Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Risk management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

Regulatory Treatment of Non-Core Sources of Radioactivity for Advanced Reactor Designs

The recent resurgence in advance (non-light water) reactor development has been paralleled by the development of risk-informed performance-based (RIPB) licensing pathways. Specifically, the creation of the RIPB Licensing Modernization Project (LMP) approach and subsequent endorsement by the U.S. Nuclear Regulatory Commission (NRC) now provides advanced reactor vendors with a defined RIPB method to develop an affirmative safety case for licensing. In addition, the Technology Inclusive Content of Applications Project (TICAP) has published guidance on developing a license application based on the LMP approach. To support the utilization of risk information as part of advanced reactor design and licensing efforts, the American Society of Mechanical Engineers (ASME)/American Nuclear Society (ANS) Joint Committee on Nuclear Risk Management (JCNRM) has developed a probabilistic risk assessment (PRA) standard for advanced reactors. The standard, which was formerly approved by the American National Standards Institute (ANSI) in 2021 and recently endorsed by the NRC in trial use Regulatory Guide (RG) 1.247, is an integral standard, covering from initiating events to offsite consequence. A major feature of the standard is that it permits the inclusion of any source of radioactivity material at the site within the plant PRA. Therefore, non-core sources of radioactivity, such as fuel storage, fuel processing, and purification systems, can be included within a single comprehensive plant PRA. For those advanced reactor vendors utilizing a RIPB licensing approach, there is an opportunity to include the non-core sources of radioactivity within the RIPB framework for licensing decision-making, such as the categorization of events, classification of structures, systems, and components (SSCs), and evaluation of the adequacy of defense-in-depth (DID). For advanced reactor designs that contain multiple non-core sources of radioactivity, or for monolithic plant sites that include associated fuel facilities, this approach could potentially simplify licensing applications through the use of a single, uniform, and consistent decision-making framework across all radioactive sources at the site. In addition, a RIPB approach could provide additional insights regarding plant behavior, flexibility regarding licensing decision-making, and potentially allow the use of risk information as part of the plant oversight process. Risk-informing these aspects of advanced reactor licensing would also be consistent with the NRC’s risk policy statement. However, there is diverse regulation and guidance regarding the licensing of non-core sources of radioactivity and generally limited experience using RIPB approaches for the evaluation as part of licensing.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Issues in NASA program and project management

This volume is the third in an ongoing series on aerospace project management at NASA. Articles in this volume cover the attitude of the program manager, program control and performance measurement, risk management, cost plus award fee contracting, lessons learned from the development of the Far Infrared Absolute Spectrometer (FIRAS), small projects management, and age distribution of NASA scientists and engineers. A section on resources for NASA managers rounds out the publication.

Hoban, Francis T.↗

Issues in NASA program and project management

This volume is the third in an ongoing series on aerospace project management at NASA. Articles in this volume cover the attitude of the program manager, program control and performance measurement, risk management, cost plus award fee contracting, lessons learned from the development of the Far Infrared Absolute Spectrometer (FIRAS), small projects management, and age distribution of NASA scientists and engineers. A section on resources for NASA managers rounds out the publication.

Hoban, Francis T.↗

Bayesian Inference for NASA Probabilistic Risk and Reliability Analysis

This document, Bayesian Inference for NASA Probabilistic Risk and Reliability Analysis, is intended to provide guidelines for the collection and evaluation of risk and reliability-related data. It is aimed at scientists and engineers familiar with risk and reliability methods and provides a hands-on approach to the investigation and application of a variety of risk and reliability data assessment methods, tools, and techniques. This document provides both: A broad perspective on data analysis collection and evaluation issues. A narrow focus on the methods to implement a comprehensive information repository. The topics addressed herein cover the fundamentals of how data and information are to be used in risk and reliability analysis models and their potential role in decision making. Understanding these topics is essential to attaining a risk informed decision making environment that is being sought by NASA requirements and procedures such as 8000.4 (Agency Risk Management Procedural Requirements), NPR 8705.05 (Probabilistic Risk Assessment Procedures for NASA Programs and Projects), and the System Safety requirements of NPR 8715.3 (NASA General Safety Program Requirements).

Dezfuli, Homayoon↗

Requirements Engineering Scorecard and the Next-Generation Space Suit

The objective for a NASA contractor, the performing organization in this case study, is to provide engineering services to develop and deliver the next generation space suit to NASA, the customer in this case study. A case study with qualitative and quantitative analyses regarding a new process and approach to requirements engineering is described, with the intent that if utilized, these tools may have contributed to improvements across the project in terms of meeting cost, scope, budget and quality while appropriately accounting for risk management. The procedure entails a research method in which the current state of the project, current state of the art, and the identified systems engineering challenges are evaluated. Iterative models are tempered through development by continual improvements by engineering evaluation of engineers on the project. The current results have produced a prototype of a requirements engineering scorecard with implementations of FMEA and quantitative analysis to (i) identify root cause of underdeveloped requirements and (ii) project management impacts with regards to project risk. Forward work includes customer, performing organization, acceptance against applicable INCOSE community accepted practices.

INCOSE↗

NASA's Agency-Wide Strategy for Environmental Regulatory Risk Analysis and Communication

NASA's Agency-wide.resource for identifying and managing risks associated with changing environmental regulations Goals of the RRAC PC: 1) Proactively. detect, analyze and communicate environmental regulatory risks to NASA Programs and facilities; 2) Communicate with regulators and participate in the mitigation of such risks; and 3) Provide centralized support on emerging regulations to NASA HQ Environmental Management Division. When significant regulatory changes are identified, timely communication is essential. Communication of changing requirements to the regulatory stakeholders - NASA Programs and Facilities. Communication of potential issues to management and, when appropriate, back to the regulating agency.

Scroggins, Sharon↗

An “EPIIC” Vision to Evolve Project Integration, Innovation, and Collaboration with Broad Impact for How NASA Executes Complex Projects

Evolving Project Integration, Innovation, and Collaboration (EPIIC) is a vision defined to transform the way projects manage information to support real-time decisions, capture best practices and lessons learned, perform assessments, and manage risk across a portfolio of projects. The foundational project management needs for data and information will be revolutionized through innovations on how we manage and access that data, implement configuration control, and certify compliance. The embedded intelligence of new interactive data interfaces integrate technical and programmatic data such that near real time analytics can be accomplished to more efficiently and accurately complete systems engineering and project management tasks. The system-wide data analytics that are integrated into customized data interfaces allows the growing team of engineers and managers required to develop and implement major NASA missions the ability to access authoritative source(s) of system information while greatly reducing the labor required to complete system assessments. This would allow, for example, much of what is accomplished in a scheduled design review to take place as needed, between any team members, at any time. An intelligent data interface that rigorously integrates systems engineering and project management information in near real time can provide substantially greater insight for systems engineers, project managers, and the large diverse teams required to complete a complex project. System engineers, programmatic personnel (those who focus on cost, schedule, and risk), the technical engineering disciplines, and project management can realize immediate benefit from the shared vision described herein. Implementation of the vision also enables significant improvements in the performance of the engineered system being developed.

Moreland, Robert J.↗

On Space Exploration and Human Error: A Paper on Reliability and Safety

NASA space exploration should largely address a problem class in reliability and risk management stemming primarily from human error, system risk and multi-objective trade-off analysis, by conducting research into system complexity, risk characterization and modeling, and system reasoning. In general, in every mission we can distinguish risk in three possible ways: a) known-known, b) known-unknown, and c) unknown-unknown. It is probably almost certain that space exploration will partially experience similar known or unknown risks embedded in the Apollo missions, Shuttle or Station unless something alters how NASA will perceive and manage safety and reliability

Bell, David G.↗

Cybersecurity for Distributed Wind: MIRACL Advisory Board Meeting 2022

This presentation for the MIRACL Industry Advisory Board summarizes the cybersecurity research for distributed wind that was performed during the project. Highlights include an overview of the distributed wind reference architecture, descriptions of the unique needs and challenges for securing distributed wind, the cyber risk management framework that was developed for this project, and key takeaways for various stakeholders.

17 WIND ENERGY↗

Dealing with Shuttle payload classifications NMI 8010.1 - A user's interpretation

The Shuttle payload classifications in the NASA Management Instruction (NMI) 8010.1 are examined in terms of risk management. The four payload classes, minimum risk, risk/cost compromise, reflight or repeat flight payload, and minimum single attempt cost, are described. The effects of the classifications on payload product assurance provisions are discussed. Environmental design and test requirements are interpreted in terms of NMI 8010.1.

Gindorf, Tom↗

Incorporating cost-benefit analyses into software assurance planning

The objective is to use cost-benefit analyses to identify, for a given project, optimal sets of software assurance activities. Towards this end we have incorporated cost-benefit calculations into a risk management framework.

investment software quality software process impro↗

Solar, Wind, and Load Forecasting Dataset for MISO, NYISO, and SPP Balancing Areas

The Performance-based Energy Resource Feedback, Optimization, and Risk Management (PERFORM) program is an initiative intended to foster "a fundamental shift in grid management rooted in an understanding of asset risk and system risk" (ARPA-E 2020). Launched by the Advanced Research Projects Agency-Energy (ARPA-E), the program supports efforts to incorporate uncertainty in electric power decision making. In support of PERFORM, the National Renewable Energy Laboratory (NREL) has produced a set of time-coincident forecasts of solar, wind, and load profiles. As part of Phase I of the PERFORM effort, NREL created a dataset that consists of one year of time-coincident load, wind, and solar actuals and probabilistic forecasts based on data from the Electric Reliability Council of Texas (ERCOT) (Bryce et al. 2023). In Phase II, NREL developed similar datasets for three other U.S. Independent System Operators (ISO): the Midcontinent Independent System Operator (MISO), the New York Independent System Operator (NYISO), and the Southwest Power Pool (SPP).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Using Dissimilarity Metrics to Identify Interesting Designs

A computer program helps to blend the power of automated-search software, which is able to generate large numbers of design solutions, with the insight of expert designers, who are able to identify preferred designs but do not have time to examine all the solutions. From among the many automated solutions to a given design problem, the program selects a smaller number of solutions that are worthy of scrutiny by the experts in the sense that they are sufficiently dissimilar from each other. The program makes the selection in an interactive process that involves a sequence of data-mining steps interspersed with visual displays of results of these steps to the experts. At crucial points between steps, the experts provide directives to guide the process. The program uses heuristic search techniques to identify nearly optimal design solutions and uses dissimilarity metrics defined by the experts to characterize the degree to which solutions are interestingly different. The search, data-mining, and visualization features of the program were derived from previously developed risk-management software used to support a risk-centric design methodology

Feather, Martin↗

Security Risk Assessment Process for UAS in the NAS CNPC Architecture

This informational paper discusses the risk assessment process conducted to analyze Control and Non-Payload Communications (CNPC) architectures for integrating civil Unmanned Aircraft Systems (UAS) into the National Airspace System (NAS). The assessment employs the National Institute of Standards and Technology (NIST) Risk Management framework to identify threats, vulnerabilities, and risks to these architectures and recommends corresponding mitigating security controls. This process builds upon earlier work performed by RTCA Special Committee (SC) 203 and the Federal Aviation Administration (FAA) to roadmap the risk assessment methodology and to identify categories of information security risks that pose a significant impact to aeronautical communications systems. A description of the deviations from the typical process is described in regards to this aeronautical communications system. Due to the sensitive nature of the information, data resulting from the risk assessment pertaining to threats, vulnerabilities, and risks is beyond the scope of this paper

data links↗

Security Risk Assessment Process for UAS in the NAS CNPC Architecture

This informational paper discusses the risk assessment process conducted to analyze Control and Non-Payload Communications (CNPC) architectures for integrating civil Unmanned Aircraft Systems (UAS) into the National Airspace System (NAS). The assessment employs the National Institute of Standards and Technology (NIST) Risk Management framework to identify threats, vulnerabilities, and risks to these architectures and recommends corresponding mitigating security controls. This process builds upon earlier work performed by RTCA Special Committee (SC) 203 and the Federal Aviation Administration (FAA) to roadmap the risk assessment methodology and to identify categories of information security risks that pose a significant impact to aeronautical communications systems. A description of the deviations from the typical process is described in regards to this aeronautical communications system. Due to the sensitive nature of the information, data resulting from the risk assessment pertaining to threats, vulnerabilities, and risks is beyond the scope of this paper.

Iannicca, Dennis C.↗

Urban Air Mobility Traffic Analysis Tool for Airspace Involving Vertiport Hub Operations to Examine Simulated Conflicts

Presented herein are details of the development of an Urban Air Mobility Traffic Analysis Tool (UAM TAT), designed to analyze the traffic of Vertical Take-off and Landing (VTOL) air-craft in urban agglomerations to enable the Urban Air Mobility(UAM) operations. The tool aims to address challenges of UAM operations in a simulated airspace by testing different scenarios and methods for air traffic management. It emphasizes the need for effective risk management practices and methodologies to ensure the safety of operations, given the increasing use of highly automated aircraft (i.e., Advanced Air Mobility (AAM))in urban environments. The tool is modular and allows for the simulation of various families of VTOLs and different air traffic rules, making it suitable for defining and estimating airspace and vertiports capacity, determining VTOL requirements, and testing and comparing air traffic management methods. The results of five different simulations are presented that show the capabilities and functionalities of the tool. The simulations present the impact of vertiport hub operations and various ATM approach on the VTOLs’ conflicts.

Urban Air Mobility↗