Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Workload management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

Fine-Grained Power and Energy Attribution on AMD GPU/APU-Based Exascale Nodes

Modern exascale GPU- and APU-based systems provide multiple power and energy sensors, but differences in scope, update rate, timing, and filtering complicate the attribution of short-lived accelerator activity. This paper presents a methodology to characterize and correct these effects on Cray EX systems with AMD Instinct MI250X GPUs (Frontier) and MI300A APUs (Portage). Using controlled square-wave workloads, we quantify update intervals, delay, aliasing, and variability across up to 512 GPUs and 480 APUs with on-chip (rocm-smi/amd-smi) and off-chip Cray Power Management sensors. We reconstruct power from cumulative energy counters to achieve faster response times, validate it against on-chip, off-chip, and node-level sensors, and integrate the resulting streams into a Score-P/PAPI-based tool for time-aligned, phase-level attribution. Applied to rocHPL, rocHPL-MxP, and HPG-MxP, the method separates energy savings due to reduced runtime from changes in power. Mixed precision reduces node energy on Frontier by 79% for rocHPL-MxP and 31% for HPG-MxP, with similar trends on Portage. These results provide portable guidance for sensor validation and power-aware optimization on current and future exascale systems.

Mcdaniel, Adam [ORNL] (ORCID:000000016926028X)↗

WTEC monograph on instrumentation, control and safety systems of Canadian nuclear facilities

This report updates a 1989-90 survey of advanced instrumentation and controls (I&C) technologies and associated human factors issues in the U.S. and Canadian nuclear industries carried out by a team from Oak Ridge National Laboratory (Carter and Uhrig 1990). The authors found that the most advanced I&C systems are in the Canadian CANDU plants, where the newest plant (Darlington) has digital systems in almost 100 percent of its control systems and in over 70 percent of its plant protection system. Increased emphasis on human factors and cognitive science in modern control rooms has resulted in a reduced workload for the operators and the elimination of many human errors. Automation implemented through digital instrumentation and control is effectively changing the role of the operator to that of a systems manager. The hypothesis that properly introducing digital systems increases safety is supported by the Canadian experience. The performance of these digital systems has been achieved using appropriate quality assurance programs for both hardware and software development. Recent regulatory authority review of the development of safety-critical software has resulted in the creation of isolated software modules with well defined interfaces and more formal structure in the software generation. The ability of digital systems to detect impending failures and initiate a fail-safe action is a significant safety issue that should be of special interest to nuclear utilities and regulatory authorities around the world.

Uhrig, Robert E.↗

A Distributed Simulation Facility to Support Human Factors Research in Advanced Air Transportation Technology

A distributed real-time simulation of the civil air traffic environment developed to support human factors research in advanced air transportation technology is presented. The distributed environment is based on a custom simulation architecture designed for simplicity and flexibility in human experiments. Standard Internet protocols are used to create the distributed environment, linking all advanced cockpit simulator, all Air Traffic Control simulator, and a pseudo-aircraft control and simulation management station. The pseudo-aircraft control station also functions as a scenario design tool for coordinating human factors experiments. This station incorporates a pseudo-pilot interface designed to reduce workload for human operators piloting multiple aircraft simultaneously in real time. The application of this distributed simulation facility to support a study of the effect of shared information (via air-ground datalink) on pilot/controller shared situation awareness and re-route negotiation is also presented.

Amonlirdviman, Keith↗

Telerobotic Control of Dexterous Dual-Arm Robots for D and D Operations - 18622

Robotic systems hold the potential to significantly reduce exposure of workers to hazardous environments such as in the deactivation and decommissioning (D and D) of nuclear facilities. Our goal is to enable an operator with minimal training to easily control a remote dual-arm robot to perform demolition tasks with hand tools. We propose a system that combines semi-autonomous coordination of the robot's arms with an intuitive operator interface based on virtual reality (VR) technology. A limb coordination system enables independent control of the robot arms, as well as coupled motion required to hold and manipulate rigid bodies such as reciprocating saws, angle grinders and crow bars. Using a VR head mounted display and stereo video from the robot for situational awareness and tracked VR hand controllers to command robot arm movement, an operator will be able to walk up to the control console, pick up the controllers, engage the manipulators, fly the grippers, grasp a tool with one or both robot arms and easily move them in unison to perform tasks. We present preliminary results using simulation and a physical dual-arm platform based on the Johns Hopkins University Applied Physics Laboratory's Modular Prosthetic Limb, an anthropomorphic device that provides hyper-dexterous human-like manipulation capabilities. Anticipated benefits of the robotic system for D and D operations include improved situational awareness, increased mission complexity, and reduced operator training time, workload, and task execution times. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Risk-Informed Margin Management (RIMM) Industry Applications IA1 - Integrated Cladding ECCS/LOCA Performance Analysis - Problem Statement

The U. S. NRC is currently proposing rulemaking designated as “10 CFR 50.46c” to revise the LOCA/ECCS acceptance criteria to include the effects of higher burnup on cladding performance as well as to address some other issues. The NRC is also currently resolving the public comments with the final rule expected to be issued in the summer of 2016. The impact of the final 50.46c rule on the industry will involve updating of fuel vendor LOCA evaluation models, NRC review and approval, and licensee submittal of new LOCA evaluations or reanalyses and associated technical specification revisions for NRC review and approval. The rule implementation process, both industry and NRC activities, is expected to take 5-10 years following the rule effective date. The need to use advanced cladding designs is expected. A loss of operational margin will result due to the more restrictive cladding embrittlement criteria. Initial and future compliance with the rule may significantly increase vendor workload and licensee cost as a spectrum of fuel rod initial burnup states may need to be analyzed to demonstrate compliance. Consequently there will be an increased focus on licensee decision making related to LOCA analysis to minimize cost and impact, and to manage margin.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Meta-Level Design Guidance and Operator Performance Measures for Hybrid Control Rooms

The purpose of this grant was to refine and test methods to evaluate digital human system interfaces (HSI) for existing largely analog nuclear power plant (NPP) control rooms (CRs). We hypothesized that CR operator performance (CROP) in hybrid NPP CRs will be improved if future digital HSI is designed based on: 1) more robust design guidelines for operator situation awareness (SA) and decision-making (DM); 2) enhanced CROP metrics during HSI evaluation; 3) an ontology for selecting simulation scenarios to evaluate digital HSI; and 4) a model to predict optimal HSI design attributes given CROP objectives. The team conducted numerous nuclear power plant site visits (e.g., to Brown’s Ferry, Palo Verde, Sequoyah and Vogtle) to study control room operations and crisis management and 3 visits to the NRC Chattanooga Training Center. We observed research studies at DC Cook and NRC Chattanooga in collaboration with the Halden Reactor Project. We collected operator performance and workload data in one NPP simulator. A comprehensive human (i.e., CROP) performance literature review was published in Applied Ergonomics. We obtained operator team performance data from CAER to produce our data fusion model and a paper delineating the results have been accepted (revision submitted) in Resilience Engineering and System Safety. We analyzed interview data related to scenario ontology development; a manuscript is still in preparation.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

EJFAT: Towards Intelligent Compute Destination Load Balancing

To handle increased data flow, Jefferson Lab (JLab) is partnering with ESnet for development of an AI/ML directed compute work Load Balancer (LB) of UDP streamed data. The LB is FPGA based featuring dynamically configurable, low latency and high throughput destination address switching. The LB provides integration of edge and core computing to support JLab experimental programs, the Electron-Ion Collider, as well as data centers of the future. In the ESnet/JLab FPGA Accelerated Transport (EJFAT) initiative, the function of the LB Data Plane (DP) is to redirect data streams to selectable (but unknown to sender) destination hosts based on current worload and within that host to destination ports as a function of sub- stream id. This effects hierarchical scaling, first across compute machines for processing over a series of events and second, across ports so different data source sub-streams may be assigned to different processors for further parallelization. The LB Control Plane (CP) programs the DP using compute farm telemetry to direct and balance workloads across a compute cluster as the operating conditions require. While Proportional/Integrative/Derivative (PID) controllers are often seen in similar applications, here we investigate the feasibility of a Reinforcement Learning (RL) based schedule manager running in the CP to provide dynamic updates to the DP scheduling policy.

Lawrence, David↗

Flight test experience using advanced airborne equipment in a time-based metered traffic environment

A series of test flights have demonstrated that time-based metering guidance and control was acceptable to pilots and air traffic controllers. The descent algorithm of the technique, with good representation of aircraft performance and wind modeling, yielded arrival time accuracy within 12 sec. It is expected that this will represent significant fuel savings (1) through a reduction of the time error dispersions at the metering fix for the entire fleet, and (2) for individual aircraft as well, through the presentation of guidance for a fuel-efficient descent. Air traffic controller workloads were also reduced, in keeping with the reduction of required communications resulting from the transfer of navigation responsibilities to pilots. A second series of test flights demonstrated that an existing flight management system could be modified to operate in the new mode.

Morello, S. A.↗

Evaluation of Initial and Mid-Term Air Traffic Procedures for Urban Air Mobility Operations

Urban air mobility (UAM) operations are expected to expand in scale over the next several years as novel aircraft types, including electric vertical takeoff and landing aircraft, are certified and begin operations. These new aircraft may increase safety, decrease noise, and lower operating costs compared with helicopters, allowing them to operate in ways existing aircraft do not. It is vital that these expanded operations are compatible with and do not disrupt existing operations or the air traffic management system. To study the ways in which scaled UAM operations can best integrate in the national airspace system, NASA and Joby Aviation partnered to conduct a high-fidelity air traffic controller-in-the-loop study. Building on air traffic procedures used to manage high tempo operations in other parts of the airspace, new procedures, routes, and communications protocols were developed and tested by retired controllers in NASA’s Future Flight Central tower simulation facility. In addition, new cooperative airspace constructs in the form of corridors were developed to understand their potential contributions to even greater scales of operation. The controllers managed traffic scenarios in the Dallas-Fort Worth and Dallas Love Field airports consisting of fleets of up to 100 UAM aircraft operating alongside traditional traffic . Metrics for air traffic controller workload, duration of communications, departure delays, and other measures of allowable aircraft throughput were collected. The analysis indicates that using today’s procedures for initial UAM operations under nominal conditions could enable up to 40 operations per hour to an airport’s central terminal area if that involved crossing a runway and up to 55operations per hour if reaching the central terminal did not involve crossing a runway. Operations at these tempos did not delay or otherwise interfere with simulated runway traffic and were rated acceptable by the air traffic controllers. The new corridor constructs dramatically lowered controller workload in certain circumstances, suggesting they may be effective in further increasing the allowable scale of operations.

Urban Air Mobility↗

Evaluation of Initial and Mid-Term Air Traffic Procedures for Urban Air Mobility

Urban air mobility (UAM) operations are expected to expand in scale over the next several years as novel aircraft types, including electric vertical takeoff and landing aircraft, are certified and begin operations. These new aircraft may increase safety, decrease noise, and lower operating costs compared with helicopters, allowing them to operate in ways existing aircraft do not. It is vital that these expanded operations are compatible with and do not disrupt existing operations or the air traffic management system. To study the ways in which scaled UAM operations can best integrate in the national airspace system, NASA and Joby Aviation partnered to conduct a high-fidelity air traffic controller-in-the-loop study. Building on air traffic procedures used to manage high tempo operations in other parts of the airspace, new procedures, routes, and communications protocols were developed and tested by retired controllers in NASA’s Future Flight Central tower simulation facility. In addition, new cooperative airspace constructs in the form of corridors were developed to understand their potential contributions to even greater scales of operation. The controllers managed traffic scenarios in the Dallas-Fort Worth and Dallas Love Field airports consisting of fleets of up to 100 UAM aircraft operating alongside traditional traffic. Metrics for air traffic controller workload, duration of communications, departure delays, and other measures of allowable aircraft throughput were collected. The analysis indicates that using today’s procedures for initial UAM operations under nominal conditions could enable up to 40 operations per hour to an airport’s central terminal area if that involved crossing a runway and up to 55 operations per hour if reaching the central terminal did not involve crossing a runway. Operations at these tempos did not delay or otherwise interfere with simulated runway traffic and were rated acceptable by the air traffic controllers. The new corridor constructs dramatically lowered controller workload in certain circumstances, suggesting they may be effective in further increasing the allowable scale of operations.

Advanced Air Mobility↗

A Cognitive Walkthrough of Multiple Drone Delivery Operations

Advances of early twenty-first century aviation and transportation technologies provide opportunities for enhanced aerial projects, and the overall integration of unmanned aircraft systems (UAS) into the National Airspace System (NAS) has applications across a wide range of operations. Through these, remote operators have learned to manage several UAS at the same time in a variety of operational environments. The present work details a component piece of an ongoing body of research into multi-UAS operations. Beginning in early 2020, NASA has collaborated with Uber Technologies to design and develop concepts of operations, roles and responsibilities, and ground control station (GCS) concepts to enable food delivery operations via multiple, small UAS (sUAS). A cognitive walkthrough was chosen as the method for data collection. This allowed information to be gathered from UAS subject matter experts (SMEs) that could further mature designs for future human-in-the-loop (HITL) simulations; in addition, it allowed information to be collected remotely during the stringent restrictions of the COVID-19 pandemic. Consequently, the described cognitive walkthrough activity utilized remote data collection protocols mediated through the usage of programs designed for presentation and telecommunications. Scenarios were designed, complete with airspace, contingencies, and remedial actions, to be presented to the SMEs. Information was collected using a combination of rating scales and open-ended questions. Results received from the SMEs revealed expected hazards, workloads, and information concerns inherent in the contingency scenarios. SMEs also provided insight into the design of GCS tools and displays as well as the duties and relationships of human operators (i.e., monitors) and automation (i.e., informers and flight managers). Implications of these findings are discussed.

unmanned aircraft systems↗

A Cognitive Walkthrough of Multiple Drone Delivery Operations

Advances of early twenty-first century aviation and transportation technologies provide opportunities for enhanced aerial projects, and the overall integration of unmanned aircraft systems (UAS) into the National Airspace System (NAS) has applications across a wide range of operations. Through these, remote operators have learned to manage several UAS at the same time in a variety of operational environments. The present work details a component piece of an ongoing body of research into multi-UAS operations. Beginning in early 2020, NASA has collaborated with Uber Technologies to design and develop concepts of operations, roles and responsibilities, and ground control station (GCS) concepts to enable food delivery operations via multiple, small UAS (sUAS). A cognitive walkthrough was chosen as the method for data collection. This allowed information to be gathered from UAS subject matter experts (SMEs) that could further mature designs for future human-in-the-loop (HITL) simulations; in addition, it allowed information to be collected remotely during the stringent restrictions of the COVID-19 pandemic. Consequently, the described cognitive walkthrough activity utilized remote data collection protocols mediated through the usage of programs designed for presentation and telecommunications. Scenarios were designed, complete with airspace, contingencies, and remedial actions, to be presented to the SMEs. Information was collected using a combination of rating scales and open-ended questions. Results received from the SMEs revealed expected hazards, workloads, and information concerns inherent in the contingency scenarios. SMEs also provided insight into the design of GCS tools and displays as well as the duties and relationships of human operators (i.e., monitors) and automation (i.e., informers and flight managers). Implications of these findings are discussed.

unmanned aircraft systems↗

Evaluation of a Tactical Surface Metering Tool for Charlotte Douglas International Airport Via Human-in-the-Loop Simulation

NASA has been working with the FAA and aviation industry partners to develop and demonstrate new concepts and technologies that integrate arrival, departure, and surface traffic management capabilities. In March 2017, NASA conducted a human-in-the-loop (HITL) simulation for integrated surface and airspace operations, modeling Charlotte Douglas International Airport, to evaluate the operational procedures and information requirements for the tactical surface metering tool, and data exchange elements between the airline controlled ramp and ATC Tower. In this paper, we focus on the calibration of the tactical surface metering tool using various metrics measured from the HITL simulation results. Key performance metrics include gate hold times from pushback advisories, taxi-in/out times, runway throughput, and departure queue size. Subjective metrics presented in this paper include workload, situational awareness, and acceptability of the metering tool and its calibration

air traffic management↗

Cockpit resource management skills enhance combat mission performance in a B-52 simulator

A cockpit resource management (CRM) program for mission-ready B-52 aircrew is developed. The relationship between CRM performance and combat mission performance is studied. The performances of six crew members flying a simulated high workload mission in a B-52 weapon system trainer are evaluated. The data reveal that CRM performance enhances tactical maneuvers and bombing accuracy.

Povenmire, H. Kingsley↗

Managing cluster-level performance variability without a centralized controller

Systems, apparatuses, and methods for managing cluster-level performance variability without a centralized controller are described. Each node of a multi-node cluster tracks a maximum and minimum progress across the plurality of nodes for a workload executed by the cluster. Each node also tracks its local progress on its current task. Each node also utilizes a comparison of the local progress to reported maximum and minimum progress across the cluster to identify a critical, or slow, node and whether to increase or reduce an amount of power allocated to the node. The nodes append information about the maximum and minimum progress to messages sent to other nodes to report their knowledge of maximum and minimum progress with other nodes. A node updates its local information if the node receives a message from another node with more up-to-date information about the state of progress across the cluster.

Piga, Leonardo↗

Evaluation of the Terminal Area Precision Scheduling and Spacing System for Performance-Based Navigation Arrivals

The growth of global demand for air transportation has put increasing strain on the nation's air traffic management system. To relieve this strain, the International Civil Aviation Organization has urged all nations to adopt Performance-Based Navigation (PBN), which can help to reduce air traffic congestion, decrease aviation fuel consumption, and protect the environment. NASA has developed a Terminal Area Precision Scheduling and Spacing (TAPSS) system that can support increased use of PBN during periods of high traffic, while supporting fuel-efficient, continuous descent approaches. In the original development of this system, arrival aircraft are assigned fuel-efficient Area Navigation (RNAV) Standard Terminal Arrival Routes before their initial descent from cruise, with routing defined to a specific runway. The system also determines precise schedules for these aircraft that facilitate continuous descent through the assigned routes. To meet these schedules, controllers are given a set of advisory tools to precisely control aircraft. The TAPSS system has been evaluated in a series of human-in-the-loop (HITL) air traffic simulations during 2010 and 2011. Results indicated increased airport arrival throughput up to 10 over current operations, and maintained fuel-efficient aircraft decent profiles from the initial descent to landing with reduced controller workload. This paper focuses on results from a joint NASA and FAA HITL simulation conducted in 2012. Due to the FAA rollout of the advance terminal area PBN procedures at mid-sized airports first, the TAPSS system was modified to manage arrival aircraft as they entered Terminal Radar Approach Control (TRACON). Dallas-Love Field airport (DAL) was selected by the FAA as a representative mid-sized airport within a constrained TRACON airspace due to the close proximity of a major airport, in this case Dallas-Ft Worth International Airport, one of the busiest in the world. To address this constraint, RNAV routes and Required Navigation Performance with the particular capability known as Radius-to-Fix (RNP-RF) approaches to a short final were used. The purpose of this simulation was to get feedback on how current operations could benefit with the TAPSS system and also to evaluate the efficacy of the advisory tools to support the broader use of PBN in the US National Airspace System. For this NASA-FAA joint experiment, an Air Traffic Control laboratory at NASA Ames was arranged to simulate arrivals into DAL in Instrument Meteorological Conditions utilizing parallel dependent approaches, with two feeder positions that handed off traffic to one final position. Four FAA controllers participated, alternately covering these three positions. All participants were Full-Performance Level terminal controllers and members of the National Air Traffic Controllers Association. During the simulation, PBN arrival operations were compared and contrasted in three conditions. They were the Baseline, where none of the TAPSS systems TRACON controller decision support advisories were provided, the Limited Advisories, reflecting the existing but dormant capabilities of the current terminal automation equipment with providing a subset of the TAPSS systems advisories; numerical delay, landing sequence, and runway assignment information, and the Full Advisories, with providing the following in addition to the ones in the Limited condition; trajectory slot markers, timelines of estimated times of arrivals and sched

Performance based navigation↗

Petascale system management experiences.

Petascale High-Performance Computing (HPC) systems are among the largest systems in the world. Intrepid, one such system, is a 40,000 node, 556 teraflop Blue Gene/P system that has been deployed at Argonne National Laboratory. In this paper, we provide some background about the system and our administration experiences. In particular, due to the scale of the system, we have faced a variety of issues, some surprising to us, that are not common in the commodity world. We discuss our expectations, these issues, and approaches we have used to address them. HPC systems are a bellwether for computing systems at large, in multiple regards. HPC users are motivated by the need for absolute performance; this results in two important pushes. HPC users are frequently early adopters of new technologies and techniques. Successful technologies, like Infiniband, prove their value in HPC before gaining wider adoption. Unfortunately, this early adoption alone is not sufficient to achieve the levels of performance required by HPC users; parallelism must also be harnessed. Over the last 15 years, beowulf clustering has provided amazing accessibility to non-HPC-savvy and even non-technical audiences. During this time, substantial adoption of clustering has occurred in many market segments unrelated to computational science. A simple trend has emerged: the scale and performance of high-end HPC systems are uncommon at first, but become commonplace over the course of 3-5 years. For example, in early 2003, several systems on the Top500 list consisted of either 1024 nodes or 4096-8192 cores. In 2008, such systems are commonplace. The most recent generation of high-end HPC systems, so called petascale systems, are the culmination of years of research and development in research and academia. Three such systems have been deployed thus far. In addition to the 556 TF Intrepid system at Argonne National Laboratory, a 596 TF Blue Gene/L-based system has been deployed at Lawrence Livermore National Laboratory, and a 504 TF Opteron-based system has been deployed at Texas Advanced Computing Center (TACC). Intrepid is comprised of 40,960 nodes with a total of 163,840 cores. While systems like these are uncommon now, we expect them to become more widespread in the coming years. The scale of these large systems impose several requirements upon system architecture. The need for scalability is obvious, however, power efficiency and density constraints have become increasingly important in recent years. At the same time, because the size of administrative staff cannot grow linearly with the system size, more efficient system management techniques are needed. In this paper we will describe our experiences administering Intrepid. Over the last year, we have experienced a number of interesting challenges in this endeavor. Our initial expectation was for scalability to be the dominant system issue. This expectation was not accurate. Several issues expected to have minor impact have played a much greater role in system operations. Debugging, due to the large numbers of components used in scalable system operations, has become a much more difficult endeavor. The system has a sophisticated monitoring system, however, the analysis of this data has been problematic. These issues are not specific to HPC workloads in any way, so we expect them to be of general interest. This paper consists of three major parts. First, we will provide a detailed overview of several important aspects of Intrepid's hardware and software. In this, we will highlight aspects that have featured prominently in our system management experiences. Next, we will describe our administration experiences in detail. Finally, we will draw some conclusions based on these experiences. In particular, we will discuss the implications for the non-HPC world, system managers, and system software developers.

99 GENERAL AND MISCELLANEOUS↗