Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “coordinated scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

The IUE Science Operations Ground System

The International Ultraviolet Explorer (IUE) Science Operations System provides full realtime operations capabilities and support to the operations staff and astronomer users. The components of this very diverse and extremely flexible hardware and software system have played a major role in maintaining the scientific efficiency and productivity of the IUE. The software provides the staff and user with all the tools necessary for pre-visit and real-time planning and operations analysis for any day of the year. Examples of such tools include the effects of spacecraft constraints on target availability, maneuver times between targets, availability of guide stars, target identification, coordinate transforms, e-mail transfer of Observatory forms and messages, and quick-look analysis of image data. Most of this extensive software package can also be accessed remotely by individual users for information, scheduling of shifts, pre-visit planning, and actual observing program execution. Astronomers, with a modest investment in hardware and software, may establish remote observing sites. We currently have over 20 such sites in our remote observers' network.

Pitts, Ronald E.↗

Optimal Integration of Departures and Arrivals in Terminal Airspace

Coordination of operations with spatially and temporally shared resources, such as route segments, fixes, and runways, improves the efficiency of terminal airspace management. Problems in this category are, in general, computationally difficult compared to conventional scheduling problems. This paper presents a fast time algorithm formulation using a non-dominated sorting genetic algorithm (NSGA). It was first applied to a test problem introduced in existing literature. An experiment with a test problem showed that new methods can solve the 20 aircraft problem in fast time with a 65% or 440 second delay reduction using shared departure fixes. In order to test its application in a more realistic and complicated problem, the NSGA algorithm was applied to a problem in LAX terminal airspace, where interactions between 28% of LAX arrivals and 10% of LAX departures are resolved by spatial separation in current operations, which may introduce unnecessary delays. In this work, three types of separations - spatial, temporal, and hybrid separations - were formulated using the new algorithm. The hybrid separation combines both temporal and spatial separations. Results showed that although temporal separation achieved less delay than spatial separation with a small uncertainty buffer, spatial separation outperformed temporal separation when the uncertainty buffer was increased. Hybrid separation introduced much less delay than both spatial and temporal approaches. For a total of 15 interacting departures and arrivals, when compared to spatial separation, the delay reduction of hybrid separation varied between 11% or 3.1 minutes and 64% or 10.7 minutes corresponding to an uncertainty buffer from 0 to 60 seconds. Furthermore, as a comparison with the NSGA algorithm, a First-Come-First-Serve based heuristic method was implemented for the hybrid separation. Experiments showed that the results from the NSGA algorithm have 9% to 42% less delay than the heuristic method with varied uncertainty buffer sizes.

terminal airspace↗

The NPG 7120.5A Electronic Review Process

The use of electronics to review a document is well within the technical realm of today's state-of-the-art workplace. File servers and web site interaction are common tools for many NASA employees. The electronic comment processing described here was developed for the NPG 7120.5A review to augment the existing NASA Online Directives Information System (NODIS). The NODIS system is NASA's official system for formal review, approval and storage of NASA Directives. The electronic review process worked so well that NASA and other agencies may want to consider it as one of our "best practices." It was participatory decision making at its very best, a process that attracted dozens of very good ideas to improve the document as well as the way we can be managing projects far more effectively. The revision of NPG 7120.5A has significant implications for the way all elements of the Agency accomplish program and project management. Therefore, the review of NPG 7120.5A was an Agencywide effort with high visibility, heavy participation and a short schedule. The level of involvement created interest in supplementing the formal NODIS system with a system to collect comments efficiently and to allow the Centers and Codes to review and consolidate their comments into the official system in a short period of time. In addition, the Program Management Council Working Group (PMCWG), responsible for the revision of the document and the disposition of official comments, needed an electronic system to manage the disposition of comments, obtain PMCWG consensus on each disposition, and coordinate the disposition with the appropriate Headquarters Code that had submitted the official comment. The combined NASA and contractor talents and resources provided a system that supplemented the NODIS system and its operating personnel to produce a thorough review and approval of NPG 7120.5A on April 3, 1998, 7.5 months from the start of the process. The original six-month schedule is indicated. All milestones occurred on time, except for completion of comment disposition, which required an additional 30 days. Approval of the document occurred sixteen days after completion of the "Purple Package."

McBrayer, Robert↗

An overview of the GOLD experiment between the ETS-6 satellite and the table mountain facility

The Ground/Orbiter Lasercomm Demonstration (GOLD) is a demonstration of optical communications between the Japanese Engineering Test Satellite (ETS-VI) and an optical ground transmitting and receiving station at the Table Mountain Facility in Wrightwood, California. Laser transmissions to the satellite are performed for approximately 4 hours every third night when the satellite is at apogee above Table Mountain. The experiment requires the coordination of resources at the Communications Research Laboratory (CRL), JPL, the National Aeronautics and Space Development Agency (NASDA) Tsukuba tracking station, and NASA's Deep Space Network at Goldstone, California, to generate and transmit real-time commands and receive telemetry from the ETS-VI. Transmissions to the ETS-VI began in November 1995 and are scheduled to last into the middle of January 1996, when the satellite is expected to be eclipsed by the Earth's shadow for a major part of its orbit. The eclipse is expected to last for about 2 months, and during this period there will be limited electrical power available on board the satellite. NASDA plans to restrict experiments with the ETS-VI during this period, and no laser transmissions are planned. Posteclipse experiments are currently being negotiated. GOLD is a joint NASA-CRL experiment that is being conducted by JPL in coordination with CRL and NASDA.

Wilson, K. E.↗

An Overview of the GOLD Experiment Between the ETS-6 Satellite and the Table Mountain Facility

The Ground/Orbiter Lasercomm Demonstration is a demonstration of optical communications between the Japanese Engineering Test Satellite (ETS-VI) and an optical ground transmitting and receiving station at the Table Mountain Facility in Wrightwood, California. Laser transmissions to the satellite are performed for approximately 4 hours every third night when the satellite is at apogee above Table Mountain. The experiment requires the coordination of resources at the Communications Research Laboratory (CRL), JPL, the National Aeronautics and Space Development Agency (NASDA) Tsukuba tracking station, and NASA's Deep Space Network at Goldstone, California, to generate and transmit real-time commands and receive telemetry from the ETS-VI. Transmissions to the ETS-VI began in November 1995 and are scheduled to last into the middle of January 1996, when the satellite is expected to be eclipsed by the Earth's shadow for a major part of its orbit. The eclipse is expected to last for about 2 months, and during this period there will be limited electrical power available on board the satellite. NASDA plans to restrict experiments with the ETS-VI during this period, and no laser transmissions are planned. Posteclipse experiments are currently being negotiated. GOLD is a joint NASA-CRL experiment that is being conducted by JPL in coordination with CRL and NASDA.

Wilson, K. E.↗

CRADA Number NFE-19-07846 with Grid Fruit, LLC (CRADA Final Report)

Cooperative Research and Development Agreement (CRADA) NFE-19-07846 between Oak Ridge National Laboratory (ORNL) and Grid Fruit, LLC (Grid Fruit) focused on simulating, monitoring, and adjusting controls of commercial refrigerator and freezer systems to provide load flexibility and demand response services from these machines. Viewing these medium and low-temp coolers as thermal masses, the volumes of chilled air in these coolers make them time-shiftable loads ripe for deployment at optimal times. Grid Fruit is a startup company developing methods to schedule the chilling cycles (e.g., in “build load” and “shed load” grid events) to provide energy efficiency, peak shifting, and other benefits both to the grid and the broader environment. These benefits can be magnified by coordinating chillers with HVAC, lights, computers, and other loads. Grid Fruit completed simulations and then selected and ordered controls hardware to prove the technology were successful, but the diversity of chiller models in the field without digital controls, as well as limited market demand at present, make further exploration necessary before commercialization.

42 ENGINEERING↗

Analysis and Grading of the Test Performance of PS Modules for the CMS Phase-2 Outer Tracker Upgrade

The Outer Tracker of the CMS experiment provides information about the trajectory of charged particles produced in proton-proton collisions at the LHC. During the High Luminosity LHC upgrade, scheduled for the late 2020s, the Outer Tracker will be replaced with new modules capable of transmitting data to the L1 Trigger. These modules are being assembled at several facilities around the world, including Fermilab, necessitating coordinated standards of module quality. Here I discuss the development of POTATO (Phase-2 Outer Tracker Analyzer of Test Outputs), a C++ software which provides a standardized procedure for analyzing and grading test results of the Outer Tracker modules. The particular focus of this poster is on the analysis and grading of the PS (pixel-strip) modules in POTATO.

Riggall, Caroline↗

Analysis and Grading of the Test Performance of PS Modules for the CMS Phase-II Outer Tracker Upgrade

The Outer Tracker detector of the Compact Muon Solenoid (CMS) experiment provides information about the trajectory of charged particles produced in proton-proton collisions at the Large Hadron Collider (LHC). During the High Luminosity LHC upgrade, scheduled for the late 2020s, the Outer Tracker will be replaced with new modules capable of transmitting data to the L1 Trigger. These modules are being assembled at several facilities around the world, including Fermilab, necessitating coordinated standards of module quality. Here I discuss the development of POTATO (Phase-II Outer Tracker Analyzer of Test Outputs), a C++ software which provides a standardized procedure for analyzing and grading test results of the Outer Tracker modules. The particular focus of this paper is on the analysis and grading of the PS (pixel-strip) modules in POTATO.

43 PARTICLE ACCELERATORS↗

Integration and Testing Challenges of Small Satellite Missions: Experiences from the Space Technology 5 Project

The Space Technology 5(ST5) payload was successfully carried into orbit on an OSC Pegasus XL launch vehicle, which was carried aloft and dropped from the OSC Lockheed L-1011 from Vandenberg Air Force Base March 22,2006, at 9:03 am Eastern time, 6:03 am Pacific time. In order to reach the completion of the development and successful launch of ST 5, the systems integration and test(I&T) team determined that a different approach was required to meet the project requirements rather than the standard I&T approach used for single, room-sized satellites. The ST5 payload, part of NASA's New Millennium Program headquartered at JPL, consisted of three micro satellites (approximately 30 kg each) and the Pegasus Support Structure (PSS), the system that connected the spacecrafts to the launch vehicle and deployed the spacecrafts into orbit from the Pegasus XL launch vehicle. ST5 was a technology demonstration payload, intended to test six (6) new technologies for potential use for future space flights along with demonstrating the ability of small satellites to perform quality science. The main technology was a science grade magnetometer designed to take measurements of the earth's magnetic field. The three spacecraft were designed, integrated, and tested at NASA Goddard Space Flight Center with integration and environmental testing occurring in the Bldg. 7-1 0-15-29. The three spacecraft were integrated and tested by the same I&T team. The I&T Manager determined that there was insufficient time in the schedule to perform the three I&T spacecraft activities in series used standard approaches. The solution was for spacecraft #1 to undergo integration and test first, followed by spacecraft #2 and #3 simultaneously. This simultaneous integration was successful for several reasons. Each spacecraft had a Lead Test Conductor who planned and coordinated their spacecraft through its integration and test activities. One team of engineers and technicians executed the integration of all three spacecraft, learning and gaining knowledge and efficiency as spacecraft #1 integration and testing progressed. They became acutely familiar with the hardware, operation and processes for I&T, thus each team member had the experience and knowledge to safely execute I&T for spacecraft #2 and #3 together. The integration team was very versatile and each member could perform many different activities or work any spacecraft, when needed. Daily meetings between the three Lead TCs and technician team allowed the team to plan and implement activities efficiently. The three (3) spacecraft and PSS were successfully integrated and tested, shipped to the launch site, and ready for launch per the I&T schedule that was planned three years previously.

Sauerwein, Timothy A.↗

Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

With an increase in the utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS realtime operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art media wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project.

Marsh, Angela L.↗

Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

With an increase in utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four-month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS real-time operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art Video Wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project. This paper describes the logistics and lessons learned in upgrading a control center capability in the middle of complex real-time operations. Combining the efficiencies of controller interaction and new technology infusion were prime drivers for this upgrade to handle the increased utilization of science research on ISS. The success of this project could not jeopardize the current operations while these facility upgrades occurred.

Dudley, Stephanie R. B.↗

Human Factors Research Considerations for Terminal Area Urban Air Mobility Operations

In this presentation, we discuss the human factors research challenges from introducing greater levels of automation in a future air transportation concept called Urban Air Mobility (UAM). UAM is an air transportation concept that aims to provide air transportation services to the daily commuter, as well as emergency response and package delivery. The principal innovation over current day large air transport system is the greater distribution of important safety functions to automated and human agents; these functions include air traffic management, traditionally an air traffic controller responsibility. A central aspect of UAM is the development of an automated air traffic manager, whose primary responsibility is to approve airspace access for vehicle operators. Vehicle operator roles may include onboard and remote pilots, as well as a human manager who will supervise an entire fleet. Alternatively, both fleet manager and vehicle operators can be merged into a single role – a feasible option if UAM aircraft are autonomous. In lieu of tower controllers, vertiport managers, with the assistance of automation, will manage arrival and departure schedules between vertiports, as well as supervise surface operations. Our approach here will be to introduce use cases currently being developed by NASA, and then provide preliminary definitions for each of the roles introduced above and how coordination between them can be configured to support the operations within the use cases described. Subsequently, we review the tools and interfaces being developed to support the various roles. To conclude, we present current human factors work related to defining the roles above and suggest future work to advance the UAM concept.

trial planning↗

Virtual Build: Low-Tech Simulations Can Be High on IPPD Content

After two years of design, component testing, and parts fabrication, the project team was within months of starting assembly on the first major elements of a new product assembly. Schedules were extremely tight and there was no room for error in the first unit build-up for test. The first draft of the assembly drawing was nearing completion and needed to be approved by key members of the Integrated Product Team (IPT) before release. Only then could the manufacturing planning be finalized and released for assembly to begin. What could we do to improve the quality of our first build effort? How could we minimize all the changes inherent in the first-time build of a complex mechanical system? Why not a dress rehearsal of the build process with all the participating players, hardware, and build documentation? A "virtual build simulation". In an organization employing integrated product teams there is no substitute for clear communication between the various cross-functional members. Despite team collocation, integrated solid modeling, and frequent coordination meetings. elements of the product-process design can still slip through the cracks and show up on the assembly floor. The virtual build exercise was designed to provide one intensive hands-on experience for all members of the design and assembly team in time to make corrections without schedule impact.

Hilscher, Rick↗

Virtual Design Studio (VDS) - Development of an Integrated Computer Simulation Environment for Performance Based Design of Very-Low Energy and High IEQ Buildings

Executive Summary The objective of this study was to develop a “Virtual Design Studio (VDS)”: a software platform for integrated, coordinated and optimized design of green building systems with low energy consumption, high indoor environmental quality (IEQ), and high level of sustainability. This VDS is intended to assist collaborating architects, engineers and project management team members throughout from the early phases to the detailed building design stages. It can be used to plan design tasks and workflow, and evaluate the potential impacts of various green building strategies on the building performance by using the state of the art simulation tools as well as industrial/professional standards and guidelines for green building system design. Engaged in the development of VDS was a multi-disciplinary research team that included architects, engineers, and software developers. Based on the review and analysis of how existing professional practices in building systems design operate, particularly those used in the U.S., Germany and UK, a generic process for performance-based building design, construction and operation was proposed. It distinguishes the whole process into five distinct stages: Assess, Define, Design, Apply, and Monitoring (ADDAM). The current VDS is focused on the first three stages. The VDS considers building design as a multi-dimensional process, involving multiple design teams, design factors, and design stages. The intersection among these three dimensions defines a specific design task in terms of “who”, “what” and “when”. It also considers building design as a multi-objective process that aims to enhance the five aspects of performance for green building systems: site sustainability, materials and resource efficiency, water utilization efficiency, energy efficiency and impacts to the atmospheric environment, and IEQ. The current VDS development has been limited to energy efficiency and IEQ performance, with particular focus on evaluating thermal performance, air quality and lighting environmental quality because of their strong interaction with the energy performance of buildings. The VDS software framework contains four major functions: 1) Design coordination: It enables users to define tasks using the Input-Process-Output flow approach, which specifies the anticipated activities (i.e., the process), required input and output information, and anticipated interactions with other tasks. It also allows task scheduling to define the work flow, and sharing of the design data and information via the internet. 2) Modeling and simulation: It enables users to perform building simulations to predict the energy consumption and IEQ conditions at any of the design stages by using EnergyPlus and a combined heat, air, moisture and pollutant simulation (CHAMPS) model. A method for co-simulation was developed to allow the use of both models at the same time step for the combined energy and indoor air quality analysis. 3) Results visualization: It enables users to display a 3-D geometric design of the building by reading BIM (building information model) file generated by design software such as SketchUp, and the predicted results of heat, air, moisture, pollutant and light distributions in the building. 4) Performance evaluation: It enables the users to compare the performance of a proposed building design against a reference building that is defined for the same type of buildings under the same climate condition, and predicts the percent of improvements over the minimum requirements specified in ASHRAE Standard 55-2010, 62.1-2010 and 90.1-2010. An approach was developed to estimate the potential impact of a design factor on the whole building performance, and hence can assist the user to identify areas that have most pay back for investment. The VDS software was developed by using C++ with the conventional Model, View and Control (MVC) software architecture. The software has been verified by using a simple 3-zone case building. The application of the VDS concepts and framework for building design and performance analysis has been illustrated by using a medium-sized, five story office building that received LEED Platinum Certification from USGBC.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

One Year Old and Growing: A Status Report on the International Space Station and Its Partners

The first elements of the International Space Station have been launched and docked together, and are performing well on-orbit. The Station is currently being operated jointly by NASA and Russian space organizations. In May 1999, the Space Shuttle was the first vehicle to dock to the International, Space Station. A crew of seven U.S. and Russian astronauts delivered 4000 pounds of supplies, made repairs to communications and battery systems, and installed external hardware during an EVA. The next module, the Russian Service Module, is due to join the orbital complex this year. This will initiate a period of rapid growth, with new modules and equipment continually added for the next five to six years, through assembly complete. The first crew is scheduled to begin permanent occupation of the International Space Station early next year. Hardware is being developed by Space Station partners and participants around the world and is largely on schedule for launch. Mission control centers are fully functioning in Houston and Moscow, with operations centers in St. Hubert, Darmstadt, Tsukuba, Turino, and Huntsville going on line as they are required. International crews are selected and in training. Coordination efforts continue with each of the five partners and two participants, involving 16 nations. All of them continue to face their own challenges and have achieved their own successes. This paper will discuss the status of the ISS partners and participants, their contributions and accomplished milestones, and upcoming events. It will also give a status report on the developments of the remainder of the ISS modules and components by each partner and participant. The ISS, the largest and most complicated peacetime project in history, is flying, and, with the help of all the ISS members, will continue to grow.

Bartoe, John-David F.↗

WinPSSP : a revamp of the computer program PSSP and its performance solving the crystal structures of small organic compounds and solids of biological and pharmaceutical interest

The direct-space methods software Powder Structure Solution Program ( PSSP ) [Pagola & Stephens (2010). J. Appl. Cryst. 43 , 370–376] has been migrated to the Windows OS and the code has been optimized for fast runs. WinPSSP is a user-friendly graphical user interface that allows the input of preliminary crystal structure information, integrated intensities of the reflections and FWHM, the definition of structural parameters and a simulated annealing schedule, and the visualization of the calculated and experimental diffraction data overlaid for each individual solution. The solutions are reported as filename.cif files, which can be used to analyze packing motifs and chemical bonding, and to input the atomic coordinates into the Rietveld analysis software GSAS. WinPSSP performance in straightforward crystal structure determinations has been evaluated using 18 molecular solids with 6–20 degrees of freedom. The free-distribution program as well as multimedia tutorials can be accessed at http://users.uoi.gr/nkourkou/winpssp/.

60 APPLIED LIFE SCIENCES↗

Scheduling and Separating Departures Crossing Arrival Flows in Shared Airspace

Flight efficiency and reduction of flight delays are among the primary goals of NextGen. In this paper, we propose a concept of shared airspace where departures fly across arrival flows, provided gaps are available in these flows. We have explored solutions to separate departures temporally from arrival traffic and pre-arranged procedures to support controllers' decisions. We conducted a Human-in-the-Loop simulation and assessed the efficiency and safety of 96 departures from the San Jose airport (SJC) climbing across the arrival airspace of the Oakland and San Francisco arrival flows. In our simulation, the SJC tower had a tool to schedule departures to fly across predicted gaps in the arrival flow. When departures were mistimed and separation could not be ensured, a safe but less efficient route was provided to the departures to fly under the arrival flows. A coordination using a point-out procedure allowed the arrival controller to control the SJC departures right after takeoff. We manipulated the accuracy of departure time (accurate vs. inaccurate) as well as which sector took control of the departures after takeoff (departure vs. arrival sector) in a 2x2 full factorial plan. Results show that coordination time decreased and climb efficiency increased when the arrival sector controlled the aircraft right after takeoff. Also, climb efficiency increased when the departure times were more accurate. Coordination was shown to be a critical component of tactical operations in shared airspace. Although workload, coordination, and safety were judged by controllers as acceptable in the simulation, it appears that in the field, controllers would need improved tools and coordination procedures to support this procedure.

shared airspace↗