Advanced Distributed Wind Turbine Controls Series: Part 3-Wind Energy in Grid-Connected Deployments – Microgrids, Infrastructure Resilience, and Advanced Controls Launchpad (MIRACL)

In recent years the technical ability and requirement for distributed wind turbines to provide grid support services beyond maximum energy production has increased. Ancillary services leveraged through advance controls of a wind turbine support grid reliability and resilience. One ancillary service that is significant to a grid-connected wind turbine deployment is fault ride through (FRT) in response to the voltage and frequency events in the power system. As part of the Microgrids, Infrastructure Resilience, and Advanced Controls Launchpad (MIRACL) this paper demonstrates, through desktop simulations, the wind turbine's FRT capabilities to support stable grid operation. We establish that the wind turbine models exceed FRT performance requirements stipulated in IEEE 1547-2018, regarding interconnection and interoperability of distributed energy resources. Utilizing a standalone CART2 (600 kW) wind turbine connected to the NREL's Flatirons Campus grid, we study voltage and frequency FRT utilizing various test cases. One of the test cases under study is a Category III voltage fault defined in IEEE 1547-2018 and derived from CA Rule 21. Some distributed wind turbines were unable to connect to the grid following the Rule 21 enforcement in California. Even if this is not a general requirement elsewhere, the grid codes might evolve in this direction. This study illustrates how a distributed wind turbine can provide some of these FRT services and enable a pathway toward a higher contribution of renewable energy in a distribution grid.

17 WIND ENERGY↗

Distribution System Blackstart and Restoration Using DERs and Dynamically Formed Microgrids

Extreme weather events have led to long-duration outages in the distribution system (DS), necessitating novel approaches to blackstart and restore the system. Existing blackstart solutions utilize blackstart units to establish multiple microgrids (MGs), sequentially energize non-blackstart units, and restore loads. However, these approaches often result in isolated MGs. In DERs-aided blackstart, the continuous operation of these MGs is limited by the finite energy capacity of commonly used blackstart units like battery energy storage (BES)-based gridforming inverters (GFMIs). To address this issue, this article proposes a holistic blackstart and restoration framework that incorporates synchronization between dynamic MGs and the entire DS with the transmission grid (TG). To support synchronization, we leveraged virtual synchronous generator-based control for GFMIs to estimate their frequency response to load pick-up events using only initial/final quasi-steady-state points. Subsequently, a synchronization switching condition is developed to model synchronizing switches, aligning them seamlessly with a linearized branch flow problem. Finally, we designed a bottomup blackstart and restoration framework that considers the switching structure of the DS, energizing/synchronizing switches, DERs with grid-following inverters, and BES-based GFMIs with frequency security constraints. In conclusion, the proposed framework is validated in IEEE-123-bus system, considering cases with two and four GFMIs under various TG recovery instants.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Microgrid Power Flow Control with Integrated Battery Management Functions

This paper presents a microgrid power flow control for islanded microgrids consisting of photovoltaic (PV) system, battery energy storage system (BESS) and diesel generator. The proposed control ensures automatic coordination among the microgrid units. To achieve the coordination, the local control of PV system and BESS are configured to regulate power flow without relying on communications. The generator is controlled as the back-up source and its connection depends on battery state of charge (SOC). A state machine with hysteresis settings is used to trigger smooth transition among operation modes. Not only does the proposed controller consider battery SOC and power limits, but also integrates three-stage charging control as battery charging mechanism, which is not considered in the existing literature. The proposed control is validated for an islanded hybrid microgrid using an OPAL-RT real-time simulator.

Long, Qian↗

Development of a Practical Secondary Control for Hardware Microgrids

Practical, vendor-agnostic interoperability guidelines for the secondary control architecture of microgrids (MGs) with multiple grid-forming (GFM) inverter-based resources (IBRs) have not yet been developed. Therefore, this paper proposes a generic and vendor-agnostic secondary control architecture that operates with all GFM IBRs and synchronous generators. This secondary control does not require the use of additional measurement devices in the MG and utilizes the inherent communication systems of the GFM units, such as Modbus TCP/IP. The practical challenges of Modbus registers, such as packet loss and quantization error, and their detrimental impacts on secondary control actions are investigated. The proposed three-stage modification for any secondary control architecture to mitigate these impacts includes: 1) averaging the data read, 2) situational event-triggering of the controller, and 3) finite iteration of the controlling action. The proposed method is validated using a 3-..phi.., 480 V, 60 Hz, 500 kVA laboratory hardware microgrid with commercial two GFM IBRs and one diesel generator. The experimental results corroborates the fact the proposed modification in the secondary control architecture is advantageous for practical usage under erroneous measurements.

communication systems↗

MIRACL Co-Simulation Platform Lab assets and tools integration

Pacific Northwest National Laboratory's (PNNL) co-simulation platform (CSP) for the Microgrids, Infrastructure Resilience, and Advanced Controls Launchpad (MIRACL) project, also known as MIRACL-CSP, is a functional layer designed and developed to oversee the operational exchanges of data at the application level to and from different resources residing on the MIRACL Data Hub shared platform. MIRACL-CSP allows virtual interactions between various data hub resources during co-simulation runtime.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Development of a Practical Secondary Control for Hardware Microgrids

Practical, vendor-agnostic interoperability guidelines for the secondary control architecture of microgrids (MGs) with multiple grid-forming (GFM) inverter-based resources (IBRs) have not yet been developed. Therefore, this paper proposes a generic and vendor-agnostic secondary control architecture that operates with all GFM IBRs and synchronous generators. This secondary control does not require the use of additional measurement devices in the MG and utilizes the inherent communication systems of the GFM units, such as Modbus TCP/IP. The practical challenges of Modbus registers, such as packet loss and quantization error, and their detrimental impacts on secondary control actions are investigated. The proposed three-stage modification for any secondary control architecture to mitigate these impacts includes: 1) averaging the data read, 2) situational event-triggering of the controller, and 3) finite iteration of the controlling action. The proposed method is validated using a three-phase electric power, 480 V, 60 Hz, 500 kVA laboratory hardware microgrid with commercial two GFM IBRs and one diesel generator. The experimental results corroborates the fact the proposed modification in the secondary control architecture is advantageous for practical usage under erroneous measurements.

grid-forming inverter↗

Optimal Electrification Using Renewable Energies: Microgrid Installation Model with Combined Mixture k-Means Clustering Algorithm, Mixed Integer Linear Programming, and Onsset Method

Optimal planning and design of microgrids are priorities in the electrification of off-grid areas. Indeed, in one of the Sustainable Development Goals (SDG 7), the UN recommends universal access to electricity for all at the lowest cost. Several optimization methods with different strategies have been proposed in the literature as ways to achieve this goal. This paper proposes a microgrid installation and planning model based on a combination of several techniques. The programming language Python 3.10 was used in conjunction with machine learning techniques such as unsupervised learning based on K-means clustering and deterministic optimization methods based on mixed linear programming. These methods were complemented by the open-source spatial method for optimal electrification planning: onsset. Four levels of study were carried out. The first level consisted of simulating the model obtained with a cluster, which is considered based on the elbow and k-means clustering method as a case study. The second level involved sizing the microgrid with a capacity of 40 kW and optimizing all the resources available on site. The example of the different resources in the Togo case was considered. At the third level, the work consisted of proposing an optimal connection model for the microgrid based on voltage stability constraints and considering, above all, the capacity limit of the source substation. Finally, the fourth level involved a planning study of electrification strategies based mainly on microgrids according to the study scenario. The results of the first level of study enabled us to obtain an optimal location for the centroid of the cluster under consideration, according to the different load positions of this cluster. Then, the results of the second level of study were used to highlight the optimal resources obtained and proposed by the optimization model formulated based on the various technology costs, such as investment, maintenance, and operating costs, which were based on the technical limits of the various technologies. In these results, solar systems account for 80% of the maximum load considered, compared to 7.5% for wind systems and 12.5% for battery systems. Next, an optimal microgrid connection model was proposed based on the constraints of a voltage stability limit estimated to be 10% of the maximum voltage drop. The results obtained for the third level of study enabled us to present selective results for load nodes in relation to the source station node. Finally, the last results made it possible to plan electrification using different network technologies and systems in the short and long term. The case study of Togo was taken into account. The various results obtained from the different techniques provide the necessary leads for a feasibility study for optimal electrification of off-grid areas using microgrid systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

AURORA - AUtonomous and Resilient Operation of energy systems with RenewAbles

This presentation provides an overview of the AURORA project. The objective of AURORA is to develop and validate novel functions for Energy Management Systems (EMS) containing Security Situational Awareness (SSA), Distributed Microgrid Coordination (DMC), Autonomous Microgrid Restoration (AMR).

14 SOLAR ENERGY↗

Optimal Network Reconfiguration and Scheduling With Hardware-in-the-Loop Validation for Improved Microgrid Resilience

With the increased occurrence of various major extreme weather events, power outages and prompt power system restorations have recently drawn more attention to the resilience and recovery of power systems. From the perspective of a more resilient power delivery at the distribution grid, system restoration using network topology reconfiguration together with optimal scheduling of distributed energy resources are adopted in this paper. The proposed optimization model aims at minimizing the total load shedding cost and other operational costs, in which linearized topological constraints borrowed from graph theory and linearized DistFlow models are respectively used to maintain the radial network topology and power flow balance after system contingencies. To demonstrate the applicability of the proposed strategy, a real-world case study of a networked three-microgrid system in Adjuntas, Puerto Rico, is used with the consideration of different independent/interconnected microgrid scenarios, contingencies, and fairness settings. Furthermore, hardware-in-the-loop testing is conducted for the same three-microgrid network, where the closely matched results with the simulated ones have validated the effectiveness of the proposed restoration strategy, which is now ready to move one step forward towards field deployment. Finally, to test the proposed restoration strategy in a larger networked system, the modified IEEE-33 bus test distribution system is considered, and the results show a more resilient power delivery for critical loads under three and four line outages.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Quantifying the Protectability of Power Systems for Restoration Applications

With the increasing availability of distributed energy resources, controllable switches, and advanced metering infrastructure, distribution systems are exploring opportunities for improving system reliability through fault location, isolation, and service restoration. During permanent outages, this requires islanding microgrids and/or reconfiguration of the feeders; however, it is critical to assess the protection of the islanded/reconfigured networks before transition because the rated load and fault current conditions change. This paper presents a novel “protectability” metric that quantifies the protection performance and allows the operators to compare the effectiveness of the protection between two or more possible reconfiguration and islanding approaches. We present the mathematical formulation and assumptions for the metric. Multiple configurations of the Electric Power Research Institute J1 feeder, both in grid-connected and weak-sourced islanded operation, are used to demonstrate the performance of the metric with reference to overcurrent protection. Takeaways for future studies on system planning integration are provided.

distributed energy resources↗

GMLC 1.5.03: Increasing Distribution System Resiliency using Flexible DER and Microgrid Assets Enabled by OpenFMB (Duke-RDS Final Report)

This is the final project report for the Grid Modernization Laboratory Consortium (GMLC) Resilient Distribution System (RDS) project titled “Increasing Distribution System Resiliency using Flexible DER and Microgrid Assets Enabled by OpenFMB”. The primary goal of this project was to increase the resiliency of distribution systems at utilities around the nation by deploying flexible operating strategies that engage end-use assets as a resource.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Overcoming Resilience Challenges on the Outer Banks of North Carolina

In 2021, the Town of Nags Head, located in the Outer Banks region of North Carolina, was among the first cohort of coastal and island communities to participate in the U.S. Department of Energy's Energy Transitions Initiative Partnership Project (ETIPP), which offers technical assistance and cash awards to competitively selected coastal, remote, and island communities seeking to transform their energy systems and increase their energy resilience. As a barrier island separated from mainland North Carolina, Nags Head experiences impacts from extreme weather events, including power outages, especially during hurricane season. To address challenges, the Nags Head ETIPP team sought to improve the town's disaster resilience by ensuring that critical facilities can remain powered during and after extreme events. With support from experts at Sandia National Laboratories, the National Renewable Energy Laboratory, and the Coastal Studies Institute, the community team identified the following goals for its participation in ETIPP: 1. Identify and prioritize critical facilities that, when powered during disruptions, support the town's resilience. 2. Analyze the potential for on-site solar photovoltaic (PV) and storage systems at 2-4 prioritized critical facilities owned and/or operated by the town. 3. Analyze the potential for interconnecting solar PV and storage systems at a cluster of public and privately owned facilities into a resilient microgrid. 4. Explore finance options and utility interconnection requirements and compensation mechanisms. 5. Summarize outcomes and next steps for town leadership.

25 ENERGY STORAGE↗

Demonstration of a fault impact reduction control module for wind turbines

Abstract. Traditionally, wind turbines in distributed applications make control decisions as isolated systems. They generally provide maximum power output during operation and manage internal faults with little consideration of the rest of the power system. Although fault detection and tolerance schemes are widely researched and implemented, controls to ameliorate such faults are uncommon in research and industry. The rapid shutdown of a wind turbine in a large transmission-connected wind plant will have a minimal impact on a large power system, but in a microgrid or isolated grid context the abrupt loss of a single wind turbine may cause grid instability and high stress on the system. This paper demonstrates a fault impact reduction control (FIRC) module for a wind turbine, which implements wider warning thresholds around fault thresholds. When the turbine crosses a warning threshold, the controller sends its predicted action to the grid controller, which facilitates the grid operator’s response to a potential wind turbine fault and then takes appropriate action to ameliorate the fault. Various test cases demonstrate the controller action under a variety of faults, and various scenarios demonstrate the grid benefit of an FIRC in both microgrid- and grid-connected contexts. The FIRC maximizes wind turbine generation and eases generation transition under a variety of fault scenarios. The FIRC module is easy to integrate with most existing controllers, just requiring derate capability, and can be easily modified to include the various warnings and thresholds that the user desires. This analysis is mainly performed in a MATLAB-Simulink-based research wind turbine model and is also implemented in the existing LabVIEW-based controller of the same research turbine at NREL.

17 WIND ENERGY↗

Experiences and Lessons from Field Demonstration of Grid-forming Inverter in An AC Microgrid

The validation of GFM control strategies through simulation and hardware demonstration is important before their large-scale deployments in the real grid. Considering the importance of testing and validation, several works have explored the GFM inverter’s capability to blackstart a microgrid, synchronize and share loads, and interact with various types of generation sources and loads present in the grid. Herein, this paper complements the existing works by presenting the results and analysis of a field demonstration in an actual AC microgrid. The capability of a three-level neutral point clamped (NPC) GFM inverter equipped with a recursive feedback type of non-linear device level control to operate with PV source on its DC input and off-the-shelf PVGFL inverters and EV chargers of different kinds on the AC side is explored. The analysis and conclusions drawn would inform the readers to make better decisions during the field demonstration process.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Scalable Control Co-design for Resilient-by-Design Cyber Physical Systems

Critical infrastructure networks, such as power and transportation networks, are often modelled as cyber-physical systems. With ever increasing complexity of these systems, there is a need for newer and more relevant metrics and design tools that will co-optimize the physical system components and control policies to guarantee resilience against cyber and natural threats. To this end, a simulation-based control co-design computational framework that will concurrently determine the system and control parameters of a cyber-physical system to meet pre-specified resilience, operational and economic objectives has been developed. The capabilities of the developed co-design engine are demonstrated by designing the physical components and control parameters of a microgrid system that will meet its resiliency objectives when subjected to various cyber and physical threats.

42 ENGINEERING↗

Introducing the 9500 Node Distribution Test System to Support Advanced Power Applications: An Operations-Focused Approach

The 9500 Node Test System is a representative section of distribution power system model developed as a part of the GridAPPS-D™ project, an effort funded by DOE as a part of the Grid Modernization Lab Consortium (GMLC) program. The test system was developed to fulfill a growing need to represent the rapidly evolving state of electric distribution systems by combining elements of legacy infrastructure systems, modern feeder topologies, and an anticipated future with smart grid technologies. It also provides a network model capable of supporting the simulation of operational scenarios such as the ones in a utility distribution control center. This test system allows the evaluation of the performance of advanced power applications in real-time, such as one that simulates the operations of an Advanced Distribution Management Systems (ADMS), Distributed Energy Resource Management Systems (DERMS), etc. in a Distribution control center. This model is an extension of the widely used IEEE 8500 Node Test Feeder and is currently being validated to become an IEEE test case to help increase adoption and widespread usage among both academia and industry. It is a full-size model representative of a section of a utility’s distribution system with multiple feeders fed from different substations. The model includes multiple distribution circuits, a sub-transmission system, multiple substations, behind the meter customer rooftop photovoltaics (PV), and multiple utility-scale distributed energy resources. To enable accurate simulations of operational scenarios, the 9500 Node Test System is designed to support procedure-based operations, with the ability to realistically demonstrate switching operations, feeder reconfiguration, adjustment of volt-var control equipment, dispatch of distributed generation, and response to planned and unplanned outages. The 9500 Node Test System includes three radial distribution feeders with 12.3 MVA of average load, consisting of both medium voltage and low voltage equipment each supplied by a different distribution substation. The three distribution feeders are connected to each other through Normally-Open switches which can be closed when needed to simulate restoration scenarios due to a fault. One feeder represents today’s grid with low penetration of customer-side renewables. The second represents a potential future grid with microgrids and 100% renewable penetration. The third has no customer generation resources, a district steam plant, and a utility-scale solar farm. The three diverse circuits were created to allow the simulation of both today’s situation as well as potential future scenarios. All three feeders have customers connected by low-voltage secondary triplex lines. This test system meets all requirements outlined in the report for creating a simulation environment that would enable discussion between key technical stakeholders as well as having the potential to accelerate operational application development and their subsequent testing and integration. The new model is a possible representation of what we believe the distribution grid may look like in the future: a high penetration of renewables, reconfigurable radial and mesh topology, numerous DERs, islanded microgrids, and significantly increased data and measurement density. The system supports both the solution of existing and newer algorithms but also enables the evaluation of applications in a realistic operational environment defined by task oriented procedural steps that represent the interaction between the control center operator and field personnel.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Transactive Campus Energy Systems: An R&D Testbed for Renewables, Integration, Efficiency, and Grid Services (CRADA 356 / Amendment 1)

The Clean Energy and Transactive Campus (CETC) work described in this report was done as part of Amendment 1 to Campus Cooperative Research and Development Agreement (CRADA) 356, the Transactive Campus CRADA with the Washington State Department of Commerce (Commerce) between the U.S. Department of Energy’s (DOE’s), Pacific Northwest National Laboratory (PNNL) and the Commerce through the Clean Energy Fund (CEF). The original project team consisted of PNNL, the University of Washington (UW) and Washington State University (WSU), to connect the PNNL, UW, and WSU campuses to construct and operate the testbed as both a regional flexibility resource and as a platform for research and development (R&D) for buildings/grid integration. Building on the foundational transactive system established by the Pacific Northwest Smart Grid Demonstration (PNWSGD), the purpose of the project was to construct the testbed as both a regional flexibility resource and as a platform for R&D on buildings/grid integration and information-based energy efficiency. The testbed supports the integration of renewables and other regional needs, using the flexibility provided by building loads, energy storage, and smart inverters for batteries and photovoltaic (PV) solar systems, at four physical scales: multiple campuses, campus, microgrid and building.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Inrush Current Mitigation for Grid-Forming Inverters in Islanded Microgrids

Virtual-inertia and droop control methods are commonly used for grid-forming inverters. While the virtual inertia is used to emulate the equation of motion/frequency, if the inverter output voltage is emulated as in synchronous generators, then the method is known as the virtual synchronous generator. An inductive pulse-load, e.g., a relatively large induction motor, connection to a microgrid fed only by grid-forming inverters may lead to blackout due to high inrush currents. This article presents virtual reactance techniques to mitigate the inrush current effects and enhance the inverter’s robustness for the safe connection of inductive and dynamic loads. This article also compares the virtual inertia and droop control methods under switching inductive-dynamic loads while the proposed techniques are implemented. Experimental tests are performed considering the linear and nonlinear virtual reactance techniques, and the findings are discussed. The mitigation significantly suppresses the inrush currents while the inverters can perform a normal operation. Furthermore, the frequency and power response of the virtual inertia control with different inertia settings to a sudden change in the load is analyzed. The virtual reactance technique is tested in a laboratory-scale hardware setup of a 208V microgrid fed by 5kVA and 10kVA inverters, and the results are presented in this article.

Gursoy, Mehmetcan↗