Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “building operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

Experience with Inner Reflector Plug exchange in SNS

The Inner Reflector Plug (IRP) is a central component of the Spallation Neutron Source target monolith, which houses the mercury target and four liter-sized neutron moderator units. It is exposed to high-level radiation fields during routine operation and builds up significant activity. The IRP needs to be replaced due to moderator neutron poison and decoupler burn-out, which is used for shaping neutron pulses. The first IRP exchange took place in March 2018. The old IRP was extracted from the target monolith, providing space for the new one. It was split into three segments, each of which was handled separately. The lowest section of the IRP is the largest segment in size and in activity and is temporarily stored on-site for cool down before conduction post irradiation examination. In support of planning the replacement activities, a wide range of activation and transport analyses were performed. This included calculating isotope inventories and the radiation fields for each segment as it is extracted in storage casks, and the radiation field from the empty IRP pit in the target monolith. While the replacement was taking place, measurements were performed and later on compared to the calculations. During these studies, it was discovered that a significant contributor to the radiation field from the lower IRP segment is from photo-neutrons. Photo-nuclear physics was added to the analyses and calculated results compared well with measured dose rates.

Popova, Irina I.↗

Critical Design Elements for an On-Site Mercury Concentration and Holding Facility - 20175

Administrative changes and funding issues have delayed the Department of Energy (DOE) from establishing and commissioning a National Repository for mercury as required under the Mercury Export Ban Act (MEBA) of 2008. In the interim, a few hazardous waste Treatment, Storage, and Disposal Facilities (TSDFs) have been authorized to accept mercury classified as a hazardous waste as under Subtitle C of the Resource Conservation and Recovery Act (RCRA). Waste generators are charged (either by weight or by volume) for the waste they manifest to these TSDFs. In many cases, mercury and mercury compounds have chemically sorbed to (or physically lodged into) the interstitial spaces of a substrate material. This almost always causes the amount of waste generated to be unnecessarily large, due to the extra volume (or weight) of the accompanying, non-mercury materials. Depending on a multitude of factors, it could be financially beneficial for waste generators to take greater control of their mercury affairs by separating these substrate materials from the mercury and mercury compounds that have become associated with them. Building and operating an on-site mercury Concentration and Holding Facility (CHF) could help relieve a waste generator's overall cost burden. The purpose of such CHFs is not to treat or dispose of mercury, but to recover and concentrate mercury from bulky mercury-laden materials to the extent that the host substrate to which the mercury may have previously been sorbed could pass a Toxicity Characteristic Leaching Procedure (TCLP) test and either be disposed of at a conventional landfill, or be disposed of at a hazardous waste landfill, but absent additional restrictions specifically for mercury. A CHF represents a way for waste generators to save money by separating mercury from common host materials, concentrating it, and then safely storing it until transportation to an authorized TSDF takes place This paper focuses on the critical design elements waste generators should consider when designing and operating a mercury CHF. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The United States' (DOE) Action Plan for Power Sector Decarbonization

A collaborative report from the Clean Energy Ministerial (CEM) on Lessons Learned for Rapid Decarbonization of Power Sectors was delivered to energy ministers and presented at the 13th CEM (CEM13) in the United States in September 2022. In light of these lessons learned and discussed at CEM13, several jurisdictions signaled intent to develop Action Plans for power sector decarbonization. The first cohort of Action Plans was released at CEM14 in India in July 2023. The U.S. Department of Energy (DOE) is pleased to release this Action Plan as a contribution to the second cohort of Action Plans released at CEM15 in Brazil in October 2024. The Action Plans, supported by the 21st Century Power Partnership, and other CEM workstreams via direct technical assistance and capacity building, are intended to focus on select implementation actions, given each country's existing power sector goals and activities, and are an opportunity for countries to display leadership in power sector decarbonization. The Action Plans are organized in a framework for Planning, Building and Operating, as well as Stakeholder Engagement where appropriate based on country priorities. These Action Plans are voluntary, developed by each country individually, not comprehensive of all activities within the jurisdiction, and are living documents that are subject to change. This Action Plan, developed by DOE, is focused on federal actions for power sector decarbonization primarily led by DOE. There are many other actions being led by other U.S. government agencies, or at the state and local level, that are not featured in this Action Plan.

21st Century Power Partnership↗

Brazil's Action Plan for Rapid Decarbonization of Power Sectors

A collaborative report from the Clean Energy Ministerial (CEM) on Lessons Learned for Rapid Decarbonization of Power Sectors was delivered to energy ministers and presented at the CEM13 in the United States in September 2022. In light of these lessons learned and discussed at CEM13, several jurisdictions signaled intent to develop Action Plans for power sector decarbonization. The first cohort of Action Plans was released at CEM14 in India in July 2023. The second cohort of action plans will be presented at CEM15 in Brazil. The Action Plans, supported by the 21st Century Power Partnership, and other CEM workstreams via direct technical assistance and capacity building, are intended to focus on select implementation actions, given each country's existing power sector goals and activities, and are an opportunity for countries to display leadership in power sector decarbonization. The Action Plans are organized in a framework for Planning, Building and Operating, as well as Stakeholder Engagement where appropriate based on country priorities. They complement, but are differentiated from, other international power sector initiatives such as the Breakthrough Agenda (whose broad purpose is to raise collective ambition) and the Global Power System Transformation Consortium (whose goals are to convene power system operators to accelerate research innovations and foster peer learning). These Action Plans are voluntary, developed by each country individually, not comprehensive of all activities within the jurisdiction, and are living documents that are subject to change.

21st Century Power Partnership↗

Uruguay's Action Plan and Experience for Power Sector Decarbonization

A collaborative report from the Clean Energy Ministerial (CEM), Lessons Learned for Rapid Decarbonization of Power Sectors, was delivered to energy ministers and presented at the 13th CEM (CEM13) in the United States in September 2022. In light of these lessons learned and discussed at CEM13, several jurisdictions signaled intent to develop Action Plans for power sector decarbonization. The first cohort of Action Plans was released at CEM14 in India in July 2023. The Uruguay Ministry of Industry, Energy and Mining is pleased to release this Action Plan as a contribution to the second cohort of Action Plans released at CEM15 in Brazil in October 2024. The Action Plans, supported by the 21st Century Power Partnership, and other CEM workstreams via direct technical assistance and capacity building, are intended to focus on select implementation actions given each country's existing power sector goals and activities, and are an opportunity for countries to display leadership in power sector decarbonization. The Action Plans are organized in a framework for planning, building, and operating, as well as stakeholder engagement where appropriate based on country priorities. They complement, but are differentiated from, other international power sector initiatives such as the Breakthrough Agenda (whose broad purpose is to raise collective ambition) and the Global Power System Transformation Consortium (whose goals are to convene power system operators to accelerate research innovations and foster peer learning). These Action Plans are voluntary, developed by each country individually, not comprehensive of all activities within the jurisdiction, and are living documents that are subject to change.

21st Century Power Partnership↗

Canada's Actions for Rapid Decarbonization of Power Sector

A collaborative report from the Clean Energy Ministerial (CEM) on Lessons Learned for Rapid Decarbonization of Power Sectors was delivered to energy ministers and presented at the 13th CEM (CEM13) in the United States in September 2022. In light of these lessons learned and discussed at CEM13, several jurisdictions signaled intent to develop Action Plans for power sector decarbonization. The first cohort of Action Plans was released at CEM14 in India in July 2023. Canada is pleased to release this Action Plan as a contribution to the second cohort of Action Plans released at CEM15 in Brazil in October 2024. The Action Plans, supported by the 21st Century Power Partnership, and other CEM workstreams via direct technical assistance and capacity building, are intended to focus on select implementation actions, given each country's existing power sector goals and activities, and are an opportunity for countries to display leadership in power sector decarbonization. The Action Plans are organized in a framework for Planning, Building and Operating, as well as Stakeholder Engagement where appropriate based on country priorities. These Action Plans are voluntary, developed by each country individually, not comprehensive of all activities within the jurisdiction, and are living documents that are subject to change.

21st Century Power Partnership↗

Accelerator-Based Neutrino Beams

Over the past six decades, accelerator-based neutrino beams have revolutionized particle physics. Neutrinos created with accelerators have been used to discover the muon neutrino and tau neutrinos was discovered and to confirm the existence of neutrino oscillations. More recently, long-baseline experiments have offered the first experimental hint of CP violation in the neutrino sector. Building and operating such beams is an enormous technical challenge, yet they remain our most versatile tool for studying neutrinos. With new experiments such as DUNE and Hyper-Kamiokande, and ideas such as neutrino factories, the next generation of beams will address open questions about neutrino mass ordering, CP violation, and possible physics beyond the standard model.

Fields, Laura [Notre Dame U.] (ORCID:0000000182813↗

Artificial Intelligence Research at Fermilab

The unique challenges of high-energy physics research present opportunities for advancing AI technologies. From the principles of fundamental physics underlying massive and rich data sets to building and operating some of the world’s most complex detector and accelerator systems, the technologies we are developing have potential connections to a broad domain of cutting-edge AI research.

Fermilab, Fermilab↗

Improving operational flexibility of integrated energy system with uncertain renewable generations considering thermal inertia of buildings

Insufficient flexibility in system operation caused by traditional "heat-set" operating modes of combined heat and power (CHP) units in winter heating periods is a key issue that limits renewable energy consumption. In order to reduce the curtailment of renewable energy resources through improving the operational flexibility, a novel optimal scheduling model based on chance-constrained programming (CCP), aiming at minimizing the lowest generation cost, is proposed for a small-scale integrated energy system (IES) with CHP units, thermal power units, renewable generations and representative auxiliary equipments. In this model, due to the uncertainties of renewable generations including wind turbines and photovoltaic units, the probabilistic spinning reserves are supplied in the form of chance-constrained; from the perspective of user experience, a heating load model is built with consideration of heat comfort and inertia in buildings. To solve the model, a solution approach based on sequence operation theory (SOT) is developed, where the original CCP-based scheduling model is tackled into a solvable mixed-integer linear programming (MILP) formulation by converting a chance constraint into its deterministic equivalence class, and thereby is solved via the CPLEX solver. We report the simulation results on the modified IEEE 30-bus system demonstrate that the presented method manages to improve operational flexibility of the IES with uncertain renewable generations by comprehensively leveraging thermal inertia of buildings and different kinds of auxiliary equipments, which provides a fundamental way for promoting renewable energy consumption.

30 DIRECT ENERGY CONVERSION↗

Mitigation for roof alterations to building 06-cp-65 at the area 6 control point, nevada national security site, nye county, nevada

Building 06-CP-65 has been determined to be a contributing element to the Area 6 Control Point Historic District (O’Neill et al. 2021; Reed 2022). It contributes to the significance of the historic district under Criterion A as one of the principal buildings that supported timing and firing operations for nuclear testing on the NNSS from 1966 to 1992. As such, the building served as a major warehouse with office space within the district. It was used by both REECo, a long-time general contractor at the NNSS, as well as EG&G, which provided technical support to the national laboratories and the DOD. The building served as an important staging area and electrical power supply point for the NNSS diagnostic trailer fleet and its unique location immediately along Mercury Highway allowed easy accessibility to the forward areas of the NNSS. The building also contributes to the historic district under Criterion C as it is one of the large, unadorned, precast concrete buildings at the Control Point. These types of buildings were the prominent elements of the compound that convey the district’s overall utilitarian, military-industrial character. Building 06-CP-65 retains all aspects of integrity to a high degree and easily conveys its significance as a warehouse that supported Control Point operations. Building 06-CP-65 is not recommended eligible for listing in the NRHP as an individual resource. While it served an important support function as part of the Control Point Historic District, an archival and literature review did not reveal information linking it to any specific test, series of tests, programs, or for any specific role on the NNSS other than as a warehouse (Criterion A). It has no direct association with any important individual (Criterion B). It also is not architecturally significant in its own right beyond reflecting the overall aesthetic of the Control Point Historic District (Criterion C), and it does not have potential to yield information important to the history of nuclear testing beyond what can be learned from historic texts, drawings, and other documents (Criterion D).

54 ENVIRONMENTAL SCIENCES↗

Design and operation of a solar heating and cooling system for a residential size building

The first year of operation of solar house is discussed. Selected design information, together with a brief system description is included. The house was equipped with an integrated solar heating and cooling system which uses fully automated state-of-the art. Evaluation of the data indicate that the solar house heating and cooling system is capable of supplying nearly 100 percent of the thermal energy required for heating and approximately 50 percent of the thermal energy required to operate the absorption cycle air conditioner.

Littles, J. W.↗

NASA's Next Generation Space Geodesy Program

Requirements for the ITRF have increased dramatically since the 1980s. The most stringent requirement comes from critical sea level monitoring programs: a global accuracy of 1.0 mm, and 0.1mm/yr stability, a factor of 10 to 20 beyond current capability. Other requirements for the ITRF coming from ice mass change, ground motion, and mass transport studies are similar. Current and future satellite missions will have ever-increasing measurement capability and will lead to increasingly sophisticated models of these and other changes in the Earth system. Ground space geodesy networks with enhanced measurement capability will be essential to meeting the ITRF requirements and properly interpreting the satellite data. These networks must be globally distributed and built for longevity, to provide the robust data necessary to generate improved models for proper interpretation of the observed geophysical signals. NASA has embarked on a Space Geodesy Program with a long-range goal to build, deploy and operate a next generation NASA Space Geodetic Network (SGN). The plan is to build integrated, multi-technique next-generation space geodetic observing systems as the core contribution to a global network designed to produce the higher quality data required to maintain the Terrestrial Reference Frame and provide information essential for fully realizing the measurement potential of the current and coming generation of Earth Observing spacecraft. Phase 1 of this project has been funded to (1) Establish and demonstrate a next-generation prototype integrated Space Geodetic Station at Goddard's Geophysical and Astronomical Observatory (GGAO), including next-generation SLR and VLBI systems along with modern GNSS and DORIS; (2) Complete ongoing Network Design Studies that describe the appropriate number and distribution of next-generation Space Geodetic Stations for an improved global network; (3) Upgrade analysis capability to handle the next-generation data; (4) Implement a modern survey system to measure inter-technique vectors for co-location; and (5) Develop an Implementation Plan to build, deploy and operate a next-generation integrated NASA SGN that will serve as NASA's contribution to the international global geodetic network. An envisioned Phase 2 (which is not currently funded) would include the replication of up to ten such stations to be deployed either as integrated units or as a complement to already in-place components provided by other organizations. This talk will give an update on the activities underway and the plans for completion.

Merkowitz, S. M.↗

NASA's Next Generation Space Geodesy Program

Requirements for the ITRF have increased dramatically since the 1980s. The most stringent requirement comes from critical sea level monitoring programs: a global accuracy of 1.0 mm, and 0.1mm/yr stability, a factor of 10 to 20 beyond current capability. Other requirements for the ITRF coming from ice mass change, ground motion, and mass transport studies are similar. Current and future satellite missions will have ever-increasing measurement capability and will lead to increasingly sophisticated models of these and other changes in the Earth system. Ground space geodesy networks with enhanced measurement capability will be essential to meeting the ITRF requirements and properly interpreting the satellite data. These networks must be globally distributed and built for longevity, to provide the robust data necessary to generate improved models for proper interpretation of the observed geophysical signals. NASA has embarked on a Space Geodesy Program with a long-range goal to build, deploy and operate a next generation NASA Space Geodetic Network (SGN). The plan is to build integrated, multi-technique next-generation space geodetic observing systems as the core contribution to a global network designed to produce the higher quality data required to maintain the Terrestrial Reference Frame and provide information essential for fully realizing the measurement potential of the current and coming generation of Earth Observing spacecraft. Phase 1 of this project has been funded to (1) Establish and demonstrate a next-generation prototype integrated Space Geodetic Station at Goddard s Geophysical and Astronomical Observatory (GGAO), including next-generation SLR and VLBI systems along with modern GNSS and DORIS; (2) Complete ongoing Network Design Studies that describe the appropriate number and distribution of next-generation Space Geodetic Stations for an improved global network; (3) Upgrade analysis capability to handle the next-generation data; (4) Implement a modern survey system to measure inter-technique vectors for co-location; and (5) Develop an Implementation Plan to build, deploy and operate a next-generation integrated NASA SGN that will serve as NASA s contribution to the international global geodetic network. An envisioned Phase 2 (which is not currently funded) would include the replication of up to ten such stations to be deployed either as integrated units or as a complement to already in-place components provided by other organizations. This talk will give an update on the activities underway and the plans for completion.

Pearlman, M. R.↗

Automated pipeline framework for processing of large-scale building energy time series data

Commercial buildings account for one third of the total electricity consumption in the United States and a significant amount of this energy is wasted. Therefore, there is a need for “virtual” energy audits, to identify energy inefficiencies and their associated savings opportunities using methods that can be non-intrusive and automated for application to large populations of buildings. Here we demonstrate virtual energy audits applied to large populations of buildings’ time-series smart-meter data using a systematic approach and a fully automated Building Energy Analytics (BEA) Pipeline that unifies, cleans, stores and analyzes building energy datasets in a non-relational data warehouse for efficient insights and results. This BEA pipeline is based on a custom compute job scheduler for a high performance computing cluster to enable parallel processing of Slurm jobs. Within the analytics pipeline, we introduced a data qualification tool that enhances data quality by fixing common errors, while also detecting abnormalities in a building’s daily operation using hierarchical clustering. We analyze the HVAC scheduling of a population of 816 buildings, using this analytics pipeline, as part of a cross-sectional study. With our approach, this sample of 816 buildings is improved in data quality and is efficiently analyzed in 34 minutes, which is 85 times faster than the time taken by a sequential processing. The analytical results for the HVAC operational hours of these buildings show that among 10 building use types, food sales buildings with 17.75 hours of daily HVAC cooling operation are decent targets for HVAC savings. Overall, this analytics pipeline enables the identification of statistically significant results from population based studies of large numbers of building energy time-series datasets with robust results. These types of BEA studies can explore numerous factors impacting building energy efficiency and virtual building energy audits. This approach enables a new generation of data-driven buildings energy analysis at scale.

36 MATERIALS SCIENCE↗

Cybersecurity Considerations and Research Pathways for Grid-Interactive Efficient Buildings

Federal facilities serve critical missions and functions that require safe, reliable, and efficient operations. Digitization of several facility operations has increased the cost-effectiveness of energy usage and optimization of energy system performance. As the building controls landscape shifts to become more connected and smarter, building operators now face unique opportunities and challenges to adopt smart enabled devices that can lower energy usage while also optimizing building system performance. The grid-interactive efficient buildings (GEB) initiative aims to make buildings cleaner and more flexible through these smart devices. Smart enabled devices allow greater connectivity and control through remote operations and provide crucial data for analytics and increased efficiency. GEBs enable demand flexibility that has the potential to reduce electrical costs and transform the grid edge where buildings connect to power grids. This operation of interconnected systems, if not designed with cybersecurity practices, causes security gaps and introduces potential attack paths by adversarial and non-adversarial entities leading to disruption of operations.

building controls↗

Simulated Tiltrotor Aircraft Operation in Close Proximity to a Building in Wind and Ground-Effect Conditions

A mid-fidelity computational fluid dynamics tool called RotCFD specifically developed to aid in rotorcraft studies has been applied to the study of wake interactions of civiltiltrotor aircraft in the immediate vicinity of buildings, in- and out-of-ground-effect, with and without winds, consistent with notional tiltrotor operations from urban vertiports. Such civil tiltrotor operations from urban vertiports could potentially enable city-center-to-city center commercial transport. However, in order to one day realize such civil tiltrotor operations, though, it is necessary to better understand the wake interaction and interactional aerodynamic operating environment of urban vertiports. In the early 2000s, a series of 7-by-10 Ft. wind tunnel tests were conducted at NASA Ames Research Center that began to explore some of these civil tiltrotor and vertiport wake interactioninteractional aerodynamics issues. This study seeks to validate computation fluid dynamic predictions against these early wind tunnel experimental results and, thereby, continue exploration of this important research area.

Rotorcraft↗

Environmental Assessment for Central Campus Complex John F. Kennedy Space Center, Florida

This Environmental Assessment addresses the Proposed Action to consolidate multiple facilities in the Kennedy Space Center (KSC) Industrial Area by constructing two new buildings in the existing headquarters area between NASA Parkway, 3rd Street, C Avenue, and D Avenue. Under the Proposed Action, the historic Headquarters Building will be demolished and a new building will be constructed closer to the Operations and Checkout Building by centering it on D A venue (Hunton Brady Architects, P A and Jones Edmunds and Associates, Inc. 2011). This option was selected from a group of 15 initial sketches as the most viable option during a Central Campus Complex Siting Study completed in February 2011. A No-Action Alternative is also presented in which no demolition or construction of new facilities would occur. Implementing the Proposed Action will have major impacts to cultural resources, while the remaining environmental impacts will be minor.

Dankert, Donald↗

EUI Benchmarks for Net-Zero Energy Buildings in India

In our study we present EUI benchmarks for NZEBs for six building types across residential and non-residential typologies and for India's five climate zones. This approach is similar to the simulation-based benchmarks used by the B3 program in Minnesota, the Cal-Arch methodology in California, and the US Solar Decathlon approach, which combine simulations with actual building data. Of the six building types we explore one in detail with a range of operation scenarios, specifically narrowing down the EUI benchmarks for mixed-mode building operation and for variable temperature set-points as prescribed in the National Building Code of India.The contribution of this work is to provide rigorous end-use level EUI benchmarks for six building types, and to describe a method for simulation-based EUI benchmarks for mixed-mode operation with variable setpoints to highlight the difference between the standard approach used for the five building types and the On-Site Construction Worker Housing which additionally has the mixed-mode variable setpoint approach.On-Site Construction Worker Housings are typically poorly constructed temporary structures, without adequate thermal comfort, It is critical to provide adequate thermal comfort to protect people from the warming effects of climate change, and to discover super efficient and cost-effective ways to do so.The methodology used for the On-Site Construction Worker Housing (CWH) results in an 80% acceptability according to the India Model for Adaptive Comfort in the National Building Code of India. EUIs of all six buildings are 60% lower than the minimum compliance with India's Energy Conservation Building Codes, providing benchmarks for efficiency levels. The end-use level EUI benchmarks are now provided to over 1800 Solar Decathlon India participants so that they can compare the performance of their NZEB designs.In particular, the CWH results provide an insight into the importance of the mixed-mode operation with variable temperature set-points. The results from the simulation study show that for an NZEB target, the EUI with standard thermal comfort model and without mixed operation is 58.26 kWh/m2*year, while that with the variable set-points of the adaptive model with mixed mode operation is 24.23 kWh/m2*year. This is a 58% reduction in EUI. Given that many building types including residential, and non-residential operate in mixed mode, it is important to take this work further to develop mixed-mode operation NZEB benchmarks so that the carbon intensity of these buildings could be lower than the standard thermal comfort model approach.

benchmarking↗