Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “SPAIN”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

Observing facilities at the European Southern Observatory (ESO) in Chile for cometary observations

The (ESO) is located on the mountain La Silla (geographical coordinates: 4h42m55s10 west, -29 deg 15' 25".8 south, 2400 m elevation. The size of the telescopes ranges from a 40 cm Astrograph to the 3.6 m Richey-Chretien telescope. Future telescopes are discussed: a 2.2 m RC-Telescope which will be identical with the German 2.2 m telescope on Calor Alto in SE-Spain, and a 3.5 m telescope, the New Technology Telescope. In addition to these telescopes, a great number of auxiliary instrumentation are operational. Because ESO has to serve all requests of the visiting astronomers these instruments are designed for very different applications. The telescopes and auxiliary instruments that are especially suited for cometary observations are discussed. The dicussion is divided into three parts: photography, photometry-polarimetry and spectroscopy.

Schnur, G. F. O.↗

Space tracking and data systems; Proceedings of the Symposium, Arlington, VA, June 16-18, 1981

The AIAA/NASA Symposium on Space Tracking and Data Systems, held in Pentagon City, Virginia, on June 16-18, 1981, had the purpose of reviewing international activities in space tracking and data systems for civil use in the 1980-2000 time frame. Participants included 225 representatives from industrial and government organizations in eight nations. The nations represented include the United States, France, Germany, India, Japan, Norway, Spain, and Sweden. The major functions of the systems described at the Symposium are related to the initial downlink of telemetry and spacecraft status data, attendant tracking activities, and uplink of spacecraft commands; communication between the associated acquisition sites and central processing and control stations; formulation and implementation of commands that control the spacecraft and its payload; and processing of spacecraft data needed to make command decisions. Attention is given to an overview of current activities and plans, and supporting developments, taking into account the time from 1980 to 1990. New developments are also considered.

Grey, J.↗

OSTA-1 - The Space Shuttle's first scientific payload

The capabilities of the first Space Shuttle scientific payload for remote sensing observations of the earth are evaluated, and the instruments used are from the Office of Space and Terrestrial Applications (OSTA-1). The payload gathered 10 million square kilometers of data over the earth's oceans, 6 million square kilometers of data over land masses, and global atmospheric data on carbon monoxide concentration. Shuttle imaging radar collected data over a 10,000 km sweep from Spain to Australia, a Shuttle multispectral infrared radiometer obtained 400,000 ten-channel spectra in clear weather conditions over four continents, and the Ocean Color Experiment detected water color for interpretation of major water constituents. The mission is considered to be a success based on the amount of data collected, and scientific and technical insight gained for the development of Shuttle flight instruments.

Moore, J. W.↗

Determination of intercontinental baselines and Earth orientation using VLBI

A series of experiments was conducted during the last decade to explore the capability of very long baseline interferometry (VLBI) to measure the crustal and rotational motions of the Earth with accuracies at the centimeter level. The observing stations are those of NASA's Deep Space Network in California, Spain and Australia. A multiparameter fit to the observed values of delay and delay rate yields radio source positions, polar motion, universal time, the precession constant, baseline vectors, and solid Earth tides. Source positions are obtained with formal errors of the order of 0''.01. UT1-UTC and polar motion are determined at 49 epochs, with formal error estimates for the more recent data of 0.5 msec for UT1-UTC and 2 to 6 mas for polar motion. Intercontinental baseline lengths are determined with formal errors of 5 to 10 cm. The Love numbers and Earth tide phase lag agree with the commonly accepted values.

Sovers, O. J.↗

The 26-meter antenna s-x conversion project

Programmatic and management aspects of converting an existing 26-meter S-band subnet to a 34-meter S- and X-band subnet of the Deep Space Network are described. The stations involved were DSS 12 near Barstow, DSS 44 in Australia, and DSS 62 in Spain. The main subsystems affected by the conversion were the antenna mechanical, antenna microwave, and receiver-exciter. Antenna mechanial modifications and electronic additions and changes are described. The design and analysis of critical areas are considered and antenna performance is discussed.

Source record↗

Intercontinental time and frequency transfer using a global positioning system timing receiver

The Deep Space Network (DSN) has a requirement to maintain knowledge of the frequency offset between DSN stations within 3 x 10 to the -13th power and time offset within 10 microseconds. It is further anticipated that in the 1987-1990 era the requirement for knowledge of time offset between DSN stations will be less than 10 nanoseconds. The Jet Propulsion Laboratory (JPL) is using the Global Positioning System (GPS) Space Vehicles, as a development project, to transfer time and frequency over intercontinental distances between stations of the DSN and between the DSN and other agencies. JPL has installed GPS timing receivers at its tracking station near Barstow, California and at its tracking station near Madrid, Spain. The details of the experiment and the data are reported. There is a discussion of the ultimate capabilities of these techniques for meeting the functional requirements of the DSN.

Clements, P. A.↗

Intercontinental time and frequency transfer using a global positioning system timing receiver

The DSN has a requirement to maintain knowledge of the frequency offset between DSN stations with 3 x 10 to the minus 13th power and time offset within 10 microseconds. It is further anticipated that in the 1987-1990 era the requirement for knowledge of time offset between DSN stations will be less than 10 nanoseconds. JPL is using the Global Positioning System (GPS) Space Vehicles, as a development project, to transfer time and frequency over intercontinental distances between stations of the DSN and between the DSN and other agencies. JPL has installed GPS timing receivers at its tracking station near Barstow, California, and at its tracking station near Madrid, Spain. The details of the experiment and the data are reported. There is a discussion of the ultimate capabilities of these techniques for meeting the functional requirements of the DSN.

Clements, P. A.↗

Case studies of NOAA 6/TIROS N data impact on numerical weather forecasts

The impact of satellite temperatures from systems which predate the launching of the third generation of vertical sounding instruments aboard TIROS N (13 Oct 1978) and NOAA 6 (27 June 1979) is reported. The first evaluation of soundings from TIROS N found that oceanic, cloudy retrievals over NH mid latitudes show a cold bias in winter. It is confirmed for both satellite systems using a larger data base. It is shown that RMS differences between retrievals and colocated radiosonde observations within the swath 30-60N during the 1979-80 winter were generally 2-3K in clear air and higher for cloudy columns. A positive impact of TIROS N temperatures on the analysis of synoptic weather systems is shown. Analyses prepared from only satellite temperatures seemed to give a better definition to weather systems' thermal structure than that provided by corresponding NMC analyses without satellite data. The results of a set of 14 numerical forecast experiments performed with the PE model of the Israel Meteorological Service (IMS) are summarized; these were designed to test the impact of TIROS N and NOAA 6 temperatures within the IMS analysis and forecast cycle. The satellite data coverage over the NH, the mean area/period S1 and RMS verification scores and the spatial distribution of SAT versus NO SAT forecast differences are discussed and it is concluded that positive forecast impact occurs over ocean areas where the extra data improve the specification which is otherwise available from conventional observations. The forecast impact for three cases from the same set of experiments was examined and it is found that satellite temperatures, observed over the Atlantic Ocean contribute to better forecasts over Iceland and central Europe although a worse result was verified over Spain. It is also shown that the better scores of a forecast based also on satellite data and verified over North America actually represent a mixed impact on the forecast synoptic patterns. A superior 48 hr 500 mb forecast over the western US due to the better initial specification afforded by satellite observed temperatures over the North Pacific Ocean is shown.

Druyan, L. M.↗

Adaptation of a software development methodology to the implementation of a large-scale data acquisition and control system

A progress report is presented on a program to upgrade the existing NASA Deep Space Network in terms of a redesigned computer-controlled data acquisition system for channelling tracking, telemetry, and command data between a California-based control center and three signal processing centers in Australia, California, and Spain. The methodology for the improvements is oriented towards single subsystem development with consideration for a multi-system and multi-subsystem network of operational software. Details of the existing hardware configurations and data transmission links are provided. The program methodology includes data flow design, interface design and coordination, incremental capability availability, increased inter-subsystem developmental synthesis and testing, system and network level synthesis and testing, and system verification and validation. The software has been implemented thus far to a 65 percent completion level, and the methodology being used to effect the changes, which will permit enhanced tracking and communication with spacecraft, has been concluded to feature effective techniques.

Madrid, G. A.↗

Stability investigation of the quadripod structure for the NASA/JPL 70-meter antenna

A new, slim-profiled, low-blockage quadripod structure was designed to support the 7.7-m-diameter subreflector for the 70-m antenna. Detailed analyses of quadripod structural stability (in frequency and buckling) are presented. The results indicate that the new quadripod design has an adequate safety margin for buckling, and its lowest natural frequency is above the control system bandwidth. The analytical design frequencies were confirmed by actual field measurements made in Spain in February 1986.

Chian, C. T.↗

ICE navigation support

The International Cometary Explorer (ICE) encounter with Comet Giacobini-Zinner took place 7 years after the spacecraft's original launch on 12 August 1978 as the International Sun Earth Explorer 3 (ISEE-3), part of a three-spacecraft project to study the interaction between the solar wind and the Earth's magnetosphere. Transfer to an interplanetary trajectory was performed via a 119-km-altitute, gravity-assist, lunar swingby on December 1983. Navigation support during interplanetary cruise and comet encounter was provided by orbit determination utilizing radio metric data from the DSN 64-meter antennas in Goldstone, California and Madrid, Spain. Orbit solutions yielding predictions of 50-km geocentric delivery accuracy in the target aim plane were achieved during interplanetary cruise and at comet encounter using 6-to-12-week data arcs between periodic attitude-change maneuvers. One-sigma two-way range and range rate residuals were consistently 40 meters and 0.2 mm/s or better, respectively. Non-gravitational forces affected the comet's motion during late August and early September 1985 and caused a 2300-km shift in the orbit of the comet relative to the spacecraft. This necessitated a final ICE orbit trim maneuver 3 days prior to encounter. Near-real-time assessment of two-way 2-GHz (S-band) Doppler pseudo-residuals during the June and July 1985 trajectory change maneuvers aided in calibration of the spacecraft's thrusters in preparation for this final critical maneuver. Post-flight analysis indicates tail centerline passage was achieved within 10 seconds of the predicted time and geocentric position uncertainty at encounter was less than 40 km.

Efron, L.↗

Models of weather effects on noise temperature and attenuation for Ka- and X-band telemetry performance analysis

Models that show the effects of weather on noise temperature and attenuation of deep space telemetry signals received by the Deep Space Network (DSN) at Ka- and X-band (32 and 8.5 GHz) are developed. These models were used to compare the performance of telemetry links at these two frequencies. The models build on an earlier 1982 model that used three months of water vapor radiometer measurements (31.4 GHz) at Goldstone, augmented with one year of radiosonde measurements made at Edwards Air Force Base. This 1986 model accounts for annual variations of rainfall and extends to a model for Canberra, Australia, and Madrid, Spain. The results show, for example, that at Ka-band, 30 degrees elevation angle, Goldstone weather adds less than 23 + or - 2 K to the system temperature 80% of the time, while Canberra or Madrid weather adds less than 32 + or - 5 K 80% of the time. At X-band, the comparable numbers are 5.1 + or - 0.2 K and 5.7 + or - 0.4 K. A simple analysis shows a substantial telemetry system signal-to-noise ratio advantage when operating at Ka-band compared to X-band.

Slobin, S. D.↗

DSN 63 64-meter antenna S- and X-band efficiency and system noise temperature calibrations, July 1986

The Deep Space Network (DSN) 64-meter antenna in Spain (DSN 63) has been calibrated prior to its upgrading to a 70-meter high efficiency configuration in preparation for the Voyager Neptune encounter in August 1989. The S-band (2285 MHz) and X-band (8420 MHz) effective area efficiency and system noise temperature calibrations were carried out during July 1986 to establish a baseline system performance for this station. It is expected that the 70-meter will result in at least a 1.9 dB G/T improvement at X-band relative to the 64-meter baseline reference.

Slobin, S. D.↗

Navigating the International Cometary Explorer for encounter with Comet Giacobini-Zinner

The navigation of the International Cometary Explorer for its encounter with Comet Giacobini-Zinner, provided by orbit determination using radio metric data from the 64-m Deep Space Network antennas in California and Spain, is discussed. Orbital solutions providing predictions of 50-km geocentric delivery accuracy in the target plane were achieved using 6-12 week data arcs between periodic attitude change maneuvers. The one-sigma two-way range and range rate were found to be 40 m and 0.2 mm/s or better, respectively. Post-flight analysis shows tail centerline passage to be achieved within 10 s of the predicted time, and a geocentric position uncertainty at the encounter of better than 40 km is found.

Efron, L.↗

A modern control theory based algorithm for control of the NASA/JPL 70-meter antenna axis servos

A digital computer-based state variable controller was designed and applied to the 70-m antenna axis servos. The general equations and structure of the algorithm and provisions for alternate position error feedback modes to accommodate intertarget slew, encoder referenced tracking, and precision tracking modes are descibed. Development of the discrete time domain control model and computation of estimator and control gain parameters based on closed loop pole placement criteria are discussed. The new algorithm was successfully implemented and tested in the 70-m antenna at Deep Space Network station 63 in Spain.

Hill, R. E.↗

DSS 14 64-meter antenna S- and X-band efficiency and system noise temperature calibrations, September 1987

The efficiency and noise temperature characteristics of the DSN 64 m antenna network prior to its upgrading to 70 m configuration are documented. The DSS 14 (Goldstone, California) is the last of the three large antennas to be upgraded, and the test results presented document its performance just prior to its downtime during the end of 1987. Antenna area efficiency was found to be somewhat higher at DSS 14 than at DSS 43 (Australia) and DSS 63 (Spain). The peak X-band efficiency was determined to be 49.8 percent (without atmosphere), compared with 45.4 and 45.1 percent for DSS 43 and DSS 63, respectively. The X-band zenith system noise temperature was found to be 1 to 3 Kelvins higher than at the other two stations, depending on which maser was chosen for the measurements. Ascribing efficiency differences to small-scale antenna surface roughness, DSS 14 may be regarded as having a 1.5 to 1.6 mm rms surface as compared to the other two antennas with 1.7 to 1.8 mm rms surfaces.

Slobin, S. D.↗

The design and implementation of the Technical Facilities Controller (TFC) for the Goldstone deep space communications complex

The Technical Facilities Controller is a microprocessor-based energy management system that is to be implemented in the Deep Space Network facilities. This system is used in conjunction with facilities equipment at each of the complexes in the operation and maintenance of air-conditioning equipment, power generation equipment, power distribution equipment, and other primary facilities equipment. The implementation of the Technical Facilities Controller was completed at the Goldstone Deep Space Communications Complex and is now operational. The installation completed at the Goldstone Complex is described and the utilization of the Technical Facilities Controller is evaluated. The findings will be used in the decision to implement a similar system at the overseas complexes at Canberra, Australia, and Madrid, Spain.

Killian, D. A.↗

Astrometric results of 1978-1985 Deep Space Network radio interferometry - The JPL 1987-1 extragalactic source catalog

An astrometric radio reference frame has been determined from intercontinental dual-frequency radio interferometric measurements. These measurements were carried out on a regular basis during 1978-1985 between NASA's Deep Space Network stations in California, Spain, and Australia. Analysis of 6800 pairs of delay and delay-rate observations made during 51 sessions produced estimates of 1300 parameters. The most significant of these are geophysical quantities and positions of extragalactic sources. The source catalog resulting from this analysis includes 106 sources fairly uniformly distributed over the celestial sphere, north of -45 deg declination. Almost all of the resulting source positions have formal uncertainties between 0.5 and 3 milliarcseconds (mas), with rms values of 2 mas in both angular coordinates. Internal consistency checks, as well as comparisons with independently determined source catalogs of comparable quality, indicate that relative source coordinates determined by VLBI contain systematic errors at the level of 1 to 2 mas.

Sovers, O. J.↗