Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

Comparison of German and American fabrication standards for transportation and storage containments of high level radioactive material type B packages - 15055

As the competent authority for the evaluation of German radioactive material (RAM) transport and storage packages, BAM (the German Federal Institute for Materials Research and Testing) has evaluated various international cask manufacturers regarding compliance with the German Type B(U) licensing requirements. The US NRC has recommended paragraphs in the ASME Boiler and Pressure Vessel (B and PV) Code, Section III, Division 3, as the measure to quantify the safety requirements of the US regulations regarding fabrication of RAM transportation and storage containments. The objective of this study is to compare the fabrication criteria of the German Dangerous Goods Procedural Rules (BAM-GGR) and the German Institute for Standardization (DIN) with the US quantitative measures for fabrication of RAM package containment vessels. This comparison will cover major similarities and differences between the requirements of the German standards and the ASME Code requirements for Type B package containment fabrication QC (quality control). While the material most often used for German RAM containment applications is ductile cast iron (DCI), in the US forged austenitic stainless steel is typically used. This study focuses on fabrication QC measures required to ensure reproducible and acceptable properties for DCI containments. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford Direct Feed Low Activity Waste Program Throughput Optimization Through Modeling - 18587

The Direct Feed Low Activity Waste (DFLAW) program at Hanford allows for the early treatment of tank wastes years earlier than previously planned. Operational Research (OR) modeling is being used to provide invaluable insight into how complex and integrated processes will operate. The DFLAW OR models are used to help optimize the design and operation of the integrated system. The DFLAW OR models include the processes and real-life complexities involved in the day-to-day operation of the systems and equipment, and can predict key performance characteristics including throughput, mission timescale, equipment and labor utilization, lag storage and capacity requirements. The DFLAW OR models also have the in-built capability to simulate random events such as equipment failures. Adding random variability to models introduces a real-life element to model results. For example, OR modeling breakdown analysis of equipment failure and restoration times may inform specific improvements to a design and plant operation, including areas where the provision of spare (duty/standby) equipment would prove beneficial; the optimum number and capacity of lag storage tanks (for waste intermediate storage, reagents, etc.); operational issues, including scheduling constraints, labor resource constraints, effect of shift schedules (e.g. days only, extended shifts, 24/7),, maintenance strategies, including planned maintenance, equipment upgrades, on-hand spare part stockholding, etc. At Hanford, standalone OR models to date, have been used to help identify key operational issues and improve the design and operation of individual systems within the Tank Farms, Low Activity Waste Pretreatment System (LAWPS), Low Activity Waste (LAW) Vitrification and Effluent Management Facility (EMF) and Integrated Disposal Facility (IDF), logistics and infrastructure, 222-S laboratory [References 1 and 2] including: - Identification of critical spares including transfer pumps; - Underpin size and number of lag storage tanks to maintain continuous LAW feed to the LAW melters; - Underpin sample turnaround times at the 222-S Laboratory (e.g. feed prequalification and evaporator campaign samples) and determine how targets can be achieved without impacting waste feed delivery to LAWPS and the LAW Vitrification Facility; - Determine operational strategy required at IDF including shift schedules and sizes and the number of ILAW transporters that can support DFLAW throughput; - Identification of lag storage management strategies for glass formers, reagents, other consumables due to delivery distance and delays due to bad weather; and - Truck delivery badging needs to support 24/7 operation and management of shift in/out times required to reduce congestion. An Integrated DFLAW OR model has been developed and combines the standalone OR models such that integrated throughput and availability can be assessed from a program perspective. The Integrated OR model will provide a more detailed understanding of the interactions between Tank Farms, LAWPS, LAW VIT and IDF such that key bottleneck areas can be identified and ensure improvements are focused. Examples of future improvements that may be considered include identification of critical spare parts, required on-site maintenance capabilities, shift scheduling, and craft and labor availability. The methods, results and insights derived by DFLAW OR modeling efforts are expected to provide useful applications to other projects that involve combinations of mechanical handling, chemical processing, waste treatment/packaging or environmental remediation operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Calibration of a Passive Neutron Counter with {sup 242}Pu Standards - 16450

At the Los Alamos National Laboratory TA 55 facility, a large quantity of Heat Source (HS) and MT42 (primarily {sup 242}Pu) has been designated for disposal as TRU waste. The waste, to be packaged in either 55 gal drums or Pipe Overpack Containers (POCs), is scheduled to be assayed with the TA 55 HENC 3 system. The system is owned and operated by the Nuclear Waste Partnership (NWP) under a contract with the Carlsbad DoE field office. The HENC 3 is a combined passive neutron/gamma assay system. The neutron component of the system was previously calibrated up to 21.9 g of {sup 240}Pu effective. This corresponds to approximately 9 g of typical HS plutonium and 13 g of MT42 waste. In order to reduce packaging efforts and radiation dose for waste handling personnel, LANL has requested an increase in the HENC 3 calibration limit to approximate the maximum allowable shipping and storage limits for TRU waste. To increase the limits, NWP has obtained the use of well characterized MT42 source materials. The sources, developed and owned by LANL, range from to 5 g to 200 g of plutonium enriched to 86.6% {sup 242}Pu. Using these sources in combination, multiple measurements were performed with both 55-gal drums and POCs to determine their suitability for extending the neutron calibration range of the system. The results of the measurements were (1) compared to the existing calibration for consistency and (2) used to extend the calibration range to 307 g of {sup 240}Pu effective. This report will discuss the elements of the neutron component of the HENC 3 system, the calibration extension effort, problems encountered, and the results of the measurements. As a result of the extension, HS and MT42 materials can be assayed in 55-gal drums and POCs up to their allowable shipping limits. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Proven Uranium Recovery Solutions for the Nuclear Fuel Manufacturing Market - 16060

During the Nuclear Fuel Manufacturing process a number of by-products and residues are generated from various sources. In recent years, Westinghouse has characterised and processed around 50,000 drums of residue comprising of numerous different types generated over 60 years from the manufacture of numerous types of fuel for greater than 50 reactors. These include, AGR, Magnox (uranium metal fuel), PWR, fast reactors and various test reactors. Different organisations have different definitions and names for each of these categories but essentially they fall into one of the following categories: Clean Scrap (U{sub 3}O{sub 8}, UO{sub 2}, UO{sub 3}, UF{sub 4}, powders, pellets), Dirty Scrap (U{sub 3}O{sub 8}, UO{sub 2}, UO{sub 3}, UF{sub 4}, powders, pellets), Gd Contaminated Scrap (U{sub 3}O{sub 8}, UO{sub 2}, powders, pellets), Ash, Sludge, Combustible / soft residues (e.g. ventilation filters, gloves, plastic bags), Contaminated metals (including contaminated scrap zirconium tubes), Materials arising from decommissioning. Routes have been developed across the industry for a number of the categories listed above, however in numerous examples, routes have not been established and materials have been stored creating a significant legacy. Westinghouse understands the issues regarding legacy uranic material and the financial and regulatory impact of storage. Interim storage of materials may seem like a low cost option in the short term; however ongoing costs for facilities, manpower and equipment, without a permanent and final solution can result in significant lifetime material management costs. Recovery of uranium and sending materials for safe disposal of enriched uranium residues is not easy because of the criticality risk both during processing and at a disposal site. Therefore quantities of materials than can be sent via permitted disposal routes are very limited The development of regulations often means that finding solutions is becoming more difficult. It is believed that timely resolution is ultimately the most cost effective solution. In addition, the intrinsic value of recycling this material is also high and in some cases can mitigate the cost of processing. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Readiness Process and Transition to Operation for a Remote-Handled Transuranic Packaging Facility at Hanford - 19298

CH2M Hill Plateau Remediation Company manages the Sludge Retrieval Project, which has the mission to develop and deploy technologies to safely retrieve and package remote-handled transuranic sludge that is currently stored in the 105K West Reactor Fuel Storage Basin located in the 100-K Area of the U.S. Department of Energy's Hanford Site near Richland, Washington. In 2017, CH2M Hill Plateau Remediation Company installed and commissioned a process for removal of the sludge. A contractor Operational Readiness Review was completed in March 2018, and a U.S. Department of Energy, Richland Operations Office Operational Readiness Review was completed in May. The first sludge transfer was successfully completed on June 12, 2018, proving that the Engineered Container Retrieval and Transfer System process equipment worked as intended. This paper will describe the issues and successes along the path of readiness and startup, as well as the challenges that remain and CH2M Hill Plateau Remediation Company's plan to overcome them. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

High-Level Waste Mechanical Sludge Removal at the Savannah River Site - F Tank Farm Closure Project

The Savannah River Site F-Tank Farm Closure project has successfully performed Mechanical Sludge Removal (MSR) using the Waste on Wheels (WOW) system for the first time within one of its storage tanks. The WOW system is designed to be relatively mobile with the ability for many components to be redeployed to multiple waste tanks. It is primarily comprised of Submersible Mixer Pumps (SMPs), Submersible Transfer Pumps (STPs), and a mobile control room with a control panel and variable speed drives. In addition, the project is currently preparing another waste tank for MSR utilizing lessons learned from this previous operational activity. These tanks, designated as Tank 6 and Tank 5 respectively, are Type I waste tanks located in F-Tank Farm (FTF) with a capacity of 2,840 cubic meters (750,000 gallons) each. The construction of these tanks was completed in 1953, and they were placed into waste storage service in 1959. The tank's primary shell is 23 meters (75 feet) in diameter, and 7.5 meters (24.5 feet) in height. Type I tanks have 34 vertically oriented cooling coils and two horizontal cooling coil circuits along the tank floor. Both Tank 5 and Tank 6 received and stored F-PUREX waste during their operating service time before sludge removal was performed. DOE intends to remove from service and operationally close (fill with grout) Tank 5 and Tank 6 and other HLW tanks that do not meet current containment standards. Mechanical Sludge Removal, the first step in the tank closure process, will be followed by chemical cleaning. After obtaining regulatory approval, the tanks will be isolated and filled with grout for long-term stabilization. Mechanical Sludge Removal operations within Tank 6 removed approximately 75% of the original 95,000 liters (25,000 gallons). This sludge material was transferred in batches to an interim storage tank to prepare for vitrification. This operation consisted of eleven (11) Submersible Mixer Pump(s) mixing campaigns and multiple intra-area transfers utilizing STPs from July 2006 to August 2007. This operation and successful removal of sludge material meets requirement of approximately 19,000 to 28,000 liters (5,000 to 7,500 gallons) remaining prior to the Chemical Cleaning process. Removal of the last 35% of sludge was exponentially more difficult, as less and less sludge was available to mobilize and the lighter sludge particles were likely removed during the early mixing campaigns. The removal of the 72,000 liters (19,000 gallons) of sludge was challenging due to a number factors. One primary factor was the complex internal cooling coil array within Tank 6 that obstructed mixer discharge jets and impacted the Effective Cleaning Radius (ECR) of the Submersible Mixer Pumps. Minimal access locations into the tank through tank openings (risers) presented a challenge because the available options for equipment locations were very limited. Mechanical Sludge Removal activities using SMPs caused the sludge to migrate to areas of the tank that were outside of the SMP ECR. Various SMP operational strategies were used to address the challenge of moving sludge from remote areas of the tank to the transfer pump. This paper describes in detail the Mechanical Sludge Removal activities and mitigative solutions to cooling coil obstructions and other challenges. The performance of the WOW system and SMP operational strategies were evaluated and the resulting lessons learned are described for application to future Mechanical Sludge Removal operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Determining the Efficiency of the Hanford Waste End Effecter through Proof of Concept Testing - 18165

The ability to effectively retrieve aged and hardened waste from leaking underground storage tanks at the Hanford Site is critical to achieving tank closure and Tank Farm mission success. DOE's Tank Operations Contractor, Washington River Protection Solutions (WRPS) is currently developing with Pacific Northwest National Laboratory (PNNL) a confined sluicing end effecter known as the Hanford Waste End Effecter (HWEE). The HWEE is a high-pressure rotating multi water-jet (for waste dislocation) with an eductor transfer system that is designed to both mobilize and extract the eroded waste settled on tank bottoms. This technology development is planned to be accomplished in four phases: 1) HWEE proof of concept testing using cold simulants (based on known Hanford tank waste hardness characteristics); 2) HWEE retrieval system development and testing using cold simulant; 3) full scale HWEE system testing using cold simulant; and 4) deployment into an actual Hanford Tank with the intent to successfully retrieve remaining waste in the tank. This paper discusses the viability of the HWEE based on how well it removed the simulated hardpan and the amount of liquid left in the test bed during Phase 1. Water usage and retrieval rate were closely monitored. This paper only discusses Phase 1 testing and results completed in October 2017. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FATE Unified Modeling Method for Spent Nuclear Fuel and Sludge Processing, Shipping and Storage - 13405

A unified modeling method applicable to the processing, shipping, and storage of spent nuclear fuel and sludge has been incrementally developed, validated, and applied over a period of about 15 years at the US DOE Hanford site. The software, FATE{sup TM}, provides a consistent framework for a wide dynamic range of common DOE and commercial fuel and waste applications. It has been used during the design phase, for safety and licensing calculations, and offers a graded approach to complex modeling problems encountered at DOE facilities and abroad (e.g., Sellafield). FATE has also been used for commercial power plant evaluations including reactor building fire modeling for fire PRA, evaluation of hydrogen release, transport, and flammability for post-Fukushima vulnerability assessment, and drying of commercial oxide fuel. FATE comprises an integrated set of models for fluid flow, aerosol and contamination release, transport, and deposition, thermal response including chemical reactions, and evaluation of fire and explosion hazards. It is one of few software tools that combine both source term and thermal-hydraulic capability. Practical examples are described below, with consideration of appropriate model complexity and validation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Updated Declaration of Legacy Waste Based on Re-evaluated Records - 18283

Kerntechnische Entsorgung Karlsruhe (KTE) has the assignment to decommission and dispose of the nuclear installations on the Karlsruhe site. The entire inventory of these installations as well as the existing waste materials stored in the interim storage of the central waste management section (formerly central decontamination department / HDB) is planned to be sent to the repository Konrad commissioned for the acceptance of low level waste and intermediate level waste. Therefore it is treated according to the respective acceptance criteria. KTE has approximately 45.000 m{sup 3} of legacy waste, which was produced prior to the first issue of these acceptance criteria [1] and hence has to be re-qualified. Legacy waste generally has a radiological declaration, which is not sufficient to meet the criteria applied by the regulators and independent experts today. In order to achieve a modern declaration, additional information such as acquisition records, operational reports, calculated activation, old and new analyses and burn-up calculations as well as knowledge of the physical and chemical boundary conditions of defined material streams is needed. At KTE the waste was treated in batches according to accepted methods documented in the database system KADABRA. For each batch, records regarding the waste type, activity and mass are available for reevaluation. Each batch record consists of information on the raw waste treated in the batch, on the batch itself and on the resulting interim products or waste products. On the basis of this existing or additionally acquired knowledge a declaration concept matching the existing information and the requirements of the repository can be derived and discussed with the independent expert and the regulator. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Tailoring of the care concept for practicality, safety and robustness

The Cavern Retrievable (CARE) concept was originally developed to provide flexibility in tailoring disposal of vitrified HLW to small volunteer host sites, where high emplacement density leads to significant challenges in terms of the management of radiogenic heat. Including an extended storage period in underground caverns prior to sealing solved the heat issue, but also provided benefits in terms of a slow decision-making process that provided more opportunities to engage stakeholders. Recently, direct disposal of spent fuel is being considered in Japan and this gives more severe challenges for heat management, even for conventional disposal concepts. Due to great uncertainties in the future of nuclear power in Japan, this may also be associated with a desire to preserve the option of retrieval for extended periods. The basic CARE concept has thus been re-assessed to consider these aspects - and also the need to be able to develop a robust safety case that can be readily communicated to stakeholders, who are more sensitive to nuclear issues than they were in the past. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Visual Servoing System for the Removal of the Elements of a Prefilter in a NPP - 18429

The maintenance of the prefilters of the condensate demineralizers in a BWR reactor nuclear plant, could represents a real problem given the substances (radioactive particles) captured by the filtering elements (called 'candles'). This trapped material can produce high doses on the personnel participating in this maintenance work. Thus, it is desirable to automate the maintenance activities required to remove the used filtering elements. Then we designed a robotic manipulator capable of detaching, one by one, the filtering elements from their fastening structure. The manipulator deposits the 'candles' into a container as they are detached, and at the end, it is automatically transported, to a storage area. The work here presented, proposes the application of the 'visual servoing control' technique to automate the operation of the robotic arm. This would minimize the intervention of human operators, reducing maintenance times and radiation dose to the personnel. The methodology is based on techniques of artificial vision and uses, in addition to a video camera, a device capable of generating a laser line, which when projected onto 3D space, creates what is known as a laser plane. This plane upon striking the candles will generate circumferential arcs in the video camera images, and these figures will be used to detect the 3D point that will guide the manipulator to take the filtering element. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Transport properties of damaged materials. Cementitious barriers partnership

The objective of the Cementitious Barriers Partnership (CBP) project is to develop tools to improve understanding and prediction of the long-term structural, hydraulic, and chemical performance of cementitious barriers used in low-level waste storage applications. One key concern for the long-term durability of concrete is the degradation of the cementitious matrix, which occurs as a result of aggressive chemical species entering the material or leaching out in the environment, depending on the exposure conditions. The objective of the experimental study described in this report is to provide experimental data relating damage in cementitious materials to changes in transport properties, which can eventually be used to support predictive model development. In order to get results within a reasonable timeframe and to induce as much as possible uniform damage level in materials, concrete samples were exposed to freezing and thawing (F/T) cycles. The methodology consisted in exposing samples to F/T cycles and monitoring damage level with ultrasonic pulse velocity measurements. Upon reaching pre-selected damage levels, samples were tested to evaluate changes in transport properties. Material selection for the study was motivated by the need to get results rapidly, in order to assess the relevance of the methodology. Consequently, samples already available at SIMCO from past studies were used. They consisted in three different concrete mixtures cured for five years in wet conditions. The mixtures had water-to-cement ratios of 0.5, 0.65 and 0.75 and were prepared with ASTM Type I cement only. The results showed that porosity is not a good indicator for damage caused by the formation of microcracks. Some materials exhibited little variations in porosity even for high damage levels. On the other hand, significant variations in tortuosity were measured in all materials. This implies that damage caused by internal pressure does not necessarily create additional pore space in the microstructure, but likely creates new thin pathways between existing pore space for species to travel. These results have a significant impact on modeling efforts. Models relating porosity to tortuosity and permeability are unlikely to provide the correct basis for predicting long-term durability of concrete sustaining internal pressures and microcrack formation. Other avenues like the modeling of internal crystallization pressure need to be explored.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Discovering Challenges and Opportunities During Sludge Removal in Savannah River Site's Tank 15 - 18415

Tank 15 is one of 43 active underground waste storage tanks in the Liquid Waste System at SRS. After receiving and storing waste containing insoluble solids (sludge), receipts stopped, and the free supernate evaporated beginning in the 1980's. Tank 15 remained a dry sludge tank for almost 30 years. In 2015, the Tank 15 sludge was rehydrated as the first step of waste removal. Submersible Mixer Pumps (SMPs) were then installed in four risers, as well as other equipment upgrades, to facilitate sludge solids removal. SMPs were successfully used in prior waste removal campaigns, but this was the first deployment of four in a tank. Automated controls were also added to better monitor and protect the SMPs during operation in the more challenging H-area sludge. Waste removal plans consisted of multiple campaigns where sludge was suspended, transferred to Tank 13 and supernate decanted back to Tank 15 for reuse after allowing solids to settle. During the first campaign, sludge solids did not settle at an adequate rate to support the operating plan, and flammability evaluations were impacted. The SMPs also experienced operational challenges. New control logic for the SMPs was useful for early identification of issues; however, some equipment failures still occurred. These challenges were overcome using a combination of additional analyses, operating plan and procedure changes, and tank mapping techniques resulting in the successful removal of the bulk of the sludge from Tank 15. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

STABILIZING GLASS BONDED WASTE FORMS CONTAINING FISSION PRODUCTS SEPARATED FROM SPENT NUCLEAR FUEL

A model has been developed to represent the stresses developed when a molten, glass-bonded brittle cylinder (used to store nuclear material) is cooled from high temperature to working temperature. Large diameter solid cylinders are formed by heating glass or glass-bonded mixtures (mixed with nuclear waste) to high temperature (915°C). These cylinders must be cooled as the final step in preparing them for storage. Fast cooling time is desirable for production; however, if cooling is too fast, the cylinder can crack into many pieces. To demonstrate the capability of the model, cooling rate cracking data were obtained on small diameter (7.8 cm diameter) glass-only cylinders. The model and experimental data were combined to determine the critical cooling rate which separates the non-cracking stable glass region from the cracked, non-stable glass regime. Although the data have been obtained so far only on small glass-only cylinders, the data and model were used to extrapolate the critical-cooling rates for large diameter ceramic waste form (CWF) cylinders. The extrapolation estimates long term cooling requirements. While a 52-cm diameter cylinder (EBR-II-waste size) can be cooled to 100°C in 70 hours without cracking, a 181.5-cm diameter cylinder (LWR waste size) requires 35 days to cool to 100°C. These cooling times are long enough that verification of these estimates are required so additional experiments are planned on both glass only and CWF material.

99 GENERAL AND MISCELLANEOUS↗

Inspection Technology Advancements for Hanford Double Shell Tank Integrity Verification - 16150

The Hanford double-shell tanks (DSTs) were constructed in southeastern Washington State between 1968 and 1986 to store nuclear waste. Most of the tank waste came from the Hanford nuclear weapons program, which has been stopped for more than 25 years. The tanks will be needed for many years to come until suitable vitrification and permanent storage solutions are developed. These tanks are nominally 45 ft. deep from the dome peak to the floor. The inner tank is nominally 75 ft. dia. and the outer tank is nominally 80 ft. dia., leaving a 2.5 ft. annulus between the two side tank walls. The waste management program (under direction of Washington River Protection Solutions, WRPS) manages inspections of these DSTs from the annulus to justify their continued safe service and to avoid the high cost of new replacement tanks. Over time, the Hanford Tank Farm contractors, currently WRPS, have increased their ultrasound inspections of these tanks. Pacific Northwest National Laboratory has worked with the Hanford Tank Farm contractors for more than 15 years to advance applicable tank nondestructive inspection technology for improved performance and cost reduction. Past, present, and planned technology advancements are addressed in this paper, including tank wall ultrasonic testing examination, extreme value statistical analysis, phased array for the tank wall, transmit/receive tandem synthetic aperture focusing technique knuckle examination, and electromagnetic acoustic transducer screening of the tank wall including mill-scale compensation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Use of Unmanned Aerial Vehicles for Rapid and Repeatable 3D Radiological Site Characterization - 18352

As unmanned aerial vehicles (UAVs) are beginning to become heavily featured within a number of industries globally, the technology remains underutilized within the nuclear industry, particularly in routine monitoring investigations. Using a temporary Japanese waste storage facility (used to house topsoil contaminated with fallout from the Fukushima nuclear incident) as an analogy for a typical low-level waste repository (LLWR) site, the suitability of UAV-hosted radiation mapping systems for routine site investigations is evaluated. The criteria used to assess the performance of the custom UAV and commercial radiation mapping system focusses on the repeatability of both the flight and the produced radiation maps from two identical surveys at the chosen site. Additionally, the speed of deployment is assessed against the time taken to complete a walking survey of the site. The results indicate that the radiation maps derived from the two repeat surveys are directly comparable both visually and statistically, despite minor differences in the flight of the UAV between both surveys. Furthermore, the terrain independent nature of the airborne radiation mapping system meant that the time taken to complete the survey was reduced when compared with the similar resolution ground-based survey. The use of UAV-hosted radiation mapping systems therefore presents a powerful tool with which to rapidly complete routine radiological monitoring procedures within active nuclear environments. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Computational Fluid Dynamics Best Practice Guidelines in the Analysis of Storage Dry Cask

Computational fluid dynamics (CFD) methods are used to evaluate the thermal performance of a dry cask under long term storage conditions in accordance with NUREG-1536 [NUREG-1536, 1997]. A three-dimensional CFD model was developed and validated using data for a ventilated storage cask (VSC-17) collected by Idaho National Laboratory (INL). The developed Fluent CFD model was validated to minimize the modeling and application uncertainties. To address modeling uncertainties, the paper focused on turbulence modeling of buoyancy driven air flow. Similarly, in the application uncertainties, the pressure boundary conditions used to model the air inlet and outlet vents were investigated and validated. Different turbulence models were used to reduce the modeling uncertainty in the CFD simulation of the air flow through the annular gap between the overpack and the multi-assembly sealed basket (MSB). Among the chosen turbulence models, the validation showed that the low Reynolds k-{epsilon} and the transitional k-{omega} turbulence models predicted the measured temperatures closely. To assess the impact of pressure boundary conditions used at the air inlet and outlet channels on the application uncertainties, a sensitivity analysis of operating density was undertaken. For convergence purposes, all available commercial CFD codes include the operating density in the pressure gradient term of the momentum equation. The validation showed that the correct operating density corresponds to the density evaluated at the air inlet condition of pressure and temperature. Next, the validated CFD method was used to predict the thermal performance of an existing dry cask storage system. The evaluation uses two distinct models: a three-dimensional and an axisymmetrical representation of the cask. In the 3-D model, porous media was used to model only the volume occupied by the rodded region that is surrounded by the BWR channel box. In the axisymmetric model, porous media was used to model the entire region that encompasses the fuel assemblies as well as the gaps in between. Consequently, a larger volume is represented by porous media in the second model; hence, a higher frictional flow resistance is introduced in the momentum equations. The conservatism and the safety margins of these models were compared to assess the applicability and the realism of these two models. The three-dimensional model included fewer geometry simplifications and is recommended as it predicted less conservative fuel cladding temperature values, while still assuring the existence of adequate safety margins. (authors)

42 ENGINEERING↗

Testing of Novel Application of GOTHIC{sup TM} to Modelling of Hydrogen Distribution in Intermediate Level Waste Storage Facilities - 16499

One of the strategies for treatment of intermediate level waste in the United Kingdom is to retrieve the waste from the legacy storage area, condition in a suitable storage container and then hold on-site in an intermediate level waste store until permanent storage in a geological disposal facility becomes available. During storage, hydrogen may be generated inside the containers at a slow rate by a number of mechanisms. The containers can be equipped with vents that release hydrogen and other gasses into the intermediate level waste store, a building which would be constructed to high standards to minimise ingress of moisture. With the low number of air changes associated with the building design there is the potential for gas to accumulate over time. There is, therefore, a requirement to be able to predict future gas concentrations inside the building over a range of operating conditions to ensure that a safe operating envelope is maintained. The usual approach to this problem is to model the evolution of the hydrogen distribution by use of computational fluid dynamics tools. In a situation where weeks of real time need to be simulated in order to understand the slow build-up of a very small volumetric concentration of hydrogen, the use of computational fluid dynamics is not practicable within the time scales demanded by industry. This paper investigates a new approach to tackling this problem using the thermal hydraulic code GOTHIC{sup TM} (GOTHIC{sup TM} incorporates technology developed for the electric power industry under the sponsorship of EPRI, the Electric Power Research Institute). (authors)