Safety and Risk Assessment for Small Modular Reactors
General slides on INL risk analysis capabilities for SMRs.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
General slides on INL risk analysis capabilities for SMRs.
Powerpoint slides for meeting with KAERI, organized by YungJoon Choi
This presentation describes the overall process of the U.S. Nuclear Regulatory Commission (NRC)operating experience (OpE) program to estimate probabilistic risk assessment parameters, the estimations of initiating event frequencies, the component unreliability, and the quality assurance and quality control activities for the OpE program. This presentation can be used for training, workshop, or knowledge transfer purpose.
In the past few decades, increasing complexity in modern engineering systems has been driven by the integration of a large number of components and by the fact that the system operations involve many disciplines (e.g., thermal-hydraulics, plant operations, cyber-security). Current safety/reliability modeling approaches to such systems are labor intensive, difficult to learn, and rely heavily on simplistic Boolean logic to depict failure propagation and accident progression. While these methods serve well for simple systems (i.e., linear causal systems with limited small inter- and intra-system interactions), their results are difficult to verify when modeling complex systems (typically performed through the extensive use of modeling assumptions). The development of new methods is addressed to meet these challenges through a model-based system engineering (MBSE) lens. Under MBSE philosophy, every aspect of the system (form or function) is represented by a model that completely characterizes its architecture or behavior. MBSE approach greatly improves the management of design, analysis and verification of complex systems. An integration of Dynamic Probabilistic Risk Assessment (DPRA) methods with MBSE models is proposed to perform safety/reliability analyses of engineering systems. In particular, MBSE representation of the system (performed using Systems Modeling Language [SysML]) is coupled with DPRA methods to automatically generate event trees and fault trees.
Presentation detailing work package to develop comprehensive fusion device safety models over the course of the next three years, including references to a blanket, divertor and magnet design, and statistical reliability models
Weather events cause most grid failures. Often, we even get notifications on our phones to take cover or be prepared for an imminent event. If electric grid utilities had a similar warning that also included probable scenarios and the equipment involved, they could prepare and minimize the effects. Recent research at Idaho National Laboratory into electric grid risk analysis methods resulted in a tool that allows for the development of the most likely scenarios given failure probabilities of grid components. INL has a project with the U.S. Department of Energy’s Cybersecurity, Energy Security, and Emergency Response (CESER) program to develop a Grid Alert application that receives messages from the existing emergency alert system, filters and determines components possibly affected by the emergency event, calculates probable scenarios uses MASTERRI and then notifies the utility if there is significant risk. Historical failure data of elements that comprise the U.S. electric grid have been compiled by utilities and organizations such as the international regulatory body North American Electric Reliability Corporation (NERC). Nominal failure rates are obtained from this data. To make this tool possible, estimated failure rates are needed for different component types given the alert type, severity, and location. Historic weather-related grid element failures are correlated with historic weather events from Integrated Public Alert & Warning System (IPAWS). These correlated events and failures are used along with Bayesian updates from the historical norms to provide a modified failure rate for grid elements in the alert areas and calculate probable scenarios. This discusses the Grid Alert project plan but focuses on the data gathered and process used in determining failure rates for possible grid failure scenarios.
Presentation slides for C200 Intern Presentation Session
Poster for ECRA poster session.