Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “SITE APPROVALS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

TU-B-210-01: MRg HIFU - Bone and Soft Tissue Tumor Ablation

MR guided focused ultrasound (MRgFUS), or alternatively high-intensity focused ultrasound (MRgHIFU), is approved for thermal ablative treatment of uterine fibroids and pain palliation in bone metastases. Ablation of malignant tumors is under active investigation in sites such as breast, prostate, brain, liver, kidney, pancreas, and soft tissue. Hyperthermia therapy with MRgFUS is also feasible, and may be used in conjunction with radiotherapy and for local targeted drug delivery. MRI allows in situ target definition and provides continuous temperature monitoring and subsequent thermal dose mapping during HIFU. Although MRgHIFU can be very precise, treatment of mobile organs is challenging and advanced techniques are required because of artifacts in MR temperature mapping, the need for intercostal firing, and need for gated HIFU or tracking of the lesion in real time. The first invited talk, “MR guided Focused Ultrasound Treatment of Tumors in Bone and Soft Tissue”, will summarize the treatment protocol and review results from treatment of bone tumors. In addition, efforts to extend this technology to treat both benign and malignant soft tissue tumors of the extremities will be presented. The second invited talk, “MRI guided High Intensity Focused Ultrasound – Advanced Approaches for Ablation and Hyperthermia”, will provide an overview of techniques that are in or near clinical trials for thermal ablation and hyperthermia, with an emphasis of applications in abdominal organs and breast, including methods for MRTI and tracking targets in moving organs. Learning Objectives: Learn background on devices and techniques for MR guided HIFU for cancer therapy Understand issues and current status of clinical MRg HIFU Understand strategies for compensating for organ movement during MRgHIFU Understand strategies for strategies for delivering hyperthermia with MRgHIFU CM - research collaboration with Philips.

60 APPLIED LIFE SCIENCES↗

TU-B-210-02: MRg HIFU - Advanced Approaches for Ablation and Hyperthermia

MR guided focused ultrasound (MRgFUS), or alternatively high-intensity focused ultrasound (MRgHIFU), is approved for thermal ablative treatment of uterine fibroids and pain palliation in bone metastases. Ablation of malignant tumors is under active investigation in sites such as breast, prostate, brain, liver, kidney, pancreas, and soft tissue. Hyperthermia therapy with MRgFUS is also feasible, and may be used in conjunction with radiotherapy and for local targeted drug delivery. MRI allows in situ target definition and provides continuous temperature monitoring and subsequent thermal dose mapping during HIFU. Although MRgHIFU can be very precise, treatment of mobile organs is challenging and advanced techniques are required because of artifacts in MR temperature mapping, the need for intercostal firing, and need for gated HIFU or tracking of the lesion in real time. The first invited talk, “MR guided Focused Ultrasound Treatment of Tumors in Bone and Soft Tissue”, will summarize the treatment protocol and review results from treatment of bone tumors. In addition, efforts to extend this technology to treat both benign and malignant soft tissue tumors of the extremities will be presented. The second invited talk, “MRI guided High Intensity Focused Ultrasound – Advanced Approaches for Ablation and Hyperthermia”, will provide an overview of techniques that are in or near clinical trials for thermal ablation and hyperthermia, with an emphasis of applications in abdominal organs and breast, including methods for MRTI and tracking targets in moving organs. Learning Objectives: Learn background on devices and techniques for MR guided HIFU for cancer therapy Understand issues and current status of clinical MRg HIFU Understand strategies for compensating for organ movement during MRgHIFU Understand strategies for strategies for delivering hyperthermia with MRgHIFU CM - research collaboration with Philips.

60 APPLIED LIFE SCIENCES↗

MARSAME Radiological Release Report TA-50, TRU Liquid Waste Construction Soil

Environmental Protection and Compliance, Environmental Stewardship (EPC-ES) has determined that the soil associated with Technical Area 50 (TA-50), Transuranic (TRU) Liquid Waste construction project (TLW) meets the criteria for unrestricted release to the public under Department of Energy (DOE) Order 458.1, Radiation Protection for the Public and the Environment (DOE 2020, NNSA 2021). This conclusion is based on the known history of the area combined with soil sample data collected in 2021; the findings are consistent with DOE Order 458.1 and Los Alamos National Laboratory (LANL) Functional Series Document EPC ES-FSD-004, Environmental Radiation Protection (LANL 2020a). Sampling and data analysis, as described in this report, were sufficient to meet measurement quality objectives under the Multi-Agency Radiation Survey and Assessment of Materials and Equipment (MARSAME) manual (MARSAME 2000) and LANL procedures (LANL 2020b). Final approvals for waste disposition will come from LANL’s Waste Management Program. The scope of this final release report includes the TLW construction site soil located south of TA-50, Building 001.

54 ENVIRONMENTAL SCIENCES↗

A New Consolidated Storage Facility for Used Nuclear Fuel in Andrews County, Texas - 16418

On February 6, 2015, Waste Control Specialists LLC (WCS) announced its plan to file a license application with the U.S. Nuclear Regulatory Commission (NRC) to construct and operate a Consolidated Interim Storage Facility (CISF). Upon issuance of the license, WCS would be authorized to receive Used Nuclear Fuel (UNF) and reactor related Greater Than Class C Low Level Radioactive Waste (referred hence forth as UNF) at the CISF in late 2020. WCS based its decision to license a CISF based on strong support from the State of Texas and the local community's willingness to host such a facility in Andrews County, Texas. WCS' decision to license a CISF in a supportive community is consistent with the consent-based licensing approach recommended by the Blue Ribbon Commission on America's Nuclear Future. WCS intends to use existing technology developed by AREVA and NAC International that have already been approved by the NRC to transport UNF from existing commercial nuclear reactors across the nation for interim storage at its 14,000 acre site in Andrew County, Texas. In the pre-application licensing meetings held with the NRC, WCS underscored that UNF would be removed first from the shutdown decommissioned reactor sites and transported to the CISF. Approximately eighty percent of the UNF currently residing at the shutdown decommissioned reactor sites can be safely placed into the storage systems developed by AREVA and NAC International that are currently licensed by the NRC. WCS plans to store up to 40,000 Metric Tons of Heavy Metal (MTHM) at the CISF that would be constructed in eight phases over the next 20 years. WCS intends to submit its license application for the CISF to the NRC by April 2016. The license application will request authorization to possess up to 5,000 MTHM of UNF for Phase One which can accommodate storing the fuel located at over ten shutdown decommissioned reactor sites. As discussed with the NRC, the license application will be developed following NRC regulatory guidance to comply with the technical requirements specified in Title 10 of the Code of Federal Regulations (CFR) Part 72, Licensing Requirements for the Independent Storage of Spent Nuclear Fuel, High-Level Radioactive Waste, and Reactor-Related Greater Than Class C Waste. In addition, to filing the license application, WCS is also seeking legislative changes to the Nuclear Waste Policy Act of 1982 requiring the U.S. Department of Energy (DOE) to take title of the UNF at the commercial nuclear reactor sites. Under such legislative changes, the DOE would also be responsible for the transport of UNF to the CISF. In addition to preparing the CISF License Application, WCS and its partners AREVA and NAC International are prepared to work with DOE to facilitate the development of the UNF transportation infrastructure in the timeframe needed to support CISF operations. The WCS site and technical approach give it several advantages which uniquely position it to become the first successful commercial CISF in the U.S. These advantages include: broad consent-based support at the local, state, and Congressional level; an operating waste disposal site with an existing transportation infrastructure; and the use of already licensed systems to address 80% of the UNF currently in dry storage at shutdown sites in the U.S. WCS firmly believes this initiative will provide an economically viable option for consolidated interim storage of UNF until a permanent geologic repository becomes available. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Final work plan : phase II investigation of potential contamination at the former CCC/USDA grain storage facility in Savannah, Missouri.

From approximately 1949 until 1970, the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) operated a grain storage facility on federally owned property approximately 0.25 mi northwest of Savannah, Missouri (Figure 1.1). During this time, commercial grain fumigants containing carbon tetrachloride were commonly used by the CCC/USDA and the private grain storage industry to preserve grain in their facilities. In November 1998, carbon tetrachloride was detected in a private well (Morgan) roughly 50 ft south of the former CCC/USDA facility, as a result of statewide screening of private wells near former CCC/USDA facilities, conducted in Missouri by the U.S. Environmental Protection Agency (EPA 1999). The 1998 and subsequent investigations by the EPA and the Missouri Department of Natural Resources (MoDNR) confirmed the presence of carbon tetrachloride in the Morgan well, as well as in a second well (on property currently occupied by the Missouri Department of Transportation [MoDOT]) described as being approximately 400 ft east of the former CCC/USDA facility. The identified concentrations in these two wells were above the EPA maximum contaminant level (MCL) and the Missouri risk-based corrective action default target level (MRBCA DTL) values of 5.0 {micro}g/L for carbon tetrachloride in water used for domestic purposes (EPA 1999; MoDNR 2000a,b, 2006). Because the observed contamination in the Morgan and MoDOT wells might be linked to the past use of carbon tetrachloride-based fumigants at its former grain storage facility, the CCC/USDA is conducting an investigation to (1) characterize the source(s), extent, and factors controlling the subsurface distribution and movement of carbon tetrachloride at Savannah and (2) evaluate the potential risks to human health, public welfare, and the environment posed by the contamination. This work is being performed in accord with the Intergovernmental Agreement established between the Farm Service Agency of the USDA and the MoDNR, to address carbon tetrachloride contamination potentially associated with a number of former CCC/USDA grain storage facilities in Missouri. The site characterization at Savannah is being conducted on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory. The investigation at Savannah is being conducted in phases. This approach is being used by the CCC/USDA and Argonne, with the approval of the MoDNR, so that information obtained and interpretations developed during each incremental stage of the investigation can be used most effectively to guide subsequent phases of the program. Phase I of the Savannah program was conducted in October-November 2007 and January 2008 (Argonne 2007a, 2008). This site-specific Work Plan provides a brief summary of the Phase I findings and the results of groundwater level monitoring that has been ongoing since completion of the Phase I study and also outlines technical objectives, investigation tasks, and investigation methods for Phase II of the site characterization at Savannah.

54 ENVIRONMENTAL SCIENCES↗

Texas authorizes disposal of large quantities of depleted uranium at wcs - 15626

The U.S. Nuclear Regulatory Commission (NRC) has been actively engaged in a rulemaking process that would revise Title 10 of the Code of Federal Regulations (CFR), Part 61, Licensing Requirements for Land Disposal of Radioactive Waste, to govern the disposal of large quantities of Depleted Uranium (DU) and Blended Waste (referred to as Unique Waste Streams). While the NRC plans to propose a Site Specific Analysis (SSA) rulemaking in early 2015, they have already issued guidance to Agreement States which identified general disposal criteria that could be used should a licensee propose to dispose of Unique Waste Streams before their rulemaking was completed. On August 5, 2013, Waste Control Specialists LLC (WCS) submitted a major license amendment application for review and approval to the Texas Commission on Environmental Quality (TCEQ). This major license amendment request proposed, among other things, authorization to dispose of large quantities of DU at its Federal Facility Waste Disposal Facility (FWF). Pursuant to Title 30 of the Texas Administrative Code (TAC), Rule 336.709, Technical and Environmental Analyses, disposal of waste must be sufficient to meet the radiological dose criteria for a minimum period of performance of 1,000 years after closure or the period where peak dose occurs, whichever is longer. These regulations are more stringent than those of any other state that hosts a facility authorized to dispose of Low-Level Radioactive Waste (LLW) in the U.S. On August 28, 2014, the TCEQ approved the major amendment request authorizing disposal of large quantities of DU. During the licensing review process, significant technical issues were successfully resolved ensuring that large quantities of DU could be safely isolated from the biosphere for long time periods after site closure. Many important lessons were learned during the licensing proceedings that have potential significant impacts to the licensed community. Namely that a modern, well designed disposal facility that is properly sited geologically and in an arid environment is ideal for ensuring that long-lived alpha emitting radionuclides are sufficiently isolated to protect public health for long into the future. The DOE is currently finalizing plans to complete a Supplemental Environmental Analysis (EA) to support shipments of DU for disposal at WCS' FWF as required under the National Environmental Policy Act of 1970. The DOE may begin shipments of DU for disposal to WCS FWF that was licensed and constructed to support disposal of waste that is the responsibility of the federal government as stipulated in the Low-Level Radioactive Waste Policy Amendments Act of 1985. This paper will present the regulatory history of events that initiated the NRC's rulemaking for Unique Waste Streams and the technical analysis that were conducted in support of WCS' major amendment that has been approved by the TCEQ. A description of the geological characteristics and engineering designs used to support the Performance Assessment will be included. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SU-F-T-231: Improving the Efficiency of a Radiotherapy Peer-Review System for Quality Assurance

Purpose: To improve the efficiency of a radiotherapy peer-review system using a commercially available software application for plan quality evaluation and documentation. Methods: A commercial application, FullAccess (Radialogica LLC, Version 1.4.4), was implemented in a Citrix platform for peer-review process and patient documentation. This application can display images, isodose lines, and dose-volume histograms and create plan reports for peer-review process. Dose metrics in the report can also be benchmarked for plan quality evaluation. Site-specific templates were generated based on departmental treatment planning policies and procedures for each disease site, which generally follow RTOG protocols as well as published prospective clinical trial data, including both conventional fractionation and hypo-fractionation schema. Once a plan is ready for review, the planner exports the plan to FullAccess, applies the site-specific template, and presents the report for plan review. The plan is still reviewed in the treatment planning system, as that is the legal record. Upon physician’s approval of a plan, the plan is packaged for peer review with the plan report and dose metrics are saved to the database. Results: The reports show dose metrics of PTVs and critical organs for the plans and also indicate whether or not the metrics are within tolerance. Graphical results with green, yellow, and red lights are displayed of whether planning objectives have been met. In addition, benchmarking statistics are collected to see where the current plan falls compared to all historical plans on each metric. All physicians in peer review can easily verify constraints by these reports. Conclusion: We have demonstrated the improvement in a radiotherapy peer-review system, which allows physicians to easily verify planning constraints for different disease sites and fractionation schema, allows for standardization in the clinic to ensure that departmental policies are maintained, and builds a comprehensive database for potential clinical outcome evaluation.

60 APPLIED LIFE SCIENCES↗

GROUNDWATER RADIOIODINE: PREVALENCE, BIOGEOCHEMISTRY, AND POTENTIAL REMEDIAL APPROACHES

Iodine-129 ({sup 129}I) has not received as much attention in basic and applied research as other contaminants associated with DOE plumes. These other contaminants, such as uranium, plutonium, strontium, and technetium are more widespread and exist at more DOE facilities. Yet, at the Hanford Site and the Savannah River Site {sup 129}I occurs in groundwater at concentrations significantly above the primary drinking water standard and there is no accepted method for treating it, other than pump-and-treat systems. With the potential arrival of a 'Nuclear Renaissance', new nuclear power facilities will be creating additional {sup 129}I waste at a rate of 1 Ci/gigawatts energy produced. If all 22 proposed nuclear power facilities in the U.S. get approved, they will produce more {sup 129}I waste in seven years than presently exists at the two facilities containing the largest {sup 129}I inventories, ({approx}146 Ci {sup 129}I at the Hanford Site and the Savannah River Site). Hence, there is an important need to fully understand {sup 129}I behavior in the environment to clean up existing plumes and to support the expected future expansion of nuclear power production. {sup 129}I is among the key risk drivers at all DOE nuclear disposal facilities where {sup 129}I is buried, because of its long half-life (16 million years), high toxicity (90% of the body's iodine accumulates in the thyroid), high inventory, and perceived high mobility in the subsurface environment. Another important reason that {sup 129}I is a key risk driver is that there is the uncertainty regarding its biogeochemical fate and transport in the environment. We typically can define {sup 129}I mass balance and flux at sites, but can not accurately predict its response to changes in the environment. This uncertainty is in part responsible for the low drinking water standard, 1 pCi/L {sup 129}I, and the low permissible inventory limits (Ci) at the Savannah River Site, Hanford Site, and the former Yucca Mountain disposal facilities. The objectives of this report are to: (1) compile the background information necessary to understand behavior of {sup 129}I in the environment, (2) discuss sustainable remediation approaches to {sup 129}I contaminated groundwater, and (3) identify areas of research that will facilitate remediation of {sup 129}I contaminated areas on DOE sites. Lines of scientific inquiry that would significantly advance the goals of basic and applied research programs for accelerating {sup 129}I environmental remediation and reducing uncertainty associated with disposal of {sup 129}I waste are: (1) Evaluation of amendments or other treatment systems that can sequester subsurface groundwater {sup 129}I. (2) Develop analytical techniques for measurement of total {sup 129}I that eliminate the necessity of collecting and shipping large samples of groundwater. (3) Develop and evaluate ways to manipulate areas with organic-rich soil, such as wetlands, to maximize {sup 129}I sorption, minimizing releases during anoxic conditions. (4) Develop analytical techniques that can identify the various {sup 129}I species in the subsurface aqueous and solid phases at ambient concentrations and under ambient conditions. (5) Identify the mechanisms and factors controlling iodine-natural organic matter interactions at appropriate environmental concentrations. (6) Understand the biological processes that transform iodine species throughout different compartments of subsurface waste sites and the role that these processes have on {sup 129}I flux.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Radiochemistry Lab Decommissioning and Dismantlement. AECL, Chalk River Labs, Ontario, Canada

Atomic Energy of Canada (AECL) was originally founded in the mid 1940's to perform research in radiation and nuclear areas under the Canadian Defense Department. In the mid 50's The Canadian government embarked on several research and development programs for the development of the Candu Reactor. AECL was initially built as a temporary site and is now faced with many redundant buildings. Prior to 2004 small amounts of Decommissioning work was in progress. Many reasons for deferring decommissioning activities were used with the predominant ones being: 1. Reduction in radiation doses to workers during the final dismantlement, 2. Development of a long-term solution for the management of radioactive wastes in Canada, 3. Financial constraints presented by the number of facilities shutdown that would require decommissioning funds and the absence of an approved funding strategy. This has led to the development of a comprehensive decommissioning plan that is all inclusive of AECL's current and legacy liabilities. Canada does not have a long-term disposal site; therefore waste minimization becomes the driving factor behind decontamination for decommissioning before and during dismantlement. This decommissioning job was a great learning experience for decommissioning and the associated contractors who worked on this project. Throughout the life of the project there was a constant focus on waste minimization. This focus was constantly in conflict with regulatory compliance primarily with respect to fire regulations and protecting the facility along with adjacent facilities during the decommissioning activities. Discrepancies in historical documents forced the project to treat every space as a contaminated space until proven differently. Decommissioning and dismantlement within an operating site adds to the complexity of the tasks especially when it is being conducted in the heart of the plant. This project was very successful with no lost time accidents in over one hundred thousand hours worked, on schedule and under budget despite some significant changes throughout the decommissioning phases. The actual cost to decommission this building will come in under 9 million dollars vs. an estimated 14.5 million dollars. This paper will cover some of the unique aspects of dismantling a radioactive building that has seen pretty much every element of the periodic table pass through it with the client requirement focused on minimization of radioactive waste volumes.

42 ENGINEERING↗

LLNL NESHAPs Radionuclide Air Emission Report for 2011 (2011 Annual Report)

Lawrence Livermore National Security, LLC operates facilities at Lawrence Livermore National Laboratory (LLNL) where radionuclides are handled and stored. These facilities are subject to the U.S. Environmental Protection Agency (EPA) National Emission Standards for Hazardous Air Pollutants (NESHAPs) in Code of Federal Regulations (CFR) Title 40, Part 61, Subpart H, which regulates radionuclide emissions to air from Department of Energy (DOE) facilities. Specifically, NESHAPs limits the emission of radionuclides to the ambient air to levels resulting in an annual effective dose equivalent of 10 mrem (100 µSv) to any member of the public. Using measured and calculated emissions, and building-specific and common parameters, LLNL personnel applied the EPA-approved computer code, CAP88-PC, Version 1.0, to calculate the dose to the maximally exposed individual member of the public for the Livermore site and Site 300.

54 ENVIRONMENTAL SCIENCES↗

Lawrence Livermore National Laboratory National Emission Standards for Hazardous Air Pollutants (NESHAPs) 2012 Annual Report

Lawrence Livermore National Security, LLC operates facilities at Lawrence Livermore National Laboratory (LLNL) where radionuclides are handled and stored. These facilities are subject to the U.S. Environmental Protection Agency (EPA) National Emission Standards for Hazardous Air Pollutants (NESHAPs) in Code of Federal Regulations (CFR) Title 40, Part 61, Subpart H, which regulates radionuclide emissions to air from Department of Energy (DOE) facilities. Specifically, NESHAPs limits the emission of radionuclides to the ambient air to levels resulting in an annual effective dose equivalent of 10 mrem (100 µSv) to any member of the public. Using measured and calculated emissions, and building-specific and common parameters, LLNL personnel applied the EPA-approved computer code, CAP88-PC, Version 1.0, to calculate the dose to the maximally exposed individual member of the public for the Livermore site and Site 300.

54 ENVIRONMENTAL SCIENCES↗

Lawrence Livermore National Laboratory Radionuclide Air Emission Report for 2013 (NESHAPs 2013 Annual Report)

Lawrence Livermore National Security, LLC operates facilities at Lawrence Livermore National Laboratory (LLNL) where radionuclides are handled and stored. These facilities are subject to the U.S. Environmental Protection Agency (EPA) National Emission Standards for Hazardous Air Pollutants (NESHAPs) in Code of Federal Regulations (CFR) Title 40, Part 61, Subpart H, which regulates radionuclide emissions to air from Department of Energy (DOE) facilities. Specifically, NESHAPs limits the emission of radionuclides to the ambient air to levels resulting in an annual effective dose equivalent of 10 mrem (100 μSv) to any member of the public. Using measured and calculated emissions, and building-specific and common parameters, LLNL personnel applied the EPA-approved computer code, CAP88-PC, Version 4.0.0.570, to calculate the dose to the maximally exposed individual member of the public for the Livermore Site and Site 300.

54 ENVIRONMENTAL SCIENCES↗

LLNL NESHAPs 2014 Annual Report

Lawrence Livermore National Security, LLC operates facilities at Lawrence Livermore National Laboratory (LLNL) where radionuclides are handled and stored. These facilities are subject to the U.S. Environmental Protection Agency (EPA) National Emission Standards for Hazardous Air Pollutants (NESHAPs) in Code of Federal Regulations (CFR) Title 40, Part 61, Subpart H, which regulates radionuclide emissions to air from Department of Energy (DOE) facilities. Specifically, NESHAPs limits the emission of radionuclides to the ambient air to levels resulting in an annual effective dose equivalent of 10 mrem (100 μSv) to any member of the public. Using measured and calculated emissions, and building-specific and common parameters, LLNL personnel applied the EPA-approved computer code, CAP88-PC, Version 4.0.1.17, to calculate the dose to the maximally exposed individual member of the public for the Livermore Site and Site 300.

61 RADIATION PROTECTION AND DOSIMETRY↗

LLNL NESHAPs 2015 Annual Report - June 2016

Lawrence Livermore National Security, LLC operates facilities at Lawrence Livermore National Laboratory (LLNL) in which radionuclides are handled and stored. These facilities are subject to the U.S. Environmental Protection Agency (EPA) National Emission Standards for Hazardous Air Pollutants (NESHAPs) in Code of Federal Regulations (CFR) Title 40, Part 61, Subpart H, which regulates radionuclide emissions to air from Department of Energy (DOE) facilities. Specifically, NESHAPs limits the emission of radionuclides to the ambient air to levels resulting in an annual effective dose equivalent of 10 mrem (100 μSv) to any member of the public. Using measured and calculated emissions, and building-specific and common parameters, LLNL personnel applied the EPA-approved computer code, CAP88-PC, Version 4.0.1.17, to calculate the dose to the maximally exposed individual member of the public for the Livermore Site and Site 300.

54 ENVIRONMENTAL SCIENCES↗

NESHAPs CY19 Report: Radionuclide Air Emission Report for 2019

Lawrence Livermore National Security, LLC operates facilities at Lawrence Livermore National Laboratory (LLNL) in which radionuclides are handled and stored. These facilities are subject to the U.S. Environmental Protection Agency (EPA) National Emission Standards for Hazardous Air Pollutants (NESHAPs) in Code of Federal Regulations (CFR) Title 40, Part 61, Subpart H, which regulates radionuclide emissions to air from Department of Energy (DOE) facilities. Specifically, NESHAPs limits the emission of radionuclides to the ambient air to levels resulting in an annual effective dose equivalent of 10 mrem (100 μSv) to any member of the public. Using measured and calculated emissions, and building-specific and common parameters, LLNL personnel applied the EPA-approved computer code, CAP88-PC, Version 4.0.1.17, to calculate the dose to the maximally exposed individual member of the public for the Livermore Site and Site 300. In 2019, LLNL maintained its compliance with 40 CFR 61, Subpart H. All radioactive air emissions resulted in calculated doses far below the annual 10 mrem (100 μSv) sitewide standard. The annual doses to the site-wide maximally exposed individual member of the public at the Livermore Site and Site 300 from planned and unplanned operations in 2019 are: Livermore Site: 4.3 x 10⁻³ mrem (4.3 x 10⁻² μSv); Site 300: 9.5 x 10⁻⁸ mrem (9.5 x 10⁻⁷ μSv).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

LLNL NESHAPs 2023 Annual Report

Lawrence Livermore National Security, LLC operates facilities at Lawrence Livermore National Laboratory (LLNL) in which radionuclides are handled and stored. These facilities are subject to the U.S. Environmental Protection Agency (EPA) National Emission Standards for Hazardous Air Pollutants (NESHAPs) in Code of Federal Regulations (CFR) Title 40, Part 61, Subpart H, which regulates radionuclide emissions to air from Department of Energy (DOE) facilities. Specifically, NESHAPs limits the emission of radionuclides to the ambient air to levels resulting in an annual effective dose equivalent of 10 mrem (100 µSv) to any member of the public. Using measured and calculated emissions, and building-specific and common parameters, LLNL personnel applied the EPA-approved computer code, CAP88-PC, Version 4.1.1.0, to calculate the dose to the maximally exposed individual member of the public for the Livermore Site and Site 300.

54 ENVIRONMENTAL SCIENCES↗

Hanford site excavation permit application automation project - 15187

Mission Support Alliance, LLC (MSA), on behalf of the Department of Energy's Richland Operations Office (DOE-RL), recently implemented the Site Excavation Permit Application (SEPA) at Hanford. The SEPA automation replaced a 20-year-old manual excavation permit process that governed all Hanford Site excavation activities. The manual process required time consuming interaction between numerous resources for submitting an excavation permit to 15 separate permit organizations for approvals and signature. The process involved numerous information exchanges - usually by phone or E-mails, and substantial vehicle travel. It also generated large amounts of paper, lengthy wait periods and the need for continual status updates to permit reviewers until all approvals were obtained. The new SEPA automated system is an entirely paperless application that streamlines over 25 separate manual permit activities into five Web-based processes. The new application provides sizable environmental sustainability benefits in terms of avoiding: paper waste, air pollution and bio-fuel consumption. SEPA also deploys automated innovations that produce an approximate 50 percent operational cost reduction when compared to the manual permit process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

EV Charging Infrastructure Energization An Overview of Approaches for Simplifying and Accelerating Timelines to Processing EV Charging Load Service Requests

The United States has seen significant growth in electric vehicle (EV) adoption, leading to increased demand for EV charging infrastructure. Over the past decade, EV charging infrastructure site developers, site hosts, and electric distribution utilities have navigated the process to integrate chargers onto the electric grid. Site developers and site hosts have raised the alarm that the integration process for high-powered EV charging projects does not meet the needs of the EV market for timeliness or cost. High-powered charging stations typically require a load service request or an agreement with the local utility to connect to the grid. The process of energizing a new high-powered charging site can be complex and time-consuming, often taking up to 2 years. This timeline is the result of current utility energization processes having been designed for construction projects that take longer to build (i.e., buildings). The specific challenges stem from various factors, including compartmentalization in application processes, the integration of EV charging process approvals with other distributed energy resources (DERs), and the need to ensure grid reliability. The energization process needs to evolve to meet the growing demand for high-powered EV charging. This white paper compiles information gathered through various conversations with key stakeholders, including utilities, utility regulators, EV charging operators, site developers, and authorities having jurisdiction (AHJ) as well as through an extensive literature review. This document identifies the challenges and provides potential solutions to streamline the process of connecting EV charging infrastructure to the power grid in the United States, serving as a starting point for future conversations around these solutions. The solutions noted in this white paper require collaborative efforts among utilities, regulators, and EV charging infrastructure developers to streamline the grid connection process for EV charging infrastructure. They are broadly organized into four areas: 1. Increase data access and transparency: Develop automated load service request tools, integrate hosting capacity and load service request analyses, incorporate EV adoption forecasts, and provide transparency on the processing queue. 2. Improve energization processes and timing: Create fast-track options based on prescreening criteria, provide flexibility or phased approvals in the load service request/interconnection process, build internal knowledge within utilities about EV charging technologies, and provide standardized workforce training. 3. Promote economic efficiency: Right size distribution components to accurately reflect the load requirements of EV charging infrastructure, make proactive investments in grid infrastructure based on EV adoption forecasts and growth projections, and consider energy equity and environmental justice factors such as equitable access to EV charging when planning infrastructure. 4. Improve grid reliability and resilience: Use load management/power control systems (PCS) at EV charging stations, adopt and implement harmonized standards for communication protocols and information models between the EV charging and grid control infrastructure, and address cybersecurity considerations by implementing robust security measures and standards for EV charging infrastructure—with particular emphasis on clarifying the security requirements for the interface to the grid. The objective of the solutions proposed in this white paper is to accelerate the timeline and decrease costs associated with connecting EV charging infrastructure to the grid. Electric utilities, utility regulators, EV charging infrastructure developers, and site hosts will first need to understand which solutions are available in their service territory, and if warranted, which combination of solutions would support their specific needs. Through the successful implementations of solutions at scale detailed here, industry will demonstrate a new and innovative ecosystem where timely deployment and energization of EV charging infrastructure with greater grid resiliency and reliability is a reality.

24 POWER TRANSMISSION AND DISTRIBUTION↗