At least 397 records · Page 22

Benchmarking Utility-Scale PV Operational Expenses and Project Lifetimes: Results from a Survey of U.S. Solar Industry Professionals

This paper draws on a survey of solar industry professionals and other sources to clarify trends in the expected useful life and operational expenditure (OpEx) of utility-scale photovoltaic (PV) plants in the United States. Solar project developers, sponsors, long-term owners, and consultants have increased project-life assumptions over time, from an average of ~21.5 years in 2007 to ~32.5 years in 2019. Current assumptions range from 25 years to more than 35 years depending on the organization; 17 out of 19 organizations surveyed or reviewed use 30 years or more. Levelized, lifetime OpEx estimates have declined from an average of ~$\$$35/kW DC -yr for projects built in 2007 to an average of ~$\$$17/kW DC -yr in 2019. Across 13 sources, the range in average lifetime OpEx for projects built in 2019 is broad, from $\$$13 to $\$$25/kW DC -yr. Operations and maintenance (O&M) costs—one component of OpEx—have declined precipitously in recent years, to $\$$5-8/kW DC -yr in many cases. Property taxes and land lease costs are highly variable across sites, but on average are—together—of similar magnitude. Other OpEx line items include security, insurance, and asset management. Given 2007-2009 values for not only project life and OpEx but also other drivers of the levelized cost of energy (LCOE, excluding the investment tax credit), the LCOE for utility-scale PV projects built from 2007 through 2009 averaged $\$$305 /MWh. Using 2019 values for all parameters yields an average LCOE of $\$$51 /MWh. The decline in LCOE from $\$$305 /MWh to $\$$51 /MWh was predominantly caused by reductions in up-front expenditures (and, to a much lesser extent, by changes in capacity factors, financing costs, and tax rates), but 9% ($\$$22 /MWh) of the overall decline is due to improvements in project life and OpEx. Project life extensions and OpEx reductions have had similarly sized impacts on LCOE over this period, at $\$$11 /MWh each. Had project life and OpEx not improved over the last decade, LCOE in 2019 would have instead been $\$$73 /MWh—43% higher. Given the limited quantity and comparability of previously available data on these cost drivers, the data and trends presented here may inform assumptions used by electric system planners, modelers, and analysts. The results may also provide useful benchmarks to the solar industry, helping developers and assets owners compare their expectations for project life and OpEx with those of their peers.

14 SOLAR ENERGY↗

Metal Alloy and RHEA Additive Manufacturing for Nuclear Energy and Aerospace Applications

An open-literature search was conducted to consider the current status of the additive manufacturing (AM) industry with respect to metal alloys and refractory high entropy alloys (RHEAs). Key areas of interest include methodologies and applications that are suitable for the nuclear and aerospace industries, as well as other industrial applications. We investigated various promising 3D metal technologies, with emphasis on cost, operation, throughput, maintenance, and output volume size. In addition, technical issues and the current status of the metal printing market are summarized. The project scope also included the manufacturing of open-literature RHEA test coupons at Sandia's laser engineered net shape (LENS) machine.

36 MATERIALS SCIENCE↗

Addressing Soiling: From Interface Chemistry to Practicality

Natural soiling has reduced the energy output of photovoltaic (PV) systems since the technology was first used. Projecting even a small average annual soiling loss translates to billions of dollars in annual lost revenue worldwide. Production losses due to soiling can be very high in some locations, substantially increasing the levelized cost of electricity (LCOE) due to lost power production, increased operating and maintenance costs, and/or increased finance cost due to the uncertainty. Furthermore, although soiling has been discussed in the literature for more than 70 years, solutions to many problems are still needed. The National Renewable Energy Laboratory (NREL) is working with the PV industry to develop the tools/knowledge so that the effects of soiling can be predicted for different environmental conditions and cost-effective mitigation can be implemented. For this project, NREL performed a number of research and development tasks/subtasks in the following general areas to 1) predict PV module soiling losses based on environmental factors at a PV installation and from its energy production data, 2) quantitatively measure the adhesion forces to understand the physics enabling soiling, and 3) develop related standards on PV module coatings and artificial soiling. At the inception of the project, the PV industry considered these efforts to be the most important and immediate soiling issues that we could address to have the highest impact on LCOE. These focused efforts have led to outstanding accomplishments that have been communicated and very well received by the community.

14 SOLAR ENERGY↗

User's Manual for the FE/NETL Onshore CO 2 EOR Cost Model, Version 1

This user's manual describes the conceptual and mathematical basis for the FE/NETL Onshore CO 2 EOR Cost Model (a Fortran program). The model performs a cash flow analysis to estimate the cost of implementing CO 2 EOR using supercritical CO 2 by incorporating oil field performance outputs for a pattern from the FE/NETL CO 2 Prophet Model (available on NETL's website along with its associated user's manuals under the Collection Name: FE/NETL CO 2 Prophet Model) and implementing patterns to develop an oil field for CO 2 EOR. The model calculates capital costs, operation and maintenance costs, and financing costs. The user’s manual also describes how to run the FE/NETL Onshore CO 2 EOR Cost Model, along with the model’s file structure, inputs and outputs. The FE/NETL Onshore CO 2 EOR Cost Model is available on NETL's website under the Collection Name: FE/NETL Onshore CO 2 EOR Cost Model.

54 ENVIRONMENTAL SCIENCES↗

Cost Projections for Utility-Scale Battery Storage (2020 Update)

In this work we describe the development of cost and performance projections for utility-scale lithium-ion battery systems, with a focus on 4-hour duration systems. The projections are developed from an analysis of 19 publications that consider utility-scale storage costs. The suite of publications demonstrates varied cost reductions for battery storage over time. Figure ES-1 shows the low, mid, and high cost projections developed in this work (on a normalized basis) relative to the published values. Figure ES-2 shows the overall capital cost for a 4-hour battery system based on those projections, with storage costs of $\$$144/kWh, $\$$208/kWh, and $\$$293/kWh in 2030 and $\$$88/kWh, $\$$156/kWh, and $\$$219/kWh in 2050. Battery variable operations and maintenance costs, lifetimes, and efficiencies are also discussed, with recommended values selected based on the publications surveyed.

14 SOLAR ENERGY↗

U.S. Efforts in Support of Examinations at Fukushima Daiichi- November 2020 Meeting Notes with Updated Information Requests

Much is still not known about the end-state of core materials in each unit that was operating on March 11, 2011 at the Fukushima Daiichi Nuclear Power Station (Daiichi). Information obtained from Daiichi is required to inform Decontamination and Decommissioning (D&D) activities, improving the ability of the Tokyo Electric Power Company Holdings, Incorporated (TEPCO Holdings) to characterize potential hazards and to ensure the safety of workers involved with cleanup activities. This information also has important implications for the safety and operation of U.S. commercial nuclear power plants. This document summarizes results from the Fiscal Year 2021 (FY2021) U.S. effort to review Daiichi information and extract insights to enhance the safety of existing and future nuclear power plant designs. This U.S. effort, which was initiated in 2014 by the Department of Energy Office of Nuclear Energy (DOE-NE), is completed by a group of experts in reactor safety and plant operations that identify examination needs and evaluate recent Daiichi examination data to address these needs. Since its inception, annual reports were issued that document significant safety insights being obtained in areas of special emphasis: system and component performance, radionuclide surveys and sampling, debris end-state location, combustible gas effects, and plant operations and maintenance. In addition to reducing uncertainties related to severe accident modeling progression, these insights have and continue to be used to update guidance for severe accident prevention, mitigation, and emergency planning. Reduced uncertainties in modeling the events at Daiichi improve the realism of reactor safety evaluations that inform future D&D activities. A key aspect of prior U.S. efforts, the updated list of information requests, is included in this FY2021 report to ensure that they are transmitted to organizations within Japan. This report also continues to emphasize how information obtained from the affected reactors at Daiichi has been and will continue to be used to update severe accident management strategies and reduce uncertainties in systems analysis code models. In addition, recommendations are included that would expand the use of this information to provide insights regarding maintenance, radiation protection, design, and siting activities for existing and new reactors.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Development of Energy Storage: Cost models

Energy storage technologies offer a promising solution to electric grid stability issues associated with the integration of variable renewable generators. The capability to match the electrical power output to instantaneous fluctuations in grid demand is crucial to ensure continuity of service. Including energy storage capability in an integrated energy system (IES) can provide the flexibility needed to meet variable electric demand and reduce the load following demands place on the reactor. In this report, economic data collected for energy storage (ES) technologies are described to support the objective of assessing the profitability of ES integration within the IES framework. In particular, there is a growing interest in thermal energy storage (TES) given its unique capability for long-duration storage for improving electricity reliability at a low levelized cost. It is common practice to evaluate the total lifetime cost and profitability before commercializing new technologies. In this report we identify and examine the models needed to better understand the economics of thermal energy storage. We extend the TES cost model in RAVEN in the context of a balance of plant (BOP) that incorporates thermal storage. To focus the discussion, following a general overview of the most promising TES technologies, we consider a use case that involves a sensible heat, two-tank, molten-salt system. Structural and operational details are reported to identify the source of construction capital expenditure and operation and maintenance cost. A detailed description of the different cost items is provided as well as the cost scaling with different storage capacity and power ratings for capacity optimization purpose. In addition, the capital expenditure and the recurring cost of representative two-tank, molten salt coupled with concentrated solar plants are provided for readers’ reference. The ES use case is noteworthy as it is in the pilot stage of commercialization. We identify those areas that would benefit from an increased economic focus to obtain a more complete compilation of cost data. We also describe the thermal coupling issues that arise from integration of the two-tank molten salt thermal energy storage system with a BOP, which is the subject of our current research. Some components of costs will need to be evaluated through dedicated technoeconomic analysis in future modeling activities using modeling procedures proposed in this report. With the data presented and the procedures described in this report, sufficiently accurate models can be implemented for the solution of both the power dispatch and the capacity expansion problems within the RAVEN-based HYBRID framework.

25 ENERGY STORAGE↗

A Risk-Informed Performance-Based Methodology to Manage Fire Protection Systems in Nuclear Facilities

Fire protection systems (FPSs) and features are installed in U.S. Department of Energy (DOE) Hazard Category 1, 2, or 3 nuclear facilities to protect property (maximum possible fire loss thresholds), life, and nuclear safety (i.e., structures, systems, and components). These FPSs and features are designed and maintained in accordance with the prescriptive guidance provided in applicable building codes and National Fire Protection Association codes and standards. Management, operations, and maintenance activities of FPSs involve significant effort. A DOE facility’s documented safety analysis or other safety basis document could also rely on FPSs to provide either a safety significant or safety class function to mitigate fire hazards and minimize radiological consequences. In some cases, the designation of safety significant or safety class may be determined to provide a layer of defense-in-depth to minimize nuclear safety risks independent of the fire risk. DOE standards allow the use of performance-based design alternatives developed by the fire industry but do not consider the defense-in-depth layers of protection provided in DOE facilities to prevent or mitigate the risks associated with unintended release of radioactive materials into the environment. Pacific Northwest National Laboratory developed a decision-making methodology tailored for DOE non-reactor nuclear facilities to manage FPSs and features by integrating nuclear safety risk insights into a performance-based analysis. This risk-informed, performance-based (RIPB) methodology can be used to provide the technical basis for classifying an FPS as safety class and safety significant, tailoring administrative controls (e.g., technical safety requirements), and ranking the importance of FPSs to prioritize maintenance, upgrades, and replacement activities. The RIPB methodology is a graded approach to inform DOE facility owners and Fire Protection Program managers of the most risk-significant FPSs and equipment, and those systems would be cost-beneficial to relax rigor if there is a need to re-design the FPS coverage or deviate from DOE and National Fire Protection Association standards for those systems that would be less significant. This paper describes the framework used to develop the RIPB methodology and the outcome of implementing this methodology in a use-case nuclear facility. This paper also discusses the impact to DOE policies and standards and the safety margins and defense-in-depth measures credited in nuclear safety assessments in a facility’s documented safety analysis and the benefits of implementing an RIPB methodology in lieu of a prescriptive method to comply with fire protection requirements.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Cost Analysis Framework for Comparing AC and DC Design Alternatives for Building Electrical Distribution Systems

In recent years, in response to the changing nature of building load, direct current (DC) distribution systems for buildings have been proposed as alternatives to traditional alternating current (AC) systems. DC distribution offers a closer match to the types of loads and generation sources found in modern buildings, the majority of which use DC electricity internally either natively or as a power conditioning stage. The proposed benefits of DC distribution compared to AC distribution within buildings include higher efficiency, lower installation cost, lower operating cost, higher reliability, improved communication and control, and simplicity. Most recent DC distribution research has focused on quantifying the efficiency advantage of DC distribution over AC distribution. However, energy savings alone do not guarantee cost savings; a more complete cost accounting is required to establish financial benefit. This report provides a framework for cost analysis and comparison of building electrical distribution systems, including common variants for both AC and DC distribution systems. The framework includes all major cost categories, including up-front costs (capital, installation labor, soft costs) and long-term costs (energy, operations and maintenance).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Cost Projections for Utility-Scale Battery Storage: 2021 Update

In this work we describe the development of cost and performance projections for utility-scale lithium-ion battery systems, with a focus on 4-hour duration systems. The projections are developed from an analysis of recent publications that consider utility-scale storage costs. The suite of publications demonstrates varied cost reductions for battery storage over time. Figure ES-1 shows the low, mid, and high cost projections developed in this work (on a normalized basis) relative to the published values. Figure ES-2 shows the overall capital cost for a 4-hour battery system based on those projections, with storage costs of $\$$143/kWh, $\$$198/kWh, and $\$$248/kWh in 2030 and $\$$87/kWh, $\$$149/kWh, and $\$$248/kWh in 2050. Battery variable operations and maintenance costs, lifetimes, and efficiencies are also discussed, with recommended values selected based on the publications surveyed.

25 ENERGY STORAGE↗

U.S. ESCO Industry: Industry Size and Recent Market Trends

This study is the latest in a series of LBNL research into U.S. ESCO industry characteristics and market trends. The research is based on interviews with ESCO industry executives conducted during the fall of 2019 and the first half of 2020. Nearly all companies that identified themselves as ESCOs were contacted as part of this project. We find that after a period of little growth (2011-2014), industry revenues reached an estimated $6 billion in 2018, or a 3.4% annual average growth rate from 2015-2018. ESCOs primarily serve the public an institutional sectors (e.g., federal, state, and local governments; university and colleges; and K-12 schools). In 2018, project investments by public and institutional organizations accounted for over 90% of industry revenue, which is consistent with previous industry studies. ESCO activity in the Middle Atlantic, East North Central, and Pacific regions in the U.S. delivered the highest share of revenue in 2018, which is also consistent with earlier research. ESCOs reported that a majority of their customers use energy savings performance contracts (ESPCs) primarily for facility capital improvement needs and resilience rather than utility savings. In addition, the importance of non-energy benefits (e.g., water savings, avoided operations and maintenance costs, and avoided capital costs) accounted for in the project savings guarantee reportedly increased in all markets during 2016-2018 compared to previous time periods. The study found that the ESCO industry faces several key challenges, including: (1) increasing project development times due to more complex projects and other factors; (2) difficulty finding qualified subcontractors in some regions, including minority- women- and disadvantaged population-owned small business enterprises; and (3) difficulty accessing project documents and quickly fulfilling customer requests to justify project payments several years into the performance period of a project.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Co-Development of Oscillating Water Column (OWC) and Offshore Power Station

The project proposed an Oscillating Water Column (OWC) at a low power rating (1-5kW); to build a prototype and perform field testing within 1–3 years and achieving a commercial version of the OWC 3–5 years. We selected the OWC off-the-shelf components to secure the supply-chain sources and to warrant stable and minimum pricing. We want to curtail the capital cost by reducing the weight and volume of the overall system structure at the design level by designing a high-speed turbine generator and optimizing the airspeed amplification. We want to minimize the operational and maintenance (O&M) costs through simplified architecture, minimal parts, modular/plug-and-play, and easy access designs.

16 TIDAL AND WAVE POWER↗

Laser Network US Experiments at the University of Texas at Austin

Under Subcontract B638654, The University of Texas at Austin (UT Austin) Center for High Energy Density Science supported three Laser Network US experiments and conducted upgrade planning for the Texas Petawatt Laser Facility. For the experiment “Investigation of the physics of MeV X-ray and particle generation using Compound Parabolic Concentrators” led by Dr. Andrew Mackinnon of Lawrence Livermore National Laboratory, UT Austin provided postdoctoral associate support in the person of Dr. Ganesh Tiwari. For the experiments “Megatesla magnetic fields and enhanced gamma-ray beam generation” led by Hans Rinderknecht of LLE, University of Rochester (experiment) and Alexey Arefiev of UC San Diego (theory) and “High resolution imaging of resonately accelerated electrons under tight focusing” led by Deepak Kumar of ELI-Beamlines, Czech Republic, UT Austin provided the Texas Petawatt Laser staff and a prorated share of the materials and supplies approximately equal to the average of those required for one 5-week experimental campaign. Summaries of these three experiments are provided in this report. Two staff members were hired—Dr. Sandra Bruce at 40% and Dr. Erhard Gaul at 50% time—to support Texas Petawatt Laser maintenance and operations and to plan for the Texas Relativistic Intensity Ultrafast Multi-beam Plasma Facility (TRIUMPF).

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Development of an Activation Analysis Methodology to Support the Disposal of the High Flux Isotope Reactor Metal Pool Waste

During operation and maintenance of the High Flux Isotope Reactor (HFIR), metal waste from reactor components is generated. Due to space limitations in the pool fuel storage, it is necessary to remove the waste and send it to off-site disposal. Most of this waste was in the reactor and is radioactive through neutron activation. Prior to shipping and disposal at a waste disposal facility, the radiological activity of the waste must be determined. Therefore, a conservative methodology to characterize the radiological activity of the waste must be performed. The methodology used was based on being able to determine a conservative overall activity and radionuclide inventory based on radiological survey data and neutron activation products for the materials present.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Solar Performance Insight (Final Report)

The PV Operations and Maintenance (O&M) service industry lacks an affordable, well-documented, intuitive PV modeling and analytics tool to calculate modeled performance from actual data from multiple data acquisition systems (DAS). We envision a performance modeling and analytics platform built on open-source, extensible, community-maintained code. The key innovation is the community-driven development of pvlib python delivered through a lightweight web service to provide configurable, consistent and reproducible PV modeling for O&M providers.

14 SOLAR ENERGY↗

Big Adaptive Rotor Phase I (Final Report)

The Big Adaptive Rotor (BAR) project was initiate by DOE in 2018 with the goal of identifying novel technologies that can enable large (>100m) blades for low specific power (SP) turbines. Five distinct tasks were completed to achieve this goal: 1. Assess trends, impacts, and value of low-SP turbines, 2. Wind turbine blade cost reduction roadmap study, 3. Research and Development (R&D) opportunity screening, 4. Detailed design and analysis, and 5. Low-cost carbon fiber. These tasks were completed by the national lab team consisting of Sandia National Laboratories (SNL), the National Renewable Energy Laboratory (NREL), and Lawrence Berkeley National Laboratory (LBNL). The objective of Task 1 was to assess the historical trends of low-SP of onshore deployments, and to assess the impact and value of low-SP turbines. Analysis under this task showed that there is significant value for low-SP turbines, especially in markets where there is a higher saturation of wind energy on the grid. This has to do with the fact that low-SP turbines have increased capacity factors, and can contribute more reliable energy to the grid, even in lower wind conditions. This bodes well as higher renewable scenarios are likely in the coming years. Task 2 was a detailed analysis on the logistical challenges of deploying very large (>100m) onshore blade. This work was completed by experts at DNV-GL. The report looked at various ways to get around the current transportation constraints which are estimated to be around 75m in length. The report concluded that there are viable solutions to this issue including: segmented blades (which the industry is already pursuing), lighter than air (LTA) transportation, on-site manufacturing, and controlled bending of blades on rail. The final option was recommended for further analysis and study by DOE and the national labs because keeping a single piece blade reduces manufacturing and operations and maintenance (O&M) costs. Task 3 focused on identifying novel concepts that are capable of enabling a cost effective 5MW 206m rotor for onshore deployment. The findings from the first two tasks were considered in the analysis, in that the concepts identified must be able to overcome the transportation logistics challenges. Around 20 concepts were identified and evaluated by experts within the industry. Additionally, science and engineering challenges were identified for each concept. Based on these evaluations six concepts were deemed the most impactful and were selected for further analysis in Task 4. The concepts were: highly flexible rail transportable blades, downwind rotors, distributed aerodynamic control (DAC) devices, inflatable blade, bi-wing blade, and 4/5 bladed rotors. Task 4 conducted detailed design, optimization, and analysis on the selected BAR concepts. A modeling gaps analysis was conducted, and modeling improvements were implemented that allowed for the study and design of the novel concepts. The BAR team established a set of baseline designs by which to compare the selected designs through a technoeconomic analysis. It was found that the highly flexible rail transportable blade, the downwind rotor, and the DAC devices have the most promise to deliver the BAR targets. A Phase II for BAR has been proposed to further mature these concepts and address the open science and engineering challenges identified in Task 3. Task 5 conducted research on optimized carbon fiber materials that were used throughout the BAR Phase I project. Overall, the BAR project has identified low-SP turbines as important to continued LCOE reductions for onshore turbines. Furthermore, the project has identified viable solutions to the technical and logistical challenges to realizing these goals. The most promising technologies that were identified in Phase I of the project will be further matured and de-risked in Phase II of the BAR project.

17 WIND ENERGY↗

Removal of Institutional Controls at CERCLA Site ANL-01 Ditches A, B and C at the Materials and Fuels Complex

ANL-01 is a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) site within Operable Unit (OU) 9-04 at the Materials and Fuels Complex (MFC). The ANL-01 site includes the Industrial Waste Pond and its associated ditches. Ditches A, B and C within ANL-01 were remediated in accordance with the Final Record of Decision for Argonne National Laboratory - West (DOE-CH 1998a). Due to the success of the selected and contingent remedies for the ditches and the determination that they are protective of human health and the environment, institutional controls (ICs) are no longer required and Idaho National Laboratory (INL) recommends termination of the ICs. In addition, the documentation requirements of the INL Site-wide Institutional Controls, and Operations and Maintenance Plan for CERCLA Response Actions (DOE-ID 2017) have been met to allow termination to occur.

54 ENVIRONMENTAL SCIENCES↗

100% Carbon-Free Electricity for Sandia NM and KAFB Using Concentrating Solar Power (CSP) (SAND Report)

This report provides a design study to produce 100% carbon-free electricity for Sandia NM and Kirtland Air Force Base (KAFB) using concentrating solar power (CSP). Annual electricity requirements for both Sandia and KAFB are presented, along with specific load centers that consume a significant and continuous amount of energy. CSP plant designs of 50 MW and 100 MW are then discussed to meet the needs of Sandia NM and the combined electrical needs of both Sandia NM and KAFB. Probabilistic modeling is performed to evaluate inherent uncertainties in performance and cost parameters on total construction costs and the levelized cost of electricity. Total overnight construction costs are expected to range between ~$300M - $400M for the 50 MW CSP plant and between ~$500M - $800M for the 100 MW plant. Annual operations and maintenance (O&M) costs are estimated together with potential offsets in electrical costs and CO 2 emissions. Other considerations such as interconnections, land use and permitting, funding options, and potential agreements and partnerships with Public Service Company of New Mexico (PNM), Western Area Power Administration (WAPA), and other entities are also discussed.

14 SOLAR ENERGY↗