Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Pilot Plant”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

Manufacture of Carbon Foam in Continuous Process at Atmospheric Pressure

CFOAM LLC has been manufacturing vitreous carbon foam from coal in panel form for several years. The process is currently set up in batch mode as two steps, where the first step is conducted at very high pressure. In order to reduce cost and increase capacity, a new process for making carbon foam is being developed that can be performed at atmospheric pressure. This advance in turn would enable the development of a continuous manufacturing process, which is also being pursued. Both carbon foam panels and light weight aggregates are being investigate. Construction of the pilot scale manufacturing plant has been completed and results of processing, microstructure, properties and performance of carbon foam products made using this new process will be discussed. This project is being supported by a cooperative agreement with the Department of Energy – National Energy Technology Laboratory (DE-FOA-0002185, Area of Interest 4: Coal-Derived Carbon Foam Produced via a Continuous Process, award number DE-FE-0031992).

01 COAL, LIGNITE, AND PEAT↗

Recent Cryogenic Carbon Capture™ Field Test Results

Sustainable Energy Solutions (SES) has been developing Cryogenic Carbon Capture™ (CCC) since 2008. In that time, two processes have been developed, the External Cooling Loop and Compressed Flue Gas CCC processes (CCC-ECL and CCC-CFG, respectively). The CCC-ECL process cools the flue gas with an external refrigerant loop. This process currently captures up to 1 tonne of CO2 per day (TPD). SES has tested CCC-ECL on real flue gas slip streams from subbituminous coal, bituminous coal, biomass, natural gas, shredded tires, and municipal waste fuels at field sites that include utility power stations, heating plants, cement kilns, and pilot-scale research reactors. The CO2 concentrations from these tests ranged from 5 to 22% on a dry basis. CO2 capture ranged from 95-99+% during these tests. Several other condensable species were also captured including NO2, SO2 and PMxx at 95+%. NO was also captured at a modest rate. The CCC-CFG process has been scaled up to a 0.25 ton per day system. This system has been tested on real flue gas streams including subbituminous coal, bituminous coal, and natural gas at field sites that include utility power stations, heating plants, and pilot-scale research reactors. CO2 concentrations for these tests ranged from 5 to 15% on a dry basis. CO2 capture ranged from 95-99+% during these tests. Several other condensable species were also captured including NO2, SO2, and PMxx at 95+%. NO was also captured at 90+%. Hg capture was also verified and the resulting effluent from CCC-CFG was below a 1ppt concentration. This paper will focus on discussion of the capabilities of CCC generally, the results of CCC-ECL field testing, and future steps surrounding the development of this technology. Test results that will be presented have been collected during 9 months of testing at a commercial power plant under funding from the US Department of Energy (DOE) and the host utility. Testing of one of the systems at a commercial cement plant in the United States will also be discussed. During this testing, the system captured CO2 from the cement plant and stored the CO2 in pressurized tanks. These tanks were provided to a partner company that later used the CO2 in a CO2 utilization demonstration. The CO2 was utilized to cure concrete manufactured using cement from the same plant where the CO2 was captured. This integrated capture and utilization demonstration was the first time that the cement industry has shown in the field that it can sequester its CO2 emissions in its main product stream. This represents a potential game changing solution for industrial CO2 emissions. Operational data and host-site feedback indicate that the CCC process is ideally suited for deployment into a variety of commercial environments. A few areas of de-risking remain to make sure the technology can meet very strict industrial reliability standards. These areas of de-risking are identified and discussed. The product CO2 is shown to meet specification for many uses including industrial and merchant applications. The technology is nearing readiness for deployment at commercial scale and several initial target markets have been identified.

20 FOSSIL-FUELED POWER PLANTS↗

Cooperative Research and Development Agreement between National Energy Technology Laboratory and Korea Institute of Energy Research [Abstract]

The Korea Institute of Energy Research (KIER) and the National Energy Technology Laboratory (NETL) intend to collaborate under a CRADA to advance the development of oxy-combustion technology, with an emphasis on process modeling, optimization, and techno-economic analysis. This collaboration will result in the development of a full-scale process model of a commercial oxy-fueled circulating fluid bed combustion (oxy-CFBC) plant, informed from pilot-scale data and built using the Institute for the Design of Advanced Energy Systems (IDAES) process systems engineering framework. It will also generate cost comparisons of the optimized oxyCFBC process with an air-CFBC process with and without carbon capture and sequestration.

20 FOSSIL-FUELED POWER PLANTS↗

Plant Water Profiler: A Water Balance and True Cost of Water Calculator for Manufacturing Plants

As the uncertainty of a sustained water supply, regulatory constraints, competition among end users, and public scrutiny increases, a growing number of manufacturing sectors are adapting to current and emerging water-related risks by optimizing productivity and reducing waste. As a step toward increasing water use efficiency and making informed business decisions, corporations must make an effort to understand and track their water demands, losses, and costs associated with each subsystem within their facilities. Manufacturers are often unaware of the “true cost of water” (i.e., the total costs associated with procurement, treatment, and consumption of water, and wastewater disposal), which reduces the visibility of the actual impact of water-saving measures. To help manufacturers account for water procurement and use in manufacturing operations, quantify the true cost of water, and identify potential areas for water and associated energy cost savings, an open access tool—Plant Water Profiler (PWP)—was developed. The tool is based on water mass balance analysis and has been adopted as the core analysis tool for plant water use assessments, Water In-Plant Training (Water INPLT), as part of the US Department of Energy’s Better Plants program. During three pilot INPLTs conducted in 2019 at three manufacturing facilities, the PWP tool allowed users to understand water flows within the facilities and provided additional capabilities to analyze their water use. This paper describes the methodology behind the PWP tool and its implementation through pilot Water INPLT trainings delivered in three manufacturing facilities in the United States. The three case studies demonstrate opportunities to improve water efficiency and reduce associated costs and the challenges encountered in three different manufacturing sectors.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Distribution of Lanthanides, Yttrium, and Scandium in the Pilot-Scale Beneficiation of Fly Ashes Derived from Eastern Kentucky Coals

In this study, Central Appalachian coal-derived fly ashes from two power plants were beneficiated in a pilot-scale facility in order to produce a product with a relatively consistent concentration of rare earth elements (REE). The <200-mesh final fly ash product was produced by removing the carbon- and Fe-rich particles prior to screening at 200 mesh (75 µm). The Plant D fly ash had high concentrations of CaO and SO3, which were diminished through the two months when the ash was being beneficiated, representing a consequence of the heat, humidity, and excessive rainfall in the Kentucky summer. The high CaO and SO3 concentrations through the early runs likely contributed to the lower REE in the <200-mesh products of those runs. Of the non-REE minor elements, Ba, V, Mn, Zn, and As showed the greatest between-run variations within the runs for each plant. The overall REE concentrations proved to be similar, both on a between-run basis for the individual fly ash sources and on a between-plant basis. Variations in fly ash quality will occur in larger-scale operations, so on-going attention to the fly ash quality and the response of the fly ash to beneficiation is necessary. Changes in the Plant D fly ash with time imply that both the freshness of the original ash and the length and conditions of its storage at the site of beneficiation could be factors in the quality and consistency of the processed fly ash.

58 GEOSCIENCES↗

Resource Analysis of NP Kunta Solar Park Site (White Paper)

India has set a target of 175 GW of renewable energy (RE) capacity by 2022 and 450 GW by 2030. Flexibility is key for efficient integration of renewables. The modern-day RE plants are grid-friendly and can also provide this flexibility. A pilot to demonstrate this flexibility by implementing automatic generation control (AGC) at a solar plant is being done by the U.S. Agency for International Development (USAID) under USAID’s Greening the Grid (GTG) Program and Renewable Integration & Sustainable Energy (RISE) initiative. This paper presents the resource variability analysis of the 250-MW NP Kunta solar plant site where the AGC pilot project is being implemented. This paper also demonstrates the use of publicly available resource quality data, which can be utilized by various stakeholders to better understand the variability of any existing or potential RE site in India and possibly increase confidence in decisions or help to understand the impacts that can be expected.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Light Water Reactor Sustainability Program Plant Modernization Technical Program Plan for FY 2021

This report presents the Technical Program Plan for FY 2019 for the Department of Energy Light Water Reactor Sustainability Program – Plant Modernization research pathway. A summary of the vision and strategy is provided to explain how this program addresses key issues and barriers for modernizing instrumentation and control technologies and infrastructure in domestic nuclear power plants. The report describes the pilot projects that have been formulated to develop and validate enabling technologies over the next several years that will result in digital alternatives to the legacy analog II&C systems in place today. This will allow much needed modernization of these systems to address reliability and obsolescence problems, as well as serve as a platform for substantial operational improvement. The report further describes key project resources and cooperative relationships, including the Electric Power Research Institute, the Nuclear Energy Institute )NEI), the Institute of Nuclear Power Operations (INPO), the IFE Halden Reactor Project, the Nuclear Regulatory Commission, and industry suppliers, that are instrumental to the success of the program. The report also lists the schedule for all program products, including the titles and report numbers for all published reports under this program.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Light Water Reactor Sustainability Program Plant Modernization Technical Program Plan for FY 2021

This report presents the Technical Program Plan for FY 2019 for the Department of Energy Light Water Reactor Sustainability Program – Plant Modernization research pathway. A summary of the vision and strategy is provided to explain how this program addresses key issues and barriers for modernizing instrumentation and control technologies and infrastructure in domestic nuclear power plants. The report describes the pilot projects that have been formulated to develop and validate enabling technologies over the next several years that will result in digital alternatives to the legacy analog II&C systems in place today. This will allow much needed modernization of these systems to address reliability and obsolescence problems, as well as serve as a platform for substantial operational improvement. The report further describes key project resources and cooperative relationships, including the Electric Power Research Institute, the Nuclear Energy Institute )NEI), the Institute of Nuclear Power Operations (INPO), the IFE Halden Reactor Project, the Nuclear Regulatory Commission, and industry suppliers, that are instrumental to the success of the program. The report also lists the schedule for all program products, including the titles and report numbers for all published reports under this program.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Hydrogen Production System Scaling Using a High-Fidelity Simulation-Optimization Framework

Proton exchange membrane (PEM) electrolyzers are widely used for hydrogen production, yet few validated, high-fidelity tools can reliably guide scale-up. Using measured performance from a 50-hour hardware-in-the-loop pilot test, a physics-based, plant-level model of a 1.25 MW PEM electrolyzer and its balance-of-plant (BoP) subsystems is developed and validated. The model couples electrochemistry and thermal/flow submodels and is calibrated against pilot test data via a genetic algorithm (GA) workflow. Validation yields a mean absolute percentage error (APE) of 0.43% for cell voltage and stack power. Two scale-out strategies are then benchmarked under a common 7-day wind-and-photovoltaic (PV) profile: (i) linear duplication of 1.25 MW blocks and (ii) shared-BoP architectures. Sharing BoP between stacks reduces BoP energy by 27% at 10 MW and 34% at 100 MW (vs. linear duplication) and improves system specific energy consumption (SEC) to 52.9 and 52.6 kWh/kg, respectively (from 54.0 kWh/kg with linear duplication). Partial-load studies (25-100% set-point) show that cumulative hydrogen production remains nearly constant down to 50% load because all cases use the same weekly renewable-energy input. Below 50%, the power cap limits how much energy can be used within 168 h, which reduces hydrogen output. The model further indicates that the practical operating optimum lies between 50% and 85% load, where efficiency gains begin to appear without significant loss in hydrogen output. Moreover, the efficiency gains at lower loads are offset by reduced production. The validated framework supports scenario-based engineering trade-off studies for large configurations (10-100 MW) and for operating policies under variable renewables.

08 HYDROGEN↗

Combustion Performance and Emissions Optimization Through Integration of a Miniaturized High-Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Combustion Performance and Emissions Optimization through Integration of Miniaturized High Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Combustion Performance and Emissions Optimization Through Integration of a Miniaturized High-Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Combustion Performance and Emissions Optimization Through Integration of a Miniaturized High-Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution of wall conditions in utility boilers. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of a coal-fired utility boiler in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

42 ENGINEERING↗

High-Temperature Multi-Process Sensor Development and Demonstration at a Full-scale PC Combustion System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution of wall conditions in utility boilers. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of a coal-fired utility boiler in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Robotics for Energy Infrastructure Construction on Earth and Beyond: Pilot Study Exploring Level 3-4 Semi-Autonomous Installation of a Reduced-Scale Photovoltaic Power Plant Prototype: Preprint

There is a growing need to build energy infrastructure at massive scale on both Earth and in space. On Earth, increasing electricity demand from applications such as AI data centers is driving rapid expansion of power systems, while in space, long-duration missions such as lunar operations require reliable and resilient energy infrastructure that can be deployed quickly. These needs outpace the capabilities of conventional construction methods. Robotic construction offers a path to faster, lower-cost, and more consistent deployment, yet most existing approaches focus on automating individual tasks rather than end-to-end assembly. The Industrialized Construction Innovation (ICI) team at the National Laboratory of the Rockies (NLR), in collaboration with the Colorado School of Mines, has been investigating robotics and automation strategies for rapid end-to-end energy infrastructure construction. This paper presents a pilot study demonstrating level 3-4 semi-autonomous, end-to-end robotic assembly of a reduced-scale photovoltaic power plant prototype under terrestrial conditions. The approach combines hardware redesign of photovoltaic components for robotic compatibility, discrete-event and physics-based robotic simulations in synthetic environments, and sim-to-real deployment to execute end-to-end robotic assembly of[NM1.1][NM1.2] tracking components, structural members, photovoltaic modules, and embedded electrical connections. The pilot identifies key limitations like tolerance management, perception and localization, end effector capability, fastening methods, and multi-physics simulation fidelity, that must be addressed to enable end-to-end robotic assembly of full-scale energy infrastructure. The study highlights how these insights inform scaling strategies for terrestrial energy infrastructure and adaptation to unstructured and extreme environments, including off-world scenarios such as robotic assembly of vertical tall lunar towers.

14 SOLAR ENERGY↗

Development of Miniaturized High Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

A. Development of Miniaturized High Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗