ELASTOMERIC MICROVASCULAR SELF-HEALING MATERIALS

Damaged elastomeric diaphragms within pneumatic controllers used in the oil and gas industry lead to an unintended release of methane. Self-healing microvascular materials capable of healing various types of damage have been fabricated. These microvascular materials are designed to replace currently available commercial diaphragms found in pneumatic controllers and provide a solution to reduce unintended methane leaks. Poly(dimethylsiloxane) (PDMS) was used as the main matrix material, with additional testing conducted on polyurethane and flexibilised epoxy materials. Microvascular networks were implemented into the elastomeric membranes to act as ves- sels to deliver healing agents to the damaged areas. The complex, interdigitated channel networks were created using a 3D printed custom compounded filament composed of polylactic acid (PLA) and tin(II) oxalate. Two-part liquid casting polymers were poured around the channels into a mould to create samples with the scaffolding of the microvascular channels intact. Hollow microvascular networks were created by placing the samples within a vacuum oven at 250◦C which causes the thermal depolymerisation of PLA into its gaseous monomers. The manufactured materials were placed in test stands and pressurized using nitrogen gas to determine their healing and mechanical behaviour. Self-healing behaviour was demonstrated using PDMS matrix materials and healing chemistries within a pressure test cell. This test cell was designed to detect any damage to a sample by record- ing an outlet pressure. Damages including puncture holes, diagonal cuts and star-shaped central iv cuts were applied to the samples and a reduction in the outlet pressure was recorded for all sam- ples. A variation in channel spacing and diameter was studied to determine the optimal design of the microvascular network for self-healing performance. The mechanical performance of elastomeric membrane materials within a diaphragmatic pressurised stand was observed. Deformations and strains around the channels and channel inter- sections at the midplane of the materials were recorded using digital image correlation. Normal stresses were calculated using Hooke’s law and the material properties of the PDMS matrix. A reduction in leak rate, implying the success of self-healing, was recorded within manu- factured diaphragm samples tested within a commercial valve. PDMS is the favourable material when compared to polyurethane and flexibilised epoxy for creating

03 NATURAL GAS↗

Poly(dimethylsiloxane) microchip-based immunoassay with multiple reaction zones: Toward on-chip multiplex detection platform

In this work, a poly(dimethylsiloxane) (PDMS) microchip-based immuno-sensing platform with integrated pneumatic micro valves is described. The microchip was fabricated with multiple layer soft lithography technology. By controlling the activation status of corresponding valves, reagent flows in the microchannel network can be well manipulated so that immuno-reactions only take place at designated reaction zones (DRZs). Four DRZs are included in the prototype microchip. Since these DRZs are all isolated from each other by micro valves, cross contamination is prevented. Using the inner surface of the all-PDMS microchannel as immunoassay substrate, on-chip sandwich format solid phase immunoassay was performed to demonstrate the feasibility of this immuno-sensing platform. Mouse IgG and fluorescein isothiocyanate (FITC) were used as the model analyte and the signal reporter respectively. Only 10 ul sample is needed for the assay and low detection limit of 5 ng/ml (≈33 pM) was achieved though low-cost polyclonal antibodies were used in our experiment for feasibility study only. The encouraging results from mouse IgG immunoassay proved the feasibility of our microchip design. With slight modification of the assay protocol, the same chip design can be used for multi-target detection and can provide a simple, cost-effective and integrated microchip solution for multiplex immunoassay applications.

60 APPLIED LIFE SCIENCES↗

Development of a Mechanical Trash Compactor (Mpactor) for Exploration Missions

NASA is developing a mechanical trash compactor (Mpactor), a pneumatically driven trash compaction system, for human space exploration missions to manage trash items such as food packaging, sanitary wipes, clothing, tape, and other types of waste. The compaction system that is under development does not involve heating, water removal, or water recovery which eliminates the need for complex ancillary hardware required to manage gaseous effluents, as well as condense the water vapor. A system called the Crew Exploration Vehicle (CEV) Compactor, intended for use in the micro-gravity environment, was developed at NASA Ames Research Center for the Constellation Program 2007. This CEV Compactor is being further developed and renamed the Mpactor (short for mechanical trash compactor). The Mpactor is being used to gather engineering data that will allow engineers and planners to scale a future design for different mission scenarios and to evaluate different bag materials and designs that help retain compaction.

transit vehicle↗

JV Task 104 - Risk Reduction Using Innovative Vacuum-Enhanced Plume Controls

The Energy & Environmental Research Center (EERC) conducted remediation of hydrocarbon-contaminated soils and groundwater at the Vining Oil site in Carrington, North Dakota. The primary technological synergies included (1) contaminant recovery using simultaneous operation of multiphase recovery and high-vacuum soil vapor extraction (SVE) and (2) vacuum-controlled air and ozone sparging on the periphery of an induced hydraulic and pneumatic depression. Final risk reduction steps included design and retrofit for the municipal well. The successful remediation effort resulted in the reduction of long-term health risks associated with rate-limited contaminant release within the capture zone for the municipal well and allowed for its reintegration into the water supply system. Contaminant recovery for the remediation period of September 2006 to June 2008 totaled over 12,653 lb (5,740 kg) of hydrocarbons, an equivalent to 2022 gallons (7653 l) of product. Integration of the air-sparging subsystem operated simultaneously with multiphase extraction and SVE systems resulted in accelerated volatile organic contaminant transport from the saturated zone and increased contaminants of concern recovery. Delivery of over 7.7 million ft{sup 3} of oxygen (219.8 thousand m{sup 3}) into the contaminated aquifer would translate into in situ biodegradation of 2007 kg (4424 lb) of benzene and provide for long term stimulation of the natural attenuation process.

54 ENVIRONMENTAL SCIENCES↗

Cle Elum Supplementation and Research Facility : Monthly Progress Report : December 1, 2008 - December 31, 2008.

FISH PRODUCTION: Brood year 2008 production and experimental hatchery & supplemental crossed eggs continue to be incubated and chilled water at 380 Fahrenheit for the month. Temperature units are {approx}960 TU's at the end of the month. Hatching was observed at {approx}900 temperature units (TU's). The 2007 Brood year (BY) has approximately 773,477 juveniles on hand at the end of December, averaging 30.6 fish per pound. Fish tagging operations wrapped up on the 5th. Transportation of fish to acclimation sites is tentatively scheduled to begin January 12th. FISH CULTURE: Production pond cleaning continues on a weekly basis, and feeding continues to be performed two days per week due to the colder river water temperatures. Eggs in the incubation continue to be tempered in 38 degree water and temperature units recorded daily. On the 20th the river became too inclement for normal operations as the intake screens were covered with ice, at that time we shutdown two river pumps and turned on wells four and six to get 6,825 gallons of water. This was the operation at the facility for twenty-four hours at which point we were able to get back to normal operations. WATER PRODUCTION: The current combined well and river water supply to the complex is 14,756 gallons/min. The river pumps are supplying 13,571 gallons per minute. Well pumps No.2 and No.4 are operating and supplying 1,185 gallons/min. More on well pumps in the well field maintenance section of this report. ACCLIMATION SITES: Preparation of acclimation sites for fish transfer was the main focus for the month of December. Each week thermographs that record water temperature have the data disc changed at the acclimations sites. Ford Excavation with assistance from YKFP maintenance has started clearing snow out of the Easton acclimation site. VEHICLE MAINTENANCE: The snowmobiles were taken in to have annual maintenance performed. The full-size John Deere tractor needed and was taken to Barnet Implement in Yakima. The tractor needed a new clutch installed and was picked up on the 31st. SHOP BUILDING MAINTENANCE: On the 12th the facility domestic water hydro pneumatic tank and its system malfunctioned. The problem persisted and had to be dealt with multiple times; first it caused the tank to over flow and floods the shop. Wallace Electric was called and after extensive monitoring of the tank, compressor and electrical operations an electrical relay switch was replaced. Weekly cleaning and tool inventory continues to be a priority. The shop is home to our liberation truck along with fish transfer equipment, fish pump and seine nets. ELECTRICAL BUILDING MAINTENANCE: The large generator is located in the electrical building and is checked daily for routine inspections. HATCHERY BUILDING MAINTENANCE: The incubation building is being used to clean and repair isolation buckets, egg incubation baskets and troughs. An experiment involving remote site incubators (RSI's) continued through the month. Chad Stockton, WDFW, records flows and monitors emergence of fry on a daily basis. Chad is working with Steve S. and Curt K. on the RSI's research along with spawning channel fry emergence. RIVERWATER COOLING FACILITY: The one pump in operation in this building is checked daily during our routine inspections, the variable pump is supplying water to the artificial spawning channel. RIVER PUMP STATION MAINTENANCE: All four river pumps are in operation and pumping {approx}13,571 gallons/min to the facility. The building is cleaned monthly and the air burst system is cycled daily during the morning checks. The crew continued weekly changing of the graph paper on the river temperature thermograph throughout the month, continuing this activity as part of the daily checks routine. WELL FIELD MAINTENANCE: Wells No.1 and No.4 were in operation and supplying 1,185 gallons/minute to the facility and incubation building. Weekly test well readings are recorded and sent via fax to CH2MHILL. Also weekly well meter readings are recorded. Well No.5 had been determined to have a faulty drain valve while trying to operate the pump for emergency water usage. It was determined that water was not able to drain and began to flow out from the test hole (TH9). Charlie and Simon pumped out the remaining water from the test hole prior to replacing the valve. The valve was subsequently dug up, replaced and tested for operation. SAFETY AND TRAINING: The winter season has approached and conditions can be hazardous as Cle Elum staff stress safety while working and preparing acclimation sites for upcoming fish transfer. Some examples include wearing proper clothing, extra caution while driving and plowing snow. GROUNDS: Linda Lamebull of fisheries and personnel from Tribal Purchasing came to the hatchery to inventory two way radios.

13 HYDRO ENERGY↗

Wireless Demand Response Controls for HVAC Systems

The objectives of this scoping study were to develop and test control software and wireless hardware that could enable closed-loop, zone-temperature-based demand response in buildings that have either pneumatic controls or legacy digital controls that cannot be used as part of a demand response automation system. We designed a SOAP client that is compatible with the Demand Response Automation Server (DRAS) being used by the IOUs in California for their CPP program, design the DR control software, investigated the use of cellular routers for connecting to the DRAS, and tested the wireless DR system with an emulator running a calibrated model of a working building. The results show that the wireless DR system can shed approximately 1.5 Watts per design CFM on the design day in a hot, inland climate in California while keeping temperatures within the limits of ASHRAE Standard 55: Thermal Environmental Conditions for Human Occupancy.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

THE USE OF DI WATER TO MITIGATE DUSTING FOR ADDITION OF DWPF FRIT TO THE SLURRY MIX EVAPORATOR

The Defense Waste Processing Facility (DPWF) presently is in the process to determine means to reduce water utilization in the Slurry Mix Evaporator (SME) process, thus reducing effluent and processing times. The frit slurry addition system mixes the dry frit with water, yielding approximately a 50 weight percent slurry containing frit and the other fraction water. This slurry is discharged into the SME and excess water is removed via boiling. To reduce this water load to the SME, DWPF has proposed using a pneumatic system in conveying the frit to the SME, in essence a dry delivery system. The problem associated with utilizing a dry delivery system with the existing frit is the generation of dust when discharged into the SME. The use of water has been shown to be effective in the mining industry as well in the DOE complex to mitigate dusting. The method employed by SRNL to determine the quantity of water to mitigate dusting in dry powders was effective, between a lab and bench scale tests. In those tests, it was shown that as high as five weight percent (wt%) of water addition was required to mitigate dust from batches of glass forming minerals used by the Waste Treatment Plant at Hanford, Washington. The same method used to determine the quantity of water to mitigate dusting was used in this task to determine the quantity of water to mitigate this dusting using as-received frit. The ability for water to mitigate dusting is due to its adhesive properties as shown in Figure 1-1. Wetting the frit particles allows for the smaller frit particles (including dust) to adhere to the larger frit particles or to agglomerate into large particles. Fluids other than water can also be used, but their adhesive properties are different than water and the quantity required to mitigate dusting is different, as was observed in reference 1. Excessive water, a few weight percentages greater than that required to mitigate dusting can cause the resulting material not to flow. The primary objective of this task is to perform bench scale testing on various frits that have been used at DWPF or in test programs at SRNL to determine the quantity of de-ionized (DI) water required to mitigate dusting per mass basis of frit. The quantity of DI water required was determined visually by observing the effluent port of the mixer, and DI water addition was made to the point where no visible dust was observed leaving the effluent port. A total of eight different frits were selected for testing. Secondary objectives in this task include the following: (1) Video taping of the de-dusting procedure, (2) Particle size distribution analyses of the dry and wetted frits at the weight fraction of water required for de-dusting, (3) Plate flow tests to determine angle of flow and quantity of material remaining on plate at 90 degrees, (4) Microscopy of dry and wetted frit, and (5) Effect of excess water for selected frits on plate flow. The above analyses were performed within one hour of water addition, to minimize the effect of evaporative water losses. To better understand the size of dust particles, perform settling tests on selected frits and capture the fines. Analyze the fines for particle size distribution. Finally, it is expected that the surface area of frit is an important parameter in the quantity of water required for dust mitigation. An analysis of particle size distribution (PSD) data of as-received frit analyzed by SRNL over the past two to three years will be performed to determine the variation in the distribution of as-received frit. The following objectives were stated in the Technical Task Request4 as objectives that given adequate time would provide insight in helping DWPF in assessing equipment or processes for de-dusting and processing of dry frit. Due to time constraints, commercial methods for dedusting are provided. These results are detailed in section 3.7. Obtain design information from Hanford with respective to equipment used for dedusting. Suggestions on enhanced design features, such as flush water, pipe air purges, humidified compressed air, options for agitation, and other base (SRNL) knowledge.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Auxiliary Drives for Automated Assembly Systems

Basic types of auxiliary drives in automated assembly systems are compared in terms of generalized characteristics. Regulation of the pneumatic drive by means of servomechanical positioning systems is considered. Diagrams are presented for assessment of the mean velocities and travel times of mechatronic modules in the angular positioning of loading drives on the basis of kinematic and mechanical characteristics.

42 ENGINEERING↗

The rolling tire under load

Dynamic pressure distributions calculated for contact patch areas of elastically supported cylindrical shell used to model pneumatic tire

CYLINDRICAL SHELL↗