Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Project Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

2020 State of the Science Report, Chapter 9: Social and Economic Data Collection for Marine Renewable Energy

The social and economic effects of marine renewable energy (MRE) are a necessary consideration for the consenting/permitting (hereafter consenting) of projects (including planning, siting, and project design) and for strategic planning processes. Social and economic effects can include impacts on people, communities, jobs, wages, and revenues. https://tethys.pnnl.gov/publications/state-of-the-science-2020-chapter-9-social-economic

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

The Ohio River Valley CO2 Storage Project AEP Mountaineer Plan, West Virginia

This report includes an evaluation of deep rock formations with the objective of providing practical maps, data, and some of the issues considered for carbon dioxide (CO{sub 2}) storage projects in the Ohio River Valley. Injection and storage of CO{sub 2} into deep rock formations represents a feasible option for reducing greenhouse gas emissions from coal-burning power plants concentrated along the Ohio River Valley area. This study is sponsored by the U.S. Department of Energy (DOE) National Energy Technology Laboratory (NETL), American Electric Power (AEP), BP, Ohio Coal Development Office, Schlumberger, and Battelle along with its Pacific Northwest Division. An extensive program of drilling, sampling, and testing of a deep well combined with a seismic survey was used to characterize the local and regional geologic features at AEP's 1300-megawatt (MW) Mountaineer Power Plant. Site characterization information has been used as part of a systematic design feasibility assessment for a first-of-a-kind integrated capture and storage facility at an existing coal-fired power plant in the Ohio River Valley region--an area with a large concentration of power plants and other emission sources. Subsurface characterization data have been used for reservoir simulations and to support the review of the issues relating to injection, monitoring, strategy, risk assessment, and regulatory permitting. The high-sulfur coal samples from the region have been tested in a capture test facility to evaluate and optimize basic design for a small-scale capture system and eventually to prepare a detailed design for a capture, local transport, and injection facility. The Ohio River Valley CO{sub 2} Storage Project was conducted in phases with the ultimate objectives of demonstrating both the technical aspects of CO{sub 2} storage and the testing, logistical, regulatory, and outreach issues related to conducting such a project at a large point source under realistic constraints. The site characterization phase was completed, laying the groundwork for moving the project towards a potential injection phase. Feasibility and design assessment activities included an assessment of the CO{sub 2} source options (a slip-stream capture system or transported CO{sub 2}); development of the injection and monitoring system design; preparation of regulatory permits; and continued stakeholder outreach.

01 COAL, LIGNITE, AND PEAT↗

EGS Collab Project: Accomplishments and Plan

To better understand stimulation and inter-well flow in crystalline rock with the goal of developing and improving subsurface heat exchangers for enhanced geothermal energy recovery, the EGS (Enhanced Geothermal Systems) Collab project is developing highly monitored, well- characterized intermediate scale (~10-20 m) field test beds, stimulating, and performing flow tests. These tests provide the ability to evaluate concepts, data to test and validate models, and tools to be used for EGS development, which may be evaluated at DOE’s Frontier Observatory for Research in Geothermal Energy (FORGE) project. Numerical simulation is key to the project, for experiment design and interpretation of results. Testbed characterization included optical and acoustic televiewers, full waveform seismic, electromagnetic, gamma, and temperature. The test block was further characterized using seismic tomography (p- and s-), electrical resistance tomography (ERT), and hydrologic characterization including tracer tests. Coupled process models are constrained by the detailed site characterization data. Installed monitoring systems include: 1) passive seismic/acoustic emissions; 2) continuous active source seismic; 3) ERT, with dynamic imaging using high contrast fluids; and 4) distributed acoustic, temperature, and strain fiber optic sensors. During flow and stimulation tests, fracture aperture strain monitoring is performed using the Step-rate Injection Method for Fracture In-situ Properties (SIMFIP) tool. Pressure and flow in the injection and production boreholes are monitored, and tracer tests and wavefield imaging and inversion are performed to provide additional constraints. Stimulations have been performed at several locations, connecting our injection and production wells. An overview of the EGS Collab project is presented to provide a framework for other EGS Collab presentations, along with results from numerical simulations and experiments performed at the Sanford Underground Research Facility in South Dakota.

Enhanced Geothermal Systems, EGS Collab, stimulati↗

Phase 1 Characterization sampling and analysis plan West Valley demonstration project.

The Phase 1 Characterization Sampling and Analysis Plan (CSAP) provides details about environmental data collection that will be taking place to support Phase 1 decommissioning activities described in the Phase 1 Decommissioning Plan for the West Valley Demonstration Project, Revision 2 (Phase I DP; DOE 2009). The four primary purposes of CSAP data collection are: (1) pre-design data collection, (2) remedial support, (3) post-remediation status documentation, and (4) Phase 2 decision-making support. Data collection to support these four main objectives is organized into two distinct data collection efforts. The first is data collection that will take place prior to the initiation of significant Phase 1 decommissioning activities (e.g., the Waste Management Area [WMA] 1 and WMA 2 excavations). The second is data collection that will occur during and immediately after environmental remediation in support of remediation activities. Both data collection efforts have a set of well-defined objectives that encompass the data needs of the four main CSAP data collection purposes detailed in the CSAP. The main body of the CSAP describes the overall data collection strategies that will be used to satisfy data collection objectives. The details of pre-remediation data collection are organized by WMA. The CSAP contains an appendix for each WMA that describes the details of WMA-specific pre-remediation data collection activities. The CSAP is intended to expand upon the data collection requirements identified in the Phase 1 Decommissioning Plan. The CSAP is intended to tightly integrate with the Phase 1 Final Status Survey Plan (FSSP). Data collection described by the CSAP is consistent with the FSSP where appropriate and to the extent possible.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

HybridPlan: A Capacity Planning Technique for Projecting Storage Requirements in Hybrid Storage Systems

Economic forces, driven by the desire to introduce flash into the high-end storage market without changing existing software-base, have resulted in the emergence of solid-state drives (SSDs), flash packaged in HDD form factors and capable of working with device drivers and I/O buses designed for HDDs. Unlike the use of DRAM for caching or buffering, however, certain idiosyncrasies of NAND Flash-based solid-state drives (SSDs) make their integration into hard disk drive (HDD)-based storage systems nontrivial. Flash memory suffers from limits on its reliability, is an order of magnitude more expensive than the magnetic hard disk drives (HDDs), and can sometimes be as slow as the HDD (due to excessive garbage collection (GC) induced by high intensity of random writes). Given the complementary properties of HDDs and SSDs in terms of cost, performance, and lifetime, the current consensus among several storage experts is to view SSDs not as a replacement for HDD, but rather as a complementary device within the high-performance storage hierarchy. Thus, we design and evaluate such a hybrid storage system with HybridPlan that is an improved capacity planning technique to administrators with the overall goal of operating within cost-budgets. HybridPlan is able to find the most cost-effective hybrid storage configuration with different types of SSDs and HDDs

Capacity Planning↗

Post Conference Activities for the NCSE 2019 Annual Conference: Sustainable Infrastructure & Resilience

The National Council for Science and the Environment (NCSE) held its 19th Annual Conference from January 7-10, 2019. The NCSE 2019 Annual Conference: Sustainable Infrastructure & Resilience explored how systems thinking that includes tools, data, and synthesis effectively supports the increasingly urgent need to advance a more resilient, sustainable society. Nearly 600 participants from a range of scientific disciplines and sectors including natural and social science, humanities, engineering, government, business, and civil society attended the conference. Post-conference activities planned through this project were planned to extend the impact of the Annual Conference and were made possible through support from the Department of Energy. These efforts included: 1) developing and producing a research pilot on Energy Systems and Resilient Infrastructure, which advances research focused on the better alignment of education and workforce needs with respect to energy resilience; 2) facilitating dialogue and in-person convenings with the Energy Education Community of Practice across the broader NCSE research community; and 3) designing and hosting a webinar series focused on the role of science in infrastructure and resilience. This report summarizes the outcomes of the proposed activities and additional work made possible by support from the Department of Energy.

54 ENVIRONMENTAL SCIENCES↗

HANFORD RIVER PROTECTION PROJECT ENHANCED MISSION PLANNING THROUGH INNOVATIVE TOOLS LIFECYCLE COST MODELING AND AQUEOUS THERMODYNAMIC MODELING - 12134

Two notable modeling efforts within the Hanford Tank Waste Operations Simulator (HTWOS) are currently underway to (1) increase the robustness of the underlying chemistry approximations through the development and implementation of an aqueous thermodynamic model, and (2) add enhanced planning capabilities to the HTWOS model through development and incorporation of the lifecycle cost model (LCM). Since even seemingly small changes in apparent waste composition or treatment parameters can result in large changes in quantities of high-level waste (HLW) and low-activity waste (LAW) glass, mission duration or lifecycle cost, a solubility model that more accurately depicts the phases and concentrations of constituents in tank waste is required. The LCM enables evaluation of the interactions of proposed changes on lifecycle mission costs, which is critical for decision makers.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Amended Stormwater Pollution Prevention Plan: Water Line Project-Northern Portion

This Storm Water Pollution Prevention Plan (SWPPP) has been prepared for the Sandia National Laboratories Water Line Project – Northern Portion, in Livermore, CA. The project, located at 7011 East Avenue, and will entail the portion of the site north of the Arroyo Section. The project is comprised of 19,584 linear feet of water line improvements totaling approximately 9.0 acres. The property is owned by the U.S. Department of Energy, and managed and operated by National Technology & Engineering Solutions of Sandia, LLC with this project being developed by NTESS for Sandia National Laboratories.

54 ENVIRONMENTAL SCIENCES↗

Site 300 Small Firearms Training Facility Project Soil Sampling and Analysis Plan

Lawrence Livermore National Laboratory's (LLNL) Project Management Office (PMO) is planning to execute a construction project at the Small Firearms Training Facility within LLNL's Experimental Test Site, Site 300 (S300). The proposed project will include extensive dirt work from a removal of a berm, the installation of a cinder block wall, and the replacement of a canopy and a fence with an access gate. This Sampling and Analysis Plan (SAP) outlines the procedures to collect environmental samples for the management and/or disposition of excess soil generated from the project site and geotechnical samples for building pad and pavement designs. This SAP has been prepared and is organized to be consistent with LLNL's Soil Screening and Management Plan (SSMP) (LLNL, 2021), as well as the U.S. Environmental Protection Agency's (EPA) Data Quality Objectives (DQO) programs (EPA, 2006).

54 ENVIRONMENTAL SCIENCES↗

Standard Measurement and Verification Plan for Lighting Retrofit Projects for Buildings and Building Sites

This document provides a framework for standard measurement and verification (M&V) of lighting retrofit and replacement projects. It was developed to provide site owners, contractors, and other involved organizations with the essential elements of a robust M&V plan for lighting projects. It includes details on all aspects of effectively measuring light levels of existing and post-retrofit projects, conducting power measurement, and developing cost-effectiveness analysis. This framework M&V plan also enables consistent comparison among similar lighting projects, and may be used to develop M&V plans for non--lighting-technology retrofits and new installations.

Richman, Eric E.↗

Appropriate assessment of plans in England

'Appropriate assessment' of plans and projects is required under the European Habitats Directive. It assesses whether a plan or project, 'in combination', could affect the 'integrity' of sites of international nature conservation importance in Europe. It is very precautionary: plans or projects that could affect site integrity may not be adopted unless a series of stringent requirements-testing of alternatives, proof of overriding need, and provision of compensation-are met. Appropriate assessment of plans began to be carried out in England in early 2006. Since then, various guidance documents have been published, but there is still considerable debate about just what methodology should be used, how to test impacts on site 'integrity', what avoidance and mitigation measures are adequate, who should be responsible for these measures etc., and even about what the process should be called. The first legal challenges based on appropriate assessment of plans are emerging. Appropriate assessments are showing that many English plans could affect European sites, either directly through land take, or indirectly by, for instance, reducing water levels or increasing recreational disturbance. The question now is how to respond to the clash between people's aspirations for new homes and economic growth, and wildlife conservation. This article discusses the legal requirements and emerging guidance on appropriate assessment of plans in England, how it relates to strategic environmental assessment, the current status of these assessments, and emerging issues.

07 ISOTOPE AND RADIATION SOURCES↗

Control System Plans for SNS Upgrade Projects

The Spallation Neutron Source at Oak Ridge National Laboratory is planning two major upgrades to the facility. The Proton Power Upgrade project, currently underway, will double the machine power from 1.4 to 2.8 MW by adding seven additional cryomodules and associated equipment. The Second Target Station project, currently in conceptual design, will construct a new target station effectively doubling the potential scientific output of the facility. This paper discusses the control system upgrades required to integrate these projects into the existing EPICS based control systems used for the machine and neutron instrument beamlines. While much of the control system can be replicated from existing solutions, some systems require new hardware and software. Operating two target stations simultaneously will require a new run permit system to safely manage beam delivery.

Hartman, Steven↗

U328 Electrical Reliability Project Soil Sampling and Analysis Plan

Lawrence Livermore National Laboratory's (LLNL’s) Project Management Office (PMO) is planning to install an underground electrical duct bank at the 3200 block of the Livermore Site (project). The proposed project will include a new electrical substation and feeders, demolition and replacement of the U328C utility building with a new structure to the west, re-routing of utilities, and update of the parking lot. This Sampling and Analysis Plan (SAP) outlines the procedures to collect and evaluate environmental samples for disposition of the excavated soil during the project and geotechnical samples for pavement design. This SAP has been prepared and is organized to be consistent with LLNL's Soils Screening and Management Plan (SSMP) (LLNL, 2022), as well as the U.S. Environmental Protection Agency's (EPA) Data Quality Objectives (DQO) process (EPA, 2006). In addition to the environmental samples, geotechnical samples will be collected by Consolidated Engineering Laboratories (CEL) on behalf of PMO. Geotechnical samples will be collected from a dedicated geotechnical boring location or co-located with environmental samples. Collection and evaluation of the geotechnical samples is determined by CEL and is therefore not discussed in this SAP.

54 ENVIRONMENTAL SCIENCES↗

An Approach to Data Management Planning for Protected Data Projects

This report describes what is required in a data management plan for data that needs to be protected in some fashion. Here we provide an overview of what a data manager should consider, including the data ingestion and various extract-transform-load processes, metadata considerations and documentation, to what might need to be accounted for in the event of data loss. In addition, this report includes two appendices: forms that, when filled out, make the user compliant with DOE data management requirements as well as additional requirements for handling protected data at ORNL.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Geolocated dataset of Chinese overseas development finance

China is now the world's largest source of bilateral development finance and will likely continue to play a prominent role in sovereign lending through its multi-billion-dollar Belt and Road Initiative. This paper introduces major methodological enhancements in tracking this finance: the use of an original application programming interface (API) to gathers news in multiple languages; double verification of every record to ensure every finance commitment has been formalized; and visual geo-location to trace the precise footprint of every project. The resulting dataset enables economic, environmental, and social analyses with high-precision spatial accuracy, as well as spatiotemporal monitoring by project stakeholders and enhanced planning by project managers. It covers the years 2008-2019 to enable analysis before and after the announcement of the Belt and Road Initiative. It includes 862 finance commitments, 669 of which have geographic location, to 94 countries across the world.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

CalWave Design for PacWave - Preliminary Design Phase - Risk Management Plan

The project objectives for CalWave's deployment at PacWave are distinguished by the Preliminary Design Phase and the Detailed Design Phase. During the Preliminary Design Phase, the Risk Register was established to identify risks and mitigation strategies. The Risk Management Plan assesses potential risks of CalWave's technology and accompanying processes and describes the risk mitigation strategies for the project.

16 TIDAL AND WAVE POWER↗