Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “WIND POWER”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

A surrogate-model-based approach for estimating the first and second-order moments of offshore wind power

Power curve, the functional relationship that governs the process of converting a set of weather variables experienced by a wind turbine into electric power, is widely used in the wind industry to estimate power output for planning and operational purposes. Existing methods for power curve estimation have three main limitations: (i) they mostly rely on wind speed as the sole input, thus ignoring the secondary, yet possibly significant effects of other environmental factors, (ii) they largely overlook the complex marine environment in which offshore turbines operate, potentially compromising their value in offshore wind energy applications, and (ii) they solely focus on the first-order properties of wind power, with little (or null) information about the variation around the mean behavior, which is important for ensuring reliable grid integration, asset health monitoring, and energy storage, among others. In light of that, this study investigates the impact of several wind-and wave-related factors on offshore wind power variability, with the ultimate goal of accurately predicting its first two moments. Further, our approach couples OpenFAST—a multi-physics wind turbine simulator—with Gaussian Process (GP) regression to reveal the underlying relationships governing offshore weather-to-power conversion. We first find that a multi-input power curve which captures the combined impact of wind speed, direction, and air density, can provide double-digit improvements, in terms of prediction accuracy, relative to univariate methods which rely on wind speed as the sole explanatory variable (e.g. the standard method of bins). Wave-related variables are found not important for predicting the average power output, but interestingly, appear to be extremely relevant in describing the fluctuation of the offshore power around its mean. Tested on real-world data collected at the New York/New Jersey bight, our proposed multi-input models demonstrate a high explanatory power in predicting the first two moments of offshore wind generation, testifying their potential value to the offshore wind industry.

17 WIND ENERGY↗

Wind Power Project Repowering: History, Economics, and Demand (Presentation)

This presentation summarizes a related NREL technical report and seeks to capture the current status of wind power project repowering in the U.S. and globally, analyze the economic and financial decision drivers that surround repowering, and to quantify the level and timing of demand for new turbine equipment to supply the repowering market.

17 WIND ENERGY↗

Power Sector, Supply Chain, Jobs, and Emissions Implications of 30 Gigawatts of Offshore Wind Power by 2030

This report summarizes the authors' analysis, focusing on the near- (through 2030) and long-term (through 2050) implications of deploying 30 gigawatts of offshore wind energy by 2030. Specifically, the authors assessed impacts on power sector evolution, offshore wind supply chain and infrastructure, and offshore wind workforce needs in the United States. The methods, limitations, and results of each aspect of the analysis are presented in their respective sections.

17 WIND ENERGY↗

Industrializing Offshore Wind Power with Serial Assembly and Lower-cost Deployment - Final Report

A team of engineers and contractors has developed a method to move offshore wind installation toward lower cost, faster deployment, and lower environmental impact. A combination of methods, some incremental and some breaks from past practice, interact to yield multiple improvements. Three designs were evaluated based on detailed engineering: 1) a 5 MW turbine on a jacket with pin piles (base case), 2) a 10 MW turbine on a conventional jacket with pin piles, assembled at sea, and 3) a 10 MW turbine on tripod jacket with suction buckets (caissons) and with complete turbine assembly on-shore. The larger turbine, assembly ashore, and the use of suction buckets together substantially reduce capital cost of offshore wind projects. Notable capital cost reductions are: changing from 5 MW to 10 MW turbine, a 31% capital cost reduction, and assembly on land then single-piece install at sea an additional 9% capital cost reduction. An estimated Design 4) estimates further cost reduction when equipment and processes of Design 3) are optimized, rather than adapted to existing equipment and process. Cost of energy for each of the four Designs are also calculated, yielding approximately the same percentage reductions. The methods of Design 3) analyzed here include accepted structures such as suction buckets used in new ways, innovations conceived but previously without engineering and economic validation, combined with new methods not previously proposed. Analysis of Designs 2) and 3) are based on extensive engineering calculations and detailed cost estimates. All design methods can be done with existing equipment, including lift equipment, ports and ships (except that design 4 assumes a more optimized ship). The design team consists of experienced offshore structure designers, heavy lift engineers, wind turbine designers, vessel operators, and marine construction contractors. Comparing the methods based on criteria of cost and deployment speed, the study selected the third design. That design is, in brief: a conventional turbine and tubular tower is mounted on a tripod jacket, in turn atop three suction buckets. Blades are mounted on the tower, not on the hub. The entire structure is built in port, from the bottom up, then assembled structures are queued in the port for deployment. During weather windows, the fully-assembled structures are lifted off the quay, lashed to the vessel, and transported to the deployment site. The vessel analyzed is a shear leg crane vessel with dynamic positioning like the existing Gulliver, or it could be a US-built crane barge. On site, the entire structure is lowered to the bottom by the crane vessel, then pumping of the suction buckets is managed by smaller service vessels. Blades are lifted into place by small winches operated by workers in the nacelle without lift vessel support. Advantages of the selected design include: cost and time at sea of the expensive lift vessel are significantly reduced; no jack up vessel is required; the weather window required for each installation is shorter; turbine structure construction is continuous with a queue feeding the weather-dependent installation process; pre-installation geotechnical work is faster and less expensive; there are no sound impacts on marine mammals, thus minimal spotting and no work stoppage Industrializing Offshore Wind Power 6 of 96 9 for mammal passage; the entire structure can be removed for decommissioning or major repairs; the method has been validated for current turbines up to 10 MW, and a calculation using simple scaling shows it usable up to 20 MW turbines.

17 WIND ENERGY↗

An Integrated Platform for Wind Power Plant Operations: From Atmosphere to Electrons to the Grid (A2e2g)

The research objective for the Atmosphere to Electrons to the Grid (A2e2g) project was to design a platform that merges forecasting tools with aerodynamic and economic models. The value proposition is that expanding wind power plant operation to include grid services allows those plants to operate in markets for grid services as well as energy markets, increasing revenue streams for wind plant operators while contributing to reliable grid operation.

17 WIND ENERGY↗

Wind power prediction models

Investigations were performed to predict the power available from the wind at the Goldstone, California, antenna site complex. The background for power prediction was derived from a statistical evaluation of available wind speed data records at this location and at nearby locations similarly situated within the Mojave desert. In addition to a model for power prediction over relatively long periods of time, an interim simulation model that produces sample wind speeds is described. The interim model furnishes uncorrelated sample speeds at hourly intervals that reproduce the statistical wind distribution at Goldstone. A stochastic simulation model to provide speed samples representative of both the statistical speed distributions and correlations is also discussed.

Levy, R.↗

Adaptive Hierarchical Voltage Control of a DFIG-Based Wind Power Plant for a Grid Fault

This paper proposes an adaptive hierarchical voltage control scheme of a doubly-fed induction generator (DFIG)-based wind power plant (WPP) that can secure more reserve of reactive power (Q) in the WPP against a grid fault. To achieve this, each DFIG controller employs an adaptive reactive power to voltage (Q-V) characteristic. The proposed adaptive Q-V characteristic is temporally modified depending on the available Q capability of a DFIG; it is dependent on the distance from a DFIG to the point of common coupling (PCC). The proposed characteristic secures more Q reserve in the WPP than the fixed one. Furthermore, it allows DFIGs to promptly inject up to the Q limit, thereby improving the PCC voltage support. To avert an overvoltage after the fault clearance, washout filters are implemented in the WPP and DFIG controllers; they can prevent a surplus Q injection after the fault clearance by eliminating the accumulated values in the proportional-integral controllers of both controllers during the fault. Test results demonstrate that the scheme can improve the voltage support capability during the fault and suppress transient overvoltage after the fault clearance under scenarios of various system and fault conditions; therefore, it helps ensure grid resilience by supporting the voltage stability.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Final Technical Report Overcoming Critical Barriers to U.S. Wind Power: A University-Industry Consortium

The objective of this project was to develop a curriculum module involving the design and simulation of a wind turbine generator. Dr. Allison Kipple, Assistant Professor of Electrical Engineering, led development of the module, employing graduate and undergraduate students, and Dr. Tom Acker served as project manager and principal investigator. This objective was achieved resulting in development of curricular materials, implementation and revision of the materials in EE 364, a Northern Arizona University electrical engineering course in “Fundamentals of Electromagnetics,” and via dissemination of the curricular materials to a broad community including other universities.

17 WIND ENERGY↗

Structural analysis of wind turbine rotors for NSF-NASA Mod-0 wind power system

Preliminary estimates are presented of vibratory loads and stresses in hingeless and teetering rotors for the proposed NSF-NASA Mod-0 wind power system. Preliminary blade design utilizes a tapered tubular aluminum spar which supports nonstructural aluminum ribs and skin and is joined to the rotor hub by a steel shank tube. Stresses in the shank of the blade are calculated for static, rated, and overload operating conditions. Blade vibrations were limited to the fundamental flapping modes, which were elastic cantilever bending for hingeless rotor blades and rigid-body rotation for teetering rotor blades. The MOSTAB-C computer code was used to calculate aerodynamic and mechanical loads. The teetering rotor has substantial advantages over the hingeless rotor with respect to shank stresses, fatigue life, and tower loading. The hingeless rotor analyzed does not appear to be structurally stable during overloads.

Spera, D. A.↗

Scaling Wind Power Innovation Assessment for Rapid Energy Transition with Artificial Intelligence

Planning for energy system decarbonization requires new insights into the potential of renewable technologies, deployed at unprecedented scale, to meet urgent sustainability goals. However, limited scalability of current wind energy research tools restricts characterization of innovation impacts to isolated reference sites, challenging investment and decision making under rapid growth. We demonstrate the transformative potential of artificial intelligence (AI) to inform future technology advancement and energy systems design by leveraging a state-of-the-art surrogate model to conduct a series of fleet-wide wind plant layout optimizations for greater than 6,800 projected U.S. onshore buildout locations. We show how innovative wake steering technology can address an array of barriers to large-scale deployment and integration of wind power. Specifically, wake steering reduces required plant area by an average of 18% and could preserve upwards of 13,000 km2 for future greenfield deployment, potentially easing siting challenges associated with wind energy infrastructure. Further, by enabling reduced turbine spacing and increased energy production, flexible operations of wake steering improve levelized cost of energy, particularly for large plants and in land-constrained settings. Finally, optimizations that consider dynamic energy prices can deliver increased power production and revenue capture during high-value (often low-wind) periods, further bolstering plant economics. Our computationally efficient approach offers a pathway to accelerate nationwide geographic evaluation of innovative technologies.

graph neural networks↗

Low-Maintenance Wind Power System

Turbines of 1, 3 and 30 kW were designed, prototyped and evaluated. A 55 kW unit has been preliminarily designed. Two 1 kW alpha units and a 3 kW alpha unit were delivered to the US in 2005 and Empire Magnetics provided custom alternators for the units. After evaluation, the 6 bladed, 3 kW unit was chosen for beta fabrication and 5 units were delivered to the US in December, 2009 while others remained for testing in Russia.

42 ENGINEERING↗

Investigating Power System Primary and Secondary Reserve Interaction under High Wind Power Penetration

Power system frequency needs to be maintained close to its nominal value at all times to successfully balance load and generation and maintain system reliability. Adequate primary frequency response and secondary frequency response are the primary forces to correct an energy imbalance at the second-to-minute level. As wind energy becomes a larger portion of the world's energy portfolio, there is an increased need for wind to provide frequency response. This paper addresses one of the major concerns about using wind for frequency regulation: the unknown factor of the interaction between primary and secondary reserves. The lack of a commercially available tool to model this has limited the energy industry's understanding of when the depletion of primary reserves will impact the performance of secondary response or vice versa. This paper investigates the issue by developing a multi-area frequency response integration tool with combined primary and secondary capabilities. The simulation is conducted in close coordination with economical energy scheduling scenarios to ensure credible simulation results.

17 WIND ENERGY↗

Value of Wind Power Forecasting

This study, building on the extensive models developed for the Western Wind and Solar Integration Study (WWSIS), uses these WECC models to evaluate the operating cost impacts of improved day-ahead wind forecasts.

17 WIND ENERGY↗

Assessment of wind power scenario creation methods for stochastic power systems operations

Probabilistic scenarios of renewable energy production, such as wind, have been gaining popularity for use in stochastic variants of power systems operations scheduling problems, allowing for optimal decision-making under uncertainty. The quality of the scenarios has a direct impact on the value of the resulting decisions, but until now, methods for creating scenarios have not been compared under realistic operational conditions. Here, we compare the quality of scenario sets created using three different methods, based on a simulated re-enactment of stochastic day-ahead unit commitment and subsequent dispatch for a realistic test system. We create scenarios using a dataset of forecasted and actual wind power values, scaled to evaluate the effects of increasing wind penetration levels. We show that the choice of scenario set can significantly impact system operating cost, renewable energy use, and the ability of the system to meet demand. This result has implications for the ability of system operators to efficiently integrate renewable production into their day-ahead planning, highlighting the need for the use of performance-based assessments for scenario evaluation.

17 WIND ENERGY↗

Maximization of the annual energy production of wind power plants by optimization of layout and yaw-based wake control: Maximization of wind plant AEP by optimization of layout and wake control

This paper presents a wind plant modeling and optimization tool that enables the maximization of wind plant annual energy production (AEP) using yaw-based wake steering control and layout changes. The tool is an extension of a wake engineering model describing the steady-state effects of yaw on wake velocity profiles and power productions of wind turbines in a wind plant. To make predictions of a wind plant's AEP, necessary extensions of the original wake model include coupling it with a detailed rotor model and a control policy for turbine blade pitch and rotor speed. This enables the prediction of power production with wake effects throughout a range of wind speeds. We use the tool to perform an example optimization study on a wind plant based on the Princess Amalia Wind Park. In this case study, combined optimization of layout and wake steering control increases AEP by 5%. The power gains from wake steering control are highest for region 1.5 inflow wind speeds, and they continue to be present to some extent for the above-rated inflow wind speeds. The results show that layout optimization and wake steering are complementary because significant AEP improvements can be achieved with wake steering in a wind plant layout that is already optimized to reduce wake losses.

17 WIND ENERGY↗