidance documents regarding the specific Class VI permit requirements, and shows a general permitting timeline example from the FutureGen Alliance 2.0 covering one-and-a-half years from permit submittal to issuance. However, the overall permitting process to-date has a high degree of variability, and in MGSC’s project experience we observed a more extended timeline to receive Class VI permits for each of two CO 2 injection wells.

01 COAL, LIGNITE, AND PEAT↗

Compressible Arch Segments for the Cigeo Access Ramps, Drifts and Vaults - A Field Test - 17011

Andra is currently implementing the detailed engineering phase of the step-wise design development of Cigeo (the French HLW and IL-LLW Deep Geological Repository). Various technical issues are at stake, including the requirements linked to 'Reversibility / Retrievability', at different stages of the repository life cycle (from its construction start-up to its final closure and monitoring). These reversibility requirements have a significant impact on the way Cigeo is designed, will be progressively developed, operated, later closed and monitored. On a shorter term, one must demonstrate that the waste container retrieval operations are technically safe and feasible. In that sense, the structural dimensioning of the ramps and mains, as well as that of the IL-LLW disposal vaults, is critical, since the concrete liner supporting the rock walls must last over a period of some 100 to 150 years (lapse of time during which retrieval operations are likely to take place). The present paper starts with a description of the geomechanical conditions prevailing in the Callovo-Oxfordian (COX) clay-stone formation (aka the argillite). The structural dimensioning of the IL-LLW disposal vault liner, as calculated at the end of the basic engineering phase is indicated. The thickness values obtained so far have led to considering an alternative design in which a compressible material is positioned between the concrete liner intrados and the rock walls: in such situation, the 'creeping effect' of the rock is mitigated, for a time, by the compressible material (nearly a perfect elastoplastic material), hence reducing the stress level exerted inside the concrete liner. This situation enables to significantly reduce the liner thickness and provides potentially significant saving in the construction of the works concerned (preliminary sensitivity results are given). The following part of the paper is then focused on a practical case story: a technological demonstration (still ongoing) of a tunnel boring experiment, implemented underground (in a dedicated drift of the Meuse Haute Marne URL infrastructures, at scale 1:2 of the Cigeo drifts/vaults). In this excavation and construction experiment, the tunnel boring machine (TBM) lays (via an erector) 'classical' concrete arch segments (forming a ring) in a first portion of the drift and 'compressible' ones (the compressible material is positioned on their extrados) in a second portion of the drift. The technical demonstration objective is two-fold: the capacity to lay compressible arch segments with a TBM is checked, their structural behavior (with time) is compared with that of 'classical' ones. The way the compressible material is produced and then fixed on the arch concrete segment is also documented, c/w a description of the complementary testing campaign to be carried out on a test bench (on surface) of a concrete ring (at a scale 1:2 of Cigeo) formed of compressible arch segments. This paper concludes with a timeline of the experiment. Should the results obtained provide some perspectives of technical and economic improvement (i.e. saving vis-a-vis the 'classical' solution) a decision could be taken by Andra to incorporate this alternative solution in the 'design freeze' of Cigeo underground infrastructures. The positive outcomes of this technical test campaign would also pave the way for specifying the Cigeo TBM characteristics (dimensions and handling equipment), scheduled for manufacturing order around 2020. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Practical Approach of Mining Operational Risks in Cigeo - A field-test - 19349

Andra is currently completing the detailed engineering phase of the stepwise design development of Cigeo (the French HLW and IL-LLW Deep Geological Repository, aka DGR). Various technical issues are at stake, including the risk management requirements linked to the safety of 'Mining Operations' (i.e. occupational safety issues related to underground excavation/dismantling works at some 500 m of depth), at different stages of the DGR life cycle (i.e. from its construction start-up to its final closure and future monitoring/or conversely a decision of waste retrieval). These occupational safety requirements have a significant impact on Cigeo's design, its progressive construction and later closure. On a shorter term, one must demonstrate that the design bases are technically sound and that the solutions selected (to build, operate, close the DGR infrastructures or conversely retrieve the waste) are both feasible and safe. In that sense (and following an identification of operational risks during construction), Andra focused on two sensitive cases: - The construction of large diameter drift crossings, in particular those related to the connection between a transfer drift (main) and a IL-LLW disposal vault (i.e. during construction operations), - The partial dismantling of a drift concrete lining (made of concrete segment rings, erected and placed by a TBM) at time of construction of a horizontal seal (i.e. during closure operations). The discussion starts with a description of the geotechnical conditions prevailing at the (French) Bure site, in the Callovo-Oxfordian (COx) claystone formation. Then the paper presents the Cigeo underground architecture (at large) and the specific structural choices made (at the end of the detailed engineering phase) for drifts, disposal vaults and seals. The discussion on construction - deconstruction challenges for each of the critical issues cited above provides an opportunity to explain the operational sequences (and how the methodology selected enables to reduce the risks). The following part of the paper focuses the technological demonstration (an in-situ test to be planned in detail) of a partial dismantling of the concrete segments rings forming the support lining of two tunnels previously built in the Meuse/Haute-Marne URL (Underground Research Laboratory) infrastructures, combined with the construction of a specific drift crossing. In this dismantling and construction test, the technical demonstration objective is three-fold: - The capacity to lay down compressible arch segments and support (by bolts and mesh) the rock after the lining removal, - The capacity to excavate and line the drift crossing, - The structural / geomechanical behavior (evolution with time) of the rock and lining compared with that of 'neighboring' zones. This paper provides a timeline of the tests. Should the results obtained deliver some positive perspectives of technical feasibility (and convincing operational safety) Andra will incorporate this dismantling/construction solution in the 'design freeze' of the DGR underground infrastructures. The positive outcomes of this technical test campaign will also provide 'elements of proof' for the instruction of the Cigeo licensing (a process likely to take place between 2020 and 2024) by the French Nuclear Safety Authority (ASN). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Performance Analysis of PIConGPU: Particle-in-Cell on GPUs using NVIDIA’s NSight Systems and NSight Compute

PIConGPU, Particle In Cell on GPUs, is an open source simulations framework for plasma and laser-plasma physics used to develop advanced particle accelerators for radiation therapy of cancer, high energy physics and photon science. While PIConGPU has been optimized for at least 5 years to run well on NVIDIA GPU-based clusters, there has been limited exploration by the development team of potential scalability bottlenecks using recently updated and new tools including NVIDIA’s NVProf tool and the brand-new NVIDIA NSight Suite (Systems and Compute) tools. PIConGPU is a highly optimized application that runs production jobs at scale on a system Oak Ridge Leadership Facility’s (OLCF) Summit supercomputer (using the full machine at 4600 nodes; at 98% of GPU utilization on all ~28000 NVIDIA Volta GPUs). PIConGPU has been selected as one of the the eight applications for OLCF’s coveted Center for Accelerated Application Readiness (CAAR) program aimed at the facility’s Frontier supercomputer (OLCF’s first exascale system to launch in 2021), to partner with our vendors (primary vendors: AMD and Cray/HPE) ensuring that Frontier will be able to perform large-scale science when it opens to users in 2022. To this effect, performance engineers on the PIConGPU team wanted to dive deep into the application to understand at the finest granularity, which portions of the code could be further optimized to exploit the hardware on Summit at it’s maximum potential and also to elucidate which key kernels should be tracked and optimized for the CAAR effort to port this code to Frontier. Any bottlenecks that are observed via performance profiling on Summit are likely to also impact scalability on the Frontier-dev system and the Frontier Early Access (EA) system. Additionally, the engineers wanted to take a closer look at the newest NVIDIA profiling tools which allows us to identify the most useful features on these tools and will provide an opportunity to compare it to new AMD and Cray’s performance analysis tool releases and provide feedback to our vendor partners on what features are most important and mission critical for CAAR efforts. The primary goal of this report is to focus on the evaluation of PIConGPU’s most time-intensive kernels using NVProf and NSight Suite. Three kernels, Current Deposition (also known as Compute Current), Particle Push (Move and Mark), and Shift Particles are known to be some of the most time-consuming kernels in PIConGPU. The Current xi Deposition kernel and Particle Push kernel both set up the particle attributes for running any physics simulation with PIConGPU, so it is crucial to improve the performance of these two kernels. In this report, we measure single GPU metrics for the three kernels, offer high level takeaways from the conducted analysis, and compare the profiling data from NSight Compute to that of NVProf. This analysis was performed using a grid size of 240 x 272 x 224, and 10 time steps with the Mid-November Figure of Merit (FOM) run setup. The Traveling Wave Electron Acceleration (TWEAC) science case used in this run is a representative science case for PIConGPU. This execution can also be used for baseline analysis on AMD MI50/ MI60 systems. As of the time of writing, the PIConGPU application has limited use for features of NSight Systems, so this report will mainly focus on insights garnered from NSight Compute. For this analysis, we run the “full” metric set available in NSight Compute version 2020.1.2 and use NSight Systems version 2020.3.1 to generate the application timeline.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗