Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “cable”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

The Dark Energy Spectrographic Instrument (DESI) Optical Fiber System

The specific research of the DESI project is to study in detail the expansion history of the Universe over the past 10 billion years. In order to do this, the project designed, fabricated, tested and commissioned the DESI instrument which has been deployed at the Mayall Telescope at the Kitt Peak National Observatory near Tucson, Arizona. The DESI project was conducted by approximately 30 US and foreign national laboratories. The complete instrument includes a prime focus corrector assembly, a focal plane with 5,000 optical fibers whose position can be set by robotic positioners, and ten spectrographs. Each spectrograph can accommodate the light from 500 fibers and include three color channels that are illuminated by a common collimator mirror and other planar transfer optics. In order for this entire system to work, optical fibers are required to connect each positioner to the spectrographs. Our CRADA with Durham University in the UK provided the 10 crucial fiber cables required to connect the DESI focal plane to the 10 spectrographs. The key major goals of this CRADA were achieved. Survey planning was another key component to the Durham contribution. Drs. Frenk, Baugh, Cole, Edge, Lacey, Li, Lucey, Massey, Metcalfe, Norberg and Shanks were all important contributors to the working groups to which they were assigned. Their work to implement emission lines and QSO in lightcone mocks, mocks for non-standard cosmologies/modified gravity, optimization of completeness of BGS in crowded regions and extended source photometry have been vital in the early planning for targets during commissioning. The major role in the project involved Dr. Ray Sharples and his team. They provided a significant portion of the design, fabrication and testing of the optical fiber system. In particular, they were responsible for the design, production of engineering drawings, component procurements, and fabrication of the 10 DESI Science fiber cables. Working in close collaboration with Dr. Claire Poppett, they also designed and fabricated the slit assemblies, the specialized termination of the groups of 500 fibers which plug into the spectrographs.

47 OTHER INSTRUMENTATION↗

Substation Configuration Survey for Electromagnetic Coupling Analysis

Impacts of a high-altitude electromagnetic pulse (HEMP) on the power grid are a growing concern due to the increased reliance on the power grid. A critical area of research is quantifying power system equipment response to HEMP since this is not known in general. Substation site surveys were performed at seven high voltage substations across the United States to gather substation layout and construction details pertinent to HEMP coupling calculations and component vulnerability assessments. The primary objective for the survey was to gather information on cable layouts and cable construction within substations. Additional information was also gathered on equipment present within the substations and control house layouts. This report provides information gathered from the substation surveys.

24 POWER TRANSMISSION AND DISTRIBUTION↗

ORBIT: Offshore Renewables Balance-of-System and Installation Tool

This report describes the Offshore Renewables Balance-of-system Installation Tool ("ORBIT"), a new model developed by the National Renewable Energy Laboratory (NREL) to evaluate the balance-of-system (BOS) costs associated with offshore wind projects. In the context of wind energy projects BOS costs encompass all expenses required to construct a project other than the capital expenditures (CapEx) of the turbines and towers, including the procurement costs for all other components (such as substructures, cables, and electrical infrastructure), offshore and land-based construction costs, port costs, site surveying fees, permitting fees, and leasing fees are all categorized as BOS costs. BOS costs significantly contribute to the levelized cost of energy (LCOE) for offshore wind, typically comprising over 50\% of the CapEx for a fixed-bottom offshore wind project and 60\% for a floating project. In addition, technology solutions and installation methods vary drastically between projects as they are impacted by factors such as vessel availability, geographic considerations and site geotechnical conditions. These effects require a model with appropriate fidelity to understand how these costs scale as turbine rating increases and the offshore wind supply chain, particularly offshore construction vessels, is expanded. For offshore wind, cost savings attributed to increased turbine rating are primarily realized through BOS procurement and project installation as fewer substructures and less cable are required. BOS costs represent both a modeling challenge, as well as an opportunity, for project developers to optimize solutions to reduce costs. It is critical to understand how these costs are affected by novel technologies, innovative installation processes, and operational constraints in order identify meaningful cost reductions for offshore wind energy.

17 WIND ENERGY↗

Ganged-PV System Evaluation

The following report contains data and data summaries collected for the SkySun LLC elevated Ganged PV arrays. These arrays were fabricated as a series of PV panels in various orientations, suspended by cables, at the National Solar Thermal Test Facility (NSTTF) at Sandia National Laboratories (SNL). Starting in February of 2021, Sandia personnel have collected power and accelerometer data for these arrays to assess design and operational efficacy of varying ganged- PV configurations. The purpose of this power data collection was to see how the various array orientations compare in power collection capability depending on the time of day, year, and the specific daily solar direct normal irradiance (DNI). The power data was collected as a measurement of the power output from the various series strings. The project team measured direct current (DC) voltage and current from the respective arrays. The accelerometer data was collected with the purpose of demonstrating potential destructive mode shapes that could take place with each of the arrays when exposed to high winds. This allowed the team to evaluate whether impacts with respect to specific array orientations using suspended cables is a safe design. All data collection was performed during calendar year 2021.

14 SOLAR ENERGY↗

CORRTEX Analysis Techniques

Continuous Reflectometry for Radius versus Time Experiments, or CORRTEX, is a diagnostic that was developed during nuclear testing to measure the distance at which rock walls were disrupted by an explosive device as a function of the time at which disruption occurred. Distances recorded are dynamic measurements of cable length as the shockwaves from an explosive event crush the experiment cables, reducing their usable length. Applications of the CORRTEX diagnostic have been expanded in recent times to include instrumentation of the explosive device itself, to record phenomena such as the speed of the detonation wave in the explosive charge and the crushing or disassembly of material in the charge housing. The diagnostic has likewise been used to monitor explosive performance in rock blasting and oil well hole-clearing activities.

42 ENGINEERING↗

Development of Quantum Computing Interconnect Based on Aerosol Jet Printing and Electrochemical Deposition of Rhenium

The electrodeposition of rhenium on to a metal seed layer on flexible substrates is presented as a means to creating superconducting flexible cable connectors in an enabling plug-and-play approach for quantum computing. Cryogenic quantum electronics are currently connected using masses of stainless-steel coaxial cables that are bulky, rigid - both in form and design - and lead to significant joule heating, thermal noise, and cross talk. Here, we present an unprecedented approach to integrate an aerosol jet printed (AJP) metal seed layer with rhenium electrodeposition on a flexible substrate in the advancement of superconducting interconnect technologies. Silver and gold were printed using the ‘Nanojet’ aerosol jet printer on Kapton films. Adhesion of gold was found to be far superior to that of silver and adhesion on roughened Kapton surpassed that of its smooth counterpart. Electrodeposition of rhenium was successful on both silver and gold and an amorphous Re film was confirmed by XRD. Results for both materials are presented however due to the poor adhesion of silver to Kapton it was ruled out as a viable candidate. Composite materials were characterized by profilometry, EDS, XRD and FIBSEM. Electrical measurements of the composite at ambient temperature showed a critical temperature (T c ), where the resistance drops to 0, of 5.8 K, well above 4.2 K, the temperature of liquid helium. Stress-strain tests of the Ag-Re and Au-Re composites on roughened and smooth Kapton were completed. Cyclic flexure testing (200 cycles) to 1.25% strain showed smooth Kapton samples reach a stress of ~16 MPa, while Kapton roughened with sandpaper, reaches ~20MPa of stress for the same 1.25% strain.

36 MATERIALS SCIENCE↗

Design, Deployment, and Characterization of the World’s First Flexible Large Power Transformer

GE Research and its partner Prolec GE have designed, built and deployed in the field the world’s first flexible power transformer. The flexible power transformer is a transmission class 3-phase autotransformer configurable in impedance and in voltage which allows it to serve as a universal spare for multiple units in a given fleet. However, the key innovation in this new concept is the online adjustable leakage impedance which allows the transformer to change its impedance without interrupting the transmission line operation. The flexible power transformer can be designed with up to three low voltage transmission class ratings and up to 12 impedance values changeable both online and offline. This report provides an overview of the design, manufacturing, testing, and commissioning of the 165kV, 60MVA prototype built including the results of the field performance validation tests. The prototype was specified in collaboration with Cooperative Energy, the utility host. It was designed and tested in the factory according to IEEE standard C57.12.00 and followed all protocols for transportation, installation, and commissioning of a power transformer. In addition to the prototype, a flexible protection system capable of automatically adjusting its settings upon the transformer impedance was also developed and deployed in the for testing and validation. On September 3, 2021 the prototype was energized in Cooperative Energy’s substation in Columbia, Mississippi to become the world’s first flexible power transformer in operation. Its performances and impact on the grid operation were demonstrated through different field tests. Results obtained confirm that the impedance of the flexible transformer can be varied under load through its full range, from 4.3% to 9.3%, without adverse impacts on the line operation, the protection system, the transformer stability and health condition. Results also proved that the flexible transformer is very effective in controlling power transfer through the line or load sharing between units operating in parallel. Indeed, it was proven that higher impedances decrease the thruput power of the transformer while lower impedances increase it. Up to 26MW was controllable on a line loading of 45MVA. It was also possible to demonstrate that the variation of the transformer impedance has no effect on the circulating current between units in parallel, except a minor transient during the impedance change. It was also proven that the flexible protection relay can update its protection settings automatically when the impedance change was detected. The prototype has operated continuously for more than 12 months now with a peak load exceeding 50MVA corresponding to >80% of its ONAN power rating. No alarm, trip or sign of failure has been reported by the utility. In addition to the development and deployment of the flexible transformer prototype, investigations were carried out on new nanodielectric fluids to replace the mineral oil used in power transformers with the goal of reducing their footprint and weight. The key parameters that were targeted for improvement included the breakdown voltage to reduce clearances between windings and tank hence the footprint; viscosity and thermal conductivity to increase the cooling efficiency and therefore to reduce the winding material. Several nanodielectric mixtures with mineral oil including with alumina (Al2O3), titania (TiO2) and Borum Nitrate (BN) with different surfactants have been analyzed and tested. Unfortunately, despite encouraging results no nanofluid candidate has been found viable to replace mineral oil. With the formulations tested, breakdown voltages are generally similar to mineral oil at lower particle contents and worse at higher particle contents. Viscosity appreciably increased at particles concertation over 2 wt% and thermal conductivity increased slightly at 5wt% and appears to be 10-15% higher at 10 wt% particle content. It is recommended to continue investigations to find solutions that can help increase the power density of future flexible power transformers. Flexible power transformers can significantly help the future power grid by providing more flexibility and resiliency. Indeed, by providing voltage and impedance flexibility, flexible power transformers reduce the need for multiple spares, hence inventory costs for utilities. With their online controllable impedance, they can provide support to the grid and help manage short-circuit currents, power flow, line congestion, and grid stability which will become more important with higher penetrations of intermittent renewable resources. During the field validation tests, it was demonstrated that up to 26MW was controllable on a line loading of 45MVA when the transformer impedance was varied from its minimum to its maximum range. Also, with the impedance range, the short-circuit currents could be reduced by up to 38% at the load side of the transformer. With its controllable impedance, flexible transformers can be used in future strategies of grid resilience to help better prepare the grid to face forecasted severe events including storms, heat waves and contingencies. The flexible power transformers can also find role in other applications including high voltage transmission cables such as offshore wind farms where solutions for energizing the cables and managing the reactive power are of critical importance. The designed flexible power transformer is now fully validated and ready for commercialization. Further analysis on the benefits of flexible power transformers for grid stability and short-circuit management including current limiting capability, reclosure and line restoration, control of inrush current, sizing of flexible AC components (FACTS) would help its rapid adoption by the industry.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Outdoor Test Bed Performance of a Power Line Sensor Using a Real-Time Event Simulator

This report summarizes the design and application of an outdoor power line sensor testbed (OPLST) with a real-time simulator and power meter to compare a potential transformer (PT) and current transformer (CT) versus an advanced line-post sensor. The OPLST was created to validate advanced medium-voltage (20/34.5 kV) outdoor power line sensors used in electrical distribution systems. Electrical utilities have installed metering and relay-protection transformers like PTs and CTs for several decades. The PTs/CTs are iron core measurement transformers based on the electromagnetic induction principle and provide reliable data in normal grid operation. However, new outdoor power line sensors (OPLS) using other technologies like voltage divider, Rogowski coil and optical principles have become available and may have favorable performance and costs compared to PTs/CTs. Therefore, the importance of testing these technologies with the PT/CT, to compare the measured phase voltage/current at different power grid scenarios is crucial to understand the performance of these new OPLS. For this study a G&W Electric Model CVS-36-O power line sensor was chosen as the OPLS to test with voltage/current signals. An OPAL-RT Technologies Model OP4510 real-time simulator and Schweitzer Engineering Laboratories Model SEL-735 power meter were installed with the 20/34.5 kV OPLST to compare the measured transient events collected from an advanced OPLS and the PT/CT. This system is installed at the Distributed Energy Communications and Control (DECC) lab, Oak Ridge National Laboratory (ORNL). The simulator generated different power grid scenarios (electrical faults, capacitor bank operation, service restoration, etc.), and its analog-output signals were connected to the voltage/current amplifiers that feed the 20/34.5 kV aerial cable loop through the PT/CT devices. Additional PT/CT devices were also wired with the medium voltage aerial cable loop to measure the phase current/voltage signals and server as references. After each test, common format for transient data exchange (COMTRADE) files were collected from the SEL-735 power meter and used to compare the performance of the OPLS with the PT/CT. The behavior of analog signals, harmonic components, total harmonic distortion and crest factors were assessed and found favorable for the G&W sensor as compared to the reference PT/CT.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Thermal simulation of the HSR arc BPM Module for EIC

The Electron Ion Collider (EIC) Hadron Storage Ring (HSR) will reuse most of the existing superconducting magnets from the RHIC storage ring. However, the existing stripline beam position monitors (BPM) used for RHIC will not be compatible with the planned EIC hadron beam parameters that include higher intensity, shorter bunches, and some operational scenarios with large radial offsets of the beam in the vacuum chamber. To address these challenges, the existing RHIC stripline BPMs will be shielded, and a new BPM design using button pick-ups and integrated in a new vacuum interconnect/bellows assembly that will be installed adjacent to the existing BPMs. A thermal analysis of the new arc BPM housing and button pick-up design has been conducted to assess the effects caused by beam induced resistive wall heating and signal propagation through the button pick-up cables for several operational scenarios. This report will describe the analysis results to quantify the heat transfer and temperature distribution that can be expected on the new HSR cryogenic arc BPM housings, button pick-ups, and cryo-signal cables.

43 PARTICLE ACCELERATORS↗

Moore Machine Motion Controls Refurbishment Statement of Work and Specification

Diamond Turning Machines known as “Moore” machines are used in the production of Potassium diHydrogen Phosphate (KDP) optics required for the National Ignition Facility (NIF). These machines are owned by the Department of Energy, as provided by Lawrence Livermore National Security LLC (LLNS). Moore Machines 1 and 2 are located at the Gooch & Housego (G&H) facility in Highland Heights, OH. The existing Aerotech motion controllers, motor drivers/amplifiers, input/output (I/O) hardware, control computer, software user interface, human machine interface (HMI), cabling, and encoders are beyond service life and require replacement. This Statement of Work (SoW) defines the motion control system refurbishment requirements for the Moore diamond turning machines designated Moore 1 and Moore 2. The motion controls system design shall include a motion control computer, control software, motor drive amplifiers and controllers, linear scale encoders, rotary encoders, HMI, power distribution, emergency stop (E-Stop) and interlocks, cabling, switches, solenoids, transducers, sensors, actuators, ancillary system interfaces, and related components necessary for a complete machine tool control system. The Subcontractor shall include effort to standardize systems between the two machines if reasonably possible.

42 ENGINEERING↗

A Systematic Approach for Estimating High-Altitude Electromagnetic Pulse Coupling onto Power Generation Facility Equipment

A systematic approach is presented to evaluate the effects of high-altitude electromagnetic pulse (HEMP) signals on the equipment located inside a power generation facility. The approach uses a combination of practical measurement and simulation efforts to characterize the radio wave propagation behavior and the device immunity profile. Of particular interest in this work was estimating the vulnerability level of equipment that is connected to long cables. As an example application, a detailed study was conducted for one common class of facility equipment, and its frequency- and time-domain HEMP coupling properties were investigated as a function of terminal loading condition and cable attachment configuration. Overall, the proposed method can be generalized and applied to other electronic components and systems found in the facility environment.

42 ENGINEERING↗

Interlaminar Fracture Toughness Testing of Nb3Sn Insulation Systems

Epoxy cracking has been the main suspected contributor to training in Nb3Sn magnets for some time, as it leads to energy release and magnet quenching. Cracking in a superconducting composite can occur from several modes, and the likelihood of these modes is not well understood. Failure has been observed between insulation systems and the superconducting cable itself rather than within the cable or insulation. To target the behavior at the interface, samples have been fabricated and tested for mode I fracture toughness in an adapted version of ASTM D5528. This work seeks to better characterize the fracture toughness of this interface to better understand how to model and design insulation systems.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

A 500 KV INVERTED GEOEMTRY FEEDTHROUGH FOR A HIGH VOLT-AGE DC ELECTRON GUN

This contribution reports on the development of an unprecedented inverted-insulator with cable connector for reliably applying 500 kV dc to a future polarized beam photogun, to be designed for operating at 350kV without field emission. Such a photogun design could then be used for generating a polarized electron beam to drive a spin-polarized positron source as a demonstrator for high energy nuclear physics at JLab. There are no commercial cable connectors that fit the large inverted insulators required for that voltage range. Our proposed concept is based on a modified epoxy receptacle with intervening SF6 layer and a test electrode in a vacuum vessel.

Hernandez-Garcia, C.↗

Plutonium-238 Loadout Calorimeter Return To Service

The calorimeter in the transfer area in Building 7920 at the US Department of Energy’s Oak Ridge National Laboratory is used to measure the amount of 238 Pu in the Plutonium Heat Source Oxide. The calorimetry measurement is taken after the oxide is packaged in an ORISC (Oak Ridge Inner Shipping Capsule)/FSO (Fuel Storage Outer) assembly before loading into the Containment Vessel and shipping container. The equipment is used in three specific configurations: zero measurement (nothing in the sample cup), FSO measurement (actual measurement of 238 Pu), and reference calibration measurement (using the reference FSO as a known heat source). System checks were performed in July 2023 in preparation for scheduled material loadout. During these checks, personnel discovered that the reference FSO had experienced an electrical short in the heater cable and was no longer functional. The calorimeter was in the reference calibration measurement configuration at this time. Facility management was notified when the damage was discovered. The data from the Yokogawa recorder were pulled and analyzed for a span of time between September 2022 and July 2023. An unusual spike was found in the sample cup temperature data that started on October 19, 2022, and ended on October 20, 2022. The sample cup reached a temperature of 191.1°C. The maximum allowable temperature for the calorimeter thermopile to reach is 220°C based on the manufacturer statement provided in Appendix B of this report [1]. The calorimeter thermopile and the sample cup thermocouple are physically close to each other; therefore, the data suggest that the calorimeter itself never saw a temperature in excess of 191.1°C. Physical damage present on the cable, tape, and insulation suggests that the temperature reached a higher value in some locations within the sample cup than the data shows. Because of this discrepancy, testing of the calorimeter was required to confirm that the calorimeter is functioning the same as it was before the electrical short. The intent of this report is to assess the functionality of the calorimeter and determine if it is acceptable to use for 238 Pu loadout material measurement. Testing showed that the calorimeter is functionally equivalent to the initial calibration that was performed in the summer of 2021, and thus, the calorimeter was cleared to be used for its intended purposes.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Rapid-cycling HTS magnet for muon acceleration

A very wide range of operational temperatures of the HTS (YBCO) superconductor makes it suitable for the construction of rapid-cycling magnets required for the muon acceleration. The measured [3] very low power loss of the 0.4 T magnet operating at 300 T/s suggested a realistic possibility of the HTS-based accelerator magnet with much higher magnetic field and ramp rate. The magnet core and the HTS cable designs for the 2 T field in the 30 mm beam gap are presented. The simulation of the HTS cable hysteresis power loss for the 1000 T/s ramp rate is discussed in terms of the operational temperatures and required cryogenic power.

43 PARTICLE ACCELERATORS↗

Conceptual Design of A 20 T Dipole Based on Hybrid REBCO/Nb 3 Sn Cos-theta Coil

This paper presents a design concept of an HTS/LTS hybrid dipole with 50 mm aperture and 20 T nominal field based on a cos-theta coil and a cold iron yoke. The HTS part of magnet coil uses REBCO Twisted Stacked Tape cable. The LTS part is graded and made of two Nb3Sn Rutherford cables. Due to high sensitivity of HTS/LTS coils to large stresses and strains at high fields, a Stress Management (SM) concept combined with the cos-theta coil geometry is used. The results of magnet magnetic analysis are presented and discussed.

43 PARTICLE ACCELERATORS↗

Simulate Wind Loading on RUTE SunTracker: Cooperative Research and Development (Final Report)

RUTE produces and delivers efficient, sustainable structural foundation systems for the wind and solar industries, instrumental in the effort to lower the cost of clean electricity and reduce CO2. RUTE's SunTracker is a high-clearance agrivoltaic solar array. The system uses raised cables, providing support with less materials and cost. These cables can provide tracking for increased energy generation and greater revenue, allowing the land beneath to be used for other means simultaneously. RUTE provided data files that NREL will use to perform computational fluid dynamics (CFD) simulations to characterize and predict wind loading on the 6x6 RUTE SunTracker photovoltaic (PV) array. Varying both the panel orientations and wind speeds provides information on how the array can manage a variety of weather conditions. These results, in turn, inform RUTE's design and construction of these arrays.

14 SOLAR ENERGY↗

Distributed Magnetic Field and Temperature Monitoring for Superconducting Radio Frequency Cavities

The overall objective of the proposed Phase I program was to design, construct and demonstrate a fiber optic sensing system capable of providing temperature and magnetic field measurements with an enhanced spatial resolution that can be implemented over a large surface area (cryomodules) to survey superconducting radio frequency cavities and magnets. A magnetic field sensor capable of detecting fluxes on the order of 1 μT is required to detect the distribution of trapped flux on the cavity surface. A unique distributed magnetic field sensor was successfully designed and constructed to demonstrate the detection of magnetic fluxes less than 500 nT. The sensor leveraged the ultra-high sensitivity of Sentek’s picoDAS to measure the magnetostriction induced vibrations in a commercially available Metglas 2605 SC ribbon that was in physical contact with sensing fiber. Static magnetic fields were detected by applying an alternating current a copper wire proximate to the Metglas 2605SC ribbon to create an AC bias magnetic field. In an alternative approach, an AC bias magnetic field was applied to a special magnetic field sensing fiber with Metglas 2605SC cladding successfully detect a magnetic field flux of a 3 μT. Exhaustive testing was performed to characterize the dependency of sensor response on the direction of the applied magnetic field. Although the special sensing fiber based magnetic field sensor did not exhibit an observable dependence on the direction of the magnetic field, the Metglas 2605SC ribbon sensor exhibited a clear directional dependence. A wide variety of polymer materials were evaluated to enhance the temperature response of an FBG based sensor at cryogenic temperatures. The processing and performance challenges provided the motivation to develop a new simple cryogenic temperature sensor that uses a commercially available fiber optic splice protector. The EVA hot melt tube that becomes adhered to the optical fiber and the polyolefin outer tube that shrinks upon heating in the fusion splicer heater provide the high thermal expansion coefficient necessary to impart a significant strain on the FBG when exposed to cryogenic temperatures. The temperature sensitivity (Δ𝜆𝐵𝑟𝑎𝑔𝑔~ 62 𝑝𝑝𝑚/℃) of the FBG-based sensor was on par with the best reported to date. The simple design, use of readily available cost-effective materials, and well-established processing techniques lends this approach to the creation of hundreds to thousands of temperature sensors on one single optical fiber length. The inherently small form factor also allows for co-location with the distributed magnetic field sensor. In preparation for field testing of the prototype sensing system at the Jefferson Labs in potential Phase II program, several different cable designs were evaluated to package the sensors. The preliminary successful demonstration of fully functional sensing cables provides the foundation for subsequent development efforts to advance the Technology Readiness Level of the technology. The technical feasibility of the proposed approach was successfully demonstrated in this Phase I effort.

43 PARTICLE ACCELERATORS↗