At least 397 records · Page 22

Atmospheric Radiation Measurement Program Climate Research Facility Operations Quarterly Report. October 1 - December 31, 2010.

Individual raw datastreams from instrumentation at the Atmospheric Radiation Measurement (ARM) Climate Research Facility fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near-real time. Raw and processed data are then sent approximately daily to the ARM Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of processed data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual datastream, site, and month for the current year and (2) site and fiscal year (FY) dating back to 1998. The U.S. Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1 - (ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the first quarter of FY2010 for the Southern Great Plains (SGP) site is 2097.60 hours (0.95 x 2208 hours this quarter). The OPSMAX for the North Slope Alaska (NSA) locale is 1987.20 hours (0.90 x 2208) and for the Tropical Western Pacific (TWP) locale is 1876.80 hours (0.85 x 2208). The first ARM Mobile Facility (AMF1) deployment in Graciosa Island, the Azores, Portugal, continued through this quarter, so the OPSMAX time this quarter is 2097.60 hours (0.95 x 2208). The second ARM Mobile Facility (AMF2) began deployment this quarter to Steamboat Springs, Colorado. The experiment officially began November 15, but most of the instruments were up and running by November 1. Therefore, the OPSMAX time for the AMF2 was 1390.80 hours (.95 x 1464 hours) for November and December (61 days). The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or datastream. Data availability reported here refers to the average of the individual, continuous datastreams that have been received by the Archive. Data not at the Archive are caused by downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly related to individual instrument uptime. Thus, the average percentage of data in the Archive represents the average percentage of the time (24 hours per day, 92 days for this quarter) the instruments were operating this quarter. Summary. Table 1 shows the accumulated maximum operation time (planned uptime), actual hours of operation, and variance (unplanned downtime) for the period October 1-December 31, 2010, for the fixed sites. Because the AMFs operate episodically, the AMF statistics are reported separately and not included in the aggregate average with the fixed sites. This first quarter comprises a total of 2,208 possible hours for the fixed sites and the AMF1 and 1,464 possible hours for the AMF2. The average of the fixed sites exceeded our goal this quarter. The AMF1 has essentially completed its mission and is shutting down to pack up for its next deployment to India. Although all the raw data from the operational instruments are in the Archive for the AMF2, only the processed data are tabulated. Approximately half of the AMF2 instruments have data that was fully processed, resulting in the 46% of all possible data made available to users through the Archive for this first quarter. Typically, raw data is not made available to users unless specifically requested.

54 ENVIRONMENTAL SCIENCES↗

Development of a low-power, low-cost front end electronics module for large scale distributed neutrino detectors

A number of concepts have been presented for distributed neutrino detectors formed of large numbers of autonomous detectors. Examples include the Antarctic Ross Ice Shelf Antenna Neutrino Array (ARIANNA) [Barwick 2006], as well as proposed radio extensions to the IceCube detector at South Pole Station such as AURA and IceRay. [Besson 2008]. We have focused on key enabling technical developments required by this class of experiments. The radio Cherenkov signal, generated by the Askaryan mechanism [Askaryan 1962, 1965], is impulsive and coherent up to above 1 GHz. In the frequency domain, the impulsive character of the emission results in simultaneous increase of the power detected in multiple frequency bands. This multiband triggering approach has proven fruitful, especially as anthropogenic interference often results from narrowband communications signals. A typical distributed experiment of this type consists of a station responsible for the readout of a cluster of antennas either near the surface of the ice or deployed in boreholes. Each antenna is instrumented with a broadband low-noise amplifier, followed by an array of filters to facilitate multi-band coincidence trigger schemes at the antenna level. The power in each band is detected at the output of each band filter, using either square-law diode detectors or log-power detectors developed for the cellular telephone market. The use of multiple antennas per station allows a local coincidence among antennas to be used as the next stage of the trigger. Station triggers can then be combined into an array trigger by comparing timestamps of triggers among stations and identifying space-time clusters of station triggers. Data from each station is buffered and can be requested from the individual stations when a multi-station coincidence occurs. This approach has been successfully used in distributed experiments such as the Pierre Auger Observatory. [Abraham et al. 2004] We identified the filters as being especially critical. The frequency range of interest, {approx}200 MHz to {approx}1.2 GHz, is a transitional region where the lumped circuit element approach taken at low frequencies begins to reach limitations due to component tolerances, component losses, and parasitic effects. Active circuits can help to mitigate against these effects at the cost of added power consumption that becomes prohibitive for distributed experiments across the band of interest. At higher frequency microstrip, stripline, and other microwave techniques come to the fore. We have developed designs and design tools for passive filters extending the high frequency techniques to the frequency range of interest. Microstrip and stripline techniques are not usually attractive here because of the large physical dimensions of the resulting circuits, but in this application the tradeoff of size against power consumption favors this choice. These techniques are also intrinsically low-cost, as the filter is built into the circuit boards and the cost of components and their assembly onto the board is avoided. The basic element of the filter tree is an impedance matched wideband diplexer. This consists of a pair of low pass and high pass filters with a shared cutoff frequency and complementary frequency responses. These are designing the lowpass filter as a high order LC filter, which can be implemented as a series of transmission line segments of varying width. This can be transformed in to a CL high pass filter with a complementary frequency response. When the two filters are coupled to a common input, the input impedances of the networks add in parallel to give a constant input impedance as a function of frequency, with power flowing into one leg or the other of the filter pair. These filters can be cascaded to divide the band into the frequency ranges of interest; the broadband impedance matching at the inputs makes coupling of successive stages straightforward. These circuits can be produced in quantity at low cost using standard PCB fabrication techniques. We have determined that to achieve best performance the circuits should be built on a low loss-tangent RF substrate. We are working in cooperation with our colleagues in condensed matter who also have a need for this capability to purchase the equipment for in-house fabrication of prototype quantities of these circuits. We plan to continue the work on these filtersusing internal funds, and produce and characterize the performance of prototypes. We also participated in deployment of a prototype detector station near McMurdo Station, Antarctica in collaboration with colleagues at UCLA and UC-Irvine. The prototype station includes a single-board computer, GPS receiver, ADC board, and Iridium satellite modem powered by an omnidirectional solar array. We operated this station in the austral summer of 2006-2007, and used the Iridium SMS mode to transmit the status of the station until the end of the daylight season.

47 OTHER INSTRUMENTATION↗

Memory access system

A method and system for accessing a memory for a data processing system. The method comprises sending a read request for a plurality of locations in the memory to read the plurality of locations in parallel based on an upper bound for reading the memory. The upper bound for a number of locations is based on a group of constraints for the memory. The method receives a summed value of a plurality of memory values in the plurality of locations in the memory.

97 MATHEMATICS AND COMPUTING↗

Karlsruhe Database for Radioactive Wastes (KADABRA) - Accounting and Management System for Radioactive Waste Treatment - 12275

The data management system KADABRA was designed according to the purposes of the Cen-tral Decontamination Department (HDB) of the Wiederaufarbeitungsanlage Karlsruhe Rueckbau- und Entsorgungs-GmbH (WAK GmbH), which is specialized in the treatment and conditioning of radioactive waste. The layout considers the major treatment processes of the HDB as well as regulatory and legal requirements. KADABRA is designed as an SAG ADABAS application on IBM system Z mainframe. The main function of the system is the data management of all processes related to treatment, transfer and storage of radioactive material within HDB. KADABRA records the relevant data concerning radioactive residues, interim products and waste products as well as the production parameters relevant for final disposal. Analytical data from the laboratory and non destructive assay systems, that describe the chemical and radiological properties of residues, production batches, interim products as well as final waste products, can be linked to the respective dataset for documentation and declaration. The system enables the operator to trace the radioactive material through processing and storage. Information on the actual sta-tus of the material as well as radiological data and storage position can be gained immediately on request. A variety of programs accessed to the database allow the generation of individual reports on periodic or special request. KADABRA offers a high security standard and is constantly adapted to the recent requirements of the organization. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lower-Energy Requirements for Power-Assist HEV Energy Storage Systems--Analysis and Rationale (Presentation)

Presented at the 27th International Battery Seminar and Exhibit, 15-18 March 2010, Fort Lauderdale, Florida. NREL conducted simulations and analysis of vehicle test data with research partners in response to a USABC request; results suggest that power-assist hybrid electric vehicles (HEVs), like conventional HEVs, can achieve high fuel savings with lower energy requirements at potentially lower cost.

25 ENERGY STORAGE↗

Jester

Jester is a Rust CLI designed to package and send time series or tabular data to the data warehouse DeepLynx. It primarily reads .csv files and then sends those via HTTP or Websocket requests to an external instance of DeepLynx. It is meant to run on a host computer which has access to the data.

Darrington, John↗

EV Charging Infrastructure Energization: An Overview of Approaches for Simplifying Processes and Accelerating Timelines to Processing EV Charging Load Service Requests

The United States has seen significant growth in electric vehicle (EV) adoption, leading to increased demand for EV charging infrastructure and electricity. Growth in electricity demand from EV charging, coupled with growth in other sectors like data centers and electrification of other sectors, is impacting electricity infrastructure and load service request processes after two decades of relatively flat electricity demand. While most electric vehicle charging occurs at home, enroute and depot charging for medium and heavy-duty vehicles, both using high-powered EV charging, are critical to meet electric vehicle operational needs. Over the past decade, EV charging infrastructure site developers, site hosts, and electric distribution utilities have navigated the process to integrate chargers onto the electric grid. Site developers and site hosts have expressed distress that the integration process for high-powered EV charging projects does not meet the needs of the EV market for timeliness or cost. High-powered charging stations typically require a load service request or an agreement with the local utility to connect to the grid. The process of energizing a new high-powered charging site can be complex and time consuming, often taking up to 2 years. This timeline is the result of current utility energization processes having been designed for construction projects that take longer to build (i.e., buildings). The specific challenges stem from various factors, including compartmentalization in application processes, the integration of EV charging process approvals with other distributed energy resources (DERs), and the need to ensure grid reliability. The energization process needs to evolve to meet the growing demand for high-powered EV charging. This white paper compiles information gathered through various conversations with key stakeholders, including utilities, utility regulators, EV charging operators, site developers, and authorities having jurisdiction (AHJ) as well as through an extensive literature review. This document identifies the challenges and provides potential solutions to streamline the process of connecting EV charging infrastructure to the power grid in the United States, serving as a starting point for future conversations around these solutions.

33 ADVANCED PROPULSION SYSTEMS↗

SU-D-BRD-02: A Web-Based Image Processing and Plan Evaluation Platform (WIPPEP) for Future Cloud-Based Radiotherapy

Purpose: Visualization and processing of medical images and radiation treatment plan evaluation have traditionally been constrained to local workstations with limited computation power and ability of data sharing and software update. We present a web-based image processing and planning evaluation platform (WIPPEP) for radiotherapy applications with high efficiency, ubiquitous web access, and real-time data sharing. Methods: This software platform consists of three parts: web server, image server and computation server. Each independent server communicates with each other through HTTP requests. The web server is the key component that provides visualizations and user interface through front-end web browsers and relay information to the backend to process user requests. The image server serves as a PACS system. The computation server performs the actual image processing and dose calculation. The web server backend is developed using Java Servlets and the frontend is developed using HTML5, Javascript, and jQuery. The image server is based on open source DCME4CHEE PACS system. The computation server can be written in any programming language as long as it can send/receive HTTP requests. Our computation server was implemented in Delphi, Python and PHP, which can process data directly or via a C++ program DLL. Results: This software platform is running on a 32-core CPU server virtually hosting the web server, image server, and computation servers separately. Users can visit our internal website with Chrome browser, select a specific patient, visualize image and RT structures belonging to this patient and perform image segmentation running Delphi computation server and Monte Carlo dose calculation on Python or PHP computation server. Conclusion: We have developed a webbased image processing and plan evaluation platform prototype for radiotherapy. This system has clearly demonstrated the feasibility of performing image processing and plan evaluation platform through a web browser and exhibited potential for future cloud based radiotherapy.

60 APPLIED LIFE SCIENCES↗

Performance and Reliability Assessment of the U.S. Department of Energy Atmospheric Radiation Measurement (ARM) Data Advisor (ADA)

The Atmospheric Radiation Measurement (ARM) User Facility provides one of the world's largest openly accessible repositories of atmospheric observations through the ARM Data Discovery platform. Although the repository contains more than three decades of measurements collected from permanent observatories, mobile facilities, aircraft campaigns, and field experiments, identifying appropriate datasets can be challenging, particularly for new users unfamiliar with ARM instrumentation and datastream organization. To improve data accessibility, the ARM Data Center developed the ARM Data Advisor (ADA), an artificial intelligence-powered assistant designed to facilitate scientific data discovery, dataset interpretation, and user guidance. This report evaluates ADA's performance as a domain-specific scientific assistant using realistic atmospheric science workflows. The evaluation examines five key capabilities: data retrieval and curation efficiency, hallucination resistance, scientific reasoning, response to ambiguous queries, and content retention and session continuity. Representative prompts were developed to simulate typical interactions between researchers and the ARM Data Discovery platform, and ADA's responses were assessed for retrieval completeness, scientific accuracy, consistency, and practical usefulness. In these representative tests, ADA reduced the complexity of discovering and accessing ARM datasets by recommending appropriate datastreams, explaining instrumentation, interpreting metadata, and assisting with data processing workflows. ADA also exhibits strong domain knowledge of atmospheric science terminology and generally resists hallucination by acknowledging unavailable datasets and requesting clarification when appropriate. Overall, the results indicate that ADA represents a promising advancement in scientific data discovery within the ARM User Facility and has considerable potential to improve researcher productivity, particularly for new users and interdisciplinary scientists seeking efficient access to ARM observations.

Salvador, Christian [ORNL] (ORCID:0000000283287777↗

Drilling, Completion, and Data Collection Plans An Assessment of Geological Carbon Sequestration Options in the Illinois Basin: Phase III

Executive Summary The Illinois Basin – Decatur Project (IBDP) is managed by the Midwest Geological Sequestration Consortium (MGSC) and is led by the Illinois State Geological Survey (ISGS) at the University of Illinois. The project site is located on the Archer Daniels Midland Company (ADM) property in Decatur, Illinois, and is a fully integrated carbon capture and storage (CCS) project that uses CO₂ captured from the ethanol-producing fermentation process at the ADM corn-processing plant (Finley et. al., 2013). IBDP has a goal of injecting one million tonnes of CO₂ into the basal sands of the Mt. Simon Sandstone over a three-year period. This is a multifaceted project, and this report details the planning and results of the drilling, completions, well testing, log data acquisition, and the Health, Safety, and Environment (HSE) aspects of the project. Three deep wells were planned for the IBDP: • The injection well: Injection Well #1 (CCS1); • The monitoring well (both in-zone and above seal): Verification Well #1 (VW1); and • The geophone monitoring well: Geophysical Monitoring Well #1 (GM1). The detailed plans for these wells are attached to the appendices of this document. The wells were drilled successfully with little deviation from the original plans. The biggest change from the plan to execution was the need to adjust for larger-than-expected loss of circulation in the Potosi section of the Knox Formation. The completions reports also attached to this document detail the well constructions as they were actually built. Injectivity testing was carried out, and the perforating plans were adjusted based on the results. Additional perforations and acidizing were performed as a result of the injectivity testing. The testing plans are detailed in this report along with the actual testing results. The injectivity testing results were used in the modeling and simulation efforts. Detailed HSE plans were developed and implemented during the planning and execution phases of the project. The implementation included an HSE Bridging Document, which served to unify the HSE policies of the project partners and key subcontractors. The HSE plan and actual HSE results are presented in this document. There were no recordable HSE incidents during the project. A detailed logging program was developed based on project needs. The log data were acquired in accordance with the plan, and both the plan and log results are presented in this report. Log data were heavily utilized by the research staff, modelers, reservoir engineers, and for technical and permitting efforts. 5 Several key lessons were learned during the project: • Safety in operations and execution is paramount and is only achieved through proper planning and behavior control. The certainty of this was reinforced through implementation of this lesson and the resultant flawless HSE performance during the project. • Losses of drilling fluid circulation were larger than anticipated within the Potosi Formation. Circulation was only recovered through cementing the loss zones. • When possible, minimizing complexity in permit requirements and well designs is preferable. • The size of the wells were outside of the standard experience and expertise typical within the basin, and therefore required substantial planning and ramp-up of contractors and partners to meet project objectives. • With multiple stakeholders and research partners, establishing objectives and requirements early and adhering to change request procedures throughout the project are critical to manage competing data and sampling objectives that may be detrimental to overall progress. The well construction and completion operations were successfully executed, with all wells built in a manner that achieved excellent wellbore integrity. Log planning involved a number of stakeholders and technical specialists. Data collection from logging, coring, and testing was excellent. Time and effort spent with the associated contractors and suppliers to develop a well plan beyond normal scope proved highly successful, resulting in a well-construction and completion project that surpassed expectations. The world-class HSE results also demonstrate the commitment of all stakeholders in the project. The details follow in the body of this document

01 COAL, LIGNITE, AND PEAT↗

Automating the Solar Interconnection Technical Evaluation Process: PREconfiguring and Controlling Inverter SEt-Points (PRECISE)

Utilities are receiving an increasing number of interconnection requests for distributed solar photovoltaic (PV) systems from their customers, requiring a solution to quickly and intelligently perform technical assessments of these requests and to manage these new renewable energy assets. In this paper, we present a stand-alone interconnection tool, PREconfiguring and Controlling Inverter SEt-points (PRECISETM), and how it overcomes the challenges of accelerating technical evaluations and leverages smart inverter functionality to provide local voltage support on an as-needed basis. The paper details the purpose and architecture of PRECISE, including tools, data source requirements, the model-based interconnection evaluation process, and technical results. PRECISE is an integrated software tool that customizes PV inverter settings for utilities by modeling and assessing impacts on local voltages and the need for advanced inverter functions (AIFs) (e.g., volt-VAR and volt-watt). PRECISE maximizes the use of readily available utility data sets to make fast online assessments of incoming PV interconnection requests and makes accept/reject recommendations along with custom settings for AIFs.

ENERGY PLANNING, POLICY, AND ECONOMY,SOLAR ENERGY↗

A Failure Detection Strategy for Intrafraction Prostate Motion Monitoring With On-Board Imagers for Fixed-Gantry IMRT

Purpose: To develop methods to monitor prostate intrafraction motion during fixed-gantry intensity-modulated radiotherapy using MV treatment beam imaging together with minimal kV imaging for a failure detection strategy that ensures prompt detection when target displacement exceeds a preset threshold. Methods and Materials: Real-time two-dimensional (2D) marker position in the MV image plane was obtained by analyzing cine-MV images. The marker's in-line movement, and thus its time-varying three-dimensional (3D) position, was estimated by combining the 2D projection data with a previously established correlative relationship between the directional components of prostate motion. A confirmation request for more accurate localization using MV-kV triangulation was triggered when the estimated prostate displacement based on the cine-MV data was greater than 3 mm. An interventional action alert followed on positive MV-kV confirmation. To demonstrate the feasibility and accuracy of the proposed method, simulation studies of conventional-fraction intensity-modulated radiotherapy sessions were done using 536 Calypso-measured prostate trajectories from 17 radiotherapy patients. Results: A technique for intrafraction prostate motion management has been developed. The technique, using 'freely available' cine-MV images and minimum on-board kV imaging (on average 2.5 images/fraction), successfully limited 3D prostate movement to within a range of 3 mm relative to the MV beam for 99.4% of the total treatment time. On average, only approximately one intervention/fraction was needed to achieve this level of accuracy. Conclusion: Instead of seeking to accurately and continuously localize the prostate target as existing motion tracking systems do, the present technique effectively uses cine-MV data to provide a clinically valuable way to minimize kV usage, while maintaining high targeting accuracy.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Analysis of the Tank 5f Final Characterization Samples-2011

The Savannah River National Laboratory (SRNL) was requested by SRR to provide sample preparation and analysis of the Tank 5F final characterization samples to determine the residual tank inventory prior to grouting. Two types of samples were collected and delivered to SRNL: floor samples across the tank and subsurface samples from mounds near risers 1 and 5 of Tank 5F. These samples were taken from Tank 5F between January and March 2011. These samples from individual locations in the tank (nine floor samples and six mound Tank 5F samples) were each homogenized and combined in a given proportion into 3 distinct composite samples to mimic the average composition in the entire tank. These Tank 5F composite samples were analyzed for radiological, chemical and elemental components. Additional measurements performed on the Tank 5F composite samples include bulk density and water leaching of the solids to account for water soluble species. With analyses for certain challenging radionuclides as the exception, all composite Tank 5F samples were analyzed and reported in triplicate. The target detection limits for isotopes analyzed were based on customer desired detection limits as specified in the technical task request documents. SRNL developed new methodologies to meet these target detection limits and provide data for the extensive suite of components. While many of the target detection limits were met for the species characterized for Tank 5F, as specified in the technical task request, some were not met. In a few cases, the relatively high levels of radioactive species of the same element or a chemically similar element precluded the ability to measure some isotopes to low levels. The Technical Task Request allows that while the analyses of these isotopes is needed, meeting the detection limits for these isotopes is a lower priority than meeting detection limits for the other specified isotopes. The isotopes whose detection limits were not met in all cases included the following: Al-26, Sn-126, Sb-126, Sb-126m, Eu-152 and Cf-249. SRNL, in conjunction with the plant customer, reviewed all these cases and determined that the impacts were negligible.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of the Tank 5F Final Characterization Samples-2011 (U)

The Savannah River National Laboratory (SRNL) was requested by SRR to provide sample preparation and analysis of the Tank 5F final characterization samples to determine the residual tank inventory prior to grouting. Two types of samples were collected and delivered to SRNL: floor samples across the tank and subsurface samples from mounds near risers 1 and 5 of Tank 5F. These samples were taken from Tank 5F between January and March 2011. These samples from individual locations in the tank (nine floor samples and six mound Tank 5F samples) were each homogenized and combined in a given proportion into 3 distinct composite samples to mimic the average composition in the entire tank. These Tank 5F composite samples were analyzed for radiological, chemical and elemental components. Additional measurements performed on the Tank 5F composite samples include bulk density and water leaching of the solids to account for water soluble species. With analyses for certain challenging radionuclides as the exception, all composite Tank 5F samples were analyzed and reported in triplicate. The target detection limits for isotopes analyzed were based on customer desired detection limits as specified in the technical task request documents. SRNL developed new methodologies to meet these target detection limits and provide data for the extensive suite of components. While many of the target detection limits were met for the species characterized for Tank 5F, as specified in the technical task request, some were not met. In a few cases, the relatively high levels of radioactive species of the same element or a chemically similar element precluded the ability to measure some isotopes to low levels. The Technical Task Request allows that while the analyses of these isotopes is needed, meeting the detection limits for these isotopes is a lower priority than meeting detection limits for the other specified isotopes. The isotopes whose detection limits were not met in all cases included the following: Al-26, Sn-126, Sb-126, Sb-126m, Eu-152 and Cf-249. SRNL, in conjunction with the plant customer, reviewed all these cases and determined that the impacts were negligible.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of the Tank 5F Final Characterization Samples-2011 (U)

The Savannah River National Laboratory (SRNL) was requested by SRR to provide sample preparation and analysis of the Tank 5F final characterization samples to determine the residual tank inventory prior to grouting. Two types of samples were collected and delivered to SRNL: floor samples across the tank and subsurface samples from mounds near risers 1 and 5 of Tank 5F. These samples were taken from Tank 5F between January and March 2011. These samples from individual locations in the tank (nine floor samples and six mound Tank 5F samples) were each homogenized and combined in a given proportion into 3 distinct composite samples to mimic the average composition in the entire tank. These Tank 5F composite samples were analyzed for radiological, chemical and elemental components. Additional measurements performed on the Tank 5F composite samples include bulk density and water leaching of the solids to account for water soluble species. With analyses for certain challenging radionuclides as the exception, all composite Tank 5F samples were analyzed and reported in triplicate. The target detection limits for isotopes analyzed were based on customer desired detection limits as specified in the technical task request documents. SRNL developed new methodologies to meet these target detection limits and provide data for the extensive suite of components. While many of the target detection limits were met for the species characterized for Tank 5F, as specified in the technical task request, some were not met. In a few cases, the relatively high levels of radioactive species of the same element or a chemically similar element precluded the ability to measure some isotopes to low levels. The Technical Task Request allows that while the analyses of these isotopes is needed, meeting the detection limits for these isotopes is a lower priority than meeting detection limits for the other specified isotopes. The isotopes whose detection limits were not met in all cases included the following: Al-26, Sn-126, Sb-126, Sb-126m, Eu-152 and Cf-249. SRNL, in conjunction with the plant customer, reviewed all these cases and determined that the impacts were negligible.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Poster - 18: New features in EGSnrc for photon cross sections

Purpose: To implement two new features in the EGSnrc Monte Carlo system. The first is an option to account for photonuclear attenuation, which can contribute a few percent to the total cross section at the higher end of the energy range of interest to medical physics. The second is an option to use exact NIST XCOM photon cross sections. Methods: For the first feature, the photonuclear total cross sections are generated from the IAEA evaluated data. In the current, first-order implementation, after a photonuclear event, there is no energy deposition or secondary particle generation. The implementation is validated against deterministic calculations and experimental measurements of transmission signals. For the second feature, before this work, if the user explicitly requested XCOM photon cross sections, EGSnrc still used its own internal incoherent scattering cross sections. These differ by up to 2% from XCOM data between 30 keV and 40 MeV. After this work, exact XCOM incoherent scattering cross sections are an available option. Minor interpolation artifacts in pair and triplet XCOM cross sections are also addressed. The default for photon cross section in EGSnrc is XCOM except for the new incoherent scattering cross sections, which have to be explicitly requested. The photonuclear, incoherent, pair and triplet data from this work are available for elements and compounds for photon energies from 1 keV to 100 GeV. Results: Both features are implemented and validated in EGSnrc.Conclusions: The two features are part of the standard EGSnrc distribution as of version 4.2.3.2.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Production Operations Management System

The Production Operations Management System (POMS) is a set of software tools which allows production teams and analysis groups across multiple Fermilab experiments to launch, modify and monitor large scale campaigns of related Monte Carlo or data processing jobs. POMS provides a web service interface that enables automated jobs submission on distributed resources according to customers’ requests and subsequent monitoring and recovery of failed submissions, debugging and record keeping. POMS interfaces with existing HEP data access, processing, movement and monitoring tools at Fermilab, including Jobsub, dCache, SAM, and FIFEmon, and in combination with them handles the creation and tracking of unique filenames for multistage campaigns. A flexible, interactive GUI interface exists as part of the system to visualize campaign stages, parallelization tracks and data flow. An important feature of POMS is a one-to-one connection between the GUI campaign visualizer and a text based representation of the complete campaign configuration. An extensible library of template campaign configurations is available. The templates are user modifiable and map cleanly to and from the GUI description of the campaign. Future releases of POMS will interface with Rucio for file movement.

97 MATHEMATICS AND COMPUTING↗

Atmospheric Radiation Measurement program climate research facility operations quarterly report July 1 - September 30, 2008.

Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real-time. Raw and processed data are then sent daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and month for the current year and (2) site and fiscal year (FY) dating back to 1998. Table 1 shows the accumulated maximum operation time (planned uptime), actual hours of operation, and variance (unplanned downtime) for the period July 1 - September 30, 2008, for the fixed sites. The AMF has been deployed to China, but the data have not yet been released. The fourth quarter comprises a total of 2,208 hours. The average exceeded our goal this quarter. The Site Access Request System is a web-based database used to track visitors to the fixed and mobile sites, all of which have facilities that can be visited. The NSA locale has the Barrow and Atqasuk sites. The SGP site has a central facility, 23 extended facilities, 4 boundary facilities, and 3 intermediate facilities. The TWP locale has the Manus, Nauru, and Darwin sites. HFE represents the AMF statistics for the Shouxian, China, deployment in 2008. FKB represents the AMF statistics for the Haselbach, Germany, past deployment in 2007. NIM represents the AMF statistics for the Niamey, Niger, Africa, past deployment in 2006. PYE represents just the AMF Archive statistics for the Point Reyes, California, past deployment in 2005. In addition, users who do not want to wait for data to be provided through the ACRF Archive can request a research account on the local site data system. The seven computers for the research accounts are located at the Barrow and Atqasuk sites; the SGP central facility; the TWP Manus, Nauru, and Darwin sites; and the DMF at PNNL. In addition, the ACRF serves as a data repository for a long-term Arctic atmospheric observatory in Eureka, Canada (80 degrees 05 minutes N, 86 degrees 43 minutes W) as part of the multiagency Study of Environmental Arctic Change (SEARCH) Program. NOAA began providing instruments for the site in 2005, and currently cloud radar data are available. The intent of the site is to monitor the important components of the Arctic atmosphere, including clouds, aerosols, atmospheric radiation, and local-scale atmospheric dynamics. Because of the similarity of ACRF NSA data streams and the important synergy that can be formed between a network of Arctic atmospheric observations, much of the SEARCH observatory data are archived in the ARM archive. Instruments will be added to the site over time. For more information, please visit http://www.db.arm.gov/data. The designation for the archived Eureka data is YEU and is now included in the ACRF user metrics. This quarterly report provides the cumulative numbers of visitors and user accounts by site for the period October 1, 2007 - September 30, 2008. Table 2 shows the summary of cumulative users for the period October 1, 2007 - September 30, 2008. For the fourth quarter of FY 2008, the overall number of users is down substantially (about 30%) from last quarter. Most of this decrease resulted from a reduction in the ACRF Infrastructure users (e.g., site visits, research accounts, on-site device accounts, etc.) associated with the AMF China deployment. While users had easy access to the previous AMF deployment in Germany that resulted in all-time high user statistics, physical and remote access to on-site accounts are extremely limited for the AMF deployment in China. Furthermore, AMF data have not yet been released from China to the Data Management Facility for processing, which affects Archive user statistics. However, Archive users are only down about 10% from last quarter. Another reason for the apparent reduction in Archive users is that data from the Indirect and Semi-Direct Aerosol Campaign (ISDAC), a major field campaign conducted on the North Slope of Alaska, are not yet available to users. For reporting purposes, the three ACRF sites and the AMF operate 24 hours per day, 7 days per week, and 52 weeks per year. Time is reported in days instead of hours. If any lost work time is incurred by any employee, it is counted as a workday loss. Table 3 reports the consecutive days since the last recordable or reportable injury or incident causing damage to property, equipment, or vehicle for the period July 1 - September 30, 2008. There were no incidents this reporting period.

54 ENVIRONMENTAL SCIENCES↗