Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “cost model”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

Managing Information On Costs

Cost Management Model, CMM, software tool for planning, tracking, and reporting costs and information related to costs. Capable of estimating costs, comparing estimated to actual costs, performing "what-if" analyses on estimates of costs, and providing mechanism to maintain data on costs in format oriented to management. Number of supportive cost methods built in: escalation rates, production-learning curves, activity/event schedules, unit production schedules, set of spread distributions, tables of rates and factors defined by user, and full arithmetic capability. Import/export capability possible with 20/20 Spreadsheet available on Data General equipment. Program requires AOS/VS operating system available on Data General MV series computers. Written mainly in FORTRAN 77 but uses SGU (Screen Generation Utility).

Taulbee, Zoe A.↗

Fuzzy/Neural Software Estimates Costs of Rocket-Engine Tests

The Highly Accurate Cost Estimating Model (HACEM) is a software system for estimating the costs of testing rocket engines and components at Stennis Space Center. HACEM is built on a foundation of adaptive-network-based fuzzy inference systems (ANFIS) a hybrid software concept that combines the adaptive capabilities of neural networks with the ease of development and additional benefits of fuzzy-logic-based systems. In ANFIS, fuzzy inference systems are trained by use of neural networks. HACEM includes selectable subsystems that utilize various numbers and types of inputs, various numbers of fuzzy membership functions, and various input-preprocessing techniques. The inputs to HACEM are parameters of specific tests or series of tests. These parameters include test type (component or engine test), number and duration of tests, and thrust level(s) (in the case of engine tests). The ANFIS in HACEM are trained by use of sets of these parameters, along with costs of past tests. Thereafter, the user feeds HACEM a simple input text file that contains the parameters of a planned test or series of tests, the user selects the desired HACEM subsystem, and the subsystem processes the parameters into an estimate of cost(s).

Douglas, Freddie↗

Documentation of the analysis of the benefits and costs of aeronautical research and technology models, volume 1

The analysis of the benefits and costs of aeronautical research and technology (ABC-ART) models are documented. These models were developed by NASA for use in analyzing the economic feasibility of applying advanced aeronautical technology to future civil aircraft. The methodology is composed of three major modules: fleet accounting module, airframe manufacturing module, and air carrier module. The fleet accounting module is used to estimate the number of new aircraft required as a function of time to meet demand. This estimation is based primarily upon the expected retirement age of existing aircraft and the expected change in revenue passenger miles demanded. Fuel consumption estimates are also generated by this module. The airframe manufacturer module is used to analyze the feasibility of the manufacturing the new aircraft demanded. The module includes logic for production scheduling and estimating manufacturing costs. For a series of aircraft selling prices, a cash flow analysis is performed and a rate of return on investment is calculated. The air carrier module provides a tool for analyzing the financial feasibility of an airline purchasing and operating the new aircraft. This module includes a methodology for computing the air carrier direct and indirect operating costs, performing a cash flow analysis, and estimating the internal rate of return on investment for a set of aircraft purchase prices.

Bobick, J. C.↗

Manual of phosphoric acid fuel cell power plant optimization model and computer program

An optimized cost and performance model for a phosphoric acid fuel cell power plant system was derived and developed into a modular FORTRAN computer code. Cost, energy, mass, and electrochemical analyses were combined to develop a mathematical model for optimizing the steam to methane ratio in the reformer, hydrogen utilization in the PAFC plates per stack. The nonlinear programming code, COMPUTE, was used to solve this model, in which the method of mixed penalty function combined with Hooke and Jeeves pattern search was chosen to evaluate this specific optimization problem.

Lu, C. Y.↗

Weight and cost forecasting for advanced manned space vehicles

A mass and cost estimating computerized methology for predicting advanced manned space vehicle weights and costs was developed. The user friendly methology designated MERCER (Mass Estimating Relationship/Cost Estimating Relationship) organizes the predictive process according to major vehicle subsystem levels. Design, development, test, evaluation, and flight hardware cost forecasting is treated by the study. This methodology consists of a complete set of mass estimating relationships (MERs) which serve as the control components for the model and cost estimating relationships (CERs) which use MER output as input. To develop this model, numerous MER and CER studies were surveyed and modified where required. Additionally, relationships were regressed from raw data to accommodate the methology. The models and formulations which estimated the cost of historical vehicles to within 20 percent of the actual cost were selected. The result of the research, along with components of the MERCER Program, are reported. On the basis of the analysis, the following conclusions were established: (1) The cost of a spacecraft is best estimated by summing the cost of individual subsystems; (2) No one cost equation can be used for forecasting the cost of all spacecraft; (3) Spacecraft cost is highly correlated with its mass; (4) No study surveyed contained sufficient formulations to autonomously forecast the cost and weight of the entire advanced manned vehicle spacecraft program; (5) No user friendly program was found that linked MERs with CERs to produce spacecraft cost; and (6) The group accumulation weight estimation method (summing the estimated weights of the various subsystems) proved to be a useful method for finding total weight and cost of a spacecraft.

Williams, Raymond↗

NASA Human Spaceflight Scenarios - Do All Our Models Still Say No?

Historically, NASA human spaceflight planning has included healthy doses of life cycle cost analysis. Planners put projects and their cost estimates in a budget context. Estimated costs became expected budgets. Regardless, real budgets rarely matched expectations. So plans would come and go as NASA canceled projects. New projects would arise and the cycle would begin again. Repeatedly, NASA schedule and performance ambitions come up against costs growing at double-digit rates while budgets barely rise a couple of percent a year. Significant skepticism greets proposed NASA programs at birth, as cost estimates for new projects are traditionally very high, and worse, far off the mark for those carried forward. In this environment the current "capability driven framework" for NASA human spaceflight evolved, where long term life cycle cost analysis are even viewed as possibly counter-productive. Here, a space exploration project, for example the Space Launch System, focuses on immediate goals. A life cycle is that of a project, not a program, and for only that span of time to a near term milestone like a first test launch. Unfortunately, attempting to avoid some pitfalls in long-term life cycle cost analysis breeds others. Government audits have noted that limiting the scope of cost analysis "does not provide the transparency necessary to assess long-term affordability" making it difficult to understand if NASA "is progressing in a cost-effective and affordable manner." Even in this short-term framework, NASA realizes the importance of long-term considerations, that it must "maximize the efficiency and sustainability of the Exploration Systems development programs", that this is "critical to free resources for re-investment...such as other required deep space exploration capabilities." Assuming the value of long-term life cycle cost analysis, where due diligence meets reconnaissance, and accepting past shortcomings, the work here approaches life cycle cost analysis for human spaceflight differently. 1) If costs have traditionally been so high that adding them up is discouraging, are there any new facts on the ground offering paths to significantly lower costs? 2) If NASA's spaceflight budget and process is an over-arching constraint, with its planning limitations favoring short-term outlooks, is there a way to step outside the budget box? 3) If life cycle answers have historically been too uncertain to be useful, is there a process where stakeholders gain valuable insights merely from emphasizing a common understanding around questions? We analyze the potential life cycle cost of assorted NASA human spaceflight architectures - an architecture as a sum of individual systems, working together. With the prior questions of high costs, limited budgets and uncertainties in mind, public private partnerships are central in these architectures. The cost data for current commercial public private partnerships is encouraging, as are cost estimates for future partnership approaches beyond low Earth orbit. Private capital, directly or indirectly, an ingredient of public private partnerships, may be a significant factor in finding a path around the limits of the NASA spaceflight budget. Also, understanding and reviewing the pros, cons and uncertainties of assorted architectures can assist in developing a common understanding around key questions as important if not more so than the numbers and answers. Lastly, a scenario planning technique is briefly explored that can mature a common understanding about the agencies situation at hand and how diverse stakeholders can go forward together. Scenario planning, rather than focusing on answers, places emphasis on stakeholders developing a common understanding about the future. Putting aside costs, this is especially true of questions about sustainability and growth, results, benefits and expectations. While efficiency exercises or analysis look to reduce resources in one place to apply them elsewhere, moving around slices in a pie, scenario planning can get at the heart of the matter, growing the pie, transforming it, and making the pieces relevant. Especially important is the question of sustainability for different scenarios in the broad sense of the word - not just the narrow ability to survive or continue, but also the ability to adapt, prosper and grow.

space systems life cycle costs↗

Preliminary design, analysis, and costing of a dynamic scale model of the NASA space station

The difficulty of testing the next generation of large flexible space structures on the ground places an emphasis on other means for validating predicted on-orbit dynamic behavior. Scale model technology represents one way of verifying analytical predictions with ground test data. This study investigates the preliminary design, scaling and cost trades for a Space Station dynamic scale model. The scaling of nonlinear joint behavior is studied from theoretical and practical points of view. Suspension system interaction trades are conducted for the ISS Dual Keel Configuration and Build-Up Stages suspended in the proposed NASA/LaRC Large Spacecraft Laboratory. Key issues addressed are scaling laws, replication vs. simulation of components, manufacturing, suspension interactions, joint behavior, damping, articulation capability, and cost. These issues are the subject of parametric trades versus the scale model factor. The results of these detailed analyses are used to recommend scale factors for four different scale model options, each with varying degrees of replication. Potential problems in constructing and testing the scale model are identified, and recommendations for further study are outlined.

Gronet, M. J.↗

Integrated risk/cost planning models for the US Air Traffic system

A prototype network planning model for the U.S. Air Traffic control system is described. The model encompasses the dual objectives of managing collision risks and transportation costs where traffic flows can be related to these objectives. The underlying structure is a network graph with nonseparable convex costs; the model is solved efficiently by capitalizing on its intrinsic characteristics. Two specialized algorithms for solving the resulting problems are described: (1) truncated Newton, and (2) simplicial decomposition. The feasibility of the approach is demonstrated using data collected from a control center in the Midwest. Computational results with different computer systems are presented, including a vector supercomputer (CRAY-XMP). The risk/cost model has two primary uses: (1) as a strategic planning tool using aggregate flight information, and (2) as an integrated operational system for forecasting congestion and monitoring (controlling) flow throughout the U.S. In the latter case, access to a supercomputer is required due to the model's enormous size.

Mulvey, J. M.↗

A unified approach for composite cost reporting and prediction in the ACT program

The Structures Technology Program Office (STPO) at NASA Langley Research Center has held two workshops with representatives from the commercial airframe companies to establish a plan for development of a standard cost reporting format and a cost prediction tool for conceptual and preliminary designers. This paper reviews the findings of the workshop representatives with a plan for implementation of their recommendations. The recommendations of the cost tracking and reporting committee will be implemented by reinstituting the collection of composite part fabrication data in a format similar to the DoD/NASA Structural Composites Fabrication Guide. The process of data collection will be automated by taking advantage of current technology with user friendly computer interfaces and electronic data transmission. Development of a conceptual and preliminary designers' cost prediction model will be initiated. The model will provide a technically sound method for evaluating the relative cost of different composite structural designs, fabrication processes, and assembly methods that can be compared to equivalent metallic parts or assemblies. The feasibility of developing cost prediction software in a modular form for interfacing with state of the art preliminary design tools and computer aided design (CAD) programs is assessed.

Freeman, W. Tom↗

Validated Feasibility Study of Integrally Stiffened Metallic Fuselage Panels for Reducing Manufacturing Costs: Cost Assessment of Manufacturing/Design Concepts

The objective of the Integral Airframe Structures (IAS) program was to demonstrate, for an integrally stiffened structural concept, performance and weight equal to "built-up" structure with lower manufacturing cost. This report presents results of the cost assessment for several design configuration/manufacturing method combinations. The attributes of various cost analysis models were evaluated and COSTRAN selected for this study. A process/design cost evaluation matrix was developed based on material, forming, machining, and assembly of structural sub-elements and assembled structure. A hybrid design, made from high-speed machined extruded frames that are mechanically fastened to high-speed machined plate skin/stringer panels, was identified as the most cost-effective manufacturing solution. Recurring labor and material costs of the hybrid design are up to 61 percent less than the current built-up technology baseline. This would correspond to a total cost reduction of $1.7 million per ship set for a 777-sized airplane. However, there are important outstanding issues with regard to the cost of capacity of high technology machinery, and the ability to cost-effectively provide surface finish acceptable to the commercial aircraft industry. The projected high raw material cost of large extrusions also played an important role in the trade-off between plate and extruded concepts.

Metschan, S.↗

High Reliability at Minimum Cost

This paper investigates the minimum cost of improving the reliability of complex technical systems. The two major methods to improve reliability are redesigning the system for higher reliability or providing redundant components to replace failed elements. The costs of redesign for reliability or adding redundancy are estimated. The most cost-effective combination for high reliability can be identified. The cost of increasing the intrinsic reliability of a system can be modeled as cost proportional to 1/(system failure rate) a , where the exponent “a” measures the difficulty of increasing reliability. The “a” exponent can vary from 0.25 to about 2.5. Operational reliability can also be increased by using redundant systems. The failure rate for N parallel redundant units is (system failure rate) N . The cost of redundancy is N times the system cost. The total redundant system cost is proportional to N/(system failure rate) a . The cost of redundancy increases as N gets larger, but larger N allows a higher system failure rate, which reduces the system design cost. There is a certain N, a certain level of redundancy, that has the minimum cost to achieve the required overall redundant system failure rate. The minimum cost for the redundant system is achieved at the optimum level of redundancy. The N for minimum cost is equal to -a ln (redundant system failure rate). The minimum cost of the N redundant systems is proportional to N * (original system failure rate) a . The optimum redesigned individual system failure rate is proportional to exp (-1/a), so the greater the difficulty, the higher the optimum individual system failure rate. Increasing the intrinsic reliability of a system encounters diminishing returns and at some point it becomes more cost-effective to add redundancy. The difficulty of increasing intrinsic system reliability determines the optimum design for high reliability at minimum cost.

reliability↗

High Reliability at Minimum Cost

This paper investigates the minimum cost of improving the reliability of complex technical systems. The two major methods to improve reliability are redesigning the system for higher reliability or providing redundant components to replace failed elements. The costs of redesign for reliability or adding redundancy are estimated. The most cost-effective combination for high reliability can be identified. The cost of increasing the intrinsic reliability of a system can be modeled as cost proportional to 1/(system failure rate) a , where the exponent “a” measures the difficulty of increasing reliability. The “a” exponent can vary from 0.25 to about 2.5. Operational reliability can also be increased by using redundant systems. The failure rate for N parallel redundant units is (system failure rate) N . The cost of redundancy is N times the system cost. The total redundant system cost is proportional to N/(system failure rate) a . The cost of redundancy increases as N gets larger, but larger N allows a higher system failure rate, which reduces the system design cost. There is a certain N, a certain level of redundancy, that has the minimum cost to achieve the required overall redundant system failure rate. The minimum cost for the redundant system is achieved at the optimum level of redundancy. The N for minimum cost is equal to -a ln (redundant system failure rate). The minimum cost of the N redundant systems is proportional to N * (original system failure rate) a . The optimum redesigned individual system failure rate is proportional to exp (-1/a), so the greater the difficulty, the higher the optimum individual system failure rate. Increasing the intrinsic reliability of a system encounters diminishing returns and at some point it becomes more cost-effective to add redundancy. The difficulty of increasing intrinsic system reliability determines the optimum design for high reliability at minimum cost.

reliability↗

ASCot, the NASA Analogy Software Cost Tool Suite: expanding our estimation horizons

The NASA Analogy Software Costing Tool Suite (ASCoT) consists of a cluster-based analogy estimator for estimating software development effort, a K-Nearest Neighbors (KNN) analogy estimator for estimating effort and delivered lines of code, a simple regression-based cost estimating relationship (CER) model that estimates cost in dollars, and a probabilistic version of COCOMO II. In this paper we document the analogy algorithms as well as summarize the results of the performance of the KNN and the principle components (PCA) cluster analogy models. KNN performance is assessed by varying the number of inputs and number of neighbors. Four different clustering methods: K-means, Spectral Clustering, Hierarchical Clustering, and Principle Components Analysis (PCA), and their respective evaluation criterion are described in detail. The comparative performance of all four estimation models is assessed using magnitude of relative error (MRE) measurements.

Menzies, Tim↗

Simple Elasticity Modeling and Failure Prediction for Composite Flexbeams

A simple 2D boundary element analysis, suitable for developing cost effective models for tapered composite laminates, is presented. Constant stress and displacement elements are used. Closed-form fundamental solutions are derived. Numerical results are provided for several configurations to illustrate the accuracy of the model.

Makeev, Andrew↗

Optimal stabilization of discrete event systems

An optimal stabilization problem for discrete event systems (DES) is addressed. A class of not necessarily finite state 'logical' DES models is utilized which can also model the costs for events to occur. Let P and A denote two such models. Suppose that P characterizes the valid behavior of a dynamical system and A represents certain design objectives which specify the allowable DES behavior which is 'contained in' the valid behavior. An optimal control problem for P and A is how to choose the sequence of inputs to P so that the DES behavior lies in A (i.e., it is allowable) and so that a performance index defined in terms of the costs of the events is minimized. Two solutions are provided to an optimal stabilization problem, i.e. how to find a sequence of inputs that results in an optimal state trajectory which cycles in a pre-specified set.

Passino, Kevin M.↗

Study of short-haul aircraft operating economics. Phase 2: An analysis of the impact of jet modernization on local service airline operating costs

The objectives of this phase of the study were (1) to assess the 10 year operating cost trends of the local service airlines operating in the 1965 through 1974 period, (2) to glean from these trends the technological and operational parameters which were impacted most significantly by the transition to newer pure jet, short haul transports, and effected by changing fuel prices and cost of living indices, and (3) to develop, construct, and evaluate an operating cost forecasting model which would incorporate those factors which best predicted airline total operating cost behavior over that 10-year period.

Andrastek, D. A.↗

Application of Rapid Prototyping Methods to High-Speed Wind Tunnel Testing

This study was undertaken in MSFC's 14-Inch Trisonic Wind Tunnel to determine if rapid prototyping methods could be used in the design and manufacturing of high speed wind tunnel models in direct testing applications, and if these methods would reduce model design/fabrication time and cost while providing models of high enough fidelity to provide adequate aerodynamic data, and of sufficient strength to survive the test environment. Rapid prototyping methods utilized to construct wind tunnel models in a wing-body-tail configuration were: fused deposition method using both ABS plastic and PEEK as building materials, stereolithography using the photopolymer SL-5170, selective laser sintering using glass reinforced nylon, and laminated object manufacturing using plastic reinforced with glass and 'paper'. This study revealed good agreement between the SLA model, the metal model with an FDM-ABS nose, an SLA nose, and the metal model for most operating conditions, while the FDM-ABS data diverged at higher loading conditions. Data from the initial SLS model showed poor agreement due to problems in post-processing, resulting in a different configuration. A second SLS model was tested and showed relatively good agreement. It can be concluded that rapid prototyping models show promise in preliminary aerodynamic development studies at subsonic, transonic, and supersonic speeds.

Springer, A. M.↗

Rapid Cost Assessment of Space Mission Concepts Through Application of Complexity-Based Cost Indices

This slide presentation reviews the development of a rapid cost assessment models for evaluation of exploration missions through the application of complexity based cost indices. In Fall of 2004, NASA began developing 13 documents, known as "strategic roadmaps," intended to outline a strategy for space exploration over the next 30 years. The Third Strategic Roadmap, The Strategic Roadmap for Solar System Exploration, focused on strategy for robotic exploration of the Solar System. Development of the Strategic Roadmap for Solar System Exploration led to the investigation of a large variety of missions. However, the necessity of planning around scientific inquiry and budgetary constraints made it necessary for the roadmap development team to evaluate potential missions not only for scientific return but also cost. Performing detailed cost studies for each of the large number of missions was impractical given the time constraints involved and lack of detailed mission studies; so a method of rapid cost assessment was developed by us to allow preliminary analysis. It has been noted that there is a strong correlation between complexity and cost and schedule of planetary missions. While these correlations were made after missions had been built and flown (successfully or otherwise), it seemed likely that a similar approach could provide at least some relative cost ranking. Cost estimation relationships (CERs) have been developed based on subsystem design choices. These CERs required more detailed information than available, forcing the team to adopt a more high level approach. Costing by analogy has been developed for small satellites, however, planetary exploration missions provide such varying spacecraft requirements that there is a lack of adequately comparable missions that can be used for analogy.

cost estimation↗