Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Shear Strength”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

Utah FORGE: Results of Direct Shear Tests on Saturated Joints in Sierra White Granite

This dataset includes an Excel file with the results of direct shear tests to investigate the mechanical and geophysical response of saturated joints. Tests were conducted on induced tension-fractured Sierra White granite joints in a custom water pressurized chamber. The preparation of granite joints is summarized in the PDF file. The PDF file also includes a description of the direct shear tests, experimental procedure, and results.

15 GEOTHERMAL ENERGY↗

Utah FORGE: Direct Shear Test Data for Investigating Seismic Precursors to Shear Failure of Fractures

This dataset includes results of direct shear tests to investigate the mechanical and geophysical response of dry and saturated fractures in Indiana limestone and Sierra White granite. Direct shear tests were performed on tensile-induced fractures in Indiana limestone and Sierra White granite in a custom water-pressurized chamber. The provided Excel files include the representative seismic wave signals and the normalized wave amplitudes of ultrasonic wave transducers. A link to the published journal article presenting the data and describing the experiment in detail is provided as well.

15 GEOTHERMAL ENERGY↗

Technical Gaps in Hanford High-Level Waste Solids Settling Behavior and Settling Time Evaluation for Direct Feed High-Level Waste (DFHLW) Operations

Settling of high-level waste (HLW) solids in process vessels is a key conceptual process step in providing HLW feed directly to the Hanford Waste Treatment and Immobilization Plant (WTP) HLW Vitrification Facility. Direct Feed High-Level Waste (DFHLW) is a potential approach to initiating HLW vitrification prior to completing of the WTP Pretreatment Facility. Settling would be used with subsequent supernatant decant to concentrate HLW feed. To support planning for DFHLW, Washington River Protection Solutions (WRPS) requested support from the Pacific Northwest National Laboratory to evaluate the current data set available to predict the time needed for HLW solids to settle, to identify gaps in the understanding and predictive capability of HLW solids waste settling times, and to provide scoping estimates of the potential settling time. Eight technical gaps were identified for predicting settling times and characteristics of the formed sediment layers including: Gap 1: In-Tank Settling Rates Faster than Settling of Laboratory Samples, Gap 2: Effect of Sludge Leaching/Washing on Predicted Settling Times, Gap 3: Predicting Waste Settling from Waste Chemistry (Waste Type), Gap 4: Predicting Waste Settling from Particle Size and Density Distributions (PSDDs), Gap 5: Insufficient Laboratory and In-Tank Settling Data to Represent Hanford Waste, Gap 6: Methods for Real-Time, In-Tank Tracking of Settling, Gap 7: Prediction of Sediment Erosion Resistance as a Function of Settling Time, and Gap 8: Prediction of Sediment Solids Content as a Function of Settling Time. In addition to the data gaps, an overarching observation of the settling rate and settled layer data is the significant variation in behavior. At similar solids concentrations, settling rates can vary by as much as 3 orders of magnitude depending on the source waste tank, and significantly different settling rates are noted between laboratory and in situ tests for the same waste tank. The range of average solids concentration in existing HLW sediment, which may have been quiescent for decades, can vary from less than 7 wt% to greater than 74 wt% solids. The shear strengths (or yield stresses) measured on laboratory samples range from less than 27 Pa to greater than 6400 Pa. These variations can challenge process planning for the application of a settle/decant process for DFHLW. This report describes the significance of the gaps to the settle/decant process and presents uncertainties by way of examples. Potential technical approaches for resolving these gaps are described and the estimated difficulty in resolving these gaps is evaluated. Based on the significance of the gap and the difficulty of resolution, recommendations are made to address specific gaps. Scoping estimates of the potential settling times for DFHLW solids have been made based on the existing data set with its associated gaps. Depending on the process vessel depth and final sediment concentration, substantial fractions of the scoping estimate results for settling times for characterized HLW exceed the 2-week period that has been previously assumed for process planning. There is also significant disparity, potentially greater than a factor of 5000 difference, in the estimated settling times depending on process vessel depth and final sediment solid concentration. This variation in results underscores the significance of the identified gaps and uncertainties with respect to process planning for utilizing settle/decant operations for DFHLW.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Multi-Process Tooling

Decisions made early in the automotive design process influence material selection, which in turn dictates process selection and tool design. Because of tool build time and cost of tooling, the original path is not easily altered, even if there is compelling evidence that another material or process would be beneficial. This project focused on tool design that is agile enough to allow its use in multiple processes—injection, injection compression, and extrusion-compression. This tool design allows for the manufacture of components with the most efficient process or materials, without building multiple, single-process tools. The primary purpose of the Multi-Process Tool project was to physically demonstrate that a single, well-designed tool could be used to manufacture parts with a variety of materials that require different processes. A multi-process tool would be beneficial to providing data for any changes to the process since materials and processes can be interchanged without incurring additional tool cost(s). Battery tray parts, (representative of a multi-process tool, were successfully manufactured using various types of materials, such as fiber reinforced (carbon fiber and/or glass fibers, recycled carbon fibers), amorphous (PP, TPU), semi-crystalline (PA6, PA66), and crystalline (thermoset epoxy resin) polymers. Processing of the parts was achieved by injection molding, compression molding, compression overmolding, and injection overmolding. Specimens extracted from various locations on the battery tray parts were evaluated for mechanical properties (flexure and interlaminar shear strength properties). The results show that the tool can be used to produce parts from a wide range of materials and processes with no degradation of the physical or cosmetic properties.

42 ENGINEERING↗

Materials, and engineering problems

Composite material engineering problems, discussing tensile, compressive and shear strengths, design approaches, unidirectional properties and substance characterizations

Dow, N. F.↗

New primers for adhesive bonding of aluminum alloys

Synthetic polypeptide adhesive primers are effective, with high temperature epoxy resins, at temperatures from 100 deg to 300 deg C. Lap-shear failure loads and lap-shear strength of both primers are discussed.

Burrell, B. W.↗

Soil mechanics results of Luna 16 and Lunokhod 1: A preliminary report

The physical and mechanical properties of the lunar soil, as determined by Luna 16 and Lunokhod 1 experiments, are discussed. Data are included for interactions between vehicle wheels and the lunar soil, compressibility, resistance to penetration, and friction characteristics of the soil. The shear strength of the returned lunar soil for various bulk densities is also examined. Several potential spacecraft materials were tested in contact with lunar soil to determine their friction and wear characteristics.

Johnson, S. W.↗

An improved diffusion welding technique for TD-NiCr

An improved diffusion welding technique has been developed for TD-NiCr sheet. In the most preferred form, the improved technique consists of diffusion welding 320-grit sanded plus chemically polished surfaces of unrecrystallized TD-NiCr at 760 C under 140 MN/m2 pressure for 1hr followed by postheating at 1180 C for 2hr. Compared to previous work, this improved technique has the advantages of shorter welding time, lower welding temperature, lower welding pressure, and a simpler and more reproducible surface preparation procedure. Weldments were made that had parent-metal creep-rupture shear strength at 1100 C.

Holko, K. H.↗

Development of gas-pressure bonding process for air-cooled turbine blades

An investigation was conducted on the application of gas-pressure bonding to the joining of components for convectively cooled turbine blades and vanes. A processing procedure was established for joining the fins of Udimet 700 and TD NiCr sheet metal airfoil shells to cast B1900 struts without the use of internal support tooling. Alternative methods employing support tooling were investigated. Testing procedures were developed and employed to determine shear strengths and internal burst pressures of flat and cylindrical bonded finned shell configurations at room temperature and 1750 F. Strength values were determined parallel and transverse to the cooling fin direction. The effect of thermal cycles from 1750 F to room temperature on strength was also investigated.

Meiners, K. E.↗

Static penetration resistance of soils

Model test results were used to define the failure mechanism associated with the static penetration resistance of cohesionless and low-cohesion soils. Knowledge of this mechanism has permitted the development of a new analytical method for calculating the ultimate penetration resistance which explicitly accounts for penetrometer base apex angle and roughness, soil friction angle, and the ratio of penetration depth to base width. Curves relating the bearing capacity factors to the soil friction angle are presented for failure in general shear. Strength parameters and penetrometer interaction properties of a fine sand were determined and used as the basis for prediction of the penetration resistance encountered by wedge, cone, and flat-ended penetrometers of different surface roughness using the proposed analytical method. Because of the close agreement between predicted values and values measured in laboratory tests, it appears possible to deduce in-situ soil strength parameters and their variation with depth from the results of static penetration tests.

Durgunoglu, H. T.↗

Friction, wear, and noise of slip ring and brush contacts for synchronous satellite use.

A program is being conducted for testing of slip rings for synchronous orbit application. Instrumentation systems necessary for monitoring electrical noise, friction, and brush wear at atmospheric pressure and at less than 50 nanotorr have been developed. A multiplex scheme necessary for the simultaneous recording of brush displacement, friction, and electrical noise has also been developed. Composite brushes consisting of silver-molybdenum disulfide-graphite and silver-niobium diselenide-graphite have been employed on rings of coin silver and rhodium plate. Brush property measurements made included measurement of density, electrical resistivity, shear strength, and microstructure.

Lewis, N. E.↗

Adhesive-bonded scarf and stepped-lap joints

Continuum mechanics solutions are derived for the static load-carrying capacity of scarf and stepped-lap adhesive-bonded joints. The analyses account for adhesive plasticity and adherend stiffness imbalance and thermal mismatch. The scarf joint solutions include a simple algebraic formula which serves as a close lower bound, within a small fraction of a per cent of the true answer for most practical geometries and materials. Digital computer programs were developed and, for the stepped-lap joints, the critical adherend and adhesive stresses are computed for each step. The scarf joint solutions exhibit grossly different behavior from that for double-lap joints for long overlaps inasmuch as that the potential bond shear strength continues to increase with indefinitely long overlaps on the scarf joints. The stepped-lap joint solutions exhibit some characteristics of both the scarf and double-lap joints. The stepped-lap computer program handles arbitrary (different) step lengths and thickness and the solutions obtained have clarified potentially weak design details and the remedies. The program has been used effectively to optimize the joint proportions.

Hart-Smith, L. J.↗