Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “SUBSTATIONS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

Voltage Optimization

Voltage optimization refers to a volt-var optimization technique which was originally designed to minimize energy consumption and improve end-use efficiency on the distribution system. This reduces source voltage at a substation, which lowers generation demand, reduces system losses, and improves system stability. This has been the conventional implementation of voltage optimization: focusing on regulation of voltages throughout the distribution system via coordinated adjustments of load tap changers, line-voltage regulators, switched shunt compensation, and the targeted placement of new shunt compensation. These methods have received increased focus following a growth in distributed-energy resources (DERs) interconnecting at the distribution level, given their developing capability to participate in voltage regulation. This is paired with the intermittency challenges they pose, load imbalances, and voltage fluctuations. Voltage optimization has long been an area of extensive research within the distribution system, with various strategies and philosophies demonstrating a range of effects. The conventional focus on the distribution system owes to the typical operation of transmission systems, which assumes firm local resources and flows strictly from generation resources to loads. The strategies employed in distribution have also been optimized for this typically radial configuration and operation of the distribution system.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

One Earth Energy FEED Process Design Basis

This report establishes the process design basis for the front-end engineering design (FEED) of a carbon capture and injection facility at One Earth Energy's (OEE) ethanol production plant in Gibson City, Illinois, developed as part of the Illinois Storage Corridor CarbonSAFE Phase III project. The facility is designed to compress and dehydrate up to approximately 458,000 metric tonnes of CO 2 per year, sourced directly from OEE's ethanol fermenters, for permanent injection into a saline aquifer approximately four miles from the plant. At normal operating conditions, the system will process 1,290 metric tonnes of CO 2 per day, assuming 355 operating days per year and an ethanol production rate of 160 million gallons per year. The proposed process trains a multistage centrifugal blower with a five-stage reciprocating compressor, delivering CO 2 to the injection wellhead at up to 1,500 psig. Triethylene glycol (TEG) dehydration, applied after the fourth compression stage, reduces water content to a target of 10 lb/MMscf, well within the 30 lb/MMscf injection limit. Beyond dehydration, no additional treatment is required; trace impurities including oxygen and nitrogen will remain in the injected stream. Key design considerations include the absence of spare cooling tower capacity at the site, necessitating new cooling infrastructure, and the need for a new electrical substation to support large motor loads. The facility is designed for continuous, largely unattended operation, monitored around the clock by existing OEE operations staff. This document serves as the foundational reference for all subsequent detailed engineering activities associated with the OEE CO 2 injection facility.

01 COAL, LIGNITE, AND PEAT↗

Digital Assurance for Grid Reliability in the Era of Large Load Growth

The rapid expansion of large electric loads is reshaping the operational and regulatory landscape of the U.S. electric grid. These facilities are reaching new scales of expansion, now exceeding a gigawatt per site, and their highly sensitive, digitally driven behaviors introduce new reliability risks. Recent grid events, including large load losses following routine transmission disturbances, highlight the consequences of limited ride-through capability, inconsistent protection settings, inadequate modeling, and lack of behind-the-meter visibility. Parallels to earlier integration challenges of new grid technologies suggest that the grid’s existing processes, standards, and interconnection frameworks are no longer adequate for emerging large loads. This brief synthesizes lessons from the evolution of inverter-based resource regulation and applies them to large-load integration. It identifies critical gaps in modeling accuracy, interconnection processes, performance standards, and compliance mechanisms. Technical recommendations emphasize advanced monitoring, improved modeling, coordinated communication protocols, modernized substations, and structured behind-the-meter control schemes. Collectively, these measures provide a roadmap to maintain bulk power system reliability while enabling the continued growth of large, electrified digital infrastructure.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Securing Grid Communications Infrastructure: Addressing Gaps Beyond NERC CIP Facility Perimeters

The North American electric grid relies on a complex communications infrastructure that extends beyond facility perimeters traditionally covered by NERC Critical Infrastructure Protection (CIP) standards. While CIP requirements have significantly strengthened cybersecurity within Electronic Security Perimeters, many operational communications—such as those between control centers, substations, and third-party networks—fall outside current regulatory scope. As grid modernization introduces new technologies and connectivity models, these external pathways present evolving security challenges. This brief explores the nature of these challenges, including emerging attack vectors and supply chain considerations, and highlights how ongoing grid transformation increases exposure to sophisticated threats. It outlines practical strategies and policy options to complement existing standards, such as expanding secure communications practices, enhancing supply chain transparency, and fostering collaboration among federal, state, and industry stakeholders. Near-term actions like encryption, authentication, and contractual safeguards can help reduce risk while longer-term frameworks are developed to ensure resilient and secure grid operations.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Lake Erie Energy Development Corporation (LEEDCo): Project Icebreaker TM

Lake Erie Energy Development Corporation (LEEDCo) began early‐stage development of Project Icebreaker (Icebreaker), a 20 Megawatt (MW) offshore wind project 8 miles north of Cleveland, OH in Lake Erie, in 2009. Icebreaker’s objective was to promote and accelerate responsible offshore wind development in Lake Erie and the Great Lakes. It is an ideal location that offers over 56,000 MW of gross potential in close proximity to 2,800 MW of underutilized substations as well as large load centers. Offshore wind energy in Lake Erie would help the Midwest reduce its greenhouse gas emissions, diversify its energy supply, provide cost‐competitive electricity, and stimulate economic revitalization of key sectors of the economy.

17 WIND ENERGY↗

Powered By ERAD [Slides]

Energy Resilience Analysis for Distribution Power System (ERAD) is a free, open-source Python toolkit for estimating the energy and service impacts of hazards like earthquakes and flooding. It uses a graph-based approach to capture high resolution connectivity among the grid, critical services, and customers and rapidly compute household level metrics and aggregated statistics across large distribution systems. It uses asset fragility curves that relate hazard severity to survival probability for power system equipment including cables, transformers, substations, etc. The tool is designed to be modular and extensible, allowing it to interface with third-party hazard simulators and integrate into broader resilience analysis workflows. ERAD enables researchers, students, communities, distribution utilities, and other stakeholders to understand hazard impacts and evaluate the effectiveness of different programs to improve energy resilience. The webinar was hosted by NLR researcher Aadil Latif.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The Role of the U.S. Electric Distribution System in Serving Data Center and Other Large Loads

The rapid expansion of data centers in the United States is reshaping how the electric distribution system must plan for and accommodate large load interconnections. This report evaluates the role of the distribution grid in serving these loads, from small edge facilities to hyperscale campuses. Using national datasets, utility filings, and industry studies, we assess demand growth, reliability requirements, interconnection thresholds, and infrastructure needs at substations and feeders. The analysis highlights the mismatch between fast data center development timelines and slower utility planning and construction cycles, as well as strategies such as phased energization, on-site generation, hosting capacity maps, and structured interconnection frameworks. While focused on data centers, the insights also apply to other high-density loads such as advanced manufacturing, hydrogen production, and electrified transportation. The report concludes with approaches to align planning processes, transparency tools, and regulatory frameworks so utilities can manage new large loads in ways that support a reliable and resilient grid.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Equipment Self-Assessment Guide Checklist

This Equipment Self-Assessment Checklist is designed for asset owners and operators (AOOs) responsible for the deployment, operation, maintenance, or cybersecurity oversight of grid systems and digital energy technologies. It provides a structured inspection checklist for evaluating the security, integrity, and operational trustworthiness of equipment across substations, generation sites, distributed energy resources (DERs), and control environments.

32 - ENERGY CONSERVATION, CONSUMPTION, AND UTILIZA↗

Sagebrush Flat Wildlife Area 2008 Annual Report.

The Sagebrush Flat Wildlife Area is a 12,718 acre complex located in Douglas County, Washington. Four distinct management units make up the area: Bridgeport, Chester Butte, Dormaier and Sagebrush Flat. The four Units are located across a wide geographic area within Douglas County. The Units are situated roughly along a north/south line from Bridgeport in the north to the Douglas/Grant county line in the south, 60 miles away. The wildlife area was established to conserve and enhance shrubsteppe habitat for the benefit shrubsteppe obligate and dependent wildlife species. In particular, the Sagebrush Flat Wildlife Area is managed to promote the recovery of three state-listed species: Columbian sharp-tailed grouse (threatened), greater sage grouse (threatened) and the pygmy rabbit (endangered). The US Fish and Wildlife Service also list the pygmy rabbit as endangered. Wildlife area staff seeded 250 acres of old agricultural fields located on the Sagebrush Flat, Dormaier and Chester Butte units. This has been a three project to reestablish high quality shrubsteppe habitat on fields that had either been abandoned (Dormaier) or were dominated by non-native grasses. A mix of 17 native grasses and forbs, most of which were locally collected and grown, was used. First year maintenance included spot spraying Dalmatian toadflax on all sites and mowing annual weeds to reduce competition. Photo points were established and will be integral to long term monitoring and evaluation. Additional monitoring and evaluation will come from existing vegetation transects. This year weed control efforts included spot treatment of noxious weeds, particularly Dalmatian toadflax, in previously restored fields on the Bridgeport Unit (150 acres). Spot treatment also took place within fields scheduled for restoration (40 acres) and in areas where toadflax infestations are small and relatively easily contained. Where toadflax is so widespread that chemical treatment would be impractical, we use the bioagent Mecinus janthinus, available through Professor Gary Piper of Washington State University. This year we released 4,000 M. janthinus on the Bridgeport Unit at 6 separate locations. Since 2002 we have released approximately 14,400 of these insects, 80% of these on the Bridgeport Unit. Additional weed control activities included mowing and spot spraying more than 32 miles of roads, cutting and removal of annual weeds within fenced deer exclosures. We upgraded the solar powered irrigation system that supplies water to a stand of water birch trees planted in 2002. Wildlife area staff designed and built a new solar array and installed a higher capacity pump. The increased capacity will ensure that these trees receive adequate water through the hot summer months and allow us to create at least one additional stand. This project is an important part in our effort to expand the available winter habitat for sharp-tailed grouse on the Bridgeport Unit. Maintenance of fences, parking areas and roads continued during throughout the year. Two parking areas, at Chester Butte and Bridgeport, were graded and additional gravel added. Roads on the Bridgeport Unit were graded and repaired following spring runoff. Trespass and dumping issues have increased in recent years on the Bridgeport Unit. To address these problems we constructed four steel gates at access points on this unit. Each gate is tubular steel attached to 8-inch diameter steel posts, 10 feet long that are cemented into the ground. Two gates allow access to BPA substation facilities and power-line right-of ways so placement, construction and locking issues had to be coordinated with BPA's Real Estate staff in Spokane. Environmental Compliance Documentation issues were addressed again this year. This process has the potential to cause delays the completion of projects within the fiscal year. With this in mind and an eye toward the future, we requested that several projects planned for the coming years be surveyed this year. Beginning in August of 2007, area staff worked with BPA staff to identify work elements that had the potential to disturb cultural resources. Subsequently, in April of 2008, BPA staff archaeologists surveyed numerous sites and several miles of fence line. Final clearance to proceed was granted in August of 2008. This year we submitted and were awarded a grant from the state Recreation and Conservation Office. This grant will provide funding to restore native shrubsteppe habitat on 335 acres of old CRP fields located on the Bridgeport Unit. These fields were planted to non-native grasses in 1988 and currently have marginal habitat values for shrubsteppe obligate and dependent wildlife. Assuming that the state legislature allocates the funds, which, given the state's financial condition is not a sure thing, work on this project can begin late in the summer of 2009.

13 HYDRO ENERGY↗

A Development Path to the Efficient and Cost-Effective Bulk Storage of Electrical Energy

Efficient and cost-effective means for storing electrical energy is becoming an increasing need in our electricity-oriented society. For example, for electric utilities an emerging need is for distributed storage systems, that is, energy storage at substations, at solar or wind-power sites, or for load-leveling at the site of major consumers of their electricity. One of the important consequences of distributed storage for the utilities would be the reduction in transmission losses that would result from having a local source of load-leveling power. For applications such as these there are three criteria that must be satisfied by any new system that is developed to meet such needs. These criteria are: (1) high 'turn-around' efficiency, that is, high efficiency of both storing and recovering the stored energy in electrical form, (2) long service life (tens of years), with low maintenance requirements, and, (3) acceptably low capital cost. An additional requirement for these particular applications is that the system should have low enough standby losses to permit operation on a diurnal cycle, that is, storing the energy during a portion of a given day (say during sunlight hours) followed several hours later by its use during night-time hours. One answer to the spectrum of energy storage needs just outlined is the 'electromechanical battery'. The E-M battery, under development for several years at the Laboratory and elsewhere in the world, has the potential to solve the above energy storage problems in a manner superior to the electro-chemical battery in the important attributes of energy recovery efficiency, cycle lifetime, and amortized capital cost. An electromechanical battery is an energy storage module consisting of a high-speed rotor, fabricated from fiber composite, and having an integrally mounted generator/motor. The rotor operates at high speed, in vacuo, inside of a hermetically sealed enclosure, supported by a 'magnetic bearing', that is, a bearing that uses magnetic forces to support the rotor against gravity. Magnetic bearings are a virtual necessity for the E-M battery in order to achieve long service life, and to minimize frictional losses so that the battery does not lose its charge (run down) too rapidly. These considerations mitigate against the use of conventional mechanical bearings in the E-M battery for most applications. The Laboratory has pioneered the development of a new form of magnetic bearing to meet the special requirements of the E-M battery: the 'ambient-temperature passive magnetic bearing'. Simpler, and potentially much less expensive than the existing 'active' magnetic bearings (ones requiring electronic amplifiers and feedback circuits for their operation) development of the ambient-temperature passive magnetic bearing represents a technological breakthrough. Beyond its use in the E-M battery, the ambient-temperature magnetic bearing could have important applications in replacing conventional lubricated mechanical bearings in electrical machinery. Here the gains would be two-fold: reduced frictional losses, leading to higher motor efficiency, and, of equal importance, the elimination of the need for lubricants and for routine replacement of the bearings owing to mechanical wear. Thus an added benefit from a vigorous pursuit of our electromechanical battery concepts could be its impact on many other areas of industry where rotating machinery in need of improved bearings is involved. If perfected, passive magnetic bearings would seem to represent an almost ideal replacement for the mechanical bearings in many types of industrial electrical machinery. Returning to the issued of energy storage, the E-M battery itself has much to contribute in the area of improving the efficiency of stationary energy storage systems. For example, many electrical utilities utilize 'pumped hydro' energy storage systems as a means of improving the utilization of their 'base-load' power plants. That is, electrical energy is stored during off-peak hours for delivery at times of peak usage. These pumped hydro systems employ upper and lower reservoirs, between which water is shuttled to store and recover the energy. Of necessity, pumped hydro storage facilities are located in mountainous areas, usually far, both from the urban centers where power uses are concentrated, and from the sites of the power plants themselves, increasing the transmission line losses that subtract from the useful energy. More importantly, pumped hydro systems themselves only return from 65 to 70 percent of the electrical energy input required to pump the water from the lower reservoir to the upper one. Thus, including the extra transmission losses from distant siting of the facility, of order 40 percent of the input electrical energy is wasted in every cycle of use of the facility.

25 ENERGY STORAGE↗

Design & development fo a 20-MW flywheel-based frequency regulation power plant : a study for the DOE Energy Storage Systems program.

This report describes the successful efforts of Beacon Power to design and develop a 20-MW frequency regulation power plant based solely on flywheels. Beacon's Smart Matrix (Flywheel) Systems regulation power plant, unlike coal or natural gas generators, will not burn fossil fuel or directly produce particulates or other air emissions and will have the ability to ramp up or down in a matter of seconds. The report describes how data from the scaled Beacon system, deployed in California and New York, proved that the flywheel-based systems provided faster responding regulation services in terms of cost-performance and environmental impact. Included in the report is a description of Beacon's design package for a generic, multi-MW flywheel-based regulation power plant that allows accurate bids from a design/build contractor and Beacon's recommendations for site requirements that would ensure the fastest possible construction. The paper concludes with a statement about Beacon's plans for a lower cost, modular-style substation based on the 20-MW design.

01 COAL, LIGNITE, AND PEAT↗

Fault Locating, Prediction and Protection (FLPPS)

One of the main objectives of this DOE-sponsored project was to reduce customer outage time. Fault location, prediction, and protection are the most important aspects of fault management for the reduction of outage time. In the past most of the research and development on power system faults in these areas has focused on transmission systems, and it is not until recently with deregulation and competition that research on power system faults has begun to focus on the unique aspects of distribution systems. This project was planned with three Phases, approximately one year per phase. The first phase of the project involved an assessment of the state-of-the-art in fault location, prediction, and detection as well as the design, lab testing, and field installation of the advanced protection system on the SCE Circuit of the Future located north of San Bernardino, CA. The new feeder automation scheme, with vacuum fault interrupters, will limit the number of customers affected by the fault. Depending on the fault location, the substation breaker might not even trip. Through the use of fast communications (fiber) the fault locations can be determined and the proper fault interrupting switches opened automatically. With knowledge of circuit loadings at the time of the fault, ties to other circuits can be closed automatically to restore all customers except the faulted section. This new automation scheme limits outage time and increases reliability for customers. The second phase of the project involved the selection, modeling, testing and installation of a fault current limiter on the Circuit of the Future. While this project did not pay for the installation and testing of the fault current limiter, it did perform the evaluation of the fault current limiter and its impacts on the protection system of the Circuit of the Future. After investigation of several fault current limiters, the Zenergy superconducting, saturable core fault current limiter was selected for installation. Because of some testing problems with the Zenergy fault current limiter, installation was delayed until early 2009 with it being put into operation on March 6, 2009. A malfunction of the FCL controller caused the DC power supply to the superconducting magnet to be turned off. This inserted the FCL impedance into the circuit while it was in normal operation causing a voltage resonance condition. While these voltages never reached a point where damage would occur on customer equipment, steps were taken to insure this would not happen again. The FCL was reenergized with load on December 18, 2009. A fault was experienced on the circuit with the FCL in operation on January 14, 2010. The FCL operated properly and reduced the fault current by about 8%, what was expected from tests and modeling. As of the end of the project, the FCL was still in operation on the circuit. The third phase of the project involved the exploration of several advanced protection ideas that might be at a state where they could be applied to the Circuit of the Future and elsewhere in the SCE electrical system. Based on the work done as part of the literature review and survey, as well as a number of internal meetings with engineering staff at SCE, a number of ideas were compiled. These ideas were then evaluated for applicability and ability to be applied on the Circuit of the Future in the time remaining for the project. Some of these basic ideas were implemented on the circuit including measurement of power quality before and after the FCL. It was also decided that we would take what was learned as part of the Circuit of the Future work and extend it to the next generation circuit protection for SCE. Also at this time, SCE put in a proposal to the DOE for the Irvine Smart Grid Demonstration using ARRA funding. SCE was successful in obtaining funding for this proposal, so it was felt that exploration of new protection schemes for this Irvine Smart Grid Demonstration would be a good use of the project resources. With this in mind, a protection system that uses fault interrupting switches, high speed communications, and looping two radial distribution circuits would have the potential for significant reductions in interruption time and number of interruptions for customers.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Public Data Set of Auto-Generated Geotagged PV Site Equipment, Generated via Deep Learning

In this research, we present a data set over 100 photovoltaic (PV) sites in TX, which have been automatically geotagged via a fully autonomous deep learning (DL) pipeline. Specifically, locations of inverters, tracker/fixed tilt rows, batteries, and substations are labeled algorithmically. To ensure high data quality, all systems have been reviewed manually and any deep learning errors have been corrected. This public data set, as well as the open-sourced pipeline used to generate it, is valuable for site planning, modelling, and insurance purposes. Given time and resources, we hope to extend the data set to additional states/regions in the US.

14 SOLAR ENERGY↗

Ripple-Type Voltage Control for Extreme-Event Contingencies: Preprint

Frequent and intense extreme events make grid operation unprecedentedly challenging. Disruptive events could lead to dangerous voltage drops and even voltage collapse if corrective actions are not quickly taken. In this paper, we present a real-time algorithm for voltage control suitable for mitigating electric grid damage scenarios. In our strategy, when agents (generators, substations) experience a dangerous undervoltage, they first respond locally. When the local control resources are depleted, agents seek assistance from peer nodes over a communication network. The algorithm is simulated on a realistic test transmission system. Using fragility curve methodology, we simulate hurricane damages to the components of the synthetic 2000-bus grid representing the ERCOT system. Although being tested over a damaged grid after a hurricane event, our algorithm can be equally successfully applied to any other emergency low-voltage situation.

extreme weather events↗

Grid-Ready Flexible Transformers for Resilient Transmission Networks

Today’s transmission networks extend for hundreds of kilometers, transferring significant amounts of electrical energy. For every country, there are sort of “back- bone” lines, where a massive failure of transformers would create serious challenges to sustain a reliable energy supply. Natural phenomena and human driven actions could be triggers of such catastrophic events. For large utilities, or groups of utilities, it would be highly convenient to count with “flexible transformers”, which could be used as replacements for different voltage levels and with impedance adjustable to match optimum local requirements of impacted substations. Currently applied “emergency transformers” are fixed-impedance devices. In this contribution, a new concept of flexible, “future-grid ready” type of power transformers, specially devised for transmission networks is explained. This transformer has adjustable impedance features, which could be on-line operated. The concept has been proven to be functional and stable in the factory lab and in the field, by means of a prototype autotransformer of of 100 MVA, 165/69 Kv.

impedance of transformers↗

Batch Measurement Extremum Seeking Control of Distributed Energy Resources to Account for Communication Delays and Information Loss

Distributed Energy Resources (DER) have great potential to enhance the operation of electric power distribution systems. Previously, we explored the use of 2 Dimensional Extremum Seeking (2D-ES) control algorithms to enable model-free optimal control of DER to provide grid services to both the distribution and transmissions systems. Motivated by preliminary deployments of DER managed by 2D-ES algorithms in hardware-in-the-loop tests and in operational distribution grids, in this work, we extend the control scheme to accommodate communication delays and information loss. We propose a modification to the 2D-ES scheme to allow for the processing of batches of possibly noncontiguous objective function measurements at unknown and possibly uneven intervals. We provide a proof of the convergence of the batch 2D-ES (2D-BES) scheme when optimizing a generic convex objective function, as well as simulation results that demonstrate the suitability of the approach for substation active and reactive power target tracking.

Sankur, Michael↗

Electricity and Gas IDS Dataset

The following dataset was collected from a set of cybersecurity experiments conducted in an Electricity and Natural Gas environment. The architecture was instantiated within the powerNET testbed at Pacific Northwest National Laboratory, and is comprised of both simulated components and hardware-in-the-loop devices. The test environment consisted of a substation and control center network representative of electrical systems. In addition, it also contained a compressor station, and an odorizer and pressure regulation station representative of oil and natural gas systems. The various devices on the electrical and gas systems were organized into multiple networks to mimic real-world deployments. There were 14 testing scenarios overall that covered a wide variety of cybersecurity and infrastructure events.

Industrial Control↗

Electricity and Gas IDS Dataset

The following dataset was collected from a set of cybersecurity experiments conducted in an Electricity and Natural Gas environment. The architecture was instantiated within the powerNET testbed at Pacific Northwest National Laboratory, and is comprised of both simulated components and hardware-in-the-loop devices. The test environment consisted of a substation and control center network representative of electrical systems. In addition, it also contained a compressor station, and an odorizer and pressure regulation station representative of oil and natural gas systems. The various devices on the electrical and gas systems were organized into multiple networks to mimic real-world deployments. There were 14 testing scenarios overall that covered a wide variety of cybersecurity and infrastructure events.

Industrial Control↗